RAMAGUNDAM NTPC FGD PROJECT (3X200 MW+ 3X500 MW)


Stage#1 Absorber and BUF area

Stage#1 Absorber and BUF area

Stage#1 Absorber and BUF area

Unit#5 Absorber and BUF area

Unit#5 Absorber and BUF area

Unit#5 Absorber and BUF area

Unit#5 Absorber and BUF area

Unit#6 Absorber and BUF area

Unit#6 Absorber and BUF area

Unit#6 Absorber and BUF area

Unit#6 Absorber and BUF area

Unit#6 Absorber and BUF area

Gypsum Tanks

Gypsum Dewatering Building

Gypsum Dewatering Building

Gypsum Dewatering Building

Gypsum Storage Shed

Gypsum Storage Shed

Lime Storage Silo Structure

LHP GHP MCC Building Foundations

Lime Slurry Tanks

Lime Slurry Tanks

LTP1 structure

LC1A/B Lime Conveyor Structure

Truck Trippler foundation

Ball Mill foundations

Silo ring barrel 1&2

Crusher house structures

Crusher house structures

Unit#5 Duct structure at Existing Chimney area

Pipe Racks Structures

Pipe Racks Structures

ACW pump house structure

UNIT #4 BUF to Absorber area

UNIT #4 BUF to Absorber area

UNIT #4 BUF to Absorber area

UNIT #4 BUF to Absorber area

Chimney U#6

RC PUMP AND OXIDATION BLOWERS AREA U#5

RC PUMP AND OXIDATION BLOWERS AREA U#5

RC PUMP AND OXIDATION BLOWERS AREA U#5

Process water tanks

Process Water Tanks

Process Water Tanks

Pipe Rack Structures

Pipe Rack Structures

Pipe Rack Structures

Control Room Building

Control Room Building

Control Room Building

Control Room Building

Control Room Building

U#6 BUF to Absorber area

U#6 BUF to Absorber area

U#6 BUF to Absorber area

U#6 BUF to Absorber area

U#6 BUF to Absorber area

U#6 BUF to Absorber area

U#6 BUF to Absorber area

U#5 BUF to Absorber area

U#5 BUF to Absorber area

U#5 BUF to Absorber area

U#5 BUF to Absorber area

U#5 BUF to Absorber area

U#5 BUF to Absorber area

ACW/ECW PUMP HOUSE STRUCTURE

ACW/ECW PUMP HOUSE STRUCTURE

UNIT #6 Absorber

UNIT #6 Absorber

UNIT #6 Absorber

UNIT #5 Absorber structure

UNIT #5 Absorber structure

Control Room Building

Control Room Building

Control Room Building

Control Room Building

Control Room Building

RC PUMP AND OXIDATION BLOWERS AREA U#4

RC PUMP AND OXIDATION BLOWERS AREA U#4

UNIT #4 BUF Duct and Structure

UNIT #4 Absorber structure

Stage 1 Duct Support Structure b/w BUF&ABSORBER

Stage 1 Duct Support Structure b/w BUF&ABSORBER

Stage 1 Duct Support Structure b/w BUF&ABSORBER

Stage 1 Duct Support Structure b/w BUF&ABSORBER

Stage 1 elevator area

ABSORBER STAGE #1

Chimney U#4

Chimney U#4

RC PUMP AND OXIDATION BLOWERS AREA U#4

RC PUMP AND OXIDATION BLOWERS AREA U#4

UNIT #4 BUF ducts structure

UNIT #4 BUF ducts structure

UNIT #4 Absorber structure

UNIT #4 Absorber structure

UNIT #4 Absorber structure

UNIT #4 Absorber structure

UNIT #4 Absorber structure

ECR Building

ECR Building

ECR Building

RC PUMP AND OXIDATION BLOWERS AREA U#5

RC PUMP AND OXIDATION BLOWERS AREA U#5

UNIT #5 Absorber structure

UNIT #5 Absorber structure

UNIT #5 Absorber structure

UNIT #6 Chimney

UNIT #5 Chimney

Process Water Tanks Fabrication &Erection

Process Water Tanks Fabrication &Erection

ACW/ECW PUMP HOUSE STRUCTURE

UNIT #5 BUF area

UNIT #5 BUF area

UNIT #5 BUF area

UNIT #5 BUF area

UNIT #5 BUF area

UNIT #6 Ducts b/w BUF &Absorber structure

UNIT #6 Ducts b/w BUF &Absorber structure

UNIT #6 Ducts b/w BUF &Absorber structure

UNIT #6 Ducts b/w BUF &Absorber structure

UNIT #6 Ducts b/w BUF &Absorber structure

UNIT #6 Ducts b/w BUF &Absorber structure

UNIT #6 Ducts b/w BUF &Absorber structure

UNIT #6 Ducts b/w BUF &Absorber structure

UNIT #6 Ducts b/w BUF &Absorber structure

UNIT #6 Ducts b/w BUF &Absorber structure

UNIT #6 Ducts b/w BUF &Absorber structure

UNIT #6 Ducts b/w BUF &Absorber structure

UNIT #6 Ducts b/w BUF &Absorber structure

UNIT #6 Ducts b/w BUF &Absorber structure

UNIT #6 Ducts b/w BUF &Absorber structure

UNIT #6 Ducts b/w BUF &Absorber structure

UNIT #6 Ducts b/w BUF &Absorber structure

ABSORBER U#6

Silo Fabrication works

RC PUMP AND OXIDATION BLOWERS AREA U#6

RC PUMP AND OXIDATION BLOWERS AREA U#6

LC1 A/B TR 3 footing

Truck Trippler

Truck Trippler

Truck Trippler

Truck Trippler

Crusher House Structures erection

Crusher House Structures erection

Crusher House Structures erection

Crusher House Structures erection

Lime Storage Silos Structure Erection

Lime Storage Silos Structure Erection

Lime Storage Silos Structure Erection

Lime MCC Building

Lime MCC Building

BALL MILLS AREA

BALL MILLS AREA

BALL MILLS AREA

LC1 A/B structures

LTP1 structures erection

Lime Slurry Tanks

Lime Slurry Tanks

Gypsum Dewatering Building

Gypsum Dewatering Building

Gypsum Dewatering Building

Gypsum Dewatering Building

Gypsum Dewatering Building

Gypsum Dewatering Building

Gypsum Dewatering Building

Gypsum storage Shed

Gypsum storage Shed

Gypsum storage Shed

Gypsum storage Shed

Gypsum storage Shed

Gypsum storage Shed

Gypsum storage Shed

Gypsum Area Tanks

Gypsum Area Tanks

Gypsum Area Tanks

Gypsum Area Tanks

Gypsum Area Tanks

Gypsum Area Tanks

Gypsum Area Tanks

Gypsum Area Tanks

Gypsum Area Tanks

Gypsum Area Tanks

Gypsum Area Tanks

Gypsum Area Tanks

Gypsum Area Tanks

Gypsum Area Tanks

Gypsum Area Tanks

Gypsum Area Tanks

Gypsum Area Tanks

Gypsum Area Tanks

Gypsum Area Tanks

Gypsum Area Tanks

Gypsum Area Tanks

Gypsum Area Tanks

Gypsum Area Tanks

Gypsum Area Tanks

Stage 1 Ducts and Elevator area

Stage 1 Ducts and Elevator area

Stage 1 BUF and Duct Support Area

Stage 1 BUF and Duct Support Area

Stage 1 BUF and Duct Support Area

Stage 1 BUF and Duct Support Area

Stage 1 BUF and Duct Support Area

Stage 1 BUF and Duct Support Area

Stage 1 BUF and Duct Support Area

Stage 1 BUF and Duct Support Area

Stage 1 BUF and Duct Support Area

Stage 1 BUF and Duct Support Area

Stage 1 BUF and Duct Support Area

Stage 1 BUF and Duct Support Area

Stage 1 BUF and Duct Support Area

Stage 1 BUF and Duct Support Area

Stage 1 BUF and Duct Support Area

Stage 1 BUF and Duct Support Area

Stage 1 BUF and Duct Support Area

Stage 1 BUF and Duct Support Area

Stage 1 Duct Support Structure b/w BUF&ABSORBER

ABSORBER STAGE #1

Chimney Stage 1

Chimney U#4

RC PUMP AND OXIDATION BLOWERS AREA U#4

ABSORBER U#4

BUF handling Structure U#4

ECR Building Transformer Area

RC PUMP AND OXIDATION BLOWERS AREA U#5

FGD CONTROL ROOM BUILDING

FGD CONTROL ROOM BUILDING

ABSORBER U#5

BUF handling Structure U#5

UNIT #5 Chimney

ACW/ECW PUMP HOUSE STRUCTURE

Process Water Tanks Fabrication &Erection

UNIT #6 Ducts& BUF handling structure

UNIT #6 Ducts& BUF handling structure

UNIT #6 Ducts& BUF handling structure

UNIT #6 Ducts& BUF handling structure

UNIT #6 Ducts& BUF handling structure

UNIT #6 Ducts& BUF handling structure

ABSORBER U#6

Chimney U#6

Chimney U#6

Pipe Rack Foundation Near Chimney U#6

RC PUMP AND OXIDATION BLOWERS AREA U#6

RC PUMP AND OXIDATION BLOWERS AREA U#6

Gypsum Dewatering Building

Tank Foundations Gypsum Area

Tank Foundations Gypsum Area

Tank Foundations Gypsum Area

Tank Foundations Gypsum Area

Gypsum storage Shed

Truck Trippler

Truck Trippler

Slurry Tank

Lime Conveyor LC1 A/B foundations

LTP1 structures erection

Lime Conveyor LC1 A/B foundations

BALL MILLS AREA

BALL MILLS

Crusher House Area

LHP MCC Building Foundations

Lime Storage Silos Structure Erection

Slurry Tank Shuttering in progress

Gypsum storage Shed

Gypsum Dewatering Building and Tanks Area

Gypsum Dewatering Building and Tanks Area

Gypsum Dewatering Building and Tanks Area

Gypsum Dewatering Building and Tanks Area

Gypsum Dewatering Building and Tanks Area

Gypsum Dewatering Building and Tanks Area

LC1 A/B structures

BALL MILLS AREA

Stage 1 Duct Support structure Area

Stage 1 Duct Support structure Area

Chimney U#6

Chimney U#6

Slurry Tank

Slurry Tank

Stage 1 Absorber

Stage 1 Ducts and BUF Area

Stage 1 Ducts and BUF Area

Stage 1 Ducts and BUF Area

Stage 1 ducts and Elevator foundations

LTP1 structures erection

LHP Silo Structures

Chimney U#6

Truck Trippler

LHP MCC Building Foundations

Conveyor LC 1 A/B foundations

Conveyor LC 1 A/B foundations

LHP-Lime Slurry Tank-1&2

LHP-Lime Slurry Tank-1&2

BALL MILLS AREA

BALL MILLS AREA

BALL MILLS AREA

BALL MILLS AREA

BALL MILLS AREA

BALL MILLS AREA

LTP1 structures erection

LTP1 structures erection

Lime Crusher House Structures Erection

Lime Crusher House Structures Erection

Lime Storage Silos Structure Erection

Gypsum Dewatering Building

Gypsum storage Shed Area

Tank Foundations Gypsum Area

Tank Foundations Gypsum Area

Elevator Stage #1 Foundation

Duct Support Structure Stage #1

ABSORBER STAGE #1

Duct Pre Assembly @ Stage #1

Duct Support Foundations@ Stage #1 BUF

Duct Support Foundations@ Stage #1 BUF

RC PUMP AND OXIDATION BLOWERS AREA U#5

Pipe Rack Foundation Near Chimney U#4

RC PUMP AND OXIDATION BLOWERS AREA U#4

Elevator U#4 Structure

UNIT #4 Absorber structure

Duct Pre Assembly @ U#4

Duct Pre Assembly @ U#4

Duct Pre Assembly @ U#4

BUF handling Structure U#4

FGD ECR Transformer Area

UNIT #5 Chimney

ACW/ECW PUMP HOUSE STRUCTURE

UNIT #5 Absorber structure

UNIT #6 Absorber structure

UNIT #6 BUF handling structure

UNIT #5 BUF handling structure

Pipe Rack Foundation Near Chimney U#6

UNIT #6 Chimney Slipform erection

Process Water Tanks Fabrication &Erection

Stage #1 Absorber structure

RC PUMP AND OXIDATION BLOWERS AREA U#6

Stage 1 Duct pre assembly works

Stage 1 Duct Support b/w BUF&ABSORBER

Stage 1 Absorber

Stage 1 Chimney

Stage 1 BUF A Area

Stage 1 BUF A Area

Stage 1 Duct Support Structure b/w BUF&ABSORBER

Stage 1 Duct Support Structure b/w BUF&ABSORBER

FGD CONTROL ROOM BUILDING

FGD CONTROL ROOM BUILDING

FGD CONTROL ROOM BUILDING

FGD CONTROL ROOM BUILDING

UNIT #6 Chimney

UNIT #6 Chimney

UNIT #6 RC Pump & Oxidation Blowers Foundations

Lime Conveyor LC1 A/B foundations

Gypsum storage Shed Area

Gypsum storage Shed Area

GHP-Filtrate Water Tank

Primary Hydrocyclone Feed Tank

GHP-Filtrate Water Tank

GHP-Waste water Tank

SWITCH GEAR BUILDING

LHP-Lime Slurry Tank-2

Gypsum storage Shed

Gypsum storage Shed

Gypsum Dewatering Building

U#4 RC PUMP AND OXIDATION BLOWERS AREA

UNIT #4 BUF handlingstructure

UNIT #4 Absorber structure

Chimney U#4

FGD ECR Transformer Area

UNIT #5 Absorber structure

Process Water Tanks Fabrication &Erection

UNIT #6 BUF handling structure

UNIT #6 Absorber structure

RC PUMP AND OXIDATION BLOWERS AREA

LTP1

Truck Trippler

BALL MILLS AREA

Crusher House Area

LHP MCC Building

Lime Storage Silos Structure Erection

LHP-Ball Mill Building

LHP-Lime Slurry Tank-1

Duct Support Structure b/w Existing Chimney to BUF

Stage 1 Chimney

Stage 1 Duct Support Structure b/w BUF&ABSORBER

Stage 1 Absorber

Stage 1 BUF A Raft

GHP-Secondary Hydro Cyclone Tank

Gypsum Filtrate Water Tank

Gypsum storage Shed

Gypsum storage Shed

BALL MILLS AREA

UNIT #6 Absorber structure

UNIT #4 Absorber structure

Lime Conveyor LC1 A/B &crusher house foundations

Lime Storage Silos Structure Erection

Lime Crusher House Foundations

Lime Conveyor LC1 A/B foundations

Process Water Tanks Fabrication &Erection

Lime Slurry Tank 2 Raft

Lime Slurry Tank 1 Raft

BALL MILLS AREA

UNIT #6 RC Pump & Oxidation Blowers Foundations

UNIT #5 BUF B Deck

UNIT #5 Absorber structure

FGD ECR Transformer Area

UNIT #4 Absorber structure

UNIT #4 BUF handling structure

FGD CONTROL ROOM BUILDING

CONTROL ROOM BUILDING SLAB PREPARATION WORKS

ABSORBER STAGE 1 COLUMNS MECHANICAL ERECTION

Chimney Stage 1

Lime Slurry Storage Tank Excavation in progress

Ball Mill Foundations and Footings Area

Ball Mill Foundations and Footings Area

Ball Mill Foundations and Footings Area

Lime Storage Silos Foundations Columns

Lime Storage Silos Foundations Columns

Lime Storage Silos Foundations Columns

Crusher House Foundations Columns

Waste Water Tank

Filtrate Water Tank

Gypsum Dewatering Building F9 Footing

Primary hydro Cyclone Feed Tank

Secondary hydro Cyclone Feed Tank

Truck Trippler Ramp

LTP1 Area

Lime Storage Silos Foundations Columns

Lime Storage Silos Foundations Columns

LTP1 Area

Ball Mill Foundations and Footings

Crusher House Foundations Columns

Ball Mill Foundations and Footings

Unit #5 Chimney

Control Room Building slab Arieal view

Unit #4B Booster Fan Deck reinforcement works

Unit #4 Ducts Supports Area

Unit #4 Chimney

Unit #6 Duct Supports Area

Stage#1 Booster 1B Deck

Stage#1 Duct Supports Area

Unit #6 Chimney, Ducts and Absorber Foundations

Unit #4 Duct b/w Booster Fans

Unit #4A Booster Fan Deck

Transformer Foundation Area

Unit 6 Chimney Raft reinforcement works

Stage 1 Chimney

Areial View of Stage 1 Absorber

Areial View of Stage 1 Booster Fans&Ducts Support

FGD Control Room Building Slab

Unit #4 Elevator Area

Unit #4 Ducts Supports Area

Unit #4 Ducts Supports Area

Unit #4 Ducts Supports Area

Unit #4 Ducts Supports Area

Unit #4 Ducts Supports Area

FGD Control Room

FGD Control Room

FGD Control Room

Unit#5 Absorber Slab & Beam Work in progress

Unit#5 Absorber Slab & Beam Work in progress

Unit#5 Absorber Slab & Beam Work in progress

Unit #5 Duct Supports Area

Unit #5 Duct Supports Area

Unit #5 Duct Supports Area

Unit #5 Booster Fan Rafts

Unit#5 Chimney

Process Water Tanks and ACW Pump House

Process Water Tanks and ACW Pump House

Unit#6 Chimney Raft Reinforcement works inprogress

Truck Trippler Ramp

Truck Trippler Ramp

Truck Trippler Ramp

Lime Storage Silos backfilling& R/F work inprocess

Lime Storage Silos backfilling& R/F work inprocess

Lime Storage Silos backfilling& R/F work inprocess

Crusher House Columns Bolts fixing in progress

Crusher House Columns Bolts fixing in progress

Crusher House Columns Bolts fixing in progress

Crusher House Columns Bolts fixing in progress

Crusher House Columns Bolts fixing in progress

Crusher House Columns Bolts fixing in progress

Ball Mill Foundations and Footings

Ball Mill Foundations and Footings

Ball Mill Foundations and Footings

Ball Mill Foundations and Footings

Ball Mill Foundations and Footings

Ball Mill Foundations and Footings

Stage1 Chimney

Stage 1 Duct Support Foundation

Stage 1 Duct Support Foundation F03 Raft RCC I/P

Unit#5 Absorber Slab Beam Earth Work in progress

Chimney 5 Shell Curing in progress

Control Room Building, Transformer Fire Wall

Unit #5 Duct Supports Area

Unit #4 Duct Area in b/w Booster Fan A&B

Truck Trippler

Truck Trippler

Truck Trippler

Truck Trippler

Truck Trippler

LTP1 Area

Ball Mill

Gypsum Dewatering Building Excavation

Filtrate Water Tank

Secondary hydro Cyclone Feed Tank

Waste Water Tank

Primary hydro Cyclone Feed Tank

Gypsum Shed Excavation

Primary tank @Gypsum area Excavation Completed

ACW Pump House and Process Water Tanks foundations

Unit#5 Booster Fan B Raft RCC Completed

Unit#4 duct pedastals near Booster A backfilling

Unit#4 Area Ducts pedastal cum plinth beams

Unit#4 Chimney Back filling in progress

Unit#4 Absorber

Unit#4 Elevator Columns bolt fixing in progress

Unit#4 Booster Fan B

Unit#4 Booster A duct area back filling in progres

ControlRoom TransformerWall Backfilling in progres

Control Room Building Back Filling Completed

Uni#5 Absorber Bolts fixing in progress

Unit5 Chimney Winch&Lift arrangement in progress

Uni#5 Duct Reinforcement Works under Progress

Uni#5 Duct Excavation Works under progress

Uni#5 Elevator Raft RCC Completed

Unit#5 Booster Fan A Raft RCC completed

Unit#6 Booster Fan A Raft Casting Completed

Unit#6 Absorber Raft RCC, bolt fixing done

LTP1 Foundations Column First Lift completed

Crusher House Foundation

Truck Trippler Ramp

Truck Trippler Ramp

Ball Mill excavation and PCC works

Lime Stone Silo Foundation

Waste Water Tank Raft RCC Completed Wall RF WIP

Secondry Tank Raft RF and shuttering completed

Gypsum Shed excavation under progress

Filtrate Tank Raft RCC done Wall Shutter progress

Unit #5 Booster Fan B RCC Casting Completed

Unit #5 Booster FanA Curing&Dewatering in progress

Process Water Tank &ACW Pump House Reinforcment works

Stage 1 Duct Support Foundation

Stage 1 Chimney

Stage 1 Absorber

Chimney Unit#4

Absorber Stage 1

Stage 1 Absorber Slab Reinforcement Works under progress

Satge 1 Booster Fan B Foundation

Chimney Stage 1

Absorber stage 1

UNIT#4 CHIMNEY RCC/SLIPPING IN PROGRESS

UNIT#4 SLIP FORM ERECTION COMPLETED

STG#1 SLIPFORM ERECTION UNDER PROGRESS

UNIT#5 CHIMNEY SHELL CURING UNDER PROGRESS

UNIT#5 CHIMNEY SHELL CONCTRETE FIRST LIFT COMPLETE

CGM NTPC visit before UNIT#5 CHIMNEY SHELL CAST

UNIT#4 CHIMNEY SLIP FORM ERECTION WORKS UNDER PROGRESS

UNIT #4 CHIMNEY STARTER RCC

NTPC RAMAGUNDAM FGD UNIT#5 ABSORBER RAFT CASTING

NTPC RAMAGUNDAM FGD UNIT#5 ABSORBER RAFT CASTING

NTPC RAMAGUNDAM FGD UNIT#5 ABSORBER RAFT CASTING

U#6 Chimney Excavation Under process

U#4 Chimney Reinforcement Under Progress

U#4 Booster fan –B Reinforcement Under Progress

U#4 Absorber RCC

U#1,2,3 Chimney Raft

Truck Trippler Ramp Reinforcement under Progress

Stage-II U#4 Booster Fan A Foundation Casted

Stage-I Booster Fan B RCC done

Stage-I Absorber RCC completed

Stage-1 Chimney Raft 5 Segment Casting (Oct`21)

Gypsum Shed Excavation under progress(Oct`21)

FGD Control Room Excavation under progress(Oct`21)

Crusher House Excavation Under progress(Oct`21)