KORBA FGD (3X200 MW+ 4X500 MW)


29.04.24 Unit#7 Block # 3&4 Duct foundations

29.04.24 LST Tank

25.04.24 33KV switchgear

22.03.2024 Gypsum Dewatering

20.04.2024 Chimney #5 Grade Slab

06.04.2024 Road Works between Absorber# Stage#1 an

04.04.2024 Stage#1 Absorber (2)

04.04.2024 Intermediate Silo

02.04.2024 33KV Switchgear building first floor ca

02.04.2024 33KV Switchgear Building

27.03.2024 Absorber Stage#1 Erection start puja (

22.03.2024 FGD Control Room Building First Floor B

22.03.2024 Gypsum Dewatering building- Belt filter

18.03.2024 Wett ball mill 2

15.03.2024 Unit#4 Booster Fan-B

15.03.2024 Unit#4 Booster Fan-B

15.03.2024 Unit#4 Booster Fan-B (2)

12.03.2024 Truck Tippler Grade Slab casting

08.03.2024 Limestone Weigh bridge

08.03.2024 GYPSUM DEWATERING BELT WASH TANK

08.03.2024 TT WEIGH BRIDGE

07.03.2024 Unit#7 Block#3

07.03.2024 Switchgear Room

07.03.2024 Switchgear Room (2)

07.03.2024 Booster Fan-4b

05.03.2024 GYPSUM DEWATERING BELT WASHING TANK

03.03.2024 Limestone Weigh Bridge

01.03.2024 Absorber Stage#1 Second Stage Casting

06.02.2024 Duct Erection Unit#5 Block#3

06.02.2024 FGD cr (2)

07.02.2024 Unit#5 Block#5 Duct Structure Erection

04.02.2024 Spool Duct Erection in Unit#5 Completed

16.01.2024 cKE WASH & BELT WASH

07.02.2024 Unit#7 Chimney Beam Erection started

07.02.2024 Unit#7 Chimney Beam Erection started (2

07.02.2024 Unit#7 Absorber Second Stage Casting af

30.12.2023 Unit#6 Chimney

29.01.2024 33Kv Swgr

20.01.2024 FGD Control Room

04.01.2024 Stage#1 RC Pump and Oxidation blower ar

04.01.2024 Stage#1 Booster Fan Raft Casting works

04.01.2024 Stage#1 Booster Fan and Elevator founda

04.01.2024 Stage#1 Booster Fan and Duct Foundation

04.01.2024 Intermediate Silo

04.01.2024 Gypsum dewatering building- plinth beam

04.01.2024 FGD control Room (2)

02.1.2024 Unit#5 Absorber and booster Fan

02.01.2024 TT area Overview

02.01.2024 Gypsum shed plinth beam shuttering work

02.01.2024 Ball Mill area

23.11.2023 Unit#7 Chimney area

23.11.2023 Unit#4 Chimney

23.11.2023 FGD control Room

22.11.2023 Silo Fabrication

22.11.2023 ECW & ACW Pump House

22.11.2023 Crusher House Erection works

21.11.2023 Unit#7 Absorber & Chimney

21.11.2023 Unit#6 Chimney

21.11.2023 Unit#5 Block#5

21.11.2023 Unit#5 Blcok#4

21.11.2023 Unit#4 Block#7

21.11.2023 Stage#1 Block#3 Duct Erection work.

21.11.2023 Stage #1 Block#3 Duct erection works

21.11.2023 LHP & GHP area

21.11.2023 Gypshum Dewatering area

21.11.2023 ECW & ACW pump House

21.11.2023 Crusher House & Silo area

08.11.2023 Unit#4 Block#7 (2)

07.11.2023 Tank Area

02.11.2023 HOP NTPC KOrba Welcomed by AGM & CM Kor

02.11.2023 HOP KOrba Welcomed by GM & PD Korba FGD

01.11.2023Site Status Review by NTPC Director Proj

01.11.2023 NTPC Director( Designate) Wecomed by GM

01.11.2023 NTPC Director( Designate) Wecomed by AG

01.11.2023 NTPC Director Project( Designate ) Site

01.11.2023 NTPC Director ( Designate) review of Ko

31.10.2023 Unit#5 Block#1

29.10.2023 Stage#1 Chimney Shell Casting Completed

29.10.2023 Stage#1 Chimeny Shell casting completed

29.10.2023 Stage#1 Chimeny Shell casting completed

21.10.2023 Truck Tippler Area

21.10.2023 IM Silo

21.10.2023 Gypsum Shed Area

20.10.2023 Crusher House Area

20.10.2023 Ball Mill area2

20.10.2023 Ball Mill area

19.10.2023 Crusher House Area Night View

19.10.2023 Crusher House Area Evening View

17.10.2023 Unit#5 Absorber & Elevator

17.10.2023 FGD control Room

17.10.2023 FGD control Room (2)

17.10.2023 FGD control room

13.10.2023 Unit#5 Chimney Beam Erection Puja works

13.10.2023 Unit#5 Chimney Beam Erection Puja works

13.10.2023 Unit#5 Chimney Beam Erection Puja works

13.10.2023 Unit#5 Chimney Beam Erection Puja works

13.10.2023 Unit#5 Chimney Beam Erection Puja works

13.10.2023 Unit#5 Chimney Beam Erection Puja works

10.10.2023 Elevator Unit#6

10.10.2023 Elevator Unit#5

10.10.23 FGD CONTROL ROOM

07.10.2023 Ball Mill Building Area

30.09.2023 Unit#6 Block#3 Duct foundations

30.09.2023 Unit#5 Block#4 Duct Location

30.09.2023 Unit#5 Block#4 duct foundations

30.09.2023 Unit#5 Block#4 duct foundations (2)

30.09.2023 Unit#5 Block#4 duct foundation

30.09.2023 Unit#5 Absorber area

30.09.23 MISC TANK AREa

30.09.23 FGD CONTROL ROOM

30.09.23 Crusher house LHP GHP AREA

30.09.23 Crusher house LHP GHP AREA

30.09.23 CRUSHER HOUSE AREA

20.09.2023 Unit#6 Chimney area

20.09.2023 Unit#6 Block#6 Duct Foundations

20.09.2023 Unit#5 Blcok#6 area Duct

20.09.2023 Unit#5 Blcok#5 Duct Foundations

20.09.2023 Unit#4 Abdorber Area and Duct Foundatio

20.09.2023 Unit#4 Abdorber Area and Duct Foundatio

20.09.2023 Stage#1 RC Pumps Foundations

20.09.2023 Stage#1 RC Pump Foundations

20.09.2023 Stage#1 Chimney

20.09.2023 FGD control room status

20.09.2023 Elevator Unit#6-1

20.09.2023 Elevator Unit#6

20.09.2023 Booster Fan Unit#7A&B

14.09.2023U#6 B#2

14.09.2023 UNIT#6 BLOCK#2

09.09.2023 Unit4 Block#7

09.09.2023 Unit#4 Block#6

09.09.2023 Unit#4 Block#5

09.09.2023 Unit#1 Block#4

09.09.2023 U#4 Block#5

09.09.2023 U#4 Blcok#6

28.08.2023 Unit#5 Block#3 Str Erection start

28.08.2023 Unit#5 Block#3 Duct Str Erection start

28.08.2023 Unit#5 Block#3 Duct Str Erection start

28.08.2023 unit#5 Block#3 Duct Str Erection start

28.08.2023 Unit#5 Block#3 Duct Str erection start

28.08.2023 Unit#5 Block#3 Duct Erection start

28.08.2023 Unit#5 Block#3 Duct Erection start (2)

28.08.2023 Unit#5 Blcok#3 Duct Str Erection start

22.08.2023 TT AREA CORBELL

22.08.2023 SILO AREA

22.08.2023 RC Unit#4

22.08.2023 LTP-1 & TT AREA

22.08.2023 GYPSUM SHED

22.08.2023 GYPSUM DEWATERING BUILDING

22.08.2023 GYPSUM DEWATERING AREA 2

22.08.2023 FGD Control room

22.08.2023 CRUSHER HOUSE AREA

22.08.2023 BALL MILL BUILDING AREA

21.08.2023 Unit#5 Block#6 Duct foundations

21.08.2023 Unit#4 Header Column Near Absorber and

21.08.2023 Stage#1 Block#4 Duct foundation Near Bo

21.08.2023 Stage#1 Block#4 Duct foundation Near Bo

21.08.2023 Stage#1 Block#3 Inside Central Store.

21.08.2023 Stage#1 Block#3 Central Store duct foun

21.08.2023 Stage#1 Block#3 Central Store Duct

09.08.2023 Primary Hydro cyclone tank

09.08.2023 Gypsum Dewatering Building

09.08.2023 Gypsum Dewatering Building

08.08.2023 Unit#1 Chimney 175Meter

07.08.2023 Unit#7 Chimney 31Meter

07.08.2023 Unit#7 Chimney 31Meter (2)

07.08.2023 Unit#5 Chimney 131Meter

07.08.2023 Unit#1 Chimney 173 Meter

09.08.2023 TT LTP-1 AREA COLUMN

09.08.2023 TT AREA COREBELL

09.08.2023 TT area Core bell

09.08.2023 LIMESTONE WB

09.08.2023 LIMESTONE WEIGH BRIDGE

09.08.2023 LIME STONE WEIGH BRIDGE

09.08.2023 Elevator #6

09.08.2023 Duct Unit#5 Block#5

09.08.2023 Duct Unit#5 Block#5 (3)

09.08.2023 Duct Unit#5 Block#5 (2)

09.08.2023 Duct Unit#1 Block#4

09.08.2023 Duct Unit#1 Block#4 (3)

09.08.2023 Duct Unit#1 Block#4 (2)

09.08.2023 Duct Unit#1 Block#3

09.08.2023 Duct Unit#1 Block#3 (3)

09.08.2023 Duct Unit#1 Block#3 (2)

09.08.2023 Duct Stage#1 Block#2

09.08.2023 Duct Stage#1 Block#2 (3)

09.08.2023 Duct Stage#1 Block#2 (2)

09.08.2023 Booster Unit#7B

09.08.2023 Booster Unit#7 A

09.08.2023 Booster Unit#5A

09.08.2023 BOOSTER FAN UNIT#6A&B

09.08.2023 BOOSTER FAN UNIT#6 A&B

09.08.2023 ACW-ECW Pump House

08.08.2023Limestone slurry Tank A

08.08.2023 Limestone slurry Tank B

08.08.2023 FGD Control Room

08.08.2023 FGD CONTROL ROOM

08.08.2023 FGD CONTROL ROOM (3)

08.08.2023 FGD control room (2)

31.07.2023 Unit#5 Blcok#5 Duct Footings Pic-1

31.07.2023 Stage#1 Block#3&4 Duct Footings Pic-4

31.07.2023 Stage#1 Block#3&4 Duct Footings Pic-3

31.07.2023 Stage#1 Block#3&4 Duct Footings Pic-2

31.07.2023 Stage#1 Block#3&4 Duct Footings Pic-1

31.07.2023 BUF#7A & &B Deck Slab

31.07.2023 BUF#5A Deck Slab

20.07.2023 Tank Works

20.07.23 Waste water tank

20.07.23 Secondary hydro cyclone tank

20.07.23 Process water tank

20.07.23 Filtrate water tank

20.07.23 FGD control room

20.07.23 FGD CONTROL ROOM (2)

20.07.23 Absorber unit#123

20.07.23 Absorber unit#7

20.07.23 Absorber 5

20.07.23 Absorber #7

20.07.23 Absorber unit#4

20.07.23 Absorber #6

20.07.23 Absorber #5

19.07.2023 Unit#7 Chimney

19.07.2023 Unit#6 Chimney

19.07.2023 Unit#5 Block#3 Duct

19.07.2023 Unit#4 Chimney

19.07.2023 Unit#1,2,3 Chimney 147Meter

19.07.23 Absorber #6

18.07.2023 Unit#5 Chimney 93.3Meter

18.07.23 Silo area

18.07.23 Crusher house

18.07.23 Ball mill area

15.07.2023 TT area Top

15.07.2023 TT area roof top

13.07.23 CHIMNEY(Unit#1) 142 METER

11.07.23 Unit #05 Chimney 90M shell

13.07.23 Chimney U# 07 13.5 meter

13.07.23 Intermediate Silo

13.07.23 Intermediate Silo (2)

13.07.23 Gypsum dewatering Building

13.07.23 Crusher House

13.07.23 Crusher House (2)

02.07.2023 Intermediate Silo and Ball mill area

02.07.23 Intermediate Silo and Ball mill

30.06.23 Unit#7 Absorber and BUF

30.06.23 Unit#6 Elevator

30.06.23 Unit#6 Absorber

30.06.23 Process Water Tanks

30.06.23 Intermediate Silo

30.06.23 Crusher house

29.06.2023 TT AREA

29.06.2023 TT AREA

29.06.2023 LBC-1AB

29.06.23 Stage#1 Chimney

26.06.23 FGD CONTROL ROOM

24.06.23 Unit#5 Chimney Shell Wall curing

24.06.23 Unit #05 Chimney curing work is progress

24.06.23 Stage#01 chimney shell curing work going

24.06.23 Crusher house area Concrete Start pooja

23.06.23 Unit#5 shell curing work in progress..

23.06.23 Stage #1 Chimney shell curing work in pr

23.06.23 TT AREA

23.06.23 Stage#1 Chimeny shell curing work in prog

12.06.2023 Elevator unit#7

12.06.2023 Elevator Unit#6

12.06.2023 Elevator Unit#5

12.06.2023 Elevator Unit#4

12.06.2023 Elevator stage-1

12.06.2023 BUF#7 and Absorber#7

12.06.2023 Ball Mill area & Intermediate Silo

12.06.2023 Absorber#5

12.06.2023 Absorber #6

12.06.23 FGD control room area

12.06.23 FGD CONTROL ROOM AND CHIMNEY-4

12.06.23 Crusher house area

12.06.23 Chimney-7 and Absorber #7

12.06.23 Chimney-6

12.06.23 Chimney-5 63.8 Meter

12.06.23 Chimney stage-01 108Meter

12.06.23 ACW ECW AREA

01.06.23 Unit#6 Chimney

03.06.23 Unit-7 Oxidation Blower-B and rest of Abs

03.06.23 Unit-7 Booster fan and deck slab nearby j

03.06.23 Unit-7 Booster fan and deck slab nearby j

03.06.23 Unit-6 area

03.06.23 Unit-5 Booster fan and block-6 duct area

03.06.23 Unit-5 absorber and RC pump area

03.06.23 Unit-1,2&3 Chimney

03.06.23 Silo area

03.06.23 Gypsum shed

03.06.23 Gypsum dewatering building (2)

03.06.23 Crusher house area (2)

03.06.23 Ball- mill area

01.06.24 FGD CR

01.06.23 Stage#1 CHIMNEY

01.06.23 RC#4

01.06.23 RC #7

01.06.23 Chimney-7

01.06.23 Chimney-5

01.06.23 BUF#7

01.06.23 BUF STAGE#1

01.06.23 BUF STAGE#1

01.06.23 Absorber #4

16.05.23 Excavation in process U#5 block#3

19.05.23 FGD control room plinth beam work started

17.05.23 FGD control room (4)

17.05.23 FGD CONTROL ROOM (3)

17.05.23 FGD CONTROL ROOM (2)

17.05.23 FGD control room

14.05.23 Unit #05 Chimney wall curing work

15.05.23 Chimney

15.05.23 RC pump #7 (2)

15.05.23 RC pump #7

13.05.2023 Absorber Unit#7

13.05.2023 Unit#5 Block #3 Duct Pre assembly

13.05.2023 Chimney Stage#1 area

13.05.2023 Chimney #4 area

13.05.2023 Central Store Area

13.05.2023 BUF #7 Area Road

13.05.2023 Absorber #7 Area

09.05.2023 09.05.23 Unit #06 pile cap 5th segments

12.05.2023 Stage#1 Chimney

11.05.2023 Stage#1 Chimney

09.05.23 Chimney Unit-1, Rcc Shell Curing work in

06.05.23 Chimney-7 absorber 7 booster fan 7

06.05.23 Chimney-5

06.05.23 Booster fan 5A

06.05.23 RC PUMP 7

06.05.23 Elevator 5

06.05.23 Elevator 7

06.05.2023 Absorber #6

06.05.23 Absorber 5

06.05.23 Chimney unit-07

06.05.2023 Chimney #6

06.05.23 Chimney unit-5

06.05.23 Chimney unit-4

06.05.23 Chimney unit 1,2&3

13.04.23 Chimney-7

12.04.23 Chimney #6

13.04.23 Unit #06 chimney pile cap 3rd segments

12.04.23 Chimney #4

13.04.2023 Chimney Stage#1, Chimney #4 and Chimney

14.04.2023 Chimney Stage#1 50Meter (2)

14.04.2023 Chimneys Stage#1 50Meter Achieved

14.04.2023 Chimney Stage#1 50Meter

13.04.23 FGD CONTROL ROOM AREA

13.04.23 ACW ECW PUMP HOUSE

30.03.23 Chimney Stage#1

29.03.2023 Stage#1 Chimney (2)

29.03.2023 Stage#1 Chimney

29.03.2023 Stage#1 Chimney

29.03.2023 Stage#1 Chimney

29.03.2023 Satge#1 Chimney

25.03.2023 Chimney #5

30.03.23 Chimney #7

30.03.23 Chimney #7

30.03.23 Chimney #6

28.03.2023 Crusher House

29.03.2023 Flue can Fabrication

29.03.2023 Flue can fabrication yard

29.03.2023 Flue can Fabrication yard (2)

29.03.2023 Flue can Fabrication

29.03.2023 Flue can fabrication

29.03.23 U#5 Block#3

28.03.2023 Duct Unit#5 Block#3

05.04.2023 Chimney#4 (2)

05.04.2023 Chimney#4

30.03.23 Absorber #5 (3)

30.03.23 Absorber #5 (2)

30.03.23 Absorber #5

30.03.23 Absorber #6

30.03.23 Absorber #6 (3)

30.03.23 Absorber #6 (2)

30.03.23 Booster Fan#7 (3)

30.03.23 Absorber #6

30.03.23 Booster Fan#7 (3)

30.03.23 Booster Fan#7 (2)

30.03.23 Booster Fan#7

30.03.23 ELEVATOR #7

30.03.23 ELEVATOR #7 (2)

30.03.23 Absorber #7

30.03.23 Absorber #4

30.03.23 RC pump #4

30.03.23 Chimney Stage #1 absorber

29.03.2023 Stage#1 Absorber and BUF

05.04.23 Process Water Tank

30.03.23 Process water tanks (2)

30.03.23 Process water tanks

05.04.23 Gypsum Dewatering

05.04.23 Gypsum Shed

05.04.23 Ball Mill area

28.03.2023 Ball Mill Area

31.03.2023 BOOSTER FAN#5

30.03.23 Booster Fan#5

31.03.2023 NTPC GM FGD Visit at Korba Site

31.03.2023 NTPC ED PM FGD Visit

31.03.2023 Chimney#4 Shell casting start occasion

31.03.23 Chimney #4 Shell casting start puja

UNit#4 Chimney

23.03.2023 Unit#7 RC Pump and Header Column

23.03.2023 Unit#5 Booster Fan #5A

23.03.2023 Unit#7 Block#3 Duct Foundation

23.03.2023 Unit #7 Block#4 Duct Foundation

23.03.2023 Unit #5 RC Pump and Header Column

23.03.2023 Stage#1 Booster Fan#A

22.03.23 Unit #06 pile cap 1st segment concreting

22.03.23 U#6 Chimney Raft Casting first Segment

22.03.23 U#6 Chimney Raft Casted First Segments

21.03.2023 U#6 Chimney Raft Casting Puja By NTPC G

21.03.2023 Gethering During Puja of U#6 Raft Casti

21.03.23 Unit#6 Chimney Raft Casting Puja by NTPC

21.03.23 Unit#6 Chimney Raft Casting Puja by NTPC

21.03.23 Unit#6 Chimney Raft Casting Puja by BHEL

21.03.23 Unit#6 Chimney Raft Casting Puja by BHEL

21.03.23 U#6 Chimney Raft Casting start Puja by NT

21.03.23 Raft Casting First Segment

20.03.23 Unit #06 chimney pile cap 1st segment shu

16.03.23 Chimney #7

16.03.23 Chimney #7 and Stage#1 Chimney

16.03.23 Chimney #7

16.03.23 Chimney#7 and absorber #7

15.03.23 FGD control room (2)

15.03.23 FGD CONTROL ROOM

15.03.23 Chimney #4 (2)

15.03.23 Chimney #4

16.03.23 Booster#7

16.03.23 Chimney #7 and Absorber#7

16.03.23 Absorber #7

16.03.23 Absorber #6

16.03.23 Chimney #6

16.03.23 Chimney #6

11.03.23 TPV4 pile head done

11.03.23 Unit#5 Absorber and RC pump

13.03.23 Unit#6 Absorber

14.03.23 Unit #06 chimney pile cap 1st segment Top

13.03.23 Unit#6 Chimney (2)

13.03.23 Unit#6 Chimney

15.03.23 Unit #04 chimney Slip for trusses erectio

14.03.23 Unit #04 chimney Slip for 04 nos. trusses

11.03.23 Unit #04 chimney Slip for erection bottom

11.03.23 Unit #04 chimney Slip for erection bottom

11.03.23 unit#4 Chimney (2)

11.03.23 unit#4 Chimney

13.03.2023 TANK FABRICATION START PUJA BY SAMAY EN

13.03.2023 TANK START PUJA BY NTPC OFFICIAL

13.03.2023 TANK FABRICATION START PUJA BY NTPC OFF

13.03.2023 TANK FABRICATION START PUJA BY NTPC OFF

13.03.2023 TANK FABRICATION START PUJA BY CM SITE

13.03.2023 TANK FABRICATION START PUJA BY CM SITE

13.03.2023 TANK FABRICATION START PUJA BY BHEL OFF

13.03.2023 TANK FABRICATION START PUJA BY BHEL OFF

13.03.2023 PUJA BY NTPC OFFICIAL

13.03.2023 POOJA BY NTPC GM FGD

13.03.2023 POOJA BY NTPC GM FGD (2)

13.03.2023 Curing work is going on at Unit #1,2

27.02.2023 Vertical Load Test Ch#6 (2)

27.02.2023 Vertical Load Test Ch#6 (3)

27.02.2023 Vertical Load Test Ch#6 (4)

27.02.2023 Vertical Load Test Ch#6

11.03.23 Chimney 6 block unloading completed

04.03.2023 Waste water Tank

04.03.2023 Crusher House status

28.01.23 Crusher House Excavation started

24.02.2023 Unit#7 Chimney Shell casting start geth

24.02.2023 UNit#7 Chimney Shell casting Pooja by G

24.02.2023 Unit#7 Chimney Shell casting Pooja by C

24.02.2023 Unit#7 Chimney Gethering of Workmens du

24.02.2023 Unit#7 Chimney Slipform Assembly Shell

24.02.2023 U#7 Chimney Shell Casting Slipform asse

24.02.23 Unit#7 Chimney Slipform assembly for Shel

24.02.23 Pooja Unit#7 Chimney Shell casting start

24.02.23 Pooja Unit#7 Chimney Shell casting start

15.02.2023 Stage#1 Chimney

15.02.23 Stage#1 Chimney

17.02.23 Chimney-5 (2)

17.02.23 Chimney #5

17.02.23 Chimney-5 (2)

17.02.23 Chimney-5

17.02.23 BUF#6

17.02.23 BUF#6 (2)

17.02.23 Chimney #7

17.02.23 Chimney #4

11.02.23 Block placing started in chimney#6

15.02.23 RC Pump#7

15.02.2023 FGD Control Room

11.02.2023 FGD Control Room

15.02.23 Absorber Unit-1 Chipping of Shear key in

15.02.23 Absorber Unit-4 Abs Cleaning in progress

17.02.23 unit#5 absorber Column Erection

17.02.2023 Absorber #5 First Column Erection start

15.02.23 Unit#4 Chimney

15.02.23 Absorber #7 First column erection

10.02.2023 Site Visit of GM(I) Sir Near Chimney #5

10.02.2023 Site review by GM(I) Sir at BHEL office

10.02.2023 Sapling plantation by GM & PD Korba Si

10.02.2023 Sapling Plantation by GM(I) sir at BHE

10.02.2023- Sapling plantation by CM site

10.02.2023 Review by GM(I) Sir the work of MBPL-

10.02.2023 Group Photographs during GM(I) Visit

10.02.2023 GM(I) Sir Welcomed by GM & PD Korba sit

10.02.2023 GM(I) sir Welcomed by AGM& CM Korba sit

10.02.2023 GM(I) Sir Welcome Poster at BHEL office

10.02.2023 GM(I) Sir Visit on Unit#5 Duct pilling

10.02.2023 GM(I) Sir Site visit

10.02.2023 GM(I) Sir BHEL Office Visit

10.02.2023 GM(I) Meet with HOP NTPC Korba

10.02.2023 GM(I) Address to Site Employee

11.02.2023 Chimney Stage-I, status

11.02.2023 FGD Control Room Status

11.02.23 Block placing started in chimney#6

12.02.23 Chimney (Unit#05) update (RCC shell casti

08.02.23 Chimney unit-05

06.02.23 Chimney Unit-5, Curing in Progress

04.02.2023 Photographs during Shell casting start

04.02.2023 Photographs during shell casting start

04.02.2023 Group Photographs during Unit#5 Chimney

04.02.2023 Chimney-5 shell casting started

04.02.2023 Chimney-5 Shell casting started

04.02.2023 Chimney #5 Shell casting start puja

04.02.2023 Chimney #5 Shell casting start Puja (2)

04.02.23 Unit #05 chimney shell wall concreting 23

04.02.23 Group Photographs Unit#5 Chimney Shell ca

04.02.23 Chimney-5 shell casting started

04.02.23 Pooja conducted and Pre job briefing to

03.02.2023 Pooja performed by GM-FGD NTPC Abs#7

03.02.2023 Pooja Performed By CM site Absorber #7

03.02.2023 Group Photographs Absorber #7 Erection

03.02.2023 Absorber #7 Erection work Pooja Perform

03.02.2023 Absorber #7 Erection Group Photographs

03.02.2023 Absorber #7 Erection Pooja performed b

28.01.23 TT AREA OUTSIDE COREBELL

28.01.2023 TT AREA CORE BELL

28.01.2023 TT AREA

28.01.2023 TT AREA

28.01.23 Crusher House Excavation started

28.01.23 Ball Mill Area Excavation completed

28.01.23 Gypsum Shed area Compection under Progres

28.01.23 Gypsum Dewatering Area Excavation started

30.01.2023 Stage-I Chimney Shell Casting

29.01.2023 Stage-I Chimney Shell Casting

29.01.2023 Stage-I Chimney Shell Casting (2)

27.01.23 Stage-I Chimney Shell Casting

27.01.23 Chimney stage-01 Date 27.01.2023 shell Co

27.01.2023 Group Photographs during Puja for Shell

27.01.2023 Stage-I Chimney Shell casting arrangeme

27.01.23 Stage-I Chimney Shell casting arrangement

27.01.23 Stage-I Chimney Shell casting arrangement

27.01.23 Pooja Performed by GM& PD BHEL KORBA FGD

27.01.23 Pooja Performed by GM& PD BHEL KORBA FGD

27.01.23 Pooja Performed by Executive Director NT

27.01.23 Pooja Performed by Executive Director NT

Korba Site-Group Photographs

Korba Site-Group Photographs..

Korba Site-Flag Hoisting by GM&PD Sir

Korba Site- Speech By GM& PD sir

Korba Site- Message to Site employees by GM& PD si

Korba Site- Marching for Flag Hoisting

Korba Site- Flag Hoisting by GM& PD sir..

REVIEW OF SITE PROGRESS AT FGD AREA STG-I CHIMNEY

REVIEW OF SITE PROGRESS AT FGD AREA STG-I CHIMNEY

REVIEW OF SITE PROGRESS AT FGD AREA STG-I CHIMNEY

GROUP PHOTOGRAPH

NTPC DIRECTOR( OPN) & NTPC RED WR-II Welcome poste

NTPC RED WR-II Welcomed by CM Korba site

Interaction of NTPC Director Opn with Construction

NTPC DIRECTOR OPN Welcomed by CM Korba site

Interaction of NTPC Director Opn with Project Dire

NTPC DIRECTOR Welcomed by Project Director Korba

16.01.2023 ACW -ECW PUMP HOUSE

16.01.23 UNIT#7 BLOCK-3 DUCT FOUNDATION EXCAVATION

16.01.23 STAGE-I BLOCK-3 DUCT FOUNDATION STATUS

16.01.23 STAGE-1 BLOCK-3 PILE FOUNDATION

16.01.23 STAGE#1 BLOCK-4 DUCT FOUNDATION

16.01.23 RC PUMP & OB SHED UNIT#4 STATUS

16.01.23 RC PUMP & OB SHED U#7

16.01.23 RC Pump #7 location

16.01.23 RC Pump #4 Location

16.01.23 PROCESS WATER TANK B STATUS

16.01.23 LIMESTONE SLURRY TANK B STATUS

16.01.23 LIMESTONE SLURRY TANK # A

16.01.23 FGD CONTROL ROOM STATUS

16.01.23 FGD CONTROL ROOM STATUS FOOTINGS

16.01.23 FGD CONTROL ROOM STATUS (2)

16.01.23 BUF#6A BOOSTER FAN

16.01.23 Absorber#6 & RC Pump #6 Location status

16.01.23 ABSORBER STAGE-1

16.01.23 ABSORBER STAGE-1 STATUS

16.01.23 ABSORBER STAGE-1 RENFORCEMENT LAYING

16.01.23 33KV Switchgear Location

24.12.22 ACW PUMP HOUSE BACKFILLING

24.12.22 ABSORBER#1,2,3 STATUS

24.12.22 TRUCK TIPPLER AREA OVERVIEW

14.12.22 TRUCK TIPPLER AREA INSIDE BACKFILLING

14.12.22 TRUCK TIPPLER AREA INSIDE BACK FILLLING

14.12.22 TRUCK TIPPLER AREA BACK FILLING

14.12.22 TRUCK TIPPLER AREA INSIDE

14.12.22 Truck Tippler AREA

24.12.22 LBC 1AB STATUS

28.12.22 CHIMNEY#6 STATUSS

28.12.22 CHIMNEY #6 STATUS

24.12.22 CHIMNEY#6 Status

28.12.22 CHIMNEY#4 STATUS

28.12.2022 CHIMNEY #4 STATUS

24.12.22 CHIMNEY#4 STATUS

24.12.22 CHIMNEY#4 STATUS

30.12.22 ABSORBER#7 STATUS

28.12.22 ABSORBER#7 SATSUS

24.12.22 ABSORBER#7 STATUS

30.12.22 RC PUMP #7 STATUS

31.12.22 CHIMNEY#7 STATUS

28.12.22 CH#7 STATUS

24.12.22 CH#7 STATUS

02.01.23 FGD CR STATUS

30.12.22 FGD CR STATUS

28.12.22 FGD CR STATUS

24.12.22 FGD CR STATUS

02.01.23 LIMESTONE SLURRY TANK B

02.01.23 LIMESTONE SLURRY TANK A

28.12.22 LIMESTONE SLURRY TANK A

28.12.22 LIMESTONE SLURRY TANK B

13.12.2022 Booster Fan Unit 7B pilecap casting com

14.12.22 BUF#6

24.12.22 Absorber # 5 status

24.12.2022,0650 Chimney unit-07 segment-06 Concret

20.12.2022,0715 Chimney unit-07 segment-02 Concret

14.12.2022 Chimney unit-07 Pile cap segment 03 cas

13.12.2022 Chimney unit-07 Pile cap segment 03 cas

13.12.2022 Booster Fan Unit 7B pilecap casting com

09.12.2022 Unit #06 chimney Raft Excavation purpos

09.12.2022 Unit #06 Excavation work has been start

06.12.22 Unit #07 balance five segments bottom bot

02.12.2022 Unit #07 chimney Raft 1st segment concr

02.12.2022 Unit #07 chimney Raft 1st segment concr

01.12.22 Unit #07 chimney Raft 1st segment concret

01.12.2022 Unit#7 First Raft Casting Pooja

29.11.2022 Unit#6 absorber 665-745 cum completed

29.11.2022 Unit#6 absorber 641-745 cum completed

29.11.2022 Unit#6 absorber 493 745 cum completed

28.11.2022 Absorber Unit#6 120- 745 cum casting co

28.11.2022 Absorber Unit 6 PC1 Pilecap casting sta

28.11.2022 Absorber unit-6 raft concrete pouring s

25.11.22 Chimney #4 Status

25.11.22 Unit #07 1st segments top jali & shell wa

24.11.2022 U#7 Chimney status

22.11.2022 Unit#7 Chimney load test (2)

18.11.22 Loading completed in chimney 7.datum fixi

12.11.22 Block placing started in unit7 chimney Lo

11.11.2022 Unit#7 Chimney Reinforment laying start

26.11.2022 ch#5

26.11.2022 ALL SIX SEGMENT CASTING COMPLETED

26.11.22 Unit #05 final two segments out of 0606 s

25.11.22 12 00Hrs Unit #05 chimney Raft final two

25.11.22 Unit #5 Chimney Raft segments #01 & 04 fi

25.11.22 Chimney unit-05 pile cap segment 01& 03 c

24.11.2022 Chimney #5

24.11.2022 Unit#5 Chimney

17.11.2022 Pile Chipping work started

10.11.22 Control room pcc in process

12.11.22 Block placing started in unit7 chimney

11.11.2022 Unit#7 Chimney Reinforment laying start

11.11.2022 Unit#7 Chimney Reinforment laying start

15.11.2022 Chimney stage-01 Segment-06 Concrete C

15.11.2022 Chimney stage-01 Segment-06 Concrete C

14.11.2022 Chimney stage-01 Segment-06 Concrete st

21.10.22 UNIT 5 BLOCK 3 PILING START NO. 24

22.10.2022 Absorber unit4 casting successfully com

21.10.2022 Absorber Unit 4 pilecap casting started

20.10.2022 Unit#6 chimney Pile Ni P20 drilling UP

04.11.2022 Unit#7 Booster Fan Area Pile chippling

04.11.2022 BALL MILL AREA

04.11.2022 TT AREA

04.11.2022 TT Area Retaining wall

04.11.2022 TT AREA RETAINING WALL

20.10.2022 Truck tippler reataining wall concrete

18.10.22 TT Area

18.10.2022 Truck Tippler Retaining Wall casting co

18.10.22 Chimney satge-01, Segment-2 casting stare

11.11.2022 Unit#7 Chimney Reinforment laying start

21.10.22 Chimney Unit 7 Pile chipping completed,

21.10.22 Chimney stage-01 Pile cap as on

19.10.22 Stage-1 Segment-2( Third Segment)

19.10.22 Segment-2( Third Sement)

11.10.22 Segment-5(Second Segment)

12.10.22 Concreting completed 664cum segment-05(Se

Date 11.10.2022 Chimney Segment-5(Second Segment)

Stage-I Chimney Safety First -Pep Talk before star

Stage-I Chimney Raft Cating Pooja by NTPC BHEL Off

Stage-I Chimney Raft Casting start Pooja by NTPC-B

Stage-I Chimney Gethering at Raft Casting Location

Stage-I Chimney Gathering at Location

Stage-I Chimeny Raft Casting started by Boom Place

Unit#4 Chimney Raft Casting Pep Talk

Unit#4 Chimney Raft Casting Group Photo

Unit#4Chimney Raft Casting Pooja by CM site

Unit#4 Chimney Raft Casting Pooja by PD BHEL Korba

Unit#4 Chimney Raft casting Pooja by NTPC GM FGD

UNit#4 Chimney Raft Casting Pooja by HOP NTPC

Unit#4 Chimney Raft Casting

Unit#5 Chimney

Truck Tippler

Unit#5 Booster Fan

Unit#5 Absorber

Unit#4 Chimney

Unit#5 Chimney

Stage-I Chimney

LTP-1 Area

Process Water Tank-B

Process Water Tank -A

Gypsum Shed Area

FGD Control Room area

Unit#5 Booster Fan

ACW/ECW AREA

Unit#7 Absorber

WASTE WATER & FILTRATE WATER TANK

TRUCK TIPPLER AREA

TRUCK TIPPLER

PROCESS WATER TANK-B

PROCESS WATER TANK-A

LTP-1( LIME STONE TERMINAL POINT-01)

GYPSUM STORAGE SHED

ACW/ ECW PUMP HOUSE

Booster Fan Unit#5

Absorber Unit#5

12.08.22 U#7 Absorber Reinforcement laying Status

Unit#5 Booster Fan Reinforcement work status

Unit#5 Chimney Raft Status

Unit#5 Chimney Raft status on 13.07.2022

Unit#5 Chimney Raft Casting 3 segment out of 6done

Unit#5 Absorber Raft Casting

Absorber Unit#5 Raft casting Started on 02.07.2022

Test Pile TPV-5 Compression Load test Start

Test Pile TPV-5 Compression Load test

Unit#5 Absorber

Unit#4 Chimney

Unit#1I2I3 Chimney

Test Pile TPV-5 Loading work start

TPV-5 TEST PILES WORKS

Welcome of GM(I) at Korba FGD site

UNIT#5 CHIMNEY WORK STATUS

Meeting of GM(I) With HOP Korba

GROUP PHOTOGRAPH ON 18.05.2022 WITH GM(I)

ACW/ ECW WORK STATUS , WORK PENDING DUE TO BOLTS

ABSORBER UNIT#5 PCC

Test Pilling Work status Review by NTPC officials

M/s NAVRUP INDIA Pilling work start

Gypsum Shed rea Footing Progress

Gypsum Shed area Footing Work Status

Gypsum Shed area Work Progress Photographs

ACW/ECW Area Work Progress Photographs

Gypsum Shed Area Work Progress Photograps

TT area Photograph Pic-2

TT area Photographs

Excavation in Gypsum Storage Shed

Excavation in Gypsum Storage Shed

Excavation in Gypsum Storage Shed

Weigh bridge installation in progress

U#2 RHS FGD Bypass Damper placed in position

U#2 RHS FGD Bypass Damper erection under progress

U#2 RHS existing duct removal for damper erection

Chimney Unit-5 Job pilling

MBPL Batching plant

1st Batching plant BJCL for job pile package

BJCL Batching plant -1 area

U#2 Existing duct RHS cutting in progress

Truck tippler raft is under progress

Truck tippler raft is under progress

Chimney-5 piling work in progress

Chimney-5 piling work in progress

Damper Erection done in Unit#2 LHS side