BHADRADRI FGD PACKAGE (4X270 MW)


Wet Ball Mill foundations

Unit#4 Booster fan foundations

Unit#4 Absorber foundations

Unit#3 Booster fan foundation

Unit#3 Absorber foundation

Unit#3 Absorber elevator and RC pump & Oxidation b

Unit#2 Booster fan foundation

Unit#2 Absorber foundation

Unit#1 Absorber foundation

Unit#2 Absorber elevator and RC Pump & Oxidation b

Unit#1 Booster fan foundation

Unit#1 Absorber elevator and RC Pump & Oxidation b

Unit#1 Absorber area

Sec and Primany Hydro cyclone feed tank

Primany Hydro cyclone feed tank and Filter water t

Primany Hydro cyclone feed tank and Filter water t

MCC & Control room

Gypsum storage shed excavation-2

Gypsum storage shed excavation-1

Gypsum storage shed excavation

U#4 RC Pump foundations casting

U#4 Absorber lift casting works

Wet ball mill excations works

U#4 RC Pump foundations

U#2 Booster fan B main beams casting

MCC building PCC works

MCC building excavation works

U#1 Absorber columns

U#4 Absorber Lift raft after casting

U#4 Absorber PCC

U#3 Absorber casting

FGD Switch Gear building columns

U#1 Absorber casting

U#1 Absorber casting

Unit#1 Absorber raft concreting works

Unit#3 Absorber foundation PCC

Unit#2 Absorber raft concreting

Unit#2 Absorber raft after concreting

Unit#2 Absorber & lift raft after concreting

Unit#3 Absorber lift foundations work progress

Unit#2 Booster fan foundation columns after concreting

FGD-unit 2 booster fan foundation

Unit#1 FGD absorber excavation

ACW & ECW Foundations

Unit#4 Booster fan A foundation raft and columns

Unit#4 Booster fan A raft concreting

Unit#3 Booster fan foundation raft and columns

Unit#3 Booster fan foundation raft after conreting

Unit#2 Booster fan foundation raft and columns

Unit#2 Booster fan raft concreting

Unit#1 Booster fan foundation raft and columns

Unit#1 Booster fan foundation - raft concreting

Unit#1 excavation for Boostar fan foundation