Home   

PANKI TPS (1X660 MW)


FGD DCS Panel erection works

LDO Tanks and CHP Galleries erection works

FGD Erection works

ID fan to Chimney Ducting works

Chimney Painting works

NDCT erection view and Pipe Racks erection

LDO Tank erection and Coal Settling Pond

NDCT Erection view

SADC Pneumatic Tubing instrumentation in Boiler

Switchyard Erection view

CW Pump House erection view

Boiler Right side Ring Beam erection completed

CHP Structural Erection works

Chimney Painting works

Mechanical equipment erection (Side arm charger)

Civil works in PT Plant

Civil works in Ash Dyke area

ESP Erection works

Civil works of Coal handling plant

Civil works in Power House Building

Civil works in LDO Dyke

Civil works in Fire Station Building

Civil works in Fuel Oil Pump House

Civil works in Cooling Water Pump house

Civil works in CW Pipe encasing

Civil works in Clarified Water MCC Room

Civil works in Compressor House

Civil works in Clarified Water Pump house

Civil works in Dispensary Building

Structural works in JT-06 in progress

Structural works in Sampling Tower in progress

Structural works in CRH in progress

Structural works in JT-04 in progress

Structural works in BCN-6AB in progress

Structural works in BCN-5AB in progress

Structural works in BCN-4AB in progress

Crusher House structure erection

JT04 & BCN-4AB (GR-9) structure erection

JT-02 Civil works in progress

NDCT 45th Lift completed

PHB Structure Erection View and Brick works

Clarified water Pump house slab works

Clarified water tank roof works

Civil works in DM Building

Condenser water chamber erected

WT (CHP) - -2m reinforcement

CW Pipeline (Along A row) - Hydro under progress

JT-4 (CHP)

JT-4 (CHP) Floor -Deck sheeting

Chimney Flue can lifting under progress

Stacker Reclaimer -CHP

Chimney Flue can lifting under progress

Cable tray in Cable vault in PHB

Portable DM Plant

BCN-4AB Trestle TR-6 & Gallery GR Structural works

BCN-4AB Structural works

BCN-5AB Structural works

Chimney Flue can pre-assembly works

ASH Slurry Pump House civil works

RWR Pump House

ASH water pump house civil works

Chemical house civil works

RWR Electrical Annexe civil works

DM Tank Final shell plate welding works under progress

Boiler & PHB erection view

Compressor House civil works

Cable tray in Cable vault in Power House Building

Power House Building Roof sheeting works

Turbine Bearing Pedestal Placement

NDCT 21st Lift completed

ESP Pass-A Outlet Funnel erection

PHB A9 Column erection

ESP Inlet View Pass-A,B,C & D

Crown Plate erection in Boiler

Boiler Top Header erection works

Boiler erection progress view (Left side)

TG Deck Column Reinforcement works

RHS Water wall Panel 2nd Lift in Boiler

ESP Inlet side erection works

Boiler erection progress view (Left side)

Structure erection in PHB

TG Deck Column Staging works

Screen sheet erection in ESP

Collecting Electrode erection works in Pass-A

Collecting Electrode erection works in Pass-A

Civil works in CW Forebay

Civil works in Admin Building

Boiler Erection View (LHS)

TG Deck Column Reinforcement works

Drain wall RCC works near Kalyanpur u/p

Backfilling works in Time office building u/p

CHP Road Excavation works u/p

CW Forbay channel

RCC wall u/p in CW Forebay

APH Column erection & alignment works u/p

Reinforcement & shuttering works in PHB D Row

Mill Bunker Pile cap in Right side of Boiler area

Reinforcement works in NDCT area u/p

Mech. Erection works in ESP Pass-D u/p

Excavation works in Wagon Tippler u/p

TG Deck Column 2nd Stage Shuttering works

Road works between Chimney and ESP

Reinforcement works in DM Building

RAW water Pump House area

RAW water compartment

RAW water compartment

PHB - C Row Pile Cap C3 Reinforcement & Shuttering

PHB - B Row Pile Cap B7&8 Concreting works

NDCT 1st segment of Shell Ring Foundation complet

Foundation Bolt fixing in Chimney of Aux. Boiler

Excavation works in Vacuum cum compressor House-1

Excavation works in CW Pump House

Excavation works in Ash Slurry Pump House

Excavation work in ERH area

Excavation Wagon Tripler

Excavation Wagon Tripler

Excavation in ERH area

ESP Pass-A, B & C mechanical works

ESP Pass - D& E Column erection

Drain works along the Road of CISF Gate no 2

DM Building Pile Cap A1&B1 concreting

CW Pump House view from Forebay

CW Pipeline lowered

CW Pipeline Encasing works under progress

Civil works in CW Forebay

Boundary Road around RAW water compartment

Boiler Right side Mill Bunker Coumn & Foundation w

Civil works in ASH Dyke

1st lift of Column of Ash Slurry Pump House

APH Column erection

ASH Dyke Soil cover on slope & top surface

Chimeny Shell Casting under progress (El+34.8 MTR)

TG Deck column shuttering works

CW Pipeline PCC works

PCC works in CW Forebay

Boiler erection view

Right SMill Bunker column Pile head breaking works

Power House Building A & B Row column erection

Civil works in NDCT area

CW Pipe line works

CW Pipe line works

Boundary wall works near Shatabdi Road

TG Raft concreting works

ESP Inlet side erection works

Excavation works in Boiler Right side Mil Bunker

ASH Slurry Pump House civil works

Drain works along CISF Gate no2 Road

Power House Building A Row column erection

View of ESP & Boiler erection

Silencer erection in Boiler Left side

Reinforcement works u/p in PHB Pile cap A12/A13

Excavation works u/p in PHB C Row

TG Raft reinforcement works u/p

Plinth beam civil works u/p in compressor building

Slip form assembly works of Chimney are und. progr

Shuttering works of MDBFP Foundation

JT6 Reinforcement works u/p

ESP Pass A 2 tier and side wall erection u/p

RCC works for laying of CW Pipe line

Boiler erection progress view (Left side)

Excavation works started for CW Piping

Drain works u/p along the 15mtr wideMainPlant road

Backfilling works in Boiler cavity area for Crane

Pedestal Reinforct. works u/p in Power House A Row

Pile head breaking works u/p in Power House A Row

Boiler erection progress view (Left side)

Boiler erection progress view (Right side)

Backfilling works in ESP Pass-A &B

Pile head breaking works in ESP Pass E

Reinforcement works u/p in ESP Pass D

6th segment reinforcement works in Chimney

5th Segment casting in chimney area

Pile cap PCA5 concrete compld in Power House area

Column RCC works u/p in Customer Site Store

View of Boiler erection works

Boiler erection works u/p

Pile head breaking works in ESP Pass C

Backfilling works in ESP Pass-A &B

Backfilling works in ESP Pass-A &B

Reinforcement works u/p in balance segmentChimney

Chimney 2nd segment readiness for casting

Shuttering works of Peripheral wall in RAW waterAr

Backfilling works u/p in Boiler area for Crane mov

Backfilling works in ESP Pass-A &B

Shuttering works of Drains along the MainPlantRoad

2nd segment reinforct and shuttering works Chimney

Boiler erection progress view (Left side)

Civil works u/p in customer site office

Boundary wall works u/p along Shatabdi Road

Boundary wall works u/p along Shatabdi Road

Boundary wall works u/p near Ratanpur village

Boundary wall works u/p near Ratanpur village

Reinft. and shuttering works are u/p in RAW water

Reinft. and shuttering works are u/p in RAW water

ESP Civil works (Pile head & Concreting)

ESP Civil works (Pile head & Concreting)

ESP Column erection works started on 06.08.19.

Reinforcement binding works and Pile load test u/p

Boiler 2nd Tier erection works are in progress

Boiler erection progress view

Piling works u/p in NDCT area

Pedestal shuttering works in ESP area

Pile head breaking works in Chimney area

Bottom layer Reinforcement works of Chimney area

Boiler left side 2nd Tier 1st box column erection

Customer site office civil works

ESP Civil works : Pile cap reinforcement under progress

Chimney bottom reinforcement binding works under progress

Boiler Mechanical Erection Left side

Raw water reservoir work progress

Raw water reservoir work progress

Raw water reservoir work progress

Ash Dyke Embankment raising work under progress

Ash Dyke Embankment raising work under progress

Ash Dyke Embankment raising work under progress

Chimney Pile Load test and reinforcement binding

ESP Pass A through C Pile cap and pedestal works

ESP Pass A through C Pile cap and pedestal works

Boiler Right side erection progress

boiler Left Site erection Progress

RWR work

boundrywall excavation next Strech

boundrywall behind Training Center

boundrywall work near RWR next strech 1

boundrywall work near RWR next strech

boundrywall work near RWR

Entrance gate instalation in existing plant

Batching Plant of LnT

boundrywall work near kalyanpur road

boundrywall work near Mirzapur village-1

boundrywall work near RWR

Raw water reservoir -Excavation under progres 1

Raw water reservoir -Excavation under progress

boundry wall-2

boundrywall work near Mirzapur village-1

Piling work

Ash Dyke Band wall

Ashdyke area

Boundary wall work near state highway

Ash Dyke Area

Closed Shed-1 store BHEL material near coal yard

Closed Shed for store BHEL material near coal yard

road barrier installed

RCC work of storage shed near coal storage shed

Pile vertical load test 1

Pilling work Progress 17 january 2019

Crane Boom Assly

new RIG Assembly under progress

Piles Load Test under progress at ESP area

PileLoad Test in FGD area

Pilling work in Boiler area

Road work at canal side-outside bdry wall

Sleeper casting for Material Storage

Road work in BHEL Store yard

Agregate chamber of batching Plant LnT

cement storage shade -LnT Batching Plant

Pilling work Progress

Batching Plant LnT1

Batching Plant LnT

canal side Road construction near GM office1

boundrywall work near Mirzapur village-4

boundrywall work near Mirzapur village-3

Material Storage area devlopmet

Sleeper casting for Material Storage

Piles Load Test at FGD area

Customer office (by JSM) work progess

Road work at canal side-outside bdry wall

boundrywall work near Mirzapur village-1

boundrywall work near Mirzapur village-2

Pilling work Progress

Raw Water : Area Marking completed

Boundary wall(Canal Side): Back filling completed

Customer site office

Portable Batching Plant operational

Main Batching Plant getting Ready

Weigh Bridge (100 MT) Operational

Piling work in Boiler area

Construction Power (4 MVA) Operational

Test Pilling at Chimney area 15 Nov-18

RCC footing casting for customer office

Enabling work Fencing work at segration 23-10-18

Customer office -Excavation for foundn 23-10-18

Boundary wall work start 17-10-18

Boundary wall agency work start 17-10-18

Enabling work 16-10-18

Weighbridge 13-10-18

Fencing work at Enabling area 13-10-18

Ramp cnocreting at Weighbridge 12-10-18

Concreting at Enabling area 12-10-18

Rig Recieve for Piling 11-10-18

Weighbridge 11-10-18

Concreting at Enabling work 11-10-18

Weighbridge 10-10-18

Enabling work 10-10-18

Ramp preparation for Weighbridge

Fencing work at Enabling area

Ramp Prepration for Weigh Bridge 8-10-18

Bar Bending for Enabling work 8-10-18

Weigh Bridge erection

Enabling work

Boundary wall Survey 6-10-18

ESP Area

Switchyard Area

Boiler Area

Power House Area

Boiler Area

Area Between Boiler and ESP

Mill Area

Chimney Area

Boiler & ESP Site Area