FGD DCS Panel erection works
|
LDO Tanks and CHP Galleries erection works
|
FGD Erection works
|
ID fan to Chimney Ducting works
|
Chimney Painting works
|
NDCT erection view and Pipe Racks erection
|
LDO Tank erection and Coal Settling Pond
|
NDCT Erection view
|
SADC Pneumatic Tubing instrumentation in Boiler
|
Switchyard Erection view
|
CW Pump House erection view
|
Boiler Right side Ring Beam erection completed
|
CHP Structural Erection works
|
Chimney Painting works
|
Mechanical equipment erection (Side arm charger)
|
Civil works in PT Plant
|
Civil works in Ash Dyke area
|
ESP Erection works
|
Civil works of Coal handling plant
|
Civil works in Power House Building
|
Civil works in LDO Dyke
|
Civil works in Fire Station Building
|
Civil works in Fuel Oil Pump House
|
Civil works in Cooling Water Pump house
|
Civil works in CW Pipe encasing
|
Civil works in Clarified Water MCC Room
|
Civil works in Compressor House
|
Civil works in Clarified Water Pump house
|
Civil works in Dispensary Building
|
Structural works in JT-06 in progress
|
Structural works in Sampling Tower in progress
|
Structural works in CRH in progress
|
Structural works in JT-04 in progress
|
Structural works in BCN-6AB in progress
|
Structural works in BCN-5AB in progress
|
Structural works in BCN-4AB in progress
|
Crusher House structure erection
|
JT04 & BCN-4AB (GR-9) structure erection
|
JT-02 Civil works in progress
|
NDCT 45th Lift completed
|
PHB Structure Erection View and Brick works
|
Clarified water Pump house slab works
|
Clarified water tank roof works
|
Civil works in DM Building
|
Condenser water chamber erected
|
WT (CHP) - -2m reinforcement
|
CW Pipeline (Along A row) - Hydro under progress
|
JT-4 (CHP)
|
JT-4 (CHP) Floor -Deck sheeting
|
Chimney Flue can lifting under progress
|
Stacker Reclaimer -CHP
|
Chimney Flue can lifting under progress
|
Cable tray in Cable vault in PHB
|
Portable DM Plant
|
BCN-4AB Trestle TR-6 & Gallery GR Structural works
|
BCN-4AB Structural works
|
BCN-5AB Structural works
|
Chimney Flue can pre-assembly works
|
ASH Slurry Pump House civil works
|
RWR Pump House
|
ASH water pump house civil works
|
Chemical house civil works
|
RWR Electrical Annexe civil works
|
DM Tank Final shell plate welding works under progress
|
Boiler & PHB erection view
|
Compressor House civil works
|
Cable tray in Cable vault in Power House Building
|
Power House Building Roof sheeting works
|
Turbine Bearing Pedestal Placement
|
NDCT 21st Lift completed
|
ESP Pass-A Outlet Funnel erection
|
PHB A9 Column erection
|
ESP Inlet View Pass-A,B,C & D
|
Crown Plate erection in Boiler
|
Boiler Top Header erection works
|
Boiler erection progress view (Left side)
|
TG Deck Column Reinforcement works
|
RHS Water wall Panel 2nd Lift in Boiler
|
ESP Inlet side erection works
|
Boiler erection progress view (Left side)
|
Structure erection in PHB
|
TG Deck Column Staging works
|
Screen sheet erection in ESP
|
Collecting Electrode erection works in Pass-A
|
Collecting Electrode erection works in Pass-A
|
Civil works in CW Forebay
|
Civil works in Admin Building
|
Boiler Erection View (LHS)
|
TG Deck Column Reinforcement works
|
Drain wall RCC works near Kalyanpur u/p
|
Backfilling works in Time office building u/p
|
CHP Road Excavation works u/p
|
CW Forbay channel
|
RCC wall u/p in CW Forebay
|
APH Column erection & alignment works u/p
|
Reinforcement & shuttering works in PHB D Row
|
Mill Bunker Pile cap in Right side of Boiler area
|
Reinforcement works in NDCT area u/p
|
Mech. Erection works in ESP Pass-D u/p
|
Excavation works in Wagon Tippler u/p
|
TG Deck Column 2nd Stage Shuttering works
|
Road works between Chimney and ESP
|
Reinforcement works in DM Building
|
RAW water Pump House area
|
RAW water compartment
|
RAW water compartment
|
PHB - C Row Pile Cap C3 Reinforcement & Shuttering
|
PHB - B Row Pile Cap B7&8 Concreting works
|
NDCT 1st segment of Shell Ring Foundation complet
|
Foundation Bolt fixing in Chimney of Aux. Boiler
|
Excavation works in Vacuum cum compressor House-1
|
Excavation works in CW Pump House
|
Excavation works in Ash Slurry Pump House
|
Excavation work in ERH area
|
Excavation Wagon Tripler
|
Excavation Wagon Tripler
|
Excavation in ERH area
|
ESP Pass-A, B & C mechanical works
|
ESP Pass - D& E Column erection
|
Drain works along the Road of CISF Gate no 2
|
DM Building Pile Cap A1&B1 concreting
|
CW Pump House view from Forebay
|
CW Pipeline lowered
|
CW Pipeline Encasing works under progress
|
Civil works in CW Forebay
|
Boundary Road around RAW water compartment
|
Boiler Right side Mill Bunker Coumn & Foundation w
|
Civil works in ASH Dyke
|
1st lift of Column of Ash Slurry Pump House
|
APH Column erection
|
ASH Dyke Soil cover on slope & top surface
|
Chimeny Shell Casting under progress (El+34.8 MTR)
|
TG Deck column shuttering works
|
CW Pipeline PCC works
|
PCC works in CW Forebay
|
Boiler erection view
|
Right SMill Bunker column Pile head breaking works
|
Power House Building A & B Row column erection
|
Civil works in NDCT area
|
CW Pipe line works
|
CW Pipe line works
|
Boundary wall works near Shatabdi Road
|
TG Raft concreting works
|
ESP Inlet side erection works
|
Excavation works in Boiler Right side Mil Bunker
|
ASH Slurry Pump House civil works
|
Drain works along CISF Gate no2 Road
|
Power House Building A Row column erection
|
View of ESP & Boiler erection
|
Silencer erection in Boiler Left side
|
Reinforcement works u/p in PHB Pile cap A12/A13
|
Excavation works u/p in PHB C Row
|
TG Raft reinforcement works u/p
|
Plinth beam civil works u/p in compressor building
|
Slip form assembly works of Chimney are und. progr
|
Shuttering works of MDBFP Foundation
|
JT6 Reinforcement works u/p
|
ESP Pass A 2 tier and side wall erection u/p
|
RCC works for laying of CW Pipe line
|
Boiler erection progress view (Left side)
|
Excavation works started for CW Piping
|
Drain works u/p along the 15mtr wideMainPlant road
|
Backfilling works in Boiler cavity area for Crane
|
Pedestal Reinforct. works u/p in Power House A Row
|
Pile head breaking works u/p in Power House A Row
|
Boiler erection progress view (Left side)
|
Boiler erection progress view (Right side)
|
Backfilling works in ESP Pass-A &B
|
Pile head breaking works in ESP Pass E
|
Reinforcement works u/p in ESP Pass D
|
6th segment reinforcement works in Chimney
|
5th Segment casting in chimney area
|
Pile cap PCA5 concrete compld in Power House area
|
Column RCC works u/p in Customer Site Store
|
View of Boiler erection works
|
Boiler erection works u/p
|
Pile head breaking works in ESP Pass C
|
Backfilling works in ESP Pass-A &B
|
Backfilling works in ESP Pass-A &B
|
Reinforcement works u/p in balance segmentChimney
|
Chimney 2nd segment readiness for casting
|
Shuttering works of Peripheral wall in RAW waterAr
|
Backfilling works u/p in Boiler area for Crane mov
|
Backfilling works in ESP Pass-A &B
|
Shuttering works of Drains along the MainPlantRoad
|
2nd segment reinforct and shuttering works Chimney
|
Boiler erection progress view (Left side)
|
Civil works u/p in customer site office
|
Boundary wall works u/p along Shatabdi Road
|
Boundary wall works u/p along Shatabdi Road
|
Boundary wall works u/p near Ratanpur village
|
Boundary wall works u/p near Ratanpur village
|
Reinft. and shuttering works are u/p in RAW water
|
Reinft. and shuttering works are u/p in RAW water
|
ESP Civil works (Pile head & Concreting)
|
ESP Civil works (Pile head & Concreting)
|
ESP Column erection works started on 06.08.19.
|
Reinforcement binding works and Pile load test u/p
|
Boiler 2nd Tier erection works are in progress
|
Boiler erection progress view
|
Piling works u/p in NDCT area
|
Pedestal shuttering works in ESP area
|
Pile head breaking works in Chimney area
|
Bottom layer Reinforcement works of Chimney area
|
Boiler left side 2nd Tier 1st box column erection
|
Customer site office civil works
|
ESP Civil works : Pile cap reinforcement under progress
|
Chimney bottom reinforcement binding works under progress
|
Boiler Mechanical Erection Left side
|
Raw water reservoir work progress
|
Raw water reservoir work progress
|
Raw water reservoir work progress
|
Ash Dyke Embankment raising work under progress
|
Ash Dyke Embankment raising work under progress
|
Ash Dyke Embankment raising work under progress
|
Chimney Pile Load test and reinforcement binding
|
ESP Pass A through C Pile cap and pedestal works
|
ESP Pass A through C Pile cap and pedestal works
|
Boiler Right side erection progress
|
boiler Left Site erection Progress
|
RWR work
|
boundrywall excavation next Strech
|
boundrywall behind Training Center
|
boundrywall work near RWR next strech 1
|
boundrywall work near RWR next strech
|
boundrywall work near RWR
|
Entrance gate instalation in existing plant
|
Batching Plant of LnT
|
boundrywall work near kalyanpur road
|
boundrywall work near Mirzapur village-1
|
boundrywall work near RWR
|
Raw water reservoir -Excavation under progres 1
|
Raw water reservoir -Excavation under progress
|
boundry wall-2
|
boundrywall work near Mirzapur village-1
|
Piling work
|
Ash Dyke Band wall
|
Ashdyke area
|
Boundary wall work near state highway
|
Ash Dyke Area
|
Closed Shed-1 store BHEL material near coal yard
|
Closed Shed for store BHEL material near coal yard
|
road barrier installed
|
RCC work of storage shed near coal storage shed
|
Pile vertical load test 1
|
Pilling work Progress 17 january 2019
|
Crane Boom Assly
|
new RIG Assembly under progress
|
Piles Load Test under progress at ESP area
|
PileLoad Test in FGD area
|
Pilling work in Boiler area
|
Road work at canal side-outside bdry wall
|
Sleeper casting for Material Storage
|
Road work in BHEL Store yard
|
Agregate chamber of batching Plant LnT
|
cement storage shade -LnT Batching Plant
|
Pilling work Progress
|
Batching Plant LnT1
|
Batching Plant LnT
|
canal side Road construction near GM office1
|
boundrywall work near Mirzapur village-4
|
boundrywall work near Mirzapur village-3
|
Material Storage area devlopmet
|
Sleeper casting for Material Storage
|
Piles Load Test at FGD area
|
Customer office (by JSM) work progess
|
Road work at canal side-outside bdry wall
|
boundrywall work near Mirzapur village-1
|
boundrywall work near Mirzapur village-2
|
Pilling work Progress
|
Raw Water : Area Marking completed
|
Boundary wall(Canal Side): Back filling completed
|
Customer site office
|
Portable Batching Plant operational
|
Main Batching Plant getting Ready
|
Weigh Bridge (100 MT) Operational
|
Piling work in Boiler area
|
Construction Power (4 MVA) Operational
|
Test Pilling at Chimney area 15 Nov-18
|
RCC footing casting for customer office
|
Enabling work Fencing work at segration 23-10-18
|
Customer office -Excavation for foundn 23-10-18
|
Boundary wall work start 17-10-18
|
Boundary wall agency work start 17-10-18
|
Enabling work 16-10-18
|
Weighbridge 13-10-18
|
Fencing work at Enabling area 13-10-18
|
Ramp cnocreting at Weighbridge 12-10-18
|
Concreting at Enabling area 12-10-18
|
Rig Recieve for Piling 11-10-18
|
Weighbridge 11-10-18
|
Concreting at Enabling work 11-10-18
|
Weighbridge 10-10-18
|
Enabling work 10-10-18
|
Ramp preparation for Weighbridge
|
Fencing work at Enabling area
|
Ramp Prepration for Weigh Bridge 8-10-18
|
Bar Bending for Enabling work 8-10-18
|
Weigh Bridge erection
|
Enabling work
|
Boundary wall Survey 6-10-18
|
ESP Area
|
Switchyard Area
|
Boiler Area
|
Power House Area
|
Boiler Area
|
Area Between Boiler and ESP
|
Mill Area
|
Chimney Area
|
Boiler & ESP Site Area
|