PATRATU (3X800 MW)


Chimney 1 Flue Liner

Areal view - Township

Areal View - Main Plant

Areal View - Main Plant

Areal View - CHP Area

Areal View - WTP Area

Track hopper Unit # 2

TG # 2- Pedestals Placed on foundations

ST # 3 and ACC Unit # 3 Columns

MPH # 1 - LT Switchgear Room

MPH # 1 - Battery Room

ACC Unit # 1

A Row Bus Duct Structures

WT - Tunnel 2AB - TP 2A

MPH - ACC CIVIL

MPH - ACC CIVIL

MPH # 2 View from Switchyard

Side Cladding started at Gable End MPH # 1

ACC Column Top Deck Structure Erection

STG # 1 Unit # 1

TD BFP FOUNDATIONS UNIT # 2

Boiler & Main Power House Unit # 1

Boiler Unit # 1

Bunker Unit # 1

Boiler Unit # 1

FA Main Silo Structure erection under progress

LDO Pump House

Dyke Wall around Fuel Oil Tanks

DM Tank 1 & 2

CHP Conv 6AB GR 2

PR 1 Erection U/p

PR 1 Erection U/p

Flue Can Erection in Chimney # 1

Boiler Unit2

Boiler Unit1

Bunker Hopper erection Unit # 1

CHP Tunnel 3AB

CHP Conv 8AB (TP 6 to Tp 7)

Track Hopper 02 - Segment 02

CHP Conv 6AB GR 1

Ash Silo Road WBM

Lower Boiler Drum erection

ACC Unit 1-3

ACC Unit 1-3

ACC Unit 1-3

ACC Unit 1-3

Boiler Unit-3

Boiler Unit-3

Boiler Unit-2

Boiler Unit-2

Boiler Unit-1

Boiler Unit-1

ESP Unit-3

ESP Unit-3

ESP Unit-2 Intlet

ESP Unit-2

ESP Unit-2

ESP Unit-2

ESP Unit-1 Inlet

ESP Unit-1 Outlet and Chimney Duct support

ESP Unit-1 Outlet and Chimney Duct support

Fire Water Pump House

TP 3 and Conv 3AB

Crusher House & TP-3 Area

STG # 1 Unit # 1

ACC-1 Grid AA/A8 pylon slipform erection work u/p

ACC-2 grid B2/AA raft bar binding u/p

Boiler U-1 DHT Completed Successfully on 29.03.23

TG Box up of Unit-1

MPH Unit-1 A ROW SIDE

Hot Box Erection U-1

Condensate Storage Tanks

MPH Unit-1 Turbine Erection

MPH Unit-1 Turbine Erection

MPH Unit-1 Turbine Erection

Bunker and Mill Structure Unit-1

ESP Unit-2 & 3 Intlet

ESP Unit-1 Inlet

ACC Unit-1

ACC Unit-1

ACC Unit-1

MPH Unit-1 9.0M EL

MPH Unit-1 9.0M EL

MPH Unit-1 9.0M EL

LPH-1

Control room

Control room

Boiler Unit-2

Boiler Unit-2

ACC Unit-3

ACC Unit-3

MPH Unit-2 Structure erection

MPH Unit-3 Structure erection

Boiler Unit-3

Township

View of Main Plant from Water System Area

View of Main Plant from Switch Yard

Track Hopper & Wagon Tippler Top View

Tunnel 3AB

Lifting of Stator Unit-1

Lifting of Stator Unit-1

Lifting of Stator Unit-1

ESP Unit-1 Outlet and Chimney Duct support

ESP Unit-1 Outlet and Chimney Duct support

ESP Unit-1 Outlet and Chimney Duct support

ESP Unit-2 and 3 Intlet

ESP Unit-1 Inlet

MPH Unit-3 Structure Erection

Hot Box Erection

MPH Unit-2 Structure erection

MPH Unit-3 Structure Erection

Control room

Compressor House

Condensate Storage Tanks

Fly Ash Intermediate Silo

ACC Unit-1

ACC Unit-1

ACC Unit-3

TP-5

Boiler Unit-3

Boiler Unit-2

Boiler Unit-2

Boiler Unit-2

Boiler Unit-1

Boiler Unit-1

CHP Conv 5 AB

CHP Conv 6 AB

CHP TP # 3

CHP Conv 3 AB

Main Plant View

Main Township

Limestone slurry storage tank- Ist lift Ring wall R/f

Track Hopper 2 Segment 1 Hopper R/f

Track Hopper 2 Segment 1 Hopper R/f

Excavation of Make Up Water pipeline

Tunnel 3AB

Wagon Tippler

Bird Eye View of Project

Bird Eye View of Project

Bird Eye View of Project

Bird Eye View of Project

Bird Eye View of Project

Bird Eye View of Project

Plant view

View from A Row Side

MPH Unit-2 Structure erection

MPH Unit-1 side cladding u/p

MPH Unit-3

ACC Unit-3

ACC Unit-3

MPH Unit-2 Structure Erection

ESP Hooper erection u/p

MPH Unit-1

Condensate Storage Tank

9Mtr Cable tray work u/p Unit-1

9Mtr Cable tray work u/p Unit-1

Hot Box Erection

Hot Box Erection

Hot Box Erection

TP-5 Erection

ACC Column Fdn.

ACC Column Fdn.

ESP Unit-3

ESP Unit-3

ESP Unit-3

ESP Unit-2 Inlet

ESP Unit-2 Outlet

ESP Unit-2 Outlet

ESP Unit-1 Inlet

ESP Unit-1 Outlet

Boiler Unit-3

Boiler Unit-3

Boiler Unit-3

Boiler Unit-2

Boiler Unit-2

Boiler Unit-2

Boiler Unit-2

Boiler Unit-1

Boiler Unit-1

FD & PA FAN Motor Erected Unit-1

Crusher House, TP-3 and Conv-3A/B Structure Erec.

TP-7

MPH Unit-1 BC Bay EL.18.0M

MPH-1 9.0M EL

ACC-1

MPH Unit-3

MPH Unit-2

MPH Unit-2

MPH Unit-1

MPH Unit-1

TD-BFP Foundation U-1

TD-BFP Foundation U-1

Control room

Boiler Unit-3

Boiler Unit-3

Boiler Unit-2

Boiler Unit-2

Boiler Unit-1

Boiler Unit-1

Boiler Unit-1

AHP Compressor House-1

TG Floor U-1

TG Floor U-1

TG Floor U-1

ACC Column Fdn.

ACC Column Fdn.

ACC Column Fdn.

Boiler Unit-1

Boiler Unit-2 Pressure parts Erection

Boiler Unit-2 Pressure parts Erection

Boiler Unit-2 Pressure parts Erection

Boiler Unit-2 Pressure parts Erection

Boiler Unit-2 Pressure parts Erection

Boiler Unit-2 Pressure parts Erection

Boiler Unit-2 Pressure parts Erection

MPH Unit-3

Boiler Unit-3

TP-3 & Convy 3a/b

TP-3 & Crusher House

TH & Wagon Tripler Area

BOP & WT Area

Switch Yard

BTG Area

Conveyor 3A/B Structure Erection

Conveyor 3A/B Structure Erection

Crusher House - Structure Erection

TP-3

Wagon Tippler

Wagon Tippler

Boundary wall work in progress

Fly Ash and Bottom Ash Silo

Fly Ash and Bottom Ash Silo

Fly Ash and Bottom Ash Silo

Fly Ash and Bottom Ash Silo

Fly Ash and Bottom Ash Silo

Chimney-3

TG Deck Unit-3

Boiler Unit-2 Pressure parts Erection

Boiler Unit-2 Pressure parts Erection

Boiler Unit-2 Pressure parts Erection

Boiler Unit-2 Pressure parts Erection

UNit-3 Bunker to Chimney

Boiler Unit-3

Boiler Unit-3

ESP Unit-2 Intlet

Bunker and Mill Structure Unit-2

Bunker and Mill Structure Unit-3

FGD Absorber

ESP Unit-2 Outlet

AHP MCC-4 cum Control Room

AHP Compressor House-1

Owner`s Office

Owner`s Office

Fire MCC Room

Fire Water Storage Tank

Chemical House

Thickner

PT Clarifier

DM Storage Tank

Integrated Building BOP Area

Cascade Aerator

TP-4 Structure Erection

Stars CRB plaster almost complete

Line side equipment completed

Line side equipment completed

Line side equipment completed lot1

Line side equipment completed lot1

ESP Unit-1 Outlet and Chimney Duct support

MPH Unit-1 BC Bay

ESP Unit-2 Outlet

MPH Unit-2 Structure erection

Bunker and ESP Unit-2

Bunker to ESP Unit-3

Boiler Unit-3

TG Deck Unit-3 R/F

Boiler Unit-2 Pressure parts

Boiler Unit-2 Pressure parts

Boiler Unit-2 Pressure parts

Boiler Unit-2 Pressure parts

CHP MCC-4

Conveyor 6A/B and TP-4 Structure Erection

Auxiliary Cooling Tower

DM TANK-3

Gravity filter House - PT plant area

Thickner

DM Clarifier

Integrated Building BOP Area

Back filling work - Clarified Water Tank

PT Clarifier

Cascade Aerator

TDBFP-B Unit1 r/f U/p

CHP MCC-2

Fly Ash Silo

Bottom Ash Silo

Bottom Ash Silo

Conveyor 6A/B Structure Erection

CHP MCC-4

Conveyor 6A/B and TP-4 Structure Erection

Track Hopper Area

Track Hopper Area

Limestone Hopper

Limestone Hopper

Wagon Tippler

Wagon Tippler

Clarified Water Tank

DM Clarifier

Gravity filter House - PT plant area

Gravity filter House - PT plant area

Gravity filter House - PT plant area

Integrated Building BOP Area

PT Clarifier

Cascade Aerator

MCC & IO ROOMS

MCC & IO ROOMS

DM Plant Tank and Structure Erection

DM Plant Tank and Structure Erection

Construction of Road - BOP Area

Construction of Road - BOP Area

Fire Water Pump House

Aux. Boiler Area

Fire Water Storage Tank

Boiler Unit-3

Boiler Unit-3

AHP MCC-3

ESP Unit-2 Outlet

ESP Unit-2 Intlet

BA TP-2 Structure Erection

Service Building

Compressor House

Unit-1 Bunker to Chimney

Unit-2 Bunker to Chimney

TP-5 Erection

FD & PA FAN foundation Unit-2

Boiler Unit-2 Pressure parts

Boiler Unit-2

Chimney-3

Chimney-2

TG Deck Unit-3 R/F

TG Deck Unit-2

Control room Unit-1

Boiler Unit-1 Pressure parts Erection

Boiler Unit-1 Pressure parts Erection

Boiler Unit-1 Pressure parts Erection

Boiler Unit-1 Pressure parts Erection

Boiler Unit-1 Pressure parts Erection

CHP MCC-3

Conveyor 3A/B Structure Erection

Limestone Hopper

Wagon Tippler

Wagon Tippler

CHP MCC-2

CHP MCC-2

Excavation of Tunnel 3A/B

Excavation of TP-1A and 1B

Fly Ash Silo

Bottom Ash Silo

CHP MCC-1

CHP MCC-1

Track Hopper Area

Track Hopper Area

Track Hopper Area

Track Hopper Area

Track Hopper Area

DM Plant Tank and Structure Erection

DM Plant Tank and Structure Erection

DM Plant Tank tank Structure Erection

Bunker and Mill Structure Unit-3

FD & PA FAN foundation Unit-2

DM Cascade Aerator

Cascade Aerator

DM Clarifier

PT Clarifier

Plant view

Gravity filter House - PT plant area

Gravity filter House - PT plant area

DM Plant Tank Erection

Construction of Road - BOP Area

DM Storage Tank-2

Integrated Building BOP Area

Integrated Building BOP Area

Conveyor 6A/B Structure Erection

CHP MCC-4

TP-4 Structure Erection

Track Hopper Area

Excavation of Tunnel 3A/B

Fly Ash Silo

Track Hopper Area

Wagon Tippler

Limestone Hopper

Construction Store

Gravity filter House - PT plant area

Gravity filter House - PT plant area

Cascade Aerator

DM Clarifier

PT Clarifier

Integrated Building BOP Area

DM Storage Tank-3

DM Storage Tank-2

MCC and IO ROOMS

DM Plant Tank Erection

DM Plant Tank Erection

Auxiliary Cooling Tower

Owner`s Office

Owner`s Office

Fire MCC Room

Fire Water Pump House

Fire Water Storage Tank

Auxiliary Boiler Area

BA TP-2 Structure Erection

TG Deck casting in progress Unit-2

TG Deck casting in progress Unit-2

CMG-7 erection Boiler Unit-3

Owner`s Officee

Owner`s Office

Conveyor 3A/B Structure Erection

Limestone Hopper

Limestone Hopper

FOPH

CHP MCC-1

Fly Ash Silo

Fly Ash Silo

Bottom Ash Silo

Bottom Ash Silo

Excavation of TP-1A & 1B

CHP MCC-2

Excavation of Tunnel 3A/B

Track Hopper Area

Track Hopper Area

Wagon Tippler

15th tower in switchyard in progress

AHP MCC-3

MPH Unit-1 BC Bay Structure Erection

Construction Store

Conveyor 8A/B Foundation

Stacker and Reclaimer-2 Area

Stacker and Reclaimer-1 foundation

Crusher House - Structure Erection

Crusher House

Excavation of TP-1A and 1B

Track Hopper Area

CHP MCC-3

TP-3

Conveyor 3A/B Structure Erection

FOPH area

Limestone Hopper

TG Deck Unit-2 Reinforcement

BC Bay MPH Unit-1

MPH Unit-1

Service Building

Dismantling of TG Deck Stagging Unit-1

Dismantling of TG Deck Stagging Unit-1

Boiler Unit-1 Pressure parts Erection

Boiler Unit-1 Pressure parts Erection

Mill Erection Unit-1

FD and PA FAN foundation Unit-2

Boiler Unit-2

Boiler Unit-2 Pressure parts Erection

Stagging of TG Deck Unit-3

Tower no 13 completed in switchyard

Switchyard line gantry erected.

Bunker and Mill Structure Unit-3

Boiler Unit-3

Boiler Unit-3

Slipform Erection Chimney-3

ESP Unit-2 Control room

Chimney-2

ESP Unit-2 Outlet

Construction of Road - BOP Area

Conveyor 6A/B Foundation

CHP MCC-4

TP-4 Structure Erection

Pipe Cum Cable Trestle Foundation

12th tower lant side in syard completed

Fire MCC Room

Auxiliary Cooling Tower

Auxiliary Cooling Tower

Back filling work - MCC Room BOP area

Gravity filter House - PT plant area

Gravity filter House - PT plant area

PT Clarifier

DM Clarifier

DM Storage Tank-3

DM Storage Tank-2

DM Storage Tank-1

Owner Office

Owner Office

Owner Office

Owner Office

FD and PA FAN foundation Unit-2

TG Deck Unit-2 R/F

TP-5 Erection

ESP Unit-2

Bunker Unit-1 Ring Beam Erection

Boiler Unit-1 Pressure parts

Boiler Unit-1 Pressure parts

Boiler Unit-1 Pressure parts

Boiler Unit-1 Pressure parts

Unit-2 Bunker to Chimney

Metal Decking MPH Unit-1

Metal Decking MPH Unit-1

Boiler Unit-2 Pressure parts

Boiler Unit-2 Pressure parts

ESP Unit-2 Intlet

ESP Unit-3

MPH Unit-3

Boiler Unit-3

Boiler Unit-3

Bunker and Mill Structure Unit-3

Limestone Hopper foundation

LDO Tanks

Excavation of Tunnel 3A/B

CHP MCC-2

CHP MCC-2

Wagon Tippler

Wagon Tippler

Track Hopper

Track Hopper Area

Track Hopper Area

Bottom Ash Silo

Bottom Ash Silo

FOPH

Limestone Crusher House

Conveyor 3A/B Structure Erection

CHP MCC-3

CHP MCC-3

TP-3 Structure

Trestle Foundation

Trestle Foundation

Stacker and Reclaimer foundation

Unit-3 Bunker Structure and ESP

Gravity filter House - PT plant area

Auxiliary Cooling Tower

Auxiliary Cooling Tower

Nineth Gntry tower in GIS switchyard in progress.

Boundary Work in progress

Clarified Water Tank

Pipe Rack Foundation

DM Water Tank

Thickner

DM Cascade Aerator

DM Clarifier

Reactor Clarifier-2

Reactor Clarifier-1

Chimney-2

MPH Unit-2

MPH Unit-1

Metal Decking MPH Unit-1

MPH Unit-1

FD Fan Unit-1

Boiler Unit-1 Pressure parts

FD & PA FAN Unit-2

Switchyard line side towers completed

Switchyard Bus reactor wall in progress

TG Deck Unit-2

MPH Unit-3

Boiler-3

Chimney-3

Boiler-2 Pressure Parts

Boiler-2 Pressure Parts

Boiler-3

Boiler-3

ESP Unit-3

ESP Unit-3

Bunker and Mill Structure Unit-3

Mill Area

Bunker and Mill Structure Unit-1

Bunker and Mill Structure Unit-2

ESP Unit-1

ESP Unit-1

ESP Unit-2 Intlet

ESP Unit-2 Outlet

Aerial view from Bunker to Chimney (Unit-1)

Aerial view from Bunker to Chimney (Unit-2)

Boiler-1 Pressure parts

TP-5

Boiler-2

FD Fan Unit-1

Mill Area

Bunker-2 and BA TP-2 Structure

Bunker Structure

ESP-2 Outlet

ESP to Chimney Duct support

Boundary Work in progress

Cascade Aerator

Reactor Clarifier

Auxiliary Cooling Tower

Fire Water Pump House

Fire Water Storage Tank

CHP MCC-3

Crusher House area

TP-3 area

Conveyor 3A/B Structure Erection

FOPH area

Dismantling of Old Oil Tank

Track Hopper-2

Track Hopper-2

Fly Ash Silo area

Bottom Ash Silo area

Excavation of Wagon Tippler

CHP MCC-2

Excavation of Tunnel 3A/B

Excavation of Wagon Tippler

Track Hopper-1

Track Hopper-1

HFO Tank-2

HFO Tank-1

LDO Tanks

Limestone Hopper foundation

Switchyard line side Drain works in progress

Switchyard line side final lift backfilling in progress

Chimney-2

Chimney-1

Seven Gantry tower in GIS switchyard in progress.

Stacker and Reclaimer foundation

GIS building ready for start of works.

Bus Reactor wall works in progress

Sixth Gantry tower in GIS switchyard in progress.

TP-4

Fire Water Pump House & FW Tank

Owners Office

Owners Office

Levelling & Grading

Gravity Filter House -PT Plant Area

Switchyard Control Room Building

Switchyard Tower and Equipment Erection Line Side

Switchyard Equipment Foundation plant side

GIS Building Plant side View

Acid & Alkali Storage Tank

DM Water Tanks

DM Water Tanks

DM Water Tanks

Clarified Water Tank

PT Clarifier

PT Clarifier

PT Clarifier

Boiler1 Pressure Parts

Boiler1 Pressure Parts

Boiler1 Pressure Parts

Boiler1 Pressure Parts

Boiler1 Pressure Parts

Boiler1 Pressure Parts

Boiler1 Pressure Parts

Boiler1 Pressure Parts

Boiler1 Pressure Parts

Boiler1 Pressure Parts

Boiler1 Pressure Parts

Boiler1 Pressure Parts

Approach Between ESP 1 and ESP 2

Unit-2 FGD Duct Foundations

PT Cascade Aerator

Main Power House-3 TG Columns

Auxiliary Cooling Tower

FGD Unit#1

ID Fan-1A Deck

ESP#1 CR foundation

ESP#1

ESP#2 Control Room

BOF to ESP Unit#2-Duct foundation

ESP#2 foundation -Pass E&F

ESP#3 Area L&G

Boiler#3 foundation

MPH3 foundation

MPH3 foundation

MPH1 Structure Erection Status

MPH2 foundation

Control Room 1 foundation

Boiler#2

Mill-H Unit1

Unit1 to Unit2 Bunker Structure

Boiler#2

PH Unit # 2 Foundation

PH Unit # 1 Foundations

PH Unit # 1 Foundations

PA & FD Fan Unit 2 (Right)

Mill J of Unit # 1

FD & PA Unit 1 (left)

FD & PA Unit 1 (Right)

ESP Unit # 2

ESP Unit # 1

Control Room Raft & Bunker Unit # 1

Chimney Unit # 1 & 2

Bunker Foundation Unit # 3

Bunker Unit # 2

Boiler Unit # 3 Foundation

Boiler Unit # 2

Boiler U # 1

Switch Yard

Chimney#2

Chimney#1

Wagon Tippler Area

Track Hopper Area

Power House #3 Over all view

Power House #3 Over all view

Boiler#3

Boiler#3

Boiler#3

Boiler#3

Power House #2 Over all view

Power House #2 Over all view

Power House #2 Over all view

Power House #2 Over all view

Power House #2 Over all view

ESP#2

ESP#2

ESP#2

Boiler#2

Power House #1 Over all view

Power House #1 Over all view

Power House #1 Over all view

Power House #1 Over all view

ESP#1 Duct Outlet foundation

ESP#1 Duct Outlet foundation

ESP#1 Duct Outlet foundation

ESP#1 Duct Outlet foundation

ESP#1 Duct Outlet foundation

Bunker Bay Unit#1

ESP#1

ESP#1

ESP#1

Boiler#1

Boiler#1

CMD & DP Review at Unit#2

CMD & DP Review at Unit#1

CMD Review Meeting

Power House #2 Over all view

Power House #2 Over all view

Power House #2 Over all view

Power House #2 Over all view

Power House #2 Over all view

Power House #2 Over all view

Power House #1 Over all view

Power House #1 Over all view

Power House #1 Over all view

ESP#2 foundation

ESP#2 foundation

ESP#2 foundation

ESP#2 foundation

ESP#2 foundation

ESP#2 foundation

ESP#1 foundation

ESP#1 foundation

ESP#1 foundation

ESP#1 foundation

ESP#1 foundation

Boiler#1 Area

Boiler#1 Area

Boiler#1 Area

Boiler#1 Area

FD-2A & PA-2A foundation status

FD-2A & PA-2A foundation status

Power House #3 Over all view

Power House #3 Over all view

Power House #3 Over all view

Power House #3 Over all view

Power House #3 Over all view

Power House #3 Over all view

Power House #3 Over all view

Power House #2 Over all view

Power House #2 Over all view

Power House #2 Over all view

Power House #2 Over all view

Power House #2 Over all view

Power House #1 Over all view

Power House #1 Over all view

Power House #1 Over all view

Power House #1 Over all view

Power House #1 Over all view

Owners Office

Owners Office

Boiler#1

Fire Station Building

Fire Station Building

Fire Station Building

Fire Station Building

ESP#2 foundation

ESP#2 foundation

ESP#2 foundation

ESP#2 foundation

ESP#2 foundation

ESP#2 foundation

ESP#2 foundation

ESP#1 foundation

ESP#1 foundation

ESP#1 foundation

ESP outlet to ID Fan Area Unit#1

ESP outlet to ID Fan Area Unit#1

ESP outlet to ID Fan Area Unit#1

ESP outlet to ID Fan Area Unit#1

ESP outlet to ID Fan Area Unit#1

Chimney#2

Chimney#1

Bunker & Mill Bay Unit#2

Boiler#2 foundation

Boiler#3

Boiler#3

Boiler#3

AHP Compressor House#1

AHP Compressor House#1

AHP Compressor House#1

Power House #3 Over all view

Power House #3 Over all view

Power House #3 Over all view

Power House #2 Over all view

Power House #2 Over all view

Power House #2 Over all view

Power House #1 Over all view

Power House #1 Over all view

Power House #1 Over all view

Power House #1 Over all view

ID Fan-1B Raft Status

ESP#2 foundation

ESP#2 foundation

ESP#2 foundation

ESP#2 foundation

ESP#2 foundation

ESP#1 foundation

ESP#1 to Boiler#1 Over all view

Chimney#2

Chimney#1

Bunker &Mill Bay Unit#2

BOF to ESP Unit#2

Boiler#3 foundation

Boiler#3 foundation

Boiler#1

Storage Yard

Storage Yard

Storage Yard

Storage Yard

Storage Yard

Storage Yard

Storage Yard

Storage Yard

Storage Yard

Storage Yard

Storage Yard

Storage Yard

Storage Yard

Storage Yard

SRC & Bunker#2 foundation

Power House #1 Over all view

Power House #1 BC Bay foundation

Power House #2 Excavation in Progress

ESP#1 Duct Outlet foundation

ESP#1 foundation

ESP#2 foundation

Chimney#2

Chimney#1

Bunker Bay Unit#1

Boiler#3

NTPC Township Area Raft Casting in Progress

NTPC Township Area Raft Casting in Progress

NTPC Township Area Raft Casting in Progress

NTPC Township Area Raft Casting in Progress

NTPC Township Area Raft Casting in Progress

NTPC Township Area Raft Casting in Progress

NTPC Township Area Raft Casting in Progress

NTPC Township Area Raft Casting in Progress

NTPC Township Area Raft Casting in Progress

NTPC Township Area Raft Casting in Progress

NTPC Township Area Raft Casting in Progress

NTPC Township Area Raft Casting in Progress

NTPC Township Area Raft Casting in Progress

NTPC Township Area Raft Casting in Progress

NTPC Township Area Raft Casting in Progress

NTPC Township Area Raft Casting in Progress

NTPC Township Area Raft Casting in Progress

NTPC Township Area Raft Casting in Progress

NTPC Township Area Raft Casting in Progress

NTPC Township Area Raft Casting in Progress

TP-02 Foundation works

Power House Unit # 2

PH Unit # 1 Foundations

PA & FD Fan Foundations Unit # 1

Excavation of Control Room Unit # 1

ESP Unit # 2 Pass D

ESP Unit # 1 Foundations

ESP to Chimney Duct Foundation Unit # 1

Boiler Unit # 3 Foundations

Boiler Unit # 2 Foundations

Boiler Unit # 1

Boiler Unit # 1 Tier 2 Erection

Township D3

Township D1

Power House Unit # 2 Excavation

Mill Foundation Works Unit # 2

ESP Unit # 2 Pass A

ESP Pass A Unit # 1

Boiler Unit # 3 Foundation

Boiler Unit # 2 Foundation

Boiler Erection U # 1 and PA & FD Fan Foundation

PH # 1

Unit # 1 Mill Reinforcement Works U/p

PA & FD Fan Fdn (LHS) U # 1 and Chimney U # 1

ESP to Chimney Duct Fdn U # 1

ESP Pass B U # 2

ESP U # 1 Pass A

Chimney # 2

CF7 reinforcement in Unit #1

Bunker fdn U # 2

Boiler Fdn of U # 2 Completed and backfilling U/p

Boiler Erection U # 1

Boiler to ESP Duct Fdn U # 1

ESP # 2 r/f

ESP # 1 Pass C r/f

TG U # 1 Raft r/f

Chimney # 1 attained 18.8 Mtr Ht

Leveling Grading in Boiler U# 3 area

Leveling Grading in Block 7 B

Crane Marched to Boiler # 1 Cavity

Power House Foundation of Unit # 1 under progress

TG Raft of Unit #1 reinforcement works U/p

Poer House CF 7 Excavation of Unit #1

B/w at Bavandhara Area

Issolation B/w

Dismantling Works of old Wagon Tippler

ESP Unit # 2 Foundation Works

ESP Unit # 1 Foundation Works U/p

80 MT & 250 MT BHEL Cranes

Chimney # 2 Slipform erection is U/p

Chimney # 1 Backfilling completed

Bunker Uinit # 2 Reinforcement U/p

Boiler to ESP Duct Fdns of Unit #1

Boiler Unit # 1 Civil Fdns Completed

Chimney#2

SG#2

SG#1

SG#1

ESP#1

Chimney#1

Retaining wall work near switch yard area

Clims shed

Earth excavation & reinforcement fixing in PH # 01

RCC raft &reinforcement fixing in Boiler Unit #02

Sand filling in Boiler Unit # 01

Reinforcemnt fixing in Mill Boiler Unit # 01

RCC footing of F Pass & reinforcement fixing in ESPUnit # 01

Chimney unit # 02 after RCC Raft

slip form slipping structure work in Chimney 01

Reinforcement fixing in ESP Unit # 01

Area stripping under progress in Ash dyke area-2

Plinth beam reinforcement in safety park

Earth excavation & RCC Raft in PH unit # 01

Levelling & grading in Boiler Unit # 03 area

Reinforcement fixing in ESP Unit # 01

old store of PVUNL area after dismantling

Slip form fabrication work for Chimney # 02

RCC raft of Chimney Unit # 02

RCC raft & reinforcement fixing in Boiler Unit # 2

RCC raft & pedestal in Boiler Unit # 01

Earth excavation in Block 7B

Excavation and reinforcement work in TG unit # 01

Dismantling work in wagon tippler 01 area

Raft footing work for closed shed

Rcc raft & reinforcement fixing in Boiler Unit # 2

RCC Raft and pedestal in Bolier Unit # 01

Slip for slipping structure work in chimney Unit # 01

PCC work in CLIMS/Labour gate area u/p

Dismantling work in wagon tippler area 1 & 2

Electrical work in Construction power sub station

PCC & reinforcement work u/p in Power House # 01

Earth excavation & reinforcement work in ESP 01

Footing excavation work for closed shed u/p

Earth excavation & reinforcement work in Boiler 02

Rcc raft work u/p in Boiler Unit # 01

Slip form slipping structure work u/p Chimney 01

Civil foundation of Way bridge

Electrical work in CP sub station area

Dismantling work of Wagon tippler 01 & 02 of old plant

Footing earth excavation work for covered shed

Earth work & reinforcement fixing work in Boiler02

Reinforcement fixing work in Boiler unit # 01

Reinforcement fixing work in ESP unit # 01

Chimney unit # 02 after 7th segment RCC Raft

Slip form of slipping structure work of Chimney 01

WBM of main Road near ATM

Slip form sliping structure work in Chimney 01

Reinforcement fixing & PCC in ESP Unit # 01

RCC Raft & reinforcement fixing in Boiler Unit #02

RCC Raft & reinforcement fixing in Boiler Unit #01

Chimney unit # 02 after 5th segment RCC Raft

Slip form slipping structure work chimney01 u/p

Dismantling of track hopper of old plant

Dismantling of old store from 23 to 27

Slip form slipping structure erection u/p chimney1

Civil work in construction power sub station area

Retaining wall work near switch yard area

PCC & earth excavation work in TG unit 01 area

Rcc Raft & reinforcement fixing in Boiler Unit 01

Main boundary wall work in Labour gate area

Rcc Raft & earth excavation in Boiler Unit # 02

Chimney Unit # 02 after 3 rd segment RCC Raft

Slip form erection work in Chimney unit # 01 u/p

Shell slip form structure work in Chimney Unit 01

RCC footing of Weigh Bridge

Isolation boundary work near Chhai gate

Earth excavation & reinforcement fixing inESPUnit1

Earth excavation & RCC Raft in Boiler Unit # 02

RCC raft and reinforcement fixing in Boiler unit 1

Chimney unit # 2 after RCC raft of second segment

First segment RCC raft of Chimney Unit # 02

Erection of central part of slip in Chimney Unit # 01

Excavation & Reinforcement fixing in ESP Unit # 01

RCC Raft, Reinforcement fixing in Boiler unit # 01

Slip form fabrication work for chimney unit # 01

Shell work in chimney unit # 01

Reinforcement fixing of chimney Unit # 01

Raft footing boundary wall M/s Hardev

Pre-fabricated panel of MBoundary wall m/s Kanwar

PCC, Raft in Boiler Unit # 01

Material stacking in Temporary yard area

Main road work back side of chimney area

Main boundary wall work near labour gate area

Earth excavation, PCC in ESP unit # 01

Earth excavation in Boiler unit # 02 area

Earth excavation in Block-5 area

Cooling Tower area after dismantling of all six CT

Civil work in construction power sub-station

Batching plant set up of M/s Bhavani

Dismantling of cooling tower # 01

Dismantling of Coveyor no. 26

RCC raft & reinforcement fixing Boiler Unit # 01

Earth excavation in Boiler unit # 01

Area Levelling & Grading in ESP Unit # 03 area

Excavation, reinforcement fixing in ESP unit # 01

Earth excavation in Boiler unit # 02

Reinforcement fixing in Chimney unit # 02

Chimney unit # 01 Reinforcement fixing for shell

Reinforcement fixing in Mill & Boiler Unit # 01

Reinforcement fixing & excavation work in ESP unit # 01

Reinforcement fixing in chimney unit # 02 for RCC

Reinforcement fixing in chimney unit # 01 for shell

Slip form work for chimney unit # 01

M/s Bhavani batching plant set up

Temporary open storage yard area in Block -5

Main boundary wall backside of BSNL office

Dismanling of Cooling Tower # 3 & 4 completed.

Dismanling of Cooling Tower # 5 & 6 completed.

isolation boundary wall near service building

Batching plant set up of M/s Shree Vijaya

Batching plant and rest room of M/s Bhavani

Temporary yard in Block 5 for material storage

PCC & Reiforcement laying in ESP unit # 01

Reinforcement fixing in Mill area Boiler unit #01

Reinforcement fixing in chimney unit # 02

Chimney unit # 01 after RCC Raft

Chimney unit # 01 after 7th segment RCC raft

Reinforcement fixing in Chimney Unit # 02

Batching plant set of shree Vijaya

Dismantling of cooling tower # 5 of old plant

Excavation and PCC in ESP Unit # 01

PCC, RCC Raft in Mill Bunker and Boiler Unit # 01

Chimney unit # 01 after 6th segment RCC Raft

Reinforcement fixing in Chimney Unit # 02

Batching plant set up of M/s Shree Vijaya

Earth excavation & PCC in ESP Unit # 01

Batching plant set up of M/s Bhavani

PCC, Excavation, RCC in MillBunker Boiler Unit # 1

Levelling & Grading in Boiler Unit # 02 area

Reinforcement fixing in Chimney unit # 02

Chimney unit # 01 after 5th segment RCC Raft

Main boundary wall work back side of BSNL office

Retaing wall work near switchyard/main road side

Reinforcement fixing in chimney unit # 02

Reinforcement fixing in chimney unit # 01

Batching plant set up M/s Bhavani

Dismantling of cooling tower five of old plant

Excavation in Boiler area Unit # 01

Levelling & Grading in Bolier area Unit # 2

Labour rest room, toilet, store of M/sShreeVijaya

Barbending of M/s Bhavani

Main road levelling&Grading back side of chimney

Earth excavation in Boiler unit # 1 area

Reinforcement fixing in chimney unit # 2

Chimney unit # 1 after 4th segment RCC Raft

Excavation in Mill, Bunker, Boiler Unit # 01

Levelling & Grading in Boiler area Unit # 02

Dismantling of cooling tower six of old plant

Reinforcement fixing in Chimney unit # 02

Reinforcement fixing in Chimney unit # 01

Toilet and rest room for labour

Dismantling of cooling tower six of old plant

Earth excavation in mill area Unit # 01

Mould for precast boundary wall preparation

Area stripping in Block- 7 area

Raft footing and column of isolation boundary wall

Batching plant set up of M/s Hayagrev

Raft footing of main boundary wall near labour gate

Area stripping in Block -5 area

Earth work excavation in Boiler Unit # 02 area

Chimney unit # 02

Chimney unit # 01 (1st segment RCC raft)

Reinforcement fixing in chimney unit # 02

Dismantling of cooling tower six of old plant

Levelling and Grading in Boiler unit # 02

Chimney unit # 1 after 3rd segment rafting

Batching plant set up of M/s Bhavani in progress

Earth excavation in Block-5 area

Earth excavation in Mill & Boiler area Unit # 01

Levelling work in construction power substation

Cooling tower five dismantling of old plant

ESP area excavation in Unit # 01

Mill bunker area excavtion of Unit # 01

Batching plant set up of M/s Shree Vijaya

Reinforcement fixing in Chimney unit # 02

Reinforcement fixing in Chimney unit # 01

Earth stripping work in Block 5 area

Hume pipe laying in main road back to chimney area

Levelling and grading in Boiler unit 02

Dismantling of cooling tower six of old plant

Reinforcement fixing in Chimney unit 02

Chimney unit 01 (1st segment RCC Raft)

Raft footingof main boundary wall near labour gate

Reinforcement fixing in Chimney unit 01

Stripping work in Block 7A

Levelling and grading in Boiler unit 02

Curring pond for precast panel

Panel casting mould of main boundarywall Ms Kanwar

Batching plant accessories of Ms shree vijaya

PCC of main boundary wall footing near labour gate

Earth excavation in Boiler unit 01

Ms Bhavani:Excavation work in unit # 01 mill area

Leveling & Grading work in switchyard area

Isolation boundary wall work near service building

Ms Shree Vijaya store and labour guest room work

Barbending & cutting of Chimney unit # 01

Chimney unit # 02: Reinforcement fixing

Chimney unit # 01: Reinforcement fixing

Mill unit #01 area excavation is under progess

M/s Hayagrev:Batching plant installation completed

Chimney Unit # 02: Reinforcement fixing

Chimney Unit # 01 :Reinforcement fixing

Raft footing of main boundary wall

Ms Hayagrev: Installation of batching plant

Unit-1 Chimney reinforcement fixing

Unit-2 Chimney PCC is under progress

Raft footing of isolation boundary wall

Leveling and grading in Boiler area

M/s Hayagrev:Batching Plant setup is under progress

Unit-2 Chimney: PCC is under progress

Unit-1 Chimney : Reinforcement fixing

Unit-1 Chimney: Reinforcement fixing

M/s Hayagrev batching plant set up

Area leveling and Grading in Boiler Area

Unit-2 Chimney: Excavation work is under progress

Unit-1 Chimney: Reinforcement fixing

Footing work of isolation boundary wall

Leveling and Grading in Boiler area

M/s Kanwar Batching plant set up

Chimney unit # 2 Excavation work

Chimney unit # 1 Reinforcement fixing

Unit-1 Chimney Bar bending and cutting

Unit-2 Chimney Excavation work

Leveling and grading in ESP & Boiler area

Unit-1 Chimney : Reinforcement and fixing

M/s Kanwar Batching plant set is under progress

Excavation work in chimney unit # 2

Leveling and Grading in Boiler area

Reinforcement fixing in chimney unit # 1

Footing of isolation boundary wall

Area stripping for isolation boundary wall

M/s Hayagrev : Batching plant installation in progress

Leveling and Grading in Boiler area

Chimney -1 : Cutting bending of RF

Chimney -1 : Reinforcement fixing on PCC

Chimney-1: PCC work completed

Levelling and grading work is in progress

Existing transmission line to be shifted

Excavation work for isolation boundary in progress

Existing power plant of 840 MW capacity

Existing power plant of 840 MW capacity

Area stripping and leveling is in progress

Area stripping work under progress

Land development work under progress

Excavation in Unit-2 chimney

Excavation in Unit-1 chimney

Approach road to construction area

Approach road to chimney

Unit-1 Chimney hard barricading

Chimney 2 Area

Road making

Approach road making

Approach road making

Chimney-1 Excavation

Chimney 2 area excavation

Chimney 1 area excavation

Leveling in Chimney area

Stripping of isolated boundary wall area

Area Stripping

HSE Facilities at site

HSE Facilities at site