Chimney 1 Flue Liner
|
Areal view - Township
|
Areal View - Main Plant
|
Areal View - Main Plant
|
Areal View - CHP Area
|
Areal View - WTP Area
|
Track hopper Unit # 2
|
TG # 2- Pedestals Placed on foundations
|
ST # 3 and ACC Unit # 3 Columns
|
MPH # 1 - LT Switchgear Room
|
MPH # 1 - Battery Room
|
ACC Unit # 1
|
A Row Bus Duct Structures
|
WT - Tunnel 2AB - TP 2A
|
MPH - ACC CIVIL
|
MPH - ACC CIVIL
|
MPH # 2 View from Switchyard
|
Side Cladding started at Gable End MPH # 1
|
ACC Column Top Deck Structure Erection
|
STG # 1 Unit # 1
|
TD BFP FOUNDATIONS UNIT # 2
|
Boiler & Main Power House Unit # 1
|
Boiler Unit # 1
|
Bunker Unit # 1
|
Boiler Unit # 1
|
FA Main Silo Structure erection under progress
|
LDO Pump House
|
Dyke Wall around Fuel Oil Tanks
|
DM Tank 1 & 2
|
CHP Conv 6AB GR 2
|
PR 1 Erection U/p
|
PR 1 Erection U/p
|
Flue Can Erection in Chimney # 1
|
Boiler Unit2
|
Boiler Unit1
|
Bunker Hopper erection Unit # 1
|
CHP Tunnel 3AB
|
CHP Conv 8AB (TP 6 to Tp 7)
|
Track Hopper 02 - Segment 02
|
CHP Conv 6AB GR 1
|
Ash Silo Road WBM
|
Lower Boiler Drum erection
|
ACC Unit 1-3
|
ACC Unit 1-3
|
ACC Unit 1-3
|
ACC Unit 1-3
|
Boiler Unit-3
|
Boiler Unit-3
|
Boiler Unit-2
|
Boiler Unit-2
|
Boiler Unit-1
|
Boiler Unit-1
|
ESP Unit-3
|
ESP Unit-3
|
ESP Unit-2 Intlet
|
ESP Unit-2
|
ESP Unit-2
|
ESP Unit-2
|
ESP Unit-1 Inlet
|
ESP Unit-1 Outlet and Chimney Duct support
|
ESP Unit-1 Outlet and Chimney Duct support
|
Fire Water Pump House
|
TP 3 and Conv 3AB
|
Crusher House & TP-3 Area
|
STG # 1 Unit # 1
|
ACC-1 Grid AA/A8 pylon slipform erection work u/p
|
ACC-2 grid B2/AA raft bar binding u/p
|
Boiler U-1 DHT Completed Successfully on 29.03.23
|
TG Box up of Unit-1
|
MPH Unit-1 A ROW SIDE
|
Hot Box Erection U-1
|
Condensate Storage Tanks
|
MPH Unit-1 Turbine Erection
|
MPH Unit-1 Turbine Erection
|
MPH Unit-1 Turbine Erection
|
Bunker and Mill Structure Unit-1
|
ESP Unit-2 & 3 Intlet
|
ESP Unit-1 Inlet
|
ACC Unit-1
|
ACC Unit-1
|
ACC Unit-1
|
MPH Unit-1 9.0M EL
|
MPH Unit-1 9.0M EL
|
MPH Unit-1 9.0M EL
|
LPH-1
|
Control room
|
Control room
|
Boiler Unit-2
|
Boiler Unit-2
|
ACC Unit-3
|
ACC Unit-3
|
MPH Unit-2 Structure erection
|
MPH Unit-3 Structure erection
|
Boiler Unit-3
|
Township
|
View of Main Plant from Water System Area
|
View of Main Plant from Switch Yard
|
Track Hopper & Wagon Tippler Top View
|
Tunnel 3AB
|
Lifting of Stator Unit-1
|
Lifting of Stator Unit-1
|
Lifting of Stator Unit-1
|
ESP Unit-1 Outlet and Chimney Duct support
|
ESP Unit-1 Outlet and Chimney Duct support
|
ESP Unit-1 Outlet and Chimney Duct support
|
ESP Unit-2 and 3 Intlet
|
ESP Unit-1 Inlet
|
MPH Unit-3 Structure Erection
|
Hot Box Erection
|
MPH Unit-2 Structure erection
|
MPH Unit-3 Structure Erection
|
Control room
|
Compressor House
|
Condensate Storage Tanks
|
Fly Ash Intermediate Silo
|
ACC Unit-1
|
ACC Unit-1
|
ACC Unit-3
|
TP-5
|
Boiler Unit-3
|
Boiler Unit-2
|
Boiler Unit-2
|
Boiler Unit-2
|
Boiler Unit-1
|
Boiler Unit-1
|
CHP Conv 5 AB
|
CHP Conv 6 AB
|
CHP TP # 3
|
CHP Conv 3 AB
|
Main Plant View
|
Main Township
|
Limestone slurry storage tank- Ist lift Ring wall R/f
|
Track Hopper 2 Segment 1 Hopper R/f
|
Track Hopper 2 Segment 1 Hopper R/f
|
Excavation of Make Up Water pipeline
|
Tunnel 3AB
|
Wagon Tippler
|
Bird Eye View of Project
|
Bird Eye View of Project
|
Bird Eye View of Project
|
Bird Eye View of Project
|
Bird Eye View of Project
|
Bird Eye View of Project
|
Plant view
|
View from A Row Side
|
MPH Unit-2 Structure erection
|
MPH Unit-1 side cladding u/p
|
MPH Unit-3
|
ACC Unit-3
|
ACC Unit-3
|
MPH Unit-2 Structure Erection
|
ESP Hooper erection u/p
|
MPH Unit-1
|
Condensate Storage Tank
|
9Mtr Cable tray work u/p Unit-1
|
9Mtr Cable tray work u/p Unit-1
|
Hot Box Erection
|
Hot Box Erection
|
Hot Box Erection
|
TP-5 Erection
|
ACC Column Fdn.
|
ACC Column Fdn.
|
ESP Unit-3
|
ESP Unit-3
|
ESP Unit-3
|
ESP Unit-2 Inlet
|
ESP Unit-2 Outlet
|
ESP Unit-2 Outlet
|
ESP Unit-1 Inlet
|
ESP Unit-1 Outlet
|
Boiler Unit-3
|
Boiler Unit-3
|
Boiler Unit-3
|
Boiler Unit-2
|
Boiler Unit-2
|
Boiler Unit-2
|
Boiler Unit-2
|
Boiler Unit-1
|
Boiler Unit-1
|
FD & PA FAN Motor Erected Unit-1
|
Crusher House, TP-3 and Conv-3A/B Structure Erec.
|
TP-7
|
MPH Unit-1 BC Bay EL.18.0M
|
MPH-1 9.0M EL
|
ACC-1
|
MPH Unit-3
|
MPH Unit-2
|
MPH Unit-2
|
MPH Unit-1
|
MPH Unit-1
|
TD-BFP Foundation U-1
|
TD-BFP Foundation U-1
|
Control room
|
Boiler Unit-3
|
Boiler Unit-3
|
Boiler Unit-2
|
Boiler Unit-2
|
Boiler Unit-1
|
Boiler Unit-1
|
Boiler Unit-1
|
AHP Compressor House-1
|
TG Floor U-1
|
TG Floor U-1
|
TG Floor U-1
|
ACC Column Fdn.
|
ACC Column Fdn.
|
ACC Column Fdn.
|
Boiler Unit-1
|
Boiler Unit-2 Pressure parts Erection
|
Boiler Unit-2 Pressure parts Erection
|
Boiler Unit-2 Pressure parts Erection
|
Boiler Unit-2 Pressure parts Erection
|
Boiler Unit-2 Pressure parts Erection
|
Boiler Unit-2 Pressure parts Erection
|
Boiler Unit-2 Pressure parts Erection
|
MPH Unit-3
|
Boiler Unit-3
|
TP-3 & Convy 3a/b
|
TP-3 & Crusher House
|
TH & Wagon Tripler Area
|
BOP & WT Area
|
Switch Yard
|
BTG Area
|
Conveyor 3A/B Structure Erection
|
Conveyor 3A/B Structure Erection
|
Crusher House - Structure Erection
|
TP-3
|
Wagon Tippler
|
Wagon Tippler
|
Boundary wall work in progress
|
Fly Ash and Bottom Ash Silo
|
Fly Ash and Bottom Ash Silo
|
Fly Ash and Bottom Ash Silo
|
Fly Ash and Bottom Ash Silo
|
Fly Ash and Bottom Ash Silo
|
Chimney-3
|
TG Deck Unit-3
|
Boiler Unit-2 Pressure parts Erection
|
Boiler Unit-2 Pressure parts Erection
|
Boiler Unit-2 Pressure parts Erection
|
Boiler Unit-2 Pressure parts Erection
|
UNit-3 Bunker to Chimney
|
Boiler Unit-3
|
Boiler Unit-3
|
ESP Unit-2 Intlet
|
Bunker and Mill Structure Unit-2
|
Bunker and Mill Structure Unit-3
|
FGD Absorber
|
ESP Unit-2 Outlet
|
AHP MCC-4 cum Control Room
|
AHP Compressor House-1
|
Owner`s Office
|
Owner`s Office
|
Fire MCC Room
|
Fire Water Storage Tank
|
Chemical House
|
Thickner
|
PT Clarifier
|
DM Storage Tank
|
Integrated Building BOP Area
|
Cascade Aerator
|
TP-4 Structure Erection
|
Stars CRB plaster almost complete
|
Line side equipment completed
|
Line side equipment completed
|
Line side equipment completed lot1
|
Line side equipment completed lot1
|
ESP Unit-1 Outlet and Chimney Duct support
|
MPH Unit-1 BC Bay
|
ESP Unit-2 Outlet
|
MPH Unit-2 Structure erection
|
Bunker and ESP Unit-2
|
Bunker to ESP Unit-3
|
Boiler Unit-3
|
TG Deck Unit-3 R/F
|
Boiler Unit-2 Pressure parts
|
Boiler Unit-2 Pressure parts
|
Boiler Unit-2 Pressure parts
|
Boiler Unit-2 Pressure parts
|
CHP MCC-4
|
Conveyor 6A/B and TP-4 Structure Erection
|
Auxiliary Cooling Tower
|
DM TANK-3
|
Gravity filter House - PT plant area
|
Thickner
|
DM Clarifier
|
Integrated Building BOP Area
|
Back filling work - Clarified Water Tank
|
PT Clarifier
|
Cascade Aerator
|
TDBFP-B Unit1 r/f U/p
|
CHP MCC-2
|
Fly Ash Silo
|
Bottom Ash Silo
|
Bottom Ash Silo
|
Conveyor 6A/B Structure Erection
|
CHP MCC-4
|
Conveyor 6A/B and TP-4 Structure Erection
|
Track Hopper Area
|
Track Hopper Area
|
Limestone Hopper
|
Limestone Hopper
|
Wagon Tippler
|
Wagon Tippler
|
Clarified Water Tank
|
DM Clarifier
|
Gravity filter House - PT plant area
|
Gravity filter House - PT plant area
|
Gravity filter House - PT plant area
|
Integrated Building BOP Area
|
PT Clarifier
|
Cascade Aerator
|
MCC & IO ROOMS
|
MCC & IO ROOMS
|
DM Plant Tank and Structure Erection
|
DM Plant Tank and Structure Erection
|
Construction of Road - BOP Area
|
Construction of Road - BOP Area
|
Fire Water Pump House
|
Aux. Boiler Area
|
Fire Water Storage Tank
|
Boiler Unit-3
|
Boiler Unit-3
|
AHP MCC-3
|
ESP Unit-2 Outlet
|
ESP Unit-2 Intlet
|
BA TP-2 Structure Erection
|
Service Building
|
Compressor House
|
Unit-1 Bunker to Chimney
|
Unit-2 Bunker to Chimney
|
TP-5 Erection
|
FD & PA FAN foundation Unit-2
|
Boiler Unit-2 Pressure parts
|
Boiler Unit-2
|
Chimney-3
|
Chimney-2
|
TG Deck Unit-3 R/F
|
TG Deck Unit-2
|
Control room Unit-1
|
Boiler Unit-1 Pressure parts Erection
|
Boiler Unit-1 Pressure parts Erection
|
Boiler Unit-1 Pressure parts Erection
|
Boiler Unit-1 Pressure parts Erection
|
Boiler Unit-1 Pressure parts Erection
|
CHP MCC-3
|
Conveyor 3A/B Structure Erection
|
Limestone Hopper
|
Wagon Tippler
|
Wagon Tippler
|
CHP MCC-2
|
CHP MCC-2
|
Excavation of Tunnel 3A/B
|
Excavation of TP-1A and 1B
|
Fly Ash Silo
|
Bottom Ash Silo
|
CHP MCC-1
|
CHP MCC-1
|
Track Hopper Area
|
Track Hopper Area
|
Track Hopper Area
|
Track Hopper Area
|
Track Hopper Area
|
DM Plant Tank and Structure Erection
|
DM Plant Tank and Structure Erection
|
DM Plant Tank tank Structure Erection
|
Bunker and Mill Structure Unit-3
|
FD & PA FAN foundation Unit-2
|
DM Cascade Aerator
|
Cascade Aerator
|
DM Clarifier
|
PT Clarifier
|
Plant view
|
Gravity filter House - PT plant area
|
Gravity filter House - PT plant area
|
DM Plant Tank Erection
|
Construction of Road - BOP Area
|
DM Storage Tank-2
|
Integrated Building BOP Area
|
Integrated Building BOP Area
|
Conveyor 6A/B Structure Erection
|
CHP MCC-4
|
TP-4 Structure Erection
|
Track Hopper Area
|
Excavation of Tunnel 3A/B
|
Fly Ash Silo
|
Track Hopper Area
|
Wagon Tippler
|
Limestone Hopper
|
Construction Store
|
Gravity filter House - PT plant area
|
Gravity filter House - PT plant area
|
Cascade Aerator
|
DM Clarifier
|
PT Clarifier
|
Integrated Building BOP Area
|
DM Storage Tank-3
|
DM Storage Tank-2
|
MCC and IO ROOMS
|
DM Plant Tank Erection
|
DM Plant Tank Erection
|
Auxiliary Cooling Tower
|
Owner`s Office
|
Owner`s Office
|
Fire MCC Room
|
Fire Water Pump House
|
Fire Water Storage Tank
|
Auxiliary Boiler Area
|
BA TP-2 Structure Erection
|
TG Deck casting in progress Unit-2
|
TG Deck casting in progress Unit-2
|
CMG-7 erection Boiler Unit-3
|
Owner`s Officee
|
Owner`s Office
|
Conveyor 3A/B Structure Erection
|
Limestone Hopper
|
Limestone Hopper
|
FOPH
|
CHP MCC-1
|
Fly Ash Silo
|
Fly Ash Silo
|
Bottom Ash Silo
|
Bottom Ash Silo
|
Excavation of TP-1A & 1B
|
CHP MCC-2
|
Excavation of Tunnel 3A/B
|
Track Hopper Area
|
Track Hopper Area
|
Wagon Tippler
|
15th tower in switchyard in progress
|
AHP MCC-3
|
MPH Unit-1 BC Bay Structure Erection
|
Construction Store
|
Conveyor 8A/B Foundation
|
Stacker and Reclaimer-2 Area
|
Stacker and Reclaimer-1 foundation
|
Crusher House - Structure Erection
|
Crusher House
|
Excavation of TP-1A and 1B
|
Track Hopper Area
|
CHP MCC-3
|
TP-3
|
Conveyor 3A/B Structure Erection
|
FOPH area
|
Limestone Hopper
|
TG Deck Unit-2 Reinforcement
|
BC Bay MPH Unit-1
|
MPH Unit-1
|
Service Building
|
Dismantling of TG Deck Stagging Unit-1
|
Dismantling of TG Deck Stagging Unit-1
|
Boiler Unit-1 Pressure parts Erection
|
Boiler Unit-1 Pressure parts Erection
|
Mill Erection Unit-1
|
FD and PA FAN foundation Unit-2
|
Boiler Unit-2
|
Boiler Unit-2 Pressure parts Erection
|
Stagging of TG Deck Unit-3
|
Tower no 13 completed in switchyard
|
Switchyard line gantry erected.
|
Bunker and Mill Structure Unit-3
|
Boiler Unit-3
|
Boiler Unit-3
|
Slipform Erection Chimney-3
|
ESP Unit-2 Control room
|
Chimney-2
|
ESP Unit-2 Outlet
|
Construction of Road - BOP Area
|
Conveyor 6A/B Foundation
|
CHP MCC-4
|
TP-4 Structure Erection
|
Pipe Cum Cable Trestle Foundation
|
12th tower lant side in syard completed
|
Fire MCC Room
|
Auxiliary Cooling Tower
|
Auxiliary Cooling Tower
|
Back filling work - MCC Room BOP area
|
Gravity filter House - PT plant area
|
Gravity filter House - PT plant area
|
PT Clarifier
|
DM Clarifier
|
DM Storage Tank-3
|
DM Storage Tank-2
|
DM Storage Tank-1
|
Owner Office
|
Owner Office
|
Owner Office
|
Owner Office
|
FD and PA FAN foundation Unit-2
|
TG Deck Unit-2 R/F
|
TP-5 Erection
|
ESP Unit-2
|
Bunker Unit-1 Ring Beam Erection
|
Boiler Unit-1 Pressure parts
|
Boiler Unit-1 Pressure parts
|
Boiler Unit-1 Pressure parts
|
Boiler Unit-1 Pressure parts
|
Unit-2 Bunker to Chimney
|
Metal Decking MPH Unit-1
|
Metal Decking MPH Unit-1
|
Boiler Unit-2 Pressure parts
|
Boiler Unit-2 Pressure parts
|
ESP Unit-2 Intlet
|
ESP Unit-3
|
MPH Unit-3
|
Boiler Unit-3
|
Boiler Unit-3
|
Bunker and Mill Structure Unit-3
|
Limestone Hopper foundation
|
LDO Tanks
|
Excavation of Tunnel 3A/B
|
CHP MCC-2
|
CHP MCC-2
|
Wagon Tippler
|
Wagon Tippler
|
Track Hopper
|
Track Hopper Area
|
Track Hopper Area
|
Bottom Ash Silo
|
Bottom Ash Silo
|
FOPH
|
Limestone Crusher House
|
Conveyor 3A/B Structure Erection
|
CHP MCC-3
|
CHP MCC-3
|
TP-3 Structure
|
Trestle Foundation
|
Trestle Foundation
|
Stacker and Reclaimer foundation
|
Unit-3 Bunker Structure and ESP
|
Gravity filter House - PT plant area
|
Auxiliary Cooling Tower
|
Auxiliary Cooling Tower
|
Nineth Gntry tower in GIS switchyard in progress.
|
Boundary Work in progress
|
Clarified Water Tank
|
Pipe Rack Foundation
|
DM Water Tank
|
Thickner
|
DM Cascade Aerator
|
DM Clarifier
|
Reactor Clarifier-2
|
Reactor Clarifier-1
|
Chimney-2
|
MPH Unit-2
|
MPH Unit-1
|
Metal Decking MPH Unit-1
|
MPH Unit-1
|
FD Fan Unit-1
|
Boiler Unit-1 Pressure parts
|
FD & PA FAN Unit-2
|
Switchyard line side towers completed
|
Switchyard Bus reactor wall in progress
|
TG Deck Unit-2
|
MPH Unit-3
|
Boiler-3
|
Chimney-3
|
Boiler-2 Pressure Parts
|
Boiler-2 Pressure Parts
|
Boiler-3
|
Boiler-3
|
ESP Unit-3
|
ESP Unit-3
|
Bunker and Mill Structure Unit-3
|
Mill Area
|
Bunker and Mill Structure Unit-1
|
Bunker and Mill Structure Unit-2
|
ESP Unit-1
|
ESP Unit-1
|
ESP Unit-2 Intlet
|
ESP Unit-2 Outlet
|
Aerial view from Bunker to Chimney (Unit-1)
|
Aerial view from Bunker to Chimney (Unit-2)
|
Boiler-1 Pressure parts
|
TP-5
|
Boiler-2
|
FD Fan Unit-1
|
Mill Area
|
Bunker-2 and BA TP-2 Structure
|
Bunker Structure
|
ESP-2 Outlet
|
ESP to Chimney Duct support
|
Boundary Work in progress
|
Cascade Aerator
|
Reactor Clarifier
|
Auxiliary Cooling Tower
|
Fire Water Pump House
|
Fire Water Storage Tank
|
CHP MCC-3
|
Crusher House area
|
TP-3 area
|
Conveyor 3A/B Structure Erection
|
FOPH area
|
Dismantling of Old Oil Tank
|
Track Hopper-2
|
Track Hopper-2
|
Fly Ash Silo area
|
Bottom Ash Silo area
|
Excavation of Wagon Tippler
|
CHP MCC-2
|
Excavation of Tunnel 3A/B
|
Excavation of Wagon Tippler
|
Track Hopper-1
|
Track Hopper-1
|
HFO Tank-2
|
HFO Tank-1
|
LDO Tanks
|
Limestone Hopper foundation
|
Switchyard line side Drain works in progress
|
Switchyard line side final lift backfilling in progress
|
Chimney-2
|
Chimney-1
|
Seven Gantry tower in GIS switchyard in progress.
|
Stacker and Reclaimer foundation
|
GIS building ready for start of works.
|
Bus Reactor wall works in progress
|
Sixth Gantry tower in GIS switchyard in progress.
|
TP-4
|
Fire Water Pump House & FW Tank
|
Owners Office
|
Owners Office
|
Levelling & Grading
|
Gravity Filter House -PT Plant Area
|
Switchyard Control Room Building
|
Switchyard Tower and Equipment Erection Line Side
|
Switchyard Equipment Foundation plant side
|
GIS Building Plant side View
|
Acid & Alkali Storage Tank
|
DM Water Tanks
|
DM Water Tanks
|
DM Water Tanks
|
Clarified Water Tank
|
PT Clarifier
|
PT Clarifier
|
PT Clarifier
|
Boiler1 Pressure Parts
|
Boiler1 Pressure Parts
|
Boiler1 Pressure Parts
|
Boiler1 Pressure Parts
|
Boiler1 Pressure Parts
|
Boiler1 Pressure Parts
|
Boiler1 Pressure Parts
|
Boiler1 Pressure Parts
|
Boiler1 Pressure Parts
|
Boiler1 Pressure Parts
|
Boiler1 Pressure Parts
|
Boiler1 Pressure Parts
|
Approach Between ESP 1 and ESP 2
|
Unit-2 FGD Duct Foundations
|
PT Cascade Aerator
|
Main Power House-3 TG Columns
|
Auxiliary Cooling Tower
|
FGD Unit#1
|
ID Fan-1A Deck
|
ESP#1 CR foundation
|
ESP#1
|
ESP#2 Control Room
|
BOF to ESP Unit#2-Duct foundation
|
ESP#2 foundation -Pass E&F
|
ESP#3 Area L&G
|
Boiler#3 foundation
|
MPH3 foundation
|
MPH3 foundation
|
MPH1 Structure Erection Status
|
MPH2 foundation
|
Control Room 1 foundation
|
Boiler#2
|
Mill-H Unit1
|
Unit1 to Unit2 Bunker Structure
|
Boiler#2
|
PH Unit # 2 Foundation
|
PH Unit # 1 Foundations
|
PH Unit # 1 Foundations
|
PA & FD Fan Unit 2 (Right)
|
Mill J of Unit # 1
|
FD & PA Unit 1 (left)
|
FD & PA Unit 1 (Right)
|
ESP Unit # 2
|
ESP Unit # 1
|
Control Room Raft & Bunker Unit # 1
|
Chimney Unit # 1 & 2
|
Bunker Foundation Unit # 3
|
Bunker Unit # 2
|
Boiler Unit # 3 Foundation
|
Boiler Unit # 2
|
Boiler U # 1
|
Switch Yard
|
Chimney#2
|
Chimney#1
|
Wagon Tippler Area
|
Track Hopper Area
|
Power House #3 Over all view
|
Power House #3 Over all view
|
Boiler#3
|
Boiler#3
|
Boiler#3
|
Boiler#3
|
Power House #2 Over all view
|
Power House #2 Over all view
|
Power House #2 Over all view
|
Power House #2 Over all view
|
Power House #2 Over all view
|
ESP#2
|
ESP#2
|
ESP#2
|
Boiler#2
|
Power House #1 Over all view
|
Power House #1 Over all view
|
Power House #1 Over all view
|
Power House #1 Over all view
|
ESP#1 Duct Outlet foundation
|
ESP#1 Duct Outlet foundation
|
ESP#1 Duct Outlet foundation
|
ESP#1 Duct Outlet foundation
|
ESP#1 Duct Outlet foundation
|
Bunker Bay Unit#1
|
ESP#1
|
ESP#1
|
ESP#1
|
Boiler#1
|
Boiler#1
|
CMD & DP Review at Unit#2
|
CMD & DP Review at Unit#1
|
CMD Review Meeting
|
Power House #2 Over all view
|
Power House #2 Over all view
|
Power House #2 Over all view
|
Power House #2 Over all view
|
Power House #2 Over all view
|
Power House #2 Over all view
|
Power House #1 Over all view
|
Power House #1 Over all view
|
Power House #1 Over all view
|
ESP#2 foundation
|
ESP#2 foundation
|
ESP#2 foundation
|
ESP#2 foundation
|
ESP#2 foundation
|
ESP#2 foundation
|
ESP#1 foundation
|
ESP#1 foundation
|
ESP#1 foundation
|
ESP#1 foundation
|
ESP#1 foundation
|
Boiler#1 Area
|
Boiler#1 Area
|
Boiler#1 Area
|
Boiler#1 Area
|
FD-2A & PA-2A foundation status
|
FD-2A & PA-2A foundation status
|
Power House #3 Over all view
|
Power House #3 Over all view
|
Power House #3 Over all view
|
Power House #3 Over all view
|
Power House #3 Over all view
|
Power House #3 Over all view
|
Power House #3 Over all view
|
Power House #2 Over all view
|
Power House #2 Over all view
|
Power House #2 Over all view
|
Power House #2 Over all view
|
Power House #2 Over all view
|
Power House #1 Over all view
|
Power House #1 Over all view
|
Power House #1 Over all view
|
Power House #1 Over all view
|
Power House #1 Over all view
|
Owners Office
|
Owners Office
|
Boiler#1
|
Fire Station Building
|
Fire Station Building
|
Fire Station Building
|
Fire Station Building
|
ESP#2 foundation
|
ESP#2 foundation
|
ESP#2 foundation
|
ESP#2 foundation
|
ESP#2 foundation
|
ESP#2 foundation
|
ESP#2 foundation
|
ESP#1 foundation
|
ESP#1 foundation
|
ESP#1 foundation
|
ESP outlet to ID Fan Area Unit#1
|
ESP outlet to ID Fan Area Unit#1
|
ESP outlet to ID Fan Area Unit#1
|
ESP outlet to ID Fan Area Unit#1
|
ESP outlet to ID Fan Area Unit#1
|
Chimney#2
|
Chimney#1
|
Bunker & Mill Bay Unit#2
|
Boiler#2 foundation
|
Boiler#3
|
Boiler#3
|
Boiler#3
|
AHP Compressor House#1
|
AHP Compressor House#1
|
AHP Compressor House#1
|
Power House #3 Over all view
|
Power House #3 Over all view
|
Power House #3 Over all view
|
Power House #2 Over all view
|
Power House #2 Over all view
|
Power House #2 Over all view
|
Power House #1 Over all view
|
Power House #1 Over all view
|
Power House #1 Over all view
|
Power House #1 Over all view
|
ID Fan-1B Raft Status
|
ESP#2 foundation
|
ESP#2 foundation
|
ESP#2 foundation
|
ESP#2 foundation
|
ESP#2 foundation
|
ESP#1 foundation
|
ESP#1 to Boiler#1 Over all view
|
Chimney#2
|
Chimney#1
|
Bunker &Mill Bay Unit#2
|
BOF to ESP Unit#2
|
Boiler#3 foundation
|
Boiler#3 foundation
|
Boiler#1
|
Storage Yard
|
Storage Yard
|
Storage Yard
|
Storage Yard
|
Storage Yard
|
Storage Yard
|
Storage Yard
|
Storage Yard
|
Storage Yard
|
Storage Yard
|
Storage Yard
|
Storage Yard
|
Storage Yard
|
Storage Yard
|
SRC & Bunker#2 foundation
|
Power House #1 Over all view
|
Power House #1 BC Bay foundation
|
Power House #2 Excavation in Progress
|
ESP#1 Duct Outlet foundation
|
ESP#1 foundation
|
ESP#2 foundation
|
Chimney#2
|
Chimney#1
|
Bunker Bay Unit#1
|
Boiler#3
|
NTPC Township Area Raft Casting in Progress
|
NTPC Township Area Raft Casting in Progress
|
NTPC Township Area Raft Casting in Progress
|
NTPC Township Area Raft Casting in Progress
|
NTPC Township Area Raft Casting in Progress
|
NTPC Township Area Raft Casting in Progress
|
NTPC Township Area Raft Casting in Progress
|
NTPC Township Area Raft Casting in Progress
|
NTPC Township Area Raft Casting in Progress
|
NTPC Township Area Raft Casting in Progress
|
NTPC Township Area Raft Casting in Progress
|
NTPC Township Area Raft Casting in Progress
|
NTPC Township Area Raft Casting in Progress
|
NTPC Township Area Raft Casting in Progress
|
NTPC Township Area Raft Casting in Progress
|
NTPC Township Area Raft Casting in Progress
|
NTPC Township Area Raft Casting in Progress
|
NTPC Township Area Raft Casting in Progress
|
NTPC Township Area Raft Casting in Progress
|
NTPC Township Area Raft Casting in Progress
|
TP-02 Foundation works
|
Power House Unit # 2
|
PH Unit # 1 Foundations
|
PA & FD Fan Foundations Unit # 1
|
Excavation of Control Room Unit # 1
|
ESP Unit # 2 Pass D
|
ESP Unit # 1 Foundations
|
ESP to Chimney Duct Foundation Unit # 1
|
Boiler Unit # 3 Foundations
|
Boiler Unit # 2 Foundations
|
Boiler Unit # 1
|
Boiler Unit # 1 Tier 2 Erection
|
Township D3
|
Township D1
|
Power House Unit # 2 Excavation
|
Mill Foundation Works Unit # 2
|
ESP Unit # 2 Pass A
|
ESP Pass A Unit # 1
|
Boiler Unit # 3 Foundation
|
Boiler Unit # 2 Foundation
|
Boiler Erection U # 1 and PA & FD Fan Foundation
|
PH # 1
|
Unit # 1 Mill Reinforcement Works U/p
|
PA & FD Fan Fdn (LHS) U # 1 and Chimney U # 1
|
ESP to Chimney Duct Fdn U # 1
|
ESP Pass B U # 2
|
ESP U # 1 Pass A
|
Chimney # 2
|
CF7 reinforcement in Unit #1
|
Bunker fdn U # 2
|
Boiler Fdn of U # 2 Completed and backfilling U/p
|
Boiler Erection U # 1
|
Boiler to ESP Duct Fdn U # 1
|
ESP # 2 r/f
|
ESP # 1 Pass C r/f
|
TG U # 1 Raft r/f
|
Chimney # 1 attained 18.8 Mtr Ht
|
Leveling Grading in Boiler U# 3 area
|
Leveling Grading in Block 7 B
|
Crane Marched to Boiler # 1 Cavity
|
Power House Foundation of Unit # 1 under progress
|
TG Raft of Unit #1 reinforcement works U/p
|
Poer House CF 7 Excavation of Unit #1
|
B/w at Bavandhara Area
|
Issolation B/w
|
Dismantling Works of old Wagon Tippler
|
ESP Unit # 2 Foundation Works
|
ESP Unit # 1 Foundation Works U/p
|
80 MT & 250 MT BHEL Cranes
|
Chimney # 2 Slipform erection is U/p
|
Chimney # 1 Backfilling completed
|
Bunker Uinit # 2 Reinforcement U/p
|
Boiler to ESP Duct Fdns of Unit #1
|
Boiler Unit # 1 Civil Fdns Completed
|
Chimney#2
|
SG#2
|
SG#1
|
SG#1
|
ESP#1
|
Chimney#1
|
Retaining wall work near switch yard area
|
Clims shed
|
Earth excavation & reinforcement fixing in PH # 01
|
RCC raft &reinforcement fixing in Boiler Unit #02
|
Sand filling in Boiler Unit # 01
|
Reinforcemnt fixing in Mill Boiler Unit # 01
|
RCC footing of F Pass & reinforcement fixing in ESPUnit # 01
|
Chimney unit # 02 after RCC Raft
|
slip form slipping structure work in Chimney 01
|
Reinforcement fixing in ESP Unit # 01
|
Area stripping under progress in Ash dyke area-2
|
Plinth beam reinforcement in safety park
|
Earth excavation & RCC Raft in PH unit # 01
|
Levelling & grading in Boiler Unit # 03 area
|
Reinforcement fixing in ESP Unit # 01
|
old store of PVUNL area after dismantling
|
Slip form fabrication work for Chimney # 02
|
RCC raft of Chimney Unit # 02
|
RCC raft & reinforcement fixing in Boiler Unit # 2
|
RCC raft & pedestal in Boiler Unit # 01
|
Earth excavation in Block 7B
|
Excavation and reinforcement work in TG unit # 01
|
Dismantling work in wagon tippler 01 area
|
Raft footing work for closed shed
|
Rcc raft & reinforcement fixing in Boiler Unit # 2
|
RCC Raft and pedestal in Bolier Unit # 01
|
Slip for slipping structure work in chimney Unit # 01
|
PCC work in CLIMS/Labour gate area u/p
|
Dismantling work in wagon tippler area 1 & 2
|
Electrical work in Construction power sub station
|
PCC & reinforcement work u/p in Power House # 01
|
Earth excavation & reinforcement work in ESP 01
|
Footing excavation work for closed shed u/p
|
Earth excavation & reinforcement work in Boiler 02
|
Rcc raft work u/p in Boiler Unit # 01
|
Slip form slipping structure work u/p Chimney 01
|
Civil foundation of Way bridge
|
Electrical work in CP sub station area
|
Dismantling work of Wagon tippler 01 & 02 of old plant
|
Footing earth excavation work for covered shed
|
Earth work & reinforcement fixing work in Boiler02
|
Reinforcement fixing work in Boiler unit # 01
|
Reinforcement fixing work in ESP unit # 01
|
Chimney unit # 02 after 7th segment RCC Raft
|
Slip form of slipping structure work of Chimney 01
|
WBM of main Road near ATM
|
Slip form sliping structure work in Chimney 01
|
Reinforcement fixing & PCC in ESP Unit # 01
|
RCC Raft & reinforcement fixing in Boiler Unit #02
|
RCC Raft & reinforcement fixing in Boiler Unit #01
|
Chimney unit # 02 after 5th segment RCC Raft
|
Slip form slipping structure work chimney01 u/p
|
Dismantling of track hopper of old plant
|
Dismantling of old store from 23 to 27
|
Slip form slipping structure erection u/p chimney1
|
Civil work in construction power sub station area
|
Retaining wall work near switch yard area
|
PCC & earth excavation work in TG unit 01 area
|
Rcc Raft & reinforcement fixing in Boiler Unit 01
|
Main boundary wall work in Labour gate area
|
Rcc Raft & earth excavation in Boiler Unit # 02
|
Chimney Unit # 02 after 3 rd segment RCC Raft
|
Slip form erection work in Chimney unit # 01 u/p
|
Shell slip form structure work in Chimney Unit 01
|
RCC footing of Weigh Bridge
|
Isolation boundary work near Chhai gate
|
Earth excavation & reinforcement fixing inESPUnit1
|
Earth excavation & RCC Raft in Boiler Unit # 02
|
RCC raft and reinforcement fixing in Boiler unit 1
|
Chimney unit # 2 after RCC raft of second segment
|
First segment RCC raft of Chimney Unit # 02
|
Erection of central part of slip in Chimney Unit # 01
|
Excavation & Reinforcement fixing in ESP Unit # 01
|
RCC Raft, Reinforcement fixing in Boiler unit # 01
|
Slip form fabrication work for chimney unit # 01
|
Shell work in chimney unit # 01
|
Reinforcement fixing of chimney Unit # 01
|
Raft footing boundary wall M/s Hardev
|
Pre-fabricated panel of MBoundary wall m/s Kanwar
|
PCC, Raft in Boiler Unit # 01
|
Material stacking in Temporary yard area
|
Main road work back side of chimney area
|
Main boundary wall work near labour gate area
|
Earth excavation, PCC in ESP unit # 01
|
Earth excavation in Boiler unit # 02 area
|
Earth excavation in Block-5 area
|
Cooling Tower area after dismantling of all six CT
|
Civil work in construction power sub-station
|
Batching plant set up of M/s Bhavani
|
Dismantling of cooling tower # 01
|
Dismantling of Coveyor no. 26
|
RCC raft & reinforcement fixing Boiler Unit # 01
|
Earth excavation in Boiler unit # 01
|
Area Levelling & Grading in ESP Unit # 03 area
|
Excavation, reinforcement fixing in ESP unit # 01
|
Earth excavation in Boiler unit # 02
|
Reinforcement fixing in Chimney unit # 02
|
Chimney unit # 01 Reinforcement fixing for shell
|
Reinforcement fixing in Mill & Boiler Unit # 01
|
Reinforcement fixing & excavation work in ESP unit # 01
|
Reinforcement fixing in chimney unit # 02 for RCC
|
Reinforcement fixing in chimney unit # 01 for shell
|
Slip form work for chimney unit # 01
|
M/s Bhavani batching plant set up
|
Temporary open storage yard area in Block -5
|
Main boundary wall backside of BSNL office
|
Dismanling of Cooling Tower # 3 & 4 completed.
|
Dismanling of Cooling Tower # 5 & 6 completed.
|
isolation boundary wall near service building
|
Batching plant set up of M/s Shree Vijaya
|
Batching plant and rest room of M/s Bhavani
|
Temporary yard in Block 5 for material storage
|
PCC & Reiforcement laying in ESP unit # 01
|
Reinforcement fixing in Mill area Boiler unit #01
|
Reinforcement fixing in chimney unit # 02
|
Chimney unit # 01 after RCC Raft
|
Chimney unit # 01 after 7th segment RCC raft
|
Reinforcement fixing in Chimney Unit # 02
|
Batching plant set of shree Vijaya
|
Dismantling of cooling tower # 5 of old plant
|
Excavation and PCC in ESP Unit # 01
|
PCC, RCC Raft in Mill Bunker and Boiler Unit # 01
|
Chimney unit # 01 after 6th segment RCC Raft
|
Reinforcement fixing in Chimney Unit # 02
|
Batching plant set up of M/s Shree Vijaya
|
Earth excavation & PCC in ESP Unit # 01
|
Batching plant set up of M/s Bhavani
|
PCC, Excavation, RCC in MillBunker Boiler Unit # 1
|
Levelling & Grading in Boiler Unit # 02 area
|
Reinforcement fixing in Chimney unit # 02
|
Chimney unit # 01 after 5th segment RCC Raft
|
Main boundary wall work back side of BSNL office
|
Retaing wall work near switchyard/main road side
|
Reinforcement fixing in chimney unit # 02
|
Reinforcement fixing in chimney unit # 01
|
Batching plant set up M/s Bhavani
|
Dismantling of cooling tower five of old plant
|
Excavation in Boiler area Unit # 01
|
Levelling & Grading in Bolier area Unit # 2
|
Labour rest room, toilet, store of M/sShreeVijaya
|
Barbending of M/s Bhavani
|
Main road levelling&Grading back side of chimney
|
Earth excavation in Boiler unit # 1 area
|
Reinforcement fixing in chimney unit # 2
|
Chimney unit # 1 after 4th segment RCC Raft
|
Excavation in Mill, Bunker, Boiler Unit # 01
|
Levelling & Grading in Boiler area Unit # 02
|
Dismantling of cooling tower six of old plant
|
Reinforcement fixing in Chimney unit # 02
|
Reinforcement fixing in Chimney unit # 01
|
Toilet and rest room for labour
|
Dismantling of cooling tower six of old plant
|
Earth excavation in mill area Unit # 01
|
Mould for precast boundary wall preparation
|
Area stripping in Block- 7 area
|
Raft footing and column of isolation boundary wall
|
Batching plant set up of M/s Hayagrev
|
Raft footing of main boundary wall near labour gate
|
Area stripping in Block -5 area
|
Earth work excavation in Boiler Unit # 02 area
|
Chimney unit # 02
|
Chimney unit # 01 (1st segment RCC raft)
|
Reinforcement fixing in chimney unit # 02
|
Dismantling of cooling tower six of old plant
|
Levelling and Grading in Boiler unit # 02
|
Chimney unit # 1 after 3rd segment rafting
|
Batching plant set up of M/s Bhavani in progress
|
Earth excavation in Block-5 area
|
Earth excavation in Mill & Boiler area Unit # 01
|
Levelling work in construction power substation
|
Cooling tower five dismantling of old plant
|
ESP area excavation in Unit # 01
|
Mill bunker area excavtion of Unit # 01
|
Batching plant set up of M/s Shree Vijaya
|
Reinforcement fixing in Chimney unit # 02
|
Reinforcement fixing in Chimney unit # 01
|
Earth stripping work in Block 5 area
|
Hume pipe laying in main road back to chimney area
|
Levelling and grading in Boiler unit 02
|
Dismantling of cooling tower six of old plant
|
Reinforcement fixing in Chimney unit 02
|
Chimney unit 01 (1st segment RCC Raft)
|
Raft footingof main boundary wall near labour gate
|
Reinforcement fixing in Chimney unit 01
|
Stripping work in Block 7A
|
Levelling and grading in Boiler unit 02
|
Curring pond for precast panel
|
Panel casting mould of main boundarywall Ms Kanwar
|
Batching plant accessories of Ms shree vijaya
|
PCC of main boundary wall footing near labour gate
|
Earth excavation in Boiler unit 01
|
Ms Bhavani:Excavation work in unit # 01 mill area
|
Leveling & Grading work in switchyard area
|
Isolation boundary wall work near service building
|
Ms Shree Vijaya store and labour guest room work
|
Barbending & cutting of Chimney unit # 01
|
Chimney unit # 02: Reinforcement fixing
|
Chimney unit # 01: Reinforcement fixing
|
Mill unit #01 area excavation is under progess
|
M/s Hayagrev:Batching plant installation completed
|
Chimney Unit # 02: Reinforcement fixing
|
Chimney Unit # 01 :Reinforcement fixing
|
Raft footing of main boundary wall
|
Ms Hayagrev: Installation of batching plant
|
Unit-1 Chimney reinforcement fixing
|
Unit-2 Chimney PCC is under progress
|
Raft footing of isolation boundary wall
|
Leveling and grading in Boiler area
|
M/s Hayagrev:Batching Plant setup is under progress
|
Unit-2 Chimney: PCC is under progress
|
Unit-1 Chimney : Reinforcement fixing
|
Unit-1 Chimney: Reinforcement fixing
|
M/s Hayagrev batching plant set up
|
Area leveling and Grading in Boiler Area
|
Unit-2 Chimney: Excavation work is under progress
|
Unit-1 Chimney: Reinforcement fixing
|
Footing work of isolation boundary wall
|
Leveling and Grading in Boiler area
|
M/s Kanwar Batching plant set up
|
Chimney unit # 2 Excavation work
|
Chimney unit # 1 Reinforcement fixing
|
Unit-1 Chimney Bar bending and cutting
|
Unit-2 Chimney Excavation work
|
Leveling and grading in ESP & Boiler area
|
Unit-1 Chimney : Reinforcement and fixing
|
M/s Kanwar Batching plant set is under progress
|
Excavation work in chimney unit # 2
|
Leveling and Grading in Boiler area
|
Reinforcement fixing in chimney unit # 1
|
Footing of isolation boundary wall
|
Area stripping for isolation boundary wall
|
M/s Hayagrev : Batching plant installation in progress
|
Leveling and Grading in Boiler area
|
Chimney -1 : Cutting bending of RF
|
Chimney -1 : Reinforcement fixing on PCC
|
Chimney-1: PCC work completed
|
Levelling and grading work is in progress
|
Existing transmission line to be shifted
|
Excavation work for isolation boundary in progress
|
Existing power plant of 840 MW capacity
|
Existing power plant of 840 MW capacity
|
Area stripping and leveling is in progress
|
Area stripping work under progress
|
Land development work under progress
|
Excavation in Unit-2 chimney
|
Excavation in Unit-1 chimney
|
Approach road to construction area
|
Approach road to chimney
|
Unit-1 Chimney hard barricading
|
Chimney 2 Area
|
Road making
|
Approach road making
|
Approach road making
|
Chimney-1 Excavation
|
Chimney 2 area excavation
|
Chimney 1 area excavation
|
Leveling in Chimney area
|
Stripping of isolated boundary wall area
|
Area Stripping
|
HSE Facilities at site
|
HSE Facilities at site
|