SCR Last Duct Erection completed
|
SCR Last Duct Erection completed
|
Work Progress of ETP and STP area
|
Work Progress of ETP and STP area
|
FGD Wet Ball Mill Wall Concrete Pouring Work in pr
|
Turbine Insulaion in Progress
|
Turbine Insulaion in Progress
|
Turbine Insulaion in Progress
|
Turbine Insulaion in Progress
|
Turbine Insulaion in Progress
|
Wagon Tippler area
|
Wagon Tippler area
|
Wagon Tippler area
|
Wagon Tippler area
|
Clarified Water PH Painting work in progress
|
CW pump House Building painting work in progress
|
PT Plant Garvity Filter Painting work in progress
|
ETP and STP Civil works
|
ETP and STP Civil works
|
Bird`s-eye view of 1x660MW Bhusawal Site
|
Bird`s-eye view of 1x660MW Bhusawal Site
|
Bird`s-eye view of 1x660MW Bhusawal Site
|
Bird`s-eye view of 1x660MW Bhusawal Site
|
Bird`s-eye view of 1x660MW Bhusawal Site
|
Bird`s-eye view of 1x660MW Bhusawal Site
|
Steam Blowing in progress
|
MPH and Boiler RHS view
|
MPH and Boiler RHS view
|
MPH and Boiler RHS view
|
MPH and Boiler RHS view
|
MPH and Boiler RHS view
|
MPH and Boiler RHS view
|
FGD Control Room Civil Work in progress
|
Site Visit of GM (I) Sir on 29082023
|
Site Visit of GM (I) Sir on 29082023
|
Site Visit of GM (I) Sir on 29082023
|
Erection of SCR Rectifier in progress
|
Erection of last Gallery of BCN6AB i/p
|
Boiler RHS Gallery 6A/B Erection i p
|
SCR Erection ip
|
FGD Absorber Tank
|
WT 1 and WT2
|
MCC 2
|
MCC 2
|
Crusher House
|
SCR L1 erection u/p
|
FGD Area
|
TG Floor Crossover Piping ip
|
TG Floor Crossover Piping ip
|
CRH AND HRH PIPING
|
Chimney Inner Painting for Borosilicate in progres
|
Chimney Inner Painting for Borosilicate in progres
|
Crossaround pipe erection and Turbine centering ip
|
SCR L2 Module erection in progress
|
SCR Reactor L3 erection in progress.
|
ETP and STP Civil works
|
ETP and STP Civil works
|
Boiler RHS Gallery 6A/B Erection i p
|
AHP Compressor house
|
ACW pump
|
CW pump Erection ip
|
CW pump Erection ip
|
FOPPH
|
FOPPH
|
HCSD SILO
|
HCSD SILO
|
Crusher House
|
MPH
|
Wagon Tippler Erection ip
|
WT2
|
Wagon Tippler Erection ip
|
DMCW Pumps
|
Turbile Pedestal Lube Oil flushing in progress
|
MOT room -
|
DMCW Pumps
|
Turbile Pedestal Lube Oil flushing in progress
|
Turbile Pedestal Lube Oil flushing in progress
|
Engineering Room Readiness
|
Engineering Room Readiness
|
NDCT FRP BEAM ERECTION STARTED
|
BOILER RHS
|
APH ERECTION
|
BOILER RHS AND APH ERECTION
|
BOILER RHS AND APH ERECTION
|
BOILER RHS AND APH ERECTION
|
Boiler Coal Piping work ip
|
LPT
|
LPT
|
MS Line To MS ESV Final Joint ip
|
MS Line To MS ESV Final Joint ip
|
MS Line To MS ESV Final Joint ip
|
MS Line To MS ESV Final Joint ip
|
MS Line To MS ESV Final Joint ip
|
DG Erection in DG Building Progress
|
DG Erection in DG Building Progress
|
DG Erection in DG Building Progress
|
Bird`s-eye view of 1x660MW Bhusawal Site
|
Bird`s-eye view of 1x660MW Bhusawal Site
|
Bird`s-eye view of 1x660MW Bhusawal Site
|
Bird`s-eye view of 1x660MW Bhusawal Site
|
Bird`s-eye view of 1x660MW Bhusawal Site
|
Mills LHS
|
APH
|
Hotwell Makeup PH
|
Hotwell Makeup PH
|
PT Plant Gravity filter
|
CW pump House Building
|
CW pump House Building
|
Mill RHS
|
ASH Slurry Pump House Pump Erection in progress
|
ASH Slurry Pump House Pump Erection in progress
|
CPU Acid and Alkaline Tank Placement
|
Plant Control Room
|
Plant Control Room
|
Ozone Generation Building
|
MCC-2 Panel Erection ip
|
Wagon Tippler Erection i/p
|
TG Floor Turbine Box up i/p
|
TG Floor Turbine Box up i/p
|
TG Hall
|
MPH CLADDING WORK IN PROGRESS
|
MPH CLADDING WORK IN PROGRESS
|
Compressor House
|
ERH
|
ERH
|
DE DS Pump House
|
CW pump House
|
MCC-3
|
MCC-3
|
MCC-3
|
Chemical Lab building
|
Stacker Realaimer
|
Stacker Realaimer
|
DM plant Building
|
CPU Building
|
CPU Building
|
Ozonization Building
|
LP turbine Box Up Completed
|
Bird`s-eye view of 1x660MW Bhusawal Site
|
Bird`s-eye view of 1x660MW Bhusawal Site
|
Bird`s-eye view of 1x660MW Bhusawal Site
|
CCR
|
CCR
|
TG Hall
|
TG Hall
|
TG Hall
|
Wagon Tippler r/f work in progress
|
Wagon Tippler r/f work in progress
|
ERH r/f work in progress
|
ERH r/f work in progress
|
NDCT and Main Plant
|
NDCT and Main Plant
|
NDCT and Main Plant
|
NDCT and Main Plant
|
Wagon Tippler 1
|
Wagon Tippler area
|
MCC 2
|
MCC 3
|
Wagon Tippler area
|
Wagon Tippler area
|
Wagon Tippler area
|
Wagon Tippler area
|
NDCT
|
NDCT
|
Transformer Yard Bus Dust Erection ip
|
DM plant and CPU Building
|
Ozonization Building
|
Boiler RHS
|
MPH
|
Chimney Painting in progress
|
Chimney Painting in progress
|
Transformer Yard and MPH
|
CW pump House Building
|
Transformer Yard and MPH
|
FGD Area
|
CW pump House Building
|
AHP Compressor
|
Pipe Rack near Clarified Water PH
|
ID to Chimney Duct
|
DG Building
|
Service Building
|
HCSD SILO
|
MCC-1
|
Wagon Tippler area
|
NDCT
|
NDCT
|
NDCT
|
NDCT
|
MCC 2
|
Wagon Tippler area
|
Wagon Tippler area
|
Wagon Tippler area
|
NDCT
|
NDCT
|
Chimney Flue can lifting
|
Transformer Yard and MPH
|
Transformer Yard and MPH
|
Transformer Yard and MPH
|
Wagon Tippler work ip
|
Condenser Erection work in progress
|
generator Rotor Insertion done further checking ip
|
generator Rotor Insertion done further checking ip
|
generator Rotor Insertion done further checking ip
|
NDCT Jumpform Erection completed and Sliping Start
|
NDCT Jumpform Erection completed and Sliping Start
|
Boiler Feeder floor status
|
Boiler Feeder floor status
|
Generator Stator Testing work in progress
|
PT Plant view
|
Turbine Erection in progress
|
Condenser Erection work in progress
|
DMCW Erection and Piping in Progress
|
CPU Vessels Erection in progress
|
Condenser Erection work in progress
|
PHE Erection in progress
|
Boiler Bottom Ring Header erection ip
|
Boiler Bottom Ring Header erection ip
|
Boiler Bottom Ring Header erection ip
|
Boiler Bottom Ring Header erection ip
|
PT Plant Gravity filter casting in progress
|
Boiler - Coal Pipe Erection in Mill B in progress
|
Chimney Flue can 1st segment lifting ip
|
Stator erection and placement in progress
|
NDCT Ring beam3rd lift reinforcement i/p
|
Bunker RHS 4th tier column erection ip
|
Boiler RHS First pass roof panel erection ip
|
CW pump House Building
|
DM plant Building Pannel shifting ip
|
Raw Water Pump House building Pannel shifting ip
|
ERH Tunnel slab Zone 3 shuttering ip
|
DM Plant Building Equipment foundation casting ip
|
DM Plant Building Equipment foundation casting ip
|
MPH Turbine floor Pedestal erection ip
|
De-super Heater erection ip
|
Deaerator erection ip
|
MPH Condenser Erection ip
|
PTP Cascade aerator
|
NDCT
|
BCN and DM Plant Building
|
Transformer Yard and MPH
|
MPH , Boiler and DM Plant Building side view
|
MPH and Boiler side view
|
PT clarifier wall casting ip
|
PT clarifier final lift wall casting ip
|
MPH A ROW RAIL TRACK CASTING IP
|
BCN 5AB GR12 CONNECTING TP4 TO TRUSTLE TR11 I/P
|
BCN 5AB GR12 CONNECTING TP4 TO TRUSTLE TR11 I/P
|
BCN 5AB GR12 CONNECTING TP4 TO TRUSTLE TR11 I/P
|
Bunker LHS Bracing Erection i/p
|
Wagon Tippler -2 side plum concrete i/p
|
CHP Stacker Reclaimer Coal stock pile yard i/p
|
EOT crane
|
Boiler RHS side Bunker Colum erection
|
ESP Front side status
|
ESP Control room building
|
CV Pump Stage IV casting ip
|
NDCT last pair Racker cloumn 44th concreting ip
|
PA fan-2 erection started
|
ESP penthouse erection started
|
Gallery GR 14 erection in progress
|
Gallery GR 14 erection in progress
|
DM Plant DE Gasser Tank erection in progress
|
DM Plant DE Gasser Tank erection in progress
|
MPH side view
|
MPH side view
|
Generator stator reached at site
|
Generator stator reached at site
|
Generator stator reached at site
|
Generator stator reached at site
|
Generator stator reached at site
|
Wagon Tippler area
|
Wagon Tippler area
|
ESP to ID Duct Erection in progress
|
ESP to ID Duct Erection in progress
|
LDO Tank erection in progress
|
HFO tank Erection in progress
|
Boiler Bunker column erection in progress
|
TP 4 and 5
|
LDO Tank status
|
ESP to ID Duct status
|
ESP Control room building
|
Boiler RHS side Bunker Colum erection
|
CPU Building floor slab concreting in progress
|
CPU Building floor slab concreting in progress
|
TDBFP B Spring Placement in progress
|
AHP Compressor House Staircase concrete in progress
|
PT Plant DM Clarifier center wall casting in progress
|
Permanent Store building erection work in progress
|
Boiler RHS Bunker bracing in progress
|
Boiler Front panel lifting in progress
|
Boiler Front panel lifting in progress
|
Boiler Front panel lifting in progress
|
PTP Gravity filter
|
Pipe Rack PR 2 column excavation
|
APH A column foundation excavation
|
PT Plant Cascade aerator
|
PT plant Stilling chamber
|
PT Plant Gravity filter
|
PT Plant Gravity filter
|
PT Plant Gravity filter
|
PT Plant Gravity filter
|
PT Plant Gravity filter
|
PT clarifier wall casting
|
TDBFP B Lube oil cooler raft status
|
TDBFP A Lube oil cooler erection status
|
RWPH Column RF status
|
Pipe Rack PR 11raft rf status
|
NDCT Ring beam rf status
|
NDCT Ring beam reinforcement status
|
MPH Stub Column rf status
|
MPH BC Bay Equipment erection status
|
Fire water Pump House
|
ESP Duct and supporting structure
|
DM Plant Degasser Tanks erection status
|
CW line erection near MPH A row status
|
CW Return line encasing status
|
CPU Erection status
|
Clarified water tank
|
Air compressor building
|
Boiler Right side
|
Clarifier pump house
|
CPU building
|
CW pipe line
|
DM Plant Building
|
DM pump house
|
EOT Girder unloading
|
ESP fron side
|
ESP fron side
|
ESP Outlet Duct
|
Gallery Erection ip
|
ID to Chimney Duct
|
ID to Chimney Duct
|
ID to Chimney Duct
|
CPU Vessels Erection in progress
|
DM Tanks
|
NDCT
|
NDCT
|
Tank Fabrication in progress
|
ID to Chimney Duct erection in progress
|
ID fan Coupling in progress
|
ESP to ID Fan Duct erection in progress
|
ESP Front side status
|
APH Duct erection in progress
|
Transformer and Bus duct foundation
|
Transformer and Bus duct foundation
|
Transformer and Bus duct foundation
|
Transformer and Bus duct foundation
|
Transformer and Bus duct foundation
|
HCSD and FOPPH Building and FO tank
|
Feeder floor and Mills erection
|
ESP MCC
|
Duct Fabrication
|
DM tanks
|
DM Plant Building
|
Deaerator erection
|
Deaerator erection
|
Coal Conveying structure erection
|
Clarified water reservoir
|
Boiler Sofa duct erection
|
Boiler Sofa duct erection
|
Boiler RHS
|
Boiler LHS
|
BFD Line joints
|
Air Compressor Building and Chemical Lab Building
|
Hot SA duct erection above APH-A status
|
Front Water Wall spiral wall erection status
|
Railway siding 18B raft & pier erection status
|
RHS bunker erection status
|
RHS mill erection status
|
ESP rear side erection status
|
ESP front side erection view
|
ESP Control room building status
|
CHP DE/DS building status
|
Crusher house erection upto 22m status
|
Coal settling pond raft casting status
|
CHP MCC-3 building status
|
CHP MCC-3 building status
|
CHP MCC-3 building status
|
BCN 2AB and TP2 erecion status
|
BCN 5AB erection status
|
BCN 3AB erection status
|
LTRH coil erection status
|
LTRH coil erection status
|
DM Plant building
|
DM Plant building
|
DM Plant building
|
DM Plant building
|
DM Plant building
|
ESP o/l duct and ID fan Motor placement
|
ESP o/l duct and ID fan Motor placement
|
ESP o/l duct and ID fan Motor placement
|
ESP o/l duct and ID fan Motor placement
|
ESP o/l duct and ID fan Motor placement
|
DM Tank and CST Tank
|
DM Tank and CST Tank
|
MPH and Boiler view from right side
|
MPH and Boiler view from right side
|
MPH and Boiler view from right side
|
MPH and Boiler view from right side
|
Gallery GR 5 BCN5AB erection i/p
|
ESP Electrode erection in Pass E i/p
|
WT complex & U/g tunnel status
|
WT complex & U/g tunnel status
|
WT complex & U/g tunnel status
|
WT complex & U/g tunnel status
|
WT complex & U/g tunnel status
|
WT complex & U/g tunnel status
|
chimney slipform readiness status
|
chimney slipform readiness status
|
chimney slipform readiness status
|
chimney slipform readiness status
|
chimney slipform readiness status
|
stacker reclaimer readiness status
|
stacker reclaimer readiness status
|
stacker reclaimer readiness status
|
stacker reclaimer readiness status
|
stacker reclaimer readiness status
|
stacker reclaimer readiness status
|
stacker reclaimer readiness status
|
stacker reclaimer readiness status
|
stacker reclaimer readiness status
|
stacker reclaimer readiness status
|
stacker reclaimer readiness status
|
BCN 2AB pedestel READINESS status
|
BCN 2AB pedestel READINESS status
|
TP2 readiness status
|
TP2 readiness status
|
BCN 3AB READINESS status
|
BCN 3AB READINESS status
|
BCN 3AB READINESS status
|
MCC3 readiness status
|
MCC3 readiness status
|
crusher house excavation status
|
BCN 4AB READINESS status
|
BCN 4AB READINESS status
|
BCN 4AB READINESS status
|
BCN 4AB READINESS status
|
BCN 4AB READINESS status
|
BCN 4AB READINESS status
|
BCN 4AB READINESS status
|
BCN 4AB READINESS status
|
TP3 pedestal readiness status
|
BJCL FABRICATION yard status
|
BJCL FABRICATION yard status
|
BJCL FABRICATION yard status
|
NDCT PCC & RAKER FOUNDATION READINESS STATUS
|
NDCT PCC & RAKER FOUNDATION READINESS STATUS
|
NDCT pond excavation status
|
NDCT pond excavation status
|
NDCT pond excavation status
|
MPH crane grider b row erection status
|
CPU regeneration building excavation status
|
CPU regeneration building excavation status
|
DM plant building excavation status
|
air compressor building plinth beam casting status
|
CD bay grouting & column encasing status
|
CD bay grouting & column encasing status
|
CG preassly bed #2 & shifting of girders inside ca
|
CG preassly bed #2 & shifting of girders inside ca
|
ESP pass A erection status
|
ESP pass A erection status
|
ESP pass A erection status
|
TP5 erection & tier 2 erection readiness status
|
TP5 erection & tier 2 erection readiness status
|
ASPH plinth beam casting preparation status
|
ASPH plinth beam casting preparation status
|
ASPH plinth beam casting preparation status
|
BC bay main beam @ 8m, 17m, 24m &33m erection stat
|
BC bay main beam @ 8m, 17m, 24m &33m erection stat
|
CW pit wall & puddle flange erection status
|
CW pit wall & puddle flange erection status
|
DM tank # 1&2 wall readiness status
|
DM tank # 1&2 wall readiness status
|
TG deck staging erection status near C1 to C6
|
TG deck staging erection status near C1 to C6
|
limestore reclaim hopper excavation status
|
limestore reclaim hopper excavation status
|
limestore reclaim hopper excavation status
|
limestore reclaim hopper excavation status
|
CG #1 welding status
|
CG #1 welding status
|
CG #1 welding status
|
ID fan 6B wall shuttering work status
|
ESP pass E erection status
|
ESP pass E erection status
|
ESP - ID duct fdn near pass E&Fstatus
|
ESP - ID duct fdn near pass E&Fstatus
|
ESP - ID duct fdn near pass E&Fstatus
|
ESP - ID duct fdn near pass E&Fstatus
|
ESP - ID duct fdn near pass E&Fstatus
|
BCN 4AB trestle status
|
BCN 4AB trestle status
|
Boiler 5th tier erection status
|
WT-1, WT-2 & U/g tunnel excavation status
|
WT-1, WT-2 & U/g tunnel excavation status
|
WT-1, WT-2 & U/g tunnel excavation status
|
TP5 erection status
|
TP4 alignment & welding work
|
TP4 alignment & welding work
|
BJCL fabrication yard, painting and work status
|
BJCL fabrication yard, painting and work status
|
BJCL fabrication yard, painting and work status
|
BJCL fabrication yard, painting and work status
|
BJCL fabrication yard, painting and work status
|
BJCL fabrication yard, painting and work status
|
stacker reclaimer excavation, raft, plinth beam st
|
stacker reclaimer excavation, raft, plinth beam st
|
stacker reclaimer excavation, raft, plinth beam st
|
stacker reclaimer excavation, raft, plinth beam st
|
stacker reclaimer excavation, raft, plinth beam st
|
stacker reclaimer excavation, raft, plinth beam st
|
ID Fan #B shuttering & r/f status
|
ID Fan #B shuttering & r/f status
|
ASPH plinth beam r/f status
|
ASPH plinth beam r/f status
|
ASPH plinth beam r/f status
|
Boiler hot SA duct preassly status
|
Boiler hot SA duct preassly status
|
Floor beam erection (grid 1 to 3) @12m & 17m statu
|
Crane girder B row erection (grid 1 to grid 5)
|
Crane girder B row erection (grid 1 to grid 5)
|
TG column (C7 - C14) status
|
TG column (C7 - C14) status
|
TG column (C7 - C14) status
|
TG deck staging status HPT side
|
TG deck staging status HPT side
|
TG deck staging status HPT side
|
TG deck staging status HPT side
|
TG deck staging status HPT side
|
CW raft r/f work status
|
GT 6A raft casting status
|
GT 6B Excavation status
|
station transformer 6A casting status
|
station transformer 6A wall casting status
|
station transformer 6A wall casting status
|
CCR Grid 3 column & tie beam erection status
|
MPH column encasing & plinth beam backfilling stat
|
MPH column encasing & plinth beam backfilling stat
|
MPH column encasing & plinth beam backfilling stat
|
Bunker LHS erection status
|
Mill E & F casting status
|
Mill E & F casting status
|
Mill E & F casting status
|
CG #1 welding preparation status
|
CG #1 welding preparation status
|
esp to id fan duct fdn status
|
esp to id fan duct fdn status
|
esp to id fan duct fdn status
|
WT UG tunnel excavation status
|
WT UG tunnel excavation status
|
Wagon tippler excavation status
|
Wagon tippler excavation status
|
Wagon tippler excavation status
|
Wagon tippler excavation status
|
Wagon tippler excavation status
|
TP5 erection status
|
TG deck staging work status
|
TG deck staging work status
|
TG column (C7 - C14) shuttering status
|
Road soling status
|
Road soling status
|
Road soling status
|
Raw water reservoir status
|
Raw water reservoir status
|
Raw water reservoir status
|
Raw water reservoir status
|
Raw water reservoir status
|
Raw water reservoir status
|
Raw water reservoir status
|
Raw water reservoir status
|
NDCT tower crane material status
|
NDCT steel shifting status
|
NDCT steel shifting status
|
NDCT steel shifting status
|
NDCT steel shifting status
|
NDCT excavation status
|
NDCT excavation status
|
NDCT excavation status
|
NDCT excavation status
|
NDCT excavation status
|
MPH Aux column (HPT side) status
|
MPH & Boiler erection status
|
MPH & Boiler erection status
|
Mill E & Mill F shuttering status
|
Mill E & Mill F shuttering status
|
MCC- 3 CHP excavation & PCC status
|
ESP to ID chimney duct fdn work status
|
ESP to ID chimney duct fdn work status
|
ESP to ID chimney duct fdn work status
|
ESP to ID chimney duct fdn work status
|
ESP Pass D & F erection status
|
ESP Pass D & F erection status
|
ESP Pass D & F erection status
|
ESP Pass D & F erection status
|
ESP pass C erection status
|
ESP pass A erection status
|
CWPH & Forebay status
|
CWPH & Forebay status
|
Crane girder fabrication work status
|
Crane girder fabrication work status
|
Crane girder fabrication work status
|
CG welding status
|
CG welding status
|
CG welding status
|
CG welding status
|
CG welding status
|
CG welding status
|
CG welding status
|
CG welding status
|
CCR erection status
|
CCR erection status
|
Boiler structure erection status
|
Boiler structure erection status
|
Boiler structure erection status
|
Boiler structure erection status
|
Boiler structure erection status
|
BJCL Steel yard status
|
BJCL Steel yard status
|
BJCL Steel yard status
|
BJCL Steel yard status
|
ASPH plinth beam work status
|
ASPH plinth beam work status
|
ASPH plinth beam work status
|
Bunker RHS erection status
|
Bunker RHS erection status
|
TG columns casting status
|
TG columns casting status
|
TG columns casting status
|
TG columns casting status
|
TG columns casting status
|
TG columns casting status
|
CW pit RCC status
|
CW pit RCC status
|
CW pit RCC status
|
DM tank # 1 & 2 fdns status
|
DM tank # 1 & 2 fdns status
|
DM tank # 1 & 2 fdns status
|
CG # 1 & 2 preassly in boiler cavity status
|
CG # 1 & 2 preassly in boiler cavity status
|
CG # 1 & 2 preassly in boiler cavity status
|
Chimney slip form structure erection status
|
Chimney slip form structure erection status
|
Chimney slip form structure erection status
|
Chimney slip form structure erection status
|
Chimney slip form structure erection status
|
ESP fdns & erection (Pass D & F) status
|
ESP fdns & erection (Pass D & F) status
|
ESP fdns & erection (Pass D & F) status
|
ESP fdns & erection (Pass D & F) status
|
ESP fdns & erection (Pass D & F) status
|
ESP fdns & erection (Pass D & F) status
|
ESP fdns & erection (Pass D & F) status
|
ESP fdns & erection (Pass D & F) status
|
ESP fdns & erection (Pass D & F) status
|
ESP fdns & erection (Pass D & F) status
|
ESP fdns & erection (Pass D & F) status
|
ESP fdns & erection (Pass D & F) status
|
ESP fdns & erection (Pass D & F) status
|
WT-1 & WT-2 excavation status
|
WT-1 & WT-2 excavation status
|
WT-1 & WT-2 excavation status
|
WT-1 & WT-2 excavation status
|
WT-1 & WT-2 excavation status
|
WT-1 & WT-2 excavation status
|
WT-1 & WT-2 excavation status
|
WT-1 & WT-2 excavation status
|
WT-1 & WT-2 excavation status
|
WT-1 & WT-2 excavation status
|
WT-1 & WT-2 excavation status
|
WT-1 & WT-2 excavation status
|
CWPH excavation status
|
CWPH excavation status
|
CWPH excavation status
|
CWPH excavation status
|
CWPH excavation status
|
CWPH excavation status
|
Feed pool (NDCT-CWPH) excavation status
|
Feed pool (NDCT-CWPH) excavation status
|
Feed pool (NDCT-CWPH) excavation status
|
Feed pool (NDCT-CWPH) excavation status
|
Feed pool (NDCT-CWPH) excavation status
|
NDCT raker & pond excavation status
|
NDCT raker & pond excavation status
|
NDCT raker & pond excavation status
|
NDCT raker & pond excavation status
|
NDCT raker & pond excavation status
|
NDCT raker & pond excavation status
|
NDCT raker & pond excavation status
|
NDCT raker & pond excavation status
|
NDCT raker & pond excavation status
|
NDCT raker & pond excavation status
|
NDCT raker & pond excavation status
|
NDCT raker & pond excavation status
|
Raw water reservoir Excavation, PCC & R/f status
|
Raw water reservoir Excavation, PCC & R/f status
|
Raw water reservoir Excavation, PCC & R/f status
|
Raw water reservoir Excavation, PCC & R/f status
|
Raw water reservoir Excavation, PCC & R/f status
|
Raw water reservoir Excavation, PCC & R/f status
|
Raw water reservoir Excavation, PCC & R/f status
|
Raw water reservoir Excavation, PCC & R/f status
|
Raw water reservoir Excavation, PCC & R/f status
|
Raw water reservoir Excavation, PCC & R/f status
|
Raw water reservoir Excavation, PCC & R/f status
|
Raw water reservoir Excavation, PCC & R/f status
|
Raw water reservoir Excavation, PCC & R/f status
|
Raw water reservoir Excavation, PCC & R/f status
|
Non-DM clarified tank RCC completion status
|
Non-DM clarified tank RCC completion status
|
Non-DM clarified tank RCC completion status
|
Non-DM clarified tank RCC completion status
|
Non-DM clarified tank RCC completion status
|
Non-DM clarified tank RCC completion status
|
Non-DM clarified tank RCC completion status
|
Non-DM clarified tank RCC completion status
|
Non-DM clarified tank RCC completion status
|
Non-DM clarified tank RCC completion status
|
Non-DM clarified tank RCC completion status
|
Non-DM clarified tank RCC completion status
|
Non-DM clarified tank RCC completion status
|
Drain excavation, RCC incl wall status
|
Drain excavation, RCC incl wall status
|
Drain excavation, RCC incl wall status
|
Drain excavation, RCC incl wall status
|
Drain excavation, RCC incl wall status
|
Drain excavation, RCC incl wall status
|
Drain excavation, RCC incl wall status
|
14m road rubble work status
|
14m road rubble work status
|
14m Road work status (rubble work)
|
TP2 excavation & PCC status
|
TP2 excavation & PCC status
|
TP2 excavation & PCC status
|
TP2 excavation & PCC status
|
TP2 excavation & PCC status
|
NDCT raker area excavation status
|
NDCT raker area excavation status
|
NDCT raker area excavation status
|
NDCT pond excavation status
|
NDCT pond excavation status
|
NDCT pond excavation status
|
NDCT pond excavation status
|
NDCT pond excavation status
|
Raw water reservoir excavation & PCC status
|
Raw water reservoir excavation & PCC status
|
Raw water reservoir excavation & PCC status
|
Raw water reservoir excavation & PCC status
|
Raw water reservoir excavation & PCC status
|
Raw water reservoir excavation & PCC status
|
Non DM clarified tank raft casting status
|
Non DM clarified tank raft casting status
|
Non DM clarified tank raft casting status
|
Non DM clarified tank raft casting status
|
Non DM clarified tank raft casting status
|
Non DM clarified tank raft casting status
|
Non DM clarified tank raft casting status
|
stacker reclaimer foundation
|
CHP wagan tippler escavation status
|
NDCT Escavation Work
|
CW PH foundation escavation work
|
ID to chimney duct foundation
|
chimney silp form status
|
RHS FD PA Fans
|
LHS PA FD Fans
|
ESP Erection Status
|
LHS Bunker status
|
RHS Bunker status
|
boiler erection status
|
TG Dack Column Shuttering
|
PHB structure
|
ID fan - B status
|
FOPPH excavation & PCC status
|
FOPPH excavation & PCC status
|
FOPPH excavation & PCC status
|
PHB structure erection status
|
PHB structure erection status
|
PHB structure erection status
|
PHB structure erection status
|
PHB structure erection status
|
Chimney slipform structure & jacking status
|
Chimney slipform structure & jacking status
|
Chimney slipform structure & jacking status
|
Chimney slipform structure & jacking status
|
Chimney slipform structure & jacking status
|
AHP MCC - compressor house excavation/ PCC status
|
AHP MCC - compressor house excavation/ PCC status
|
NDCT raker & pond excavation status
|
NDCT raker & pond excavation status
|
NDCT raker & pond excavation status
|
NDCT raker & pond excavation status
|
NDCT raker & pond excavation status
|
NDCT raker & pond excavation status
|
NDCT raker & pond excavation status
|
NDCT raker & pond excavation status
|
NDCT raker & pond excavation status
|
Non-DM clarified tank 2nd segment RCC status
|
Non-DM clarified tank 2nd segment RCC status
|
Non-DM clarified tank 2nd segment RCC status
|
Non-DM clarified tank 2nd segment RCC status
|
Non-DM clarified tank 2nd segment RCC status
|
Non-DM clarified tank 2nd segment RCC status
|
CW pump house founding level excavation
|
CW pump house founding level excavation
|
WT1, WT2, TP1 & U/g tunnel excavation status
|
WT1, WT2, TP1 & U/g tunnel excavation status
|
WT1, WT2, TP1 & U/g tunnel excavation status
|
WT1, WT2, TP1 & U/g tunnel excavation status
|
WT1, WT2, TP1 & U/g tunnel excavation status
|
WT1, WT2, TP1 & U/g tunnel excavation status
|
TG column shuttering & R/f sattus
|
TG column shuttering & R/f sattus
|
TG column shuttering & R/f sattus
|
NONDM STORAGE TANK
|
TP 4Column erection
|
7AB Trustel foundation
|
Truss erection started inPH erecti
|
NDCT escavation
|
NDCT forbay Escavation work progress
|
ESP stracture
|
DM Storage tank foundation casting progress
|
Casting of Stacker reclaimer footing
|
Wagon tippler Escavation work
|
Compressor house foundation work
|
Chimney slip form structure erection
|
LHS bunker raft
|
RHS bunker foundation
|
PA & FD B side Foundation work deails
|
PA & FD Fans- B side foundation details
|
ID B Foundation casting preparation
|
ID to Chimney duct foundation work
|
ID fan -B raft status
|
ID fan -B raft status
|
ID fan -B raft status
|
ID fan -B raft status
|
TP-4 column erection started on 04/02/2020
|
TP-4 column erection started on 04/02/2020
|
TP-4 column erection started on 04/02/2020
|
Chimney slip form structure erection status
|
Chimney slip form structure erection status
|
Chimney slip form structure erection status
|
ID fan-A PCC status
|
ID fan-A PCC status
|
Power house structure 010220
|
Power house structure 010220
|
TR7 TP5 To Bunker LHS Foundation status
|
ESp pass D erection status 020220
|
ESp Pass D erection start 310120
|
compressor house foundation
|
chimney slip structure erection
|
Escavation work for ID To chimney Duct foundation
|
ID Fan B Foundation casting Preparation
|
TG Raft Casting completed 31/01/20
|
3rd tire structure erection status 01/02/20
|
3 tire erection staterd 0n 300120
|
MPH column erection status
|
MPH column erection status
|
MPH column erection status
|
MPH column erection status
|
MPH column erection status
|
MPH column erection status
|
TG raft status
|
TG raft status
|
TG raft status
|
TG raft status
|
TG raft status
|
TG raft status
|
TG raft status
|
Boiler Erection status
|
Boiler Erection status
|
Boiler Erection status
|
Boiler Erection status
|
Boiler Erection status
|
ESP Control room & ESP pass - F erection status
|
ESP Control room & ESP pass - F erection status
|
ESP Control room & ESP pass - F erection status
|
ESP Control room & ESP pass - F erection status
|
ESP Control room & ESP pass - F erection status
|
Chimney slip form structure erection status
|
Chimney slip form structure erection status
|
Chimney slip form structure erection status
|
Chimney slip form structure erection status
|
ID fan - B status
|
ESP to ID duct foundation (Pass-A to C) status
|
ESP to ID duct foundation (Pass-A to C) status
|
DM tank civil work status
|
DM tank civil work status
|
DM tank civil work status
|
TP2 &Trestle status
|
TG Raft
|
Wagon tippler area Escavation status
|
stacker reclaimer foundation status
|
Chimney Slip form structure erection
|
bunker Raft LHS RCC status
|
boiler structure erection
|
TG raft & B - row status
|
TG raft & B - row status
|
TG raft & B - row status
|
TG raft & B - row status
|
TG raft & B - row status
|
FOPPH excavation status
|
FOPPH excavation status
|
FOPPH excavation status
|
Chimney raft 6/6 segments completion status
|
Chimney raft 6/6 segments completion status
|
Chimney raft 6/6 segments completion status
|
ESP to ID duct foundation (Pass-A to C) status
|
ESP to ID duct foundation (Pass-A to C) status
|
ESP pass - A status
|
ESP pass - A status
|
ESP pass - A status
|
Wagon tippler, TP1 & UG tunnel excavation status
|
Wagon tippler, TP1 & UG tunnel excavation status
|
Wagon tippler, TP1 & UG tunnel excavation status
|
Wagon tippler, TP1 & UG tunnel excavation status
|
Wagon tippler, TP1 & UG tunnel excavation status
|
Wagon tippler, TP1 & UG tunnel excavation status
|
NDCT excavation status
|
NDCT excavation status
|
NDCT excavation status
|
NDCT excavation status
|
NDCT excavation status
|
NDCT excavation status
|
Erection of Boiler 2nd tier status
|
Erection of Boiler 2nd tier status
|
Erection of ESP pass - F status
|
Erection of ESP pass - F status
|
Erection of ESP pass - F status
|
TP-4 pedestal status
|
TP-4 pedestal status
|
BOF to ESP fdn readiness status
|
BOF to ESP fdn readiness status
|
Bunker LHS raft readiness status
|
Bunker LHS raft readiness status
|
CW duct (feedpool to NDCT) status
|
CW duct (feedpool to NDCT) status
|
CW duct (feedpool to NDCT) status
|
CW duct (feedpool to NDCT) status
|
NDCT excavation status
|
NDCT excavation status
|
NDCT excavation status
|
NDCT excavation status
|
NDCT excavation status
|
NDCT excavation status
|
NDCT excavation status
|
Bunker - LHS excavation & PCC status
|
Bunker - LHS excavation & PCC status
|
Bunker - LHS excavation & PCC status
|
Bunker - LHS excavation & PCC status
|
Bunker - LHS excavation & PCC status
|
Boiler cavity & erection status
|
Boiler cavity & erection status
|
Boiler cavity & erection status
|
TP5 raft casting i/p status
|
TP5 raft casting i/p status
|
TP5 raft casting i/p status
|
TP5 raft casting i/p status
|
ESP pass A & B status
|
ESP pass A & B status
|
ESP pass A & B status
|
ESP pass A & B status
|
ESP pass A & B status
|
ESP pass A & B status
|
BOF to ESP duct fdn LHS status
|
BOF to ESP duct fdn LHS status
|
BOF to ESP duct fdn LHS status
|
PA & FD fan - LHS status
|
PA & FD fan - LHS status
|
ESP 4 passes fdns status
|
ESP 4 passes fdns status
|
ESP 4 passes fdns status
|
ESP CR status
|
ESP CR status
|
ESP CR status
|
Chimney raft 3/6 casting status
|
Chimney raft 3/6 casting status
|
Chimney raft 3/6 casting status
|
Chimney raft 3/6 casting status
|
Chimney slip form fabrication status
|
Chimney slip form fabrication status
|
Chimney slip form fabrication status
|
Chimney slip form fabrication status
|
Chimney slip form fabrication status
|
Chimney slip form fabrication status
|
Chimney slip form fabrication status
|
Chimney slip form fabrication status
|
Chimney slip form fabrication status
|
Chimney slip form fabrication status
|
Chimney slip form fabrication status
|
TP3 & trestles status
|
TP3 & trestles status
|
TP3 & trestles status
|
TP3 & trestles status
|
TP3 & trestles status
|
TP3 & trestles status
|
TP3 & trestles status
|
MPH civil & structure status
|
MPH civil & structure status
|
MPH civil & structure status
|
MPH civil & structure status
|
MPH civil & structure status
|
MPH civil & structure status
|
MPH civil & structure status
|
MPH civil & structure status
|
MPH civil & structure status
|
MPH civil & structure status
|
MPH civil & structure status
|
FD/PA fan - LHS & RHS status
|
FD/PA fan - LHS & RHS status
|
FD/PA fan - LHS & RHS status
|
FD/PA fan - LHS & RHS status
|
FD/PA fan - LHS & RHS status
|
FD/PA fan - LHS & RHS status
|
ESP pass A & B status
|
ESP pass A & B status
|
ESP pass A & B status
|
ESP pass A & B status
|
BOF to ESP duct fdns status
|
BOF to ESP duct fdns status
|
BOF to ESP duct fdns status
|
BOF to ESP duct fdns status
|
BOF to ESP duct fdns status
|
BOF to ESP duct fdns status
|
BOF to ESP duct fdns status
|
Bunker LHS & RHS status
|
Bunker LHS & RHS status
|
Bunker LHS & RHS status
|
Bunker LHS & RHS status
|
Bunker LHS & RHS status
|
Bunker LHS & RHS status
|
Bunker LHS & RHS status
|
Bunker LHS & RHS status
|
Bunker LHS & RHS status
|
Bunker LHS & RHS status
|
Bunker LHS & RHS status
|
Boiler Erection status
|
Boiler Erection status
|
Boiler Erection status
|
Boiler Erection status
|
Boiler Erection status
|
Boiler Erection status
|
Boiler Erection status
|
Boiler Erection status
|
Boiler Erection status
|
Director visits & Boiler pooja
|
Director visits & Boiler pooja
|
Director visits & Boiler pooja
|
Director visits & Boiler pooja
|
Director visits & Boiler pooja
|
Director visits & Boiler pooja
|
Director visits & Boiler pooja
|
Director visits & Boiler pooja
|
Director visits & Boiler pooja
|
Director visits & Boiler pooja
|
Director visits & Boiler pooja
|
Director visits & Boiler pooja
|
BJCL fabrication status
|
BJCL fabrication status
|
BJCL fabrication status
|
PA & FD fan - RHS status
|
PA & FD fan - RHS status
|
PA & FD fan - RHS status
|
PA & FD fan - RHS status
|
MBL pre-assly & material status
|
MBL pre-assly & material status
|
MBL pre-assly & material status
|
MBL pre-assly & material status
|
MPH status
|
MPH status
|
MPH status
|
MPH status
|
MPH status
|
NDCT & connecting duct status
|
NDCT & connecting duct status
|
NDCT & connecting duct status
|
NDCT & connecting duct status
|
NDCT & connecting duct status
|
NDCT & connecting duct status
|
NDCT & connecting duct status
|
trestles in SG area status
|
trestles in SG area status
|
trestles in SG area status
|
trestles in SG area status
|
trestles in SG area status
|
ESP control room status
|
ESP control room status
|
ESP control room status
|
ESP control room status
|
ESP status
|
ESP status
|
ESP status
|
ESP status
|
ESP status
|
BOF to ESP duct fdn status
|
BOF to ESP duct fdn status
|
BOF to ESP duct fdn status
|
Chimney raft status
|
Chimney raft status
|
Chimney raft status
|
Chimney raft status
|
Bunker RHS raft & pedestal status
|
Bunker RHS raft & pedestal status
|
Boiler status
|
Boiler status
|
TP5 excavation & PCC completed
|
TP5 excavation & PCC completed
|
TP5 excavation & PCC completed
|
MPH columns & boiler column erection status
|
MPH columns & boiler column erection status
|
MPH columns & boiler column erection status
|
ESP pass C RCC completed, pedestal i/p
|
ESP pass C RCC completed, pedestal i/p
|
PA fan RHS status
|
PA fan RHS status
|
PA fan RHS status
|
PA fan RHS status
|
FD fan RHS status
|
FD fan RHS status
|
FD fan RHS status
|
wagon tippler area excavation status
|
wagon tippler area excavation status
|
wagon tippler area excavation status
|
wagon tippler area excavation status
|
wagon tippler area excavation status
|
wagon tippler area excavation status
|
wagon tippler area excavation status
|
wagon tippler area excavation status
|
wagon tippler area excavation status
|
wagon tippler area excavation status
|
Boiler pooja
|
Boiler pooja
|
Boiler pooja
|
Boiler pooja
|
Boiler pooja
|
Boiler pooja
|
Boiler pooja
|
Boiler pooja
|
Boiler pooja
|
SG area trestle status
|
SG area trestle status
|
SG area trestle status
|
SG area trestle status
|
SG area trestle status
|
SG area trestle status
|
SG area trestle status
|
ESP control room status
|
ESP control room status
|
BOF to ESP duct fdn status
|
BOF to ESP duct fdn status
|
BOF to ESP duct fdn status
|
BOF to ESP duct fdn status
|
Chimney raft 1 segment casting final stage
|
Chimney raft 1 segment casting final stage
|
Chimney raft 1 segment casting final stage
|
Chimney raft 1 segment casting final stage
|
Chimney raft 1 segment casting final stage
|
Chimney raft 1 segment casting final stage
|
Chimney status
|
Chimney status
|
Chimney status
|
Chimney status
|
Chimney status
|
Chimney status
|
Last row of Boiler SCR columns status
|
Last row of Boiler SCR columns status
|
Last row of Boiler SCR columns status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Air compressor building status
|
Air compressor building status
|
Air compressor building status
|
Air compressor building status
|
Boiler
|
Boiler
|
Boiler
|
Boiler
|
Boiler
|
Boiler
|
Boiler
|
Visit
|
Visit
|
Visit
|
Visit
|
Visit
|
Visit
|
Visit
|
Visit
|
Visit
|
Visit
|
Visit
|
tp4
|
tp4
|
tp4
|
tp4
|
Ndct
|
Ndct
|
Ndct
|
Ndct
|
Ndct
|
Level Grading
|
Level Grading
|
Level Grading
|
Level Grading
|
Level Grading
|
Level Grading
|
Level Grading
|
Level Grading
|
Fabrication
|
Fabrication
|
Fabrication
|
Fabrication
|
Fabrication
|
ESP
|
ESP
|
ESP
|
ESP
|
ESP
|
ESP
|
ESP
|
ESP
|
ESP
|
ESP
|
Cranes
|
Cranes
|
Cranes
|
Bunker
|
Bunker
|
Chimney
|
Chimney
|
Chimney
|
Chimney
|
Chimney
|
Chimney
|
Chimney
|
Chimney
|
Chimney
|
Chimney
|
Chimney
|
Chimney
|
Chimney
|
MPH
|
MPH
|
MPH
|
MPH
|
MPH
|
MPH
|
MPH
|
CHP batching plant status
|
CHP batching plant status
|
CHP batching plant status
|
CHP batching plant status
|
Wagon tippler excavation status
|
Wagon tippler excavation status
|
Wagon tippler excavation status
|
Wagon tippler excavation status
|
Wagon tippler excavation status
|
Wagon tippler excavation status
|
Wagon tippler excavation status
|
Wagon tippler excavation status
|
ESP Control room excavation status
|
ESP Control room excavation status
|
ESP Control room excavation status
|
ESP Control room excavation status
|
ESP pass - F & E status
|
ESP pass - F & E status
|
ESP pass - F & E status
|
TP-4 status
|
TP-4 status
|
TP-4 status
|
TP-4 status
|
TP-4 status
|
ESp pass F & E status
|
ESp pass F & E status
|
ESp pass F & E status
|
MPH status
|
MPH status
|
MPH status
|
MPH status
|
Chimney R/f status
|
Chimney R/f status
|
Chimney R/f status
|
Chimney R/f status
|
Chimney R/f status
|
Chimney R/f status
|
Chimney R/f status
|
Boiler Excavation & RCC status
|
Boiler Excavation & RCC status
|
Boiler Excavation & RCC status
|
Boiler Excavation & RCC status
|
Boiler Excavation & RCC status
|
Boiler Excavation & RCC status
|
Boiler Excavation & RCC status
|
Boiler Excavation & RCC status
|
Boiler Excavation & RCC status
|
Boiler Excavation & RCC status
|
Boiler Excavation & RCC status
|
Boiler Excavation & RCC status
|
Boiler Excavation & RCC status
|
Bunker raft r/f status
|
Bunker raft r/f status
|
Bunker raft r/f status
|
Bunker raft r/f status
|
Air compressor building excavation work status
|
Air compressor building excavation work status
|
MPH excavation, raft & pedestal status
|
MPH excavation, raft & pedestal status
|
MPH excavation, raft & pedestal status
|
MPH excavation, raft & pedestal status
|
MPH excavation, raft & pedestal status
|
MPH excavation, raft & pedestal status
|
R/f work in Bunker raft RHS
|
R/f work in Bunker raft RHS
|
R/f work in Bunker raft RHS
|
Excavation work in TP-4 Boiler RHS area
|
Excavation work in TP-4 Boiler RHS area
|
Excavation work in TP-4 Boiler RHS area
|
Grading & excavation work in CHP area
|
Grading & excavation work in CHP area
|
Grading & excavation work in CHP area
|
Grading & excavation work in CHP area
|
Grading & excavation work in CHP area
|
Grading & excavation work in CHP area
|
Levelling & grading work in CHP area
|
Levelling & grading work in CHP area
|
BJCL informal pooja for CHP& AHP works
|
BJCL informal pooja for CHP& AHP works
|
BJCL informal pooja for CHP& AHP works
|
BJCL informal pooja for CHP& AHP works
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Bunker & Mills - RHS status
|
Bunker & Mills - RHS status
|
Bunker & Mills - RHS status
|
Bunker & Mills - RHS status
|
Bunker & Mills - RHS status
|
TP-4 boiler RHS excavation in completion stage
|
TP-4 boiler RHS excavation in completion stage
|
TP-4 boiler RHS excavation in completion stage
|
TP-4 boiler RHS excavation in completion stage
|
TP-4 boiler RHS excavation in completion stage
|
ESP control room excavation status
|
ESP control room excavation status
|
ESP control room excavation status
|
ESP control room excavation status
|
ESP control room excavation status
|
ESP control room excavation status
|
TG raft excavation i/p
|
TG raft excavation i/p
|
MPH grid-1 to grid 3 status
|
MPH grid-1 to grid 3 status
|
Main power house excavation & RCC status
|
Main power house excavation & RCC status
|
Main power house excavation & RCC status
|
Main power house excavation & RCC status
|
Main power house excavation & RCC status
|
Main power house excavation & RCC status
|
Main power house excavation & RCC status
|
Main power house excavation & RCC status
|
Main power house excavation & RCC status
|
Main power house excavation & RCC status
|
Main power house excavation & RCC status
|
Main power house excavation & RCC status
|
Main power house excavation & RCC status
|
ESP pass-C PCC i/p
|
ESP pass-C PCC i/p
|
ESP pass-C PCC i/p
|
ESP status
|
ESP status
|
ESP status
|
ESP status
|
ESP status
|
ESP status
|
ESP status
|
ESP status
|
ESP status
|
ESP status
|
Chimney status
|
Chimney status
|
Chimney status
|
Chimney status
|
Chimney status
|
Chimney status
|
Chimney status
|
Chimney status
|
Chimney status
|
Chimney status
|
installation of 2nd batching plant
|
installation of 2nd batching plant
|
installation of 2nd batching plant
|
Fabrication yard status
|
Fabrication yard status
|
Fabrication yard status
|
Fabrication yard status
|
Fabrication yard status
|
Fabrication yard status
|
Fabrication yard status
|
Fabrication yard status
|
Boiler excavation & RCC status
|
Boiler excavation & RCC status
|
Boiler excavation & RCC status
|
Boiler excavation & RCC status
|
Boiler excavation & RCC status
|
Boiler excavation & RCC status
|
Boiler excavation & RCC status
|
Boiler excavation & RCC status
|
Boiler excavation & RCC status
|
Boiler excavation & RCC status
|
Boiler excavation & RCC status
|
ESP status
|
ESP status
|
ESP status
|
ESP status
|
ESP status
|
ESP status
|
ESP status
|
ESP status
|
ESP status
|
MPH excavation & RCC status
|
MPH excavation & RCC status
|
MPH excavation & RCC status
|
MPH excavation & RCC status
|
MPH excavation & RCC status
|
MPH excavation & RCC status
|
MPH excavation & RCC status
|
MPH excavation & RCC status
|
Bunker RHS status
|
Bunker RHS status
|
Bunker RHS status
|
Bunker RHS status
|
ESP RCC & excavation status
|
ESP RCC & excavation status
|
ESP RCC & excavation status
|
ESP RCC & excavation status
|
ESP RCC & excavation status
|
CHP area grading work
|
CHP area grading work
|
CHP area grading work
|
Chimney well plum concreting
|
Chimney well plum concreting
|
Chimney well plum concreting
|
Chimney well plum concreting
|
Fabrication yard status
|
Fabrication yard status
|
Fabrication yard status
|
Fabrication yard status
|
Fabrication yard status
|
Fabrication yard status
|
Fabrication yard status
|
Chimney status
|
Chimney status
|
Chimney status
|
Chimney status
|
Chimney status
|
Chimney status
|
ESP status
|
ESP status
|
ESP status
|
ESP status
|
ESP status
|
ESP status
|
ESP status
|
ESP status
|
Chimney PCC status
|
Chimney PCC status
|
Chimney PCC status
|
Chimney PCC status
|
fabrication yard status
|
fabrication yard status
|
fabrication yard status
|
fabrication yard status
|
fabrication yard status
|
fabrication yard status
|
fabrication yard status
|
fabrication yard status
|
fabrication yard status
|
fabrication yard status
|
fabrication yard status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
Boiler status
|
MPH PCC & RCC status
|
MPH PCC & RCC status
|
MPH PCC & RCC status
|
Boiler LHS RCC status- rear side view
|
Boiler LHS RCC status- rear side view
|
Boiler LHS RCC status- rear side view
|
Boiler zone 5 excavation status
|
Boiler zone 5 excavation status
|
Boiler zone 5 excavation status
|
Boiler zone 5 excavation status
|
Boiler zone 5 excavation status
|
Boiler zone 5 excavation status
|
ESP pass-E & F front side status
|
ESP pass-E & F front side status
|
ESP pass-E & F front side status
|
ESP pass-E & F front side status
|
Chimney status
|
Chimney status
|
Chimney status
|
Chimney status
|
Chimney status
|
ESP PCC & RCC pass E & F
|
ESP PCC & RCC pass E & F
|
ESP PCC & RCC pass E & F
|
ESP PCC & RCC pass E & F
|
ESP PCC & RCC pass E & F
|
ESP PCC & RCC pass E & F
|
ESP PCC & RCC pass E & F
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Boiler foundations status
|
Main Power House Civil status
|
Main Power House Civil status
|
Main Power House Civil status
|
Main Power House Civil status
|
Main Power House Civil status
|
Main Power House Civil status
|
Main Power House Civil status
|
Main Power House Civil status
|
Main Power House Civil status
|
Boiler excavation rear side
|
Boiler excavation rear side
|
Boiler excavation rear side
|
Boiler excavation rear side
|
ESP excavation, PCC & RCC
|
ESP excavation, PCC & RCC
|
ESP excavation, PCC & RCC
|
ESP excavation, PCC & RCC
|
ESP excavation, PCC & RCC
|
ESP excavation, PCC & RCC
|
ESP excavation, PCC & RCC
|
ESP excavation, PCC & RCC
|
ESP excavation, PCC & RCC
|
Chimney excavation
|
Chimney excavation
|
Chimney excavation
|
Chimney excavation
|
Chimney excavation
|
Chimney excavation
|
Boiler RCC & PCC works
|
Boiler RCC & PCC works
|
Boiler RCC & PCC works
|
Boiler RCC & PCC works
|
Boiler RCC & PCC works
|
Boiler RCC & PCC works
|
Boiler RCC & PCC works
|
Boiler RCC & PCC works
|
Boiler RCC & PCC works
|
Boiler RCC & PCC works
|
Boiler RCC & PCC works
|
Boiler RCC & PCC works
|
Boiler RCC & PCC works
|
Boiler RCC & PCC works
|
MPH excavation & PCC work
|
MPH excavation & PCC work
|
MPH excavation & PCC work
|
MPH excavation & PCC work
|
MPH excavation & PCC work
|
MPH excavation & PCC work
|
MPH excavation & PCC work
|
MPH excavation & PCC work
|
Batching plant
|
Batching plant
|
sand, aggregates storage
|
sand, aggregates storage
|
sand, aggregates storage
|
sand, aggregates storage
|
Quality lab
|
Quality lab
|
Quality lab
|
Quality lab
|
Quality lab
|
Fabrication beds & yard
|
Fabrication beds & yard
|
Fabrication beds & yard
|
Fabrication beds & yard
|
Fabrication beds & yard
|
Fabrication beds & yard
|
Fabrication beds & yard
|
Fabrication beds & yard
|
Fabrication beds & yard
|
Fabrication beds & yard
|
Access road between ESP & Chimney
|
Access road between ESP & Chimney
|
Access road between ESP & Chimney
|
MPH excavation
|
MPH excavation
|
MPH excavation
|
MPH excavation
|
MPH excavation
|
MPH excavation
|
MPH excavation
|
MPH excavation
|
MPH excavation
|
MPH excavation
|
MPH excavation
|
MPH excavation
|
MPH excavation
|
MPH excavation
|
MPH excavation
|
MPH excavation
|
MPH excavation
|
MPH excavation
|
MPH excavation
|
MPH excavation
|
MPH excavation
|
MPH excavation
|
ESP excavation, PCC & RCC status
|
ESP excavation, PCC & RCC status
|
ESP excavation, PCC & RCC status
|
ESP excavation, PCC & RCC status
|
ESP excavation, PCC & RCC status
|
ESP excavation, PCC & RCC status
|
ESP excavation, PCC & RCC status
|
ESP excavation, PCC & RCC status
|
ESP excavation, PCC & RCC status
|
ESP excavation, PCC & RCC status
|
ESP excavation, PCC & RCC status
|
ESP excavation, PCC & RCC status
|
ESP excavation, PCC & RCC status
|
ESP excavation, PCC & RCC status
|
ESP excavation, PCC & RCC status
|
ESP excavation, PCC & RCC status
|
ESP PCC & RCC pass-F
|
ESP PCC & RCC pass-F
|
ESP PCC & RCC pass-F
|
ESP PCC & RCC pass-F
|
ESP PCC & RCC pass-F
|
Chimney excavation
|
Chimney excavation
|
Chimney excavation
|
Chimney excavation
|
Chimney excavation
|
Chimney excavation
|
Chimney excavation
|
Chimney excavation
|
Chimney excavation
|
Chimney excavation
|
Chimney excavation
|
Chimney excavation
|
Chimney excavation
|
Chimney excavation
|
Chimney excavation
|
Chimney excavation
|
Chimney excavation
|
Chimney excavation
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
work for readiness of access road ESP & chimney
|
Work for access road to ESP & chimney
|
Work for access road to ESP & chimney
|
Bunker-RHS excavation status
|
Bunker-RHS excavation status
|
Boiler cavity front side view
|
Boiler cavity front side view
|
Boiler cavity front side view
|
Boiler cavity front side view
|
Boiler cavity front side view
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Fabrication welder test
|
Fabrication welder test
|
Fabrication welder test
|
Fabrication bed pre-assly
|
Fabrication bed pre-assly
|
Fabrication yard area
|
Fabrication yard area
|
Fabrication yard area
|
Fabrication yard area
|
Fabrication bed pre-assly
|
Fabrication bed pre-assly
|
Fabrication bed pre-assly
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
MPH excavation
|
MPH excavation
|
MPH excavation
|
MPH excavation
|
MPH excavation
|
MPH excavation
|
Chimney excavation
|
Chimney excavation
|
ESP F pass status
|
ESP F pass status
|
ESP F pass status
|
ESP cavity
|
ESP cavity
|
ESP cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Batching plant storage area
|
batching plant commissioning i/p.
|
Batching plant control room
|
sand
|
Batching plant local water source
|
Batching plant local water source
|
Quality lab
|
Quality lab
|
Batching plant status
|
Batching plant status
|
Batching plant status
|
Batching plant status
|
fabrication yard development
|
fabrication yard development
|
fabrication yard development
|
fabrication yard development
|
fabrication yard development
|
PMPL fabrication yard area
|
PMPL fabrication yard area
|
PMPL fabrication yard area
|
PMPL fabrication yard area
|
PMPL fabrication yard area
|
PMPL fabrication yard area
|
PMPL fabrication yard area
|
Fabrication yard area PMPL
|
Fabrication yard area
|
Chimney excavation pooja
|
Chimney excavation pooja
|
Chimney excavation pooja
|
Chimney excavation pooja
|
TG excavation
|
TG excavation
|
TG excavation
|
TG excavation
|
TG excavation
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
ESP excavation
|
ESP excavation
|
ESP excavation
|
ESP excavation
|
ESP excavation
|
ESP excavation
|
ESP excavation
|
ESP excavation
|
ESP pass-C excavation
|
D(pro)-MSPGCL visit 20/07/19
|
ESP PCC pooja
|
ESP excavation
|
ESP excavation
|
D(pro)-MSPGCL visit 20/07/19
|
D(pro)-MSPGCL visit 20/07/19
|
RHS Bunker excavation
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
|
Fabrication yard area PMPL
|
Fabrication yard area PMPL
|
Fabrication yard area PMPL
|
Fabrication yard area PMPL
|
Approach road excavation
|
Approach road excavation
|
Storage area for sand & aggregates
|
Storage area for sand & aggregates
|
Storage area for sand & aggregates
|
Quality lab
|
Quality lab
|
Batching plant
|
Batching plant status
|
Batching plant status
|
Batching plant status
|
Boiler rear side excavation
|
Boiler rear side excavation
|
ESP excavation
|
ESP excavation
|
ESP excavation
|
ESP excavation
|
ESP excavation
|
ESP excavation
|
Boiler cavity
|
Boiler cavity
|
RHS Bunker excavation
|
Boiler cavity
|
Boiler cavity
|
Boiler cavity
|
Boiler status
|
Boiler S11L PCC preparation i/p.
|
Boiler PCC & RCC (LHS)
|
Boiler PCC & RCC (LHS)
|
Boiler PCC & RCC preparation
|
Boiler Fdns PCC (LHS) preparation
|
RHS bunker excavation 70% completed
|
RHS bunker excavation
|
RHS bunker excavation
|
ESP E pass excavation
|
RHS Bunker excavation
|
Boiler PCC& RCC status
|
Boiler PCC & RCC
|
ESP excavation F pass
|
ESP_F_pass excavation_2
|
ESP_F_pass excavation
|
Boiler cavity excavation_pcc_rcc
|
RHS Bunker excavation
|
fabrication yard area development in progress
|
Levelling work in boiler in progress
|
Batching plant foundation readiness
|
PCC for S5L & S6L completed
|
RCC work for S5L
|
batching plant PMPL
|
Inside View of Office
|
First aid & RO complex - BHEL
|
Storage yard power source
|
Entry Point closed on 290619_1
|
Previous open entry points MAHAGENCO_1
|
Closed storage sheds_2
|
Closed storage sheds_1
|
BHEL new office complex_2
|
BHEL new office complex_1
|
Rain water logging in boiler cavity_21
|
Rain water logging in boiler cavity_1
|
Material stacking_4
|
Material stacking_3
|
Material stacking_2
|
Material stacking_1
|
Boiler cavity excavation_6
|
Boiler cavity excavation_5
|
Boiler cavity excavation_4
|
Boiler cavity excavation_3
|
Boiler cavity excavation_2
|
Main plant civil - pooja_4
|
Main plant civil - pooja_3
|
Main plant civil - pooja_2
|
Main plant civil - pooja_1
|
Status of new office complex
|
Status of new office complex
|
Status of new office complex
|
Status of new office complex
|
Excavation of Boiler cavity area (~ 11900 cum)
|
Excavation of Boiler cavity area (~ 11900 cum)
|
Excavation of Boiler cavity area (~ 11900 cum)
|
Excavation of Boiler cavity area (~ 11900 cum)
|
Excavation of Boiler cavity area (~ 11900 cum)
|
Weigh bridge working
|
Fencing works
|
closed sheds
|
Shed and road works
|
Yard Levelling
|
Shed erection works
|
Office Brickworks
|
Office area work
|
Material verification and weigh bridge
|
Fencing works
|
Fencing and material stacking
|
Closed shed 3 inside area murrom filling works
|
Closed shed 1, 2 inside area flooring
|
Closed Shed erection works (Enabling works)
|
Weigh Bridge (Enabling works)
|
Road and yard development works (Enabling works)
|
New Site office works (Enabling works)
|
Material storage (Enabling works)
|
Closed storage shed-3 foundation works (Enabling)
|
Weigh Bridge works (Enabling works)
|
Closed Shed erection works (Enabling works)
|
New Site office works (Enabling works)
|
Road and yard development works (Enabling works)
|
Weigh Bridge Erection (Enabling works)
|
Storage shed No. 2 works (Enabling works)
|
Site Office works (Enabling works)
|
Storage shed No. 2 works (Enabling works)
|
Storage shed TB/Pedestals works (Enabling works)
|
Storage shed works (Enabling works)
|
2nd Storage shed works (Enabling works)
|
Yard Road works (Enabling works)
|
Weigh Bridge control room works (Enabling works)
|
Structural steel unloading/mm
|
Structural steel unloading/mm
|
Structural steel unloading/mm
|
|
|
|
Weigh Bridge control room works (Enabling works)
|
Weigh Bridge control room works (Enabling works)
|
Storage shed works (Enabling works)
|
Structural steel unloading/mm
|
Structural steel unloading/mm
|
Structural steel unloading/mm
|
Site office foundation works (Enabling works)
|
Shed excavation works (Enabling works)
|
weigh bridge control room work (Enabling work)
|
Store shed work (Enabling work)
|
weigh bridge control room work (Enabling work)
|
weigh bridge control room work (Enabling work)
|
weigh bridge tie beam work (Enabling work)
|
Office foundation PCC work (Enabling work)
|
weigh bridge tie beam work (Enabling work)
|
Store shed foundation casting (Enabling work)
|
Storage Shed Foundation Raft Casting Under progres
|
Storage Shed Foundation Raft Casting Under progres
|
weigh bridge pedestals casting (Enabling work)
|
weigh bridge pedestals casting (Enabling work)
|
weigh bridge foundation casting (Enabling work)
|
weigh bridge foundation casting (Enabling work)
|
Structural steel unloading/mm
|
Structural steel unloading/mm
|
Structural steel unloading/mm
|
Open storage Yard Stripping/Grading_Enabling Work
|
Open Storage Yard development work(Enabling works)
|
Yard Road Development work(Enabling works)
|
Yard Road Development work(Enabling works)
|
Storage shed foundation work(Enabling works)
|
Open Storage Yard development work(Enabling works)
|
Structural steel unloading/mm
|
Structural steel unloading/mm
|
Structural steel unloading/mm
|
Yard Road Development work(Enabling works)
|
Weigh Bridge Foundation work(Enabling works)
|
Storage area development work(Enabling works)
|
Storage area development work(Enabling works)
|
Structural steel unloading/mm
|
Structural steel unloading/mm
|
Structural steel unloading/mm
|
Storage shed foundation work(Enabling works)
|
Structural steel unloading/mm
|
Structural steel unloading/mm
|
Structural steel unloading/mm
|
Yard Road Excavation works(Enabling works)
|
Yard Development works (Enabling works)
|
Yard Development works (Enabling works)
|
Storage shed works(Enabling works)
|
Yard Development works (Enabling works)
|
Yard Development works (Enabling works)
|
Structural steel receipt /mm
|
Structural steel receipt /mm
|
Structural steel receipt /mm
|
Structural steel receipt /mm
|
Structural steel receipt /mm
|
Structural steel receipt /mm
|
Structural steel receipt /mm
|
Structural steel receipt /mm
|
Structural steel receipt /mm
|
Structural steel receipt /mm
|
Structural steel receipt /mm
|
yard development
|
yard development
|
yard development
|
yard development
|
yard development
|
yard development
|
yard development
|
yard development
|
yard development
|
Steel storage at site
|
Open storage yard
|
Main plant area
|
Geotech work in progress
|
Geotech and soil testing work in progress
|
Geotech work in progress
|
Geotech work in progress
|
|
|
|
|