UDANGUDI TPS (2X660 MW)


Aux. Boiler : Erection Status

JNT #7 : Erection works u/p

JNT #6 : Erection works u/p

CHP MCC 2

Coal Stock yard 2 : Paving works u/p

CHP 2 : Drain works u/p.

DSPH and Overhead Tank fdn works u/p.

BCN 1A/B Erection Status

View of the Plant - East Side

View of the Plant - West Side

Filter shed : 11/14 PSF`s positioned.

Status of DM Tanks

Status of UF-RO-DM Building

HSD and HFO Tanks - Status

GRP Erection works u/p.

Status of FOPH along with PR-10

Status of UF-RO-DM Control Room

U#1:Transformer yard works u/p.

U#2: ESP to ID duct erection u/p.

U#2:ESP Insulation works u/p.

U#1:ESP Insulation works u/p.

Chimney: 4/6 flue can erection u/p.

U#2:Bottom Ash Hopper civil works u/p.

U#1:ESP to ID duct erection u/p

U#1:Portal Crane erection u/p.

U#1:Critical Piping works u/p in ground floor.

U#1:Condenser 2 :Tube Support Plate (TSP) Erection U/p.

CHP STOCK YARD 2

U#01 PORTAL CRANE ERECTION

U#02 LP HEATER 4 ERECTION

UFRODM BUILDING

FILTER BUILDING

TRANSFORMER YARD 2

NDCT U # 01

DG BUILDING

TRANSFORMER YARD 1

STANDBY MAINTENANCE TRANSFORMER

AIR COMPRESSOR HOUSE

BOILER U # 01 PA FAN B & FD FAN B

BOILER U # 01 ERECTION

U#02 ID SYSTEM

U#01 ID SYSTEM

JNT 7

BCN 3 A/B CONVEYOR GALLERY

CRUSHER HOUSE

NDCT U # 01

CHP STOCK YARD

U#01 EOT CRANE

NDCT U # 01

BOILER U # 02 ERECTION

U#01 ESP TO ID DUCT

CCR BUILDING

BOILER U # 01 PA FAN B and FD FAN B

SW Intake well#2 : Air bags placing completed.

BCN 3A/B : GR-5 Erected.

TG #1: Turbine pedestal (1-5) placed in postion.

STACKER CUM RECLAIMER 02

JNT 2 & 3

CRUSHER HOUSE

BCN 14 A/B

FUEL OIL HANDLING SYSTEM

WATER TREATMENT SYSTEM

TRANSFORMER YARD 1

POWER HOUSE BUILDING

Civil Works under progress in ERH area.

Inside GRP Piping works under progress

PT Plant civil works under progress

FOPH civil works under progress

View of NDCT and CW PH

NDCT U # 01

NDCT U # 02

U #01 POWER HOUSE BUILDING

AUX BOILER

BCN 14 A/B

CHP STOCK YARD 2

ESP DUCT UNIT 02

U#2: PA and FD Fan- A : Civil works under progress.

SWIO: Intake well #1 casting u/p.

U#2: ESP to ID and ID to Chimney Duct Erection U/p.

CLARIFIED WATER STORAGE TANK

CHP JNT 07

CHP: Stock yard

JNT 3 B1 column erected

#1 power house c12 column Erected

CRUSHER HOUSE

BCN 3 A/B CONVEYOR GALLERY

EMERGENCY RE CLAIMER & HOPPER :

CW FEEDPOOL

AUX BOILER

BOILER U # 02 ERECTION

SWIO : PIPE LAYING

TG DECK U # 02

ESP U#1 : Pass B ATT Completed successfully.

TG #2 : Deck reinforcement fixing works and outer shuttering u/p

Aux. Boiler : S3 and S4 Columns Erection U/p.

FA Silo #1 : Shell Wall Casting U/p.

BOILER & ESP U # 02

BOILER & ESP U # 01

BOILER U # 01 & U # 02

POWER HOUSE U #01

CCR BUILDING

POWER HOUSE U #02

BOILER U #02 ERECTION

UNIT # 02 PA & FD FAN CIVIL

ESP U #01 ERECTION

BOILER U #01 ERECTION

BCN 15 AB : ERECTION

TG DECK UNIT # 02

BCN 15 AB : ERECTION

TDBFP U # 02

UNIT # 02 : ID FAN TO CHIMNEY ERECTION

SEA WATER INTAKE PUMP HOUSE

NDCT # 02

NDCT U # 01

TG DECK U # 02

OVERALL VIEW OF PROJECT

NDCT U # 01

NDCT U # 01

SWIO : INTAKE WELL

TG DECK U # 02

POWER HOUSE UNIT #01 STRUCTURE ERECTION

NDCT U # 01

NDCT U # 02

ESP UNIT 02

ESP UNIT 01

CCR BUILDING

BOILER U # 02 ERECTION

BOILER U # 01 ERECTION

PH # 02 STRUCTURAL ERECTION

TG U # 02 DECK

BOILER 02

CHP BCN 9 A/B

PH U # 1 Fabricarion

NDCT # 02

NDCT # 01

TG DECK UNIT # 02

UNIT#2 FLUE CANE 5/6 ERECTION

U#2 PASS -A INSULATION AND ROOF SHEETING

UNIT-2 ALL ECO HOPPER ERECTED

NDCT-1 BASIN FLOOR RCC COMMENCED

SCR-2 COAL STOCK YARD RCC PAVING COMMENCED

BCN 5AB GR3,GR3A,GR3B ERECTED

NDCT U # 01

EMERGENCY RE CLAIMER & HOPPER :

UFRODM BUILDING

CCR 8.5 FLOOR SHUTTERING COMMENCED

JNT -6 ERECTION COMMENCED

NDCT # 01 : RAKER COLUMN

CW FOREBAY

CWPH

PH # 02 STRUCTURAL ERECTION

PH # 02 STRUCTURAL ERECTION

PH # 01 STRUCTURAL ERECTION

PH # 01 STRUCTURAL ERECTION

emergency reclaim hopper

UFRODM BUILDING

DM TANKS

ID DUCT U # 02 ERECTION (ID FAN TO CHIMNEY )

STACKER CUM RECLAIMER U # 02

STACKER CUM RECLAIMER U # 02

STACKER CUM RECLAIMER U # 01

CW PIPE ENCASING

CRUSHER HOUSE

CS TANK

ESP UNIT 02

BOILER 02

BOILER 01

TG UNIT # 02

FLY ASH SILO

CCR BLG ERECTION

NDCT # 01 : RAKER COLUMN

NDCT # 01 : RAKER COLUMN

NDCT # 01

ESP UNIT 01

CHP JNT 11 & 12

ESP CONTROL ROOM UNIT 02

CHP JNT 08

TG U # 01 DECK TOP VIEW

TG U # 01 DECK

TG U # 01 DECK

TG U # 01 DECK

TG U # 01 DECK

TG U # 01 DECK TOP VIEW

View of USTPP

Status of JNT -2 & BCN 16 A/B

Status of JNT-11

Status of BCN 15 A/B

Status of ESP Control Room- U2

Status of FD and PA Fan Civil Foundation - U2

Status of Vacuum PH - U2

Status of Vacuum PH - U1

Encasing of CW Piping Works U/p.

Status of EOT - U1

CLARIFIED WATER STORAGE TANK

Remineralization Blg

CHIMNEY

CLARIFIED WATER STORAGE TANK

NDCT # 01

STACKER CUM RECLAIMER U # 02

emergency reclaim hopper

CLARIFIED WATER STORAGE TANK

PT SLUDGE PIT

ULTRA FILTERATION BUILDING

UFRODM BUILDING

ECP BUILDING

NEUTRALIZATION PIT

TRANSFORMER YARD U # 01

BOILER 01

BOILER 02

POWER HOUSE BUILDING U # 02

POWER HOUSE BUILDING U # 01

PH # 01 EOT CRANE

ESP UNIT 01

TG U # 01 DECK

NDCT # 01 : RAKER COLUMN

CRUSHER HOUSE

UFRODM BUILDING

emergency reclaim hopper

NEUTRALIZATION PIT

ID FAN U # 02

CCR BUILDING

EMERGENCY RE CLAIMER & HOPPER :

STAKER CUM RECLAIMER 02

STAKER CUM RECLAIMER 02

NDCT U # 01 :Raker Column

STACKER CUM RECLAIMER 02

BW - STONE PITCHING WORK

FA SILO 04

NEUTRALIZATION PIT

emergency reclaim hopper

ID DUCT U # 02 ERECTION (ID FAN TO CHIMNEY )

LT MCC BUILDING

BACKWASH WASTE SUMP

UFRODM BUILDING

CHIMNEY : FLUE CAN ERECTION

CHIMNEY : FLUE CAN ERECTION

DM TANKS

VPH 01

TG UNIT 02

CW PIPE ENCASING

CW PIPE ENCASING

NDCT 1: Raker column

NDCT 2 : Overall view

NDCT 2 : Overall view

FA SILO

FA SILO 04

NDCT U # 01 : RAKER COLUMN

VPH 01

SERVICE AND PORTABLE OVERHEAD TANK

CW FEED POOL

CWPH

CW PIPE ENCASING

TG UNIT 02

WORKSHOP BUILDING

FIRE STATION

TG U1: Deck

CCR STRUCTURAL FABRICATION

BOILER 02

BOILER U # 01

NDCT 2 : Overall view

TG UNIT 02

NDCT 1:

FA SILO 04

UFRODM BUILDING

TRANSFORMER YARD # 01

CHIMNEY - FLUE CAN

NDCT # 01

ECP BUILDING

CHEMICAL DOSING BUILDING

FILTER BUILDING

RO DM LTMCC

DM TANKS

TG U # 01 DECK

BOILER U # 02

CCR BUILDING

ESP U # 01

PH STRUCTURE # 01

BOILER U # 01

TG U # 01 DECK

TDBFP UNIT 01

UFRODM BUILDING

NDCT U # 01

EMERGENCY RE CLAIMER AND HOPPER :

DM TANK

NDCT U #02

CW PUMP HOUSE

ECP BUILDING

POWER HOUSE BUILDING U # 01

TRANSFORMER YARD U # 01

POWER HOUSE BUILDING U # 01

POWER HOUSE BUILDING U # 02

ESP UNIT 02 : HOPPER ERECTION

CCR BLG : G 14 COLUMN ERECTION IN PROGRESS

ESP UNIT # 2 PASS C : PENT HOUSE ERECTION

ID FAN U # 01 ( FAN B )

ID DUCT U # 02 ERECTION (ID FAN TO CHIMNEY )

TG U # 01 DECK BOTTOM SHUTTERING WORK

BOILER 01

U2: ECO to APH ( LHS) Duct Erection U/p

CCR : F14 Column Erected.

PH U2: Structural Erection Status

NDCT 2 : Overall view

CW Piping & Transformer Yard

NDCT 1: Back filling Works U/p

NDCT 1: Pond Floor PCC Started

TG U1: Deck Slab Bottom Shuttering works started

Plant - Overall View

Status of NDCT -2

Status of NDCT -1

JNT-2 Erection Status

Status of Desalinated Fire Water PH

Status of CW PH Area

Status of Crusher House

Status of Coal Runoff Pond

Status of Clarified Storage Water Tank

CHP - MCC 2

Chemical Dosing Building

Status of CCR Fdns

Status of Power House - U2

Status of Power House- U1

Status of DM Tank

ESP - U2

ESP- U1

Boiler- U2

Boiler - U1

SWIO ALL INTAKE HDPE PIPE STRINGS SINKING COMPLE

SWIO:Desilting Basin: Hydro test completed.

Status of NDCT -2

Status of NDCT -2

Status of NDCT -1

Aerial View of NDCT with CW Piping

Chimney View

Power House - U2

Status of TG & PH U2 Civil Foundations

Power House - U1

TG Unit 1

ESP U 2

ESP U1

View of Boiler U2

View of Boiler U1

Boiler U1

Overall View

SWIO; Offshore Dredging works u/p.

SWIO: HDPE Welding Under progress

SWIO: Outfall GRP Pipe Laying works under progress

Status of D to H Fdns ( CCR)

Status of JNT -11

Status of CPU regeneration building

DM Tank Erection Under Progress

Status of DM Pump House

Status of PT Plant

Status of ECP

Status of Chemical Dosing Building

SW Outfall Pump House - Status

Status of SW Outfall Tank and Feed pool

Status of Crusher House

Reinforcement Works under progress in JNT 3

Excavation Works under progress in BCN 5A/5B

Status of JNT -2

SEA WATER INTAKE PUMP HOUSE

POWER HOUSE BUILDING


ESP UNIT 01

BOILER U # 02 ERECTION

DM Tank & DM makeup pump house

Sea Water intake pump house

Unit-1 NDCT

ESP Unit-2

Boiler U-2 Erection

Power House Unit-1 structure erection

Mills U-2 Erection

Mills U-1 Erection

ESP Unit-1

Boiler U -1 erection

Boiler U2 - Permanent Lift - 4thTier Erection under progress

Status of Bunker Fabrication yard.

Status of U2 ESP.

Status of U 2 : CW Pit & TG area

Status of Fire Water Tank.

Status of Ash Water Pump House.

Status of AHP MCC3 & Compressor House.

Status of CW Feed pool.

Status of SW Out fall Tank

Status of SW Out fall Feed pool & Pump House

SWIO:Desilting Basin:4th lift shuttering works under progress

Status of NDCT -1

Status of CW Pit -1

PH U1 : B5 Column Erected.

Heavy rains at switchyard

Heavy rains at switchyard

Heavy rains at switchyard

BOILER 02 / MILL FDN

BOILER 01

DESALINATED & FIRE WATER STORAGE TANK

BOILER 01

CCR BLG / PH

CW PIPE ENCASING

DESALINATED & FIRE WATER STORAGE TANK

CS TANK & PUMP HOUSE

ESP UNIT 02

TG UNIT # 01

DESALINATED & FIRE WATER STORAGE TANK

DISPENSARY BUILDING

CW PIPE ENCASING

WORKSHOP BLG

CHP-JNT 03

CHP-JNT 02

DM TANK / PH

DESALINATED & FIRE WATER STORAGE TANK

FILTER SHED

UFRODM SYSTEM

ESP UNIT 02

ESP UNIT 01

BOILER 01

POWER HOUSE BUILDING U # 02

CCR BLG / PH

TG UNIT # 02

POWER HOUSE BUILDING U # 02

CW PIPE ENCASING

CW PIPE ENCASING

DESALINATED & FIRE WATER STORAGE TANK

FILTER SHED

TG UNIT # 02

CCR BLG / PH

BOILER 01

Chemical Dozing Building ..

CW PIPE ENCASING

CWPH& FEEDPOOL

ESP UNIT 01

BOILER 02

POWER HOUSE BUILDING U # 02

BOILER 02

BOILER 01

FLY ASH SILO

CW PIPE ENCASING

TG UNIT # 02

CW PIPE ENCASING

BOUNDARY WALL

ESP UNIT 01

BOILER 02

BOILER 01

ESP UNIT 02

CCR BLG / PH

POWER HOUSE BUILDING U # 02

MILL FDN # 01

CWPH& FEEDPOOL

CS TANK & PUMP HOUSE

Chemical Dosing Building

VACCUM PUMP HOUSE UNIT # 02

COMPRESSOR HOUSE

ESP UNIT 01

DM TANK

UFRODM SYSTEM

CW PIPE ENCASING

CHP - JNT 03

CHP - BCN 12 AB

stacker cum Reclaimer 01

POWER HOUSE BUILDING

TG UNIT # 01

FILTER SHED

CHP-JNT 12

BOILER 01

BOILER 02

CWPH& FEEDPOOL

CW PIPE ENCASING

TG UNIT # 01

AUXILIARY BOILER

FILTER SHED

DM TANK

UFRODM SYSTEM

FIRE STATION

DM TANK

UFRODM SYSTEM

CHP-JNT 04

CW PIPE ENCASING

POWER HOUSE BUILDING U # 02

ESP UNIT 01

TG UNIT # 01

CCR BLG / PH

POWER HOUSE BUILDING U # 02

BOILER 02

TG UNIT # 01

BOILER U # 01

CCR BLG / PH

WORKSHOP BLG

POWER HOUSE BUILDING

NDCT # 01

VACCUM PUMP HOUSE UNIT # 02

CHP-JNT 12

BOILER 02

BOILER 02

BOILER 02

BOUNDARY WALL

BOUNDARY WALL

POWER HOUSE BUILDING U # 01

BOILER 02

BOUNDARY WALL

NDCT # 01

TG UNIT # 02

TG UNIT # 01

CW PIPE ENCASING

VACCUM PUMP HOUSE UNIT # 02

POWER HOUSE BUILDING U # 02

CHP-JNT 09

BOILER 02

TG UNIT # 01

NDCT # 01

DM TANK

CS TANK & PUMP HOUSE

VACCUM PUMP HOUSE U # 02

AUXILIARY BOILER

CHP JNT 12

ESP 01

BOILER 02

BOILER 01

BOUNDARY WALL

BOILER 02

BOUNDARY WALL

LEVELLING & GRADING

POWER HOUSE BUILDING

POWER HOUSE BUILDING

TG RAFT UNIT 1

AUXILIARY BOILER

WORKSHOP BLG

CHP - JNT 12

BOILER 02

CW PIPE ENCASING

CHP-JNT 09

BOILER 01

BOILER 01

CHP-JNT 12

POWER HOUSE BUILDING

POWER HOUSE BUILDING

CW PIPE ENCASING

BOILER 02

BOILER 01

TG UNIT # 01

WORKSHOP BLG

BOILER 01

ESP UNIT 01

DM TANK

TG UNIT # 01

FIRE STATION

BOILER 01

TG UNIT # 01

ESP UNIT 02

BOILER 02

BOILER 02

BOILER 01

BOILER 01

WORKSHOP BLG

TG UNIT # 01

CHP-JNT 09

CHP-JNT 03 EXCAVATION

CHP-JNT 02

ESP UNIT 01

FIRE STATION

CHP-JNT 12

BOILER 02

CW PIPE ENCASING

NDCT # 01

TG UNIT # 01

POWER HOUSE BUILDING

TG UNIT # 02

CCR BLG / PH

BOUNDARY WALL

BOUNDARY WALL

SEA WATER INTAKE & OUTFALL SYSTEM

BOILER 02

BOILER 01

ESP UNIT 02

DM TANK

BOILER 02

CCR BLG / PH

TG UNIT # 01

CHP - JNT 09

BOILER 01

NDCT U # 01

NDCT U # 01

WORKSHOP BUILDING

BOTTOM ASH HOPPER U # 02

BOTTOM ASH HOPPER U # 01

TG U # 01

BOILER 02

UNIT 2

ESP 01

ESP 01

BOILER 01

BOILER 01

BOILER 02

BOILER 02


CHP JNT 09

NDCT # 01

DM TANK

AUXILIARY BOILER

CANTEEN BUILDING

CCR BUILDING

CCR BUILDING

ESP 02

BOILER 02

BOILER 01

DM TANK

TG UNIT # 02

CHP-JNT 12

ESP UNIT 02

CCR BLG / PH

BOILER 02

BOILER 01

BOILER 01

WORKSHOP BUILDING

TG UNIT # 02

CCR BLG / PH

ESP UNIT 02

ESP UNIT 01

CHP JNT 09

ESP UNIT 02

SEA WATER INTAKE & OUTFALL

CCR BUILDING

BOILER U # 02 ERECTION

BOILER U # 01 ERECTION

NDCT # 01

CHIMNEY

ESP U # 02

ESP U # 01

TG U # 02

BOILER 02

BOILER 02

BOILER 01

BOILER 01

CHIMNEY

Aerial View Photos as on 11.05.2020

Aerial View Photos as on 11.05.2020

Aerial View Photos as on 11.05.2020

Aerial View Photos as on 11.05.2020

Aerial View Photos as on 11.05.2020

Aerial View Photos as on 11.05.2020

Aerial View Photos as on 11.05.2020

Aerial View Photos as on 11.05.2020

BOILER 01

BOUNDARY WALL

BOILER 02

BOTTOM ASH HOPPER U # 02

BOTTOM ASH HOPPER U # 01

BOILER 01

NDCT U # 01

ESP UNIT 02

BOILER U # 01 ERECTION

BOILER 01

BOILER 02

BOILER 02

BOILER 02

TG UNIT 02

NDCT # 01

ESP # 01

CHP JNT 09

BOILER 02

BOILER 01

BOUNDARY WALL

BOUNDARY WALL

CHP JNT 09

BOTTOM ASH HOPPER U # 01

BOTTOM ASH HOPPER U # 01

TG UNIT 01

BOILER 02

BOILER 01

SEA WATER INTAKE & OUTFALL SYSTEM

TG UNIT 01

PH STRUCTURAL FABRICATION

PH STRUCTURAL FABRICATION

BOILER 02

ESP 02

VACUUM PUMP HOUSE UNIT 2

SEA WATER INTAKE AND OUTFALL SYSTEM

SEA WATER INTAKE AND OUTFALL SYSTEM

NDCT 1

BOTTOM ASH HOPPER U # 01

BOILER 02

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

BOILER 01- ERECTION

BUNKER RAFT UNIT 2 LHS

ESP 2

POWER HOUSE FABRICATION

POWER HOUSE FABRICATION

POWER HOUSE BUILDING

BOILER 02

TG RAFT UNIT 1

BOTTOM ASH HOPPER U # 02

ESP 02

BOILER 02

BOILER 01

BOILER 01

POWER HOUSE BUILDING

BOILER 02

BOILER 01

BOILER 01

BOUNDARY WALL

BOUNDARY WALL

BOUNDARY WALL

CHIMNEY

BOILER 02

BOILER 02

BOILER 01

BOILER 01

BOILER 01

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

ID FAN

CW PIPE ENCASING

BOTTOM ASH HOPPER - 02

BOTTOM ASH HOPPER - 01

VACCUM PUMP HOUSE UNIT # 02

DESALINATED & FIRE WATER STORAGE TANK

CHP-JNT 12

CHP-JNT 09

CHP-JNT 03 EXCAVATION

CHP-JNT 02

PH-STRUCTURAL FABRICATION YARD

DM TANK

UFRODM SYSTEM

NDCT # 01

NDCT # 01

NDCT # 01

ESP UNIT 02

FIRE STATION

POWER HOUSE BUILDING

POWER HOUSE BUILDING

Chemical Dozing Building

CHIMNEY

CANTEEN BLG

BOILER 02

BOILER 02

BOILER 02

BOILER 01

BOILER 01

BOILER 01

BOILER & ESP U # 02 ERECTION

BOILER & ESP U # 01 ERECTION

ESP 01

BOILER 01

CHP - JNT 09

SEA WATER INTAKE AND OUTFALL SYSTEM

SEA WATER INTAKE AND OUTFALL SYSTEM

SEA WATER INTAKE AND OUTFALL SYSTEM

BOILER U # 01 ERECTION

BOILER U # 02 ERECTION

CW PIPE ENCASING

ESP UNIT 01

NDCT # 01

BOUNDARY WALL

BOUNDARY WALL

BOUNDARY WALL

stacker cum Reclaimer 01

CHP-JNT 03 EXCAVATION

CHP-JNT 02

CHP-JNT 09

BOTTOM ASH HOPPER - 02

BOTTOM ASH HOPPER - 01

CHIMNEY

BOILER 02

BOILER 02

BOILER 01

BOILER 01

TG UNIT # 02

TG UNIT # 01

TG UNIT # 01

CHIMNEY

BOTTOM ASH HOPPER - 02

UFRODM SYSTEM

ESP UNIT 02

DM TANK

BOILER 01

BOILER 02

BOILER U # 02

BOILER U # 01

DM TANK

UFRODM SYSTEM

NDCT U # 01

CHP JNT 02

FIRE STATION

CANTEEN BUILDING

BOUNDARY WALL EAST SIDE

BOUNDARY WALL NORTH SIDE

BOTTOM ASH HOPPER # 02

BOTTOM ASH HOPPER # 01

CHP JNT 09

CHIMNEY

ESP UNIT 02

ESP UNIT 02

BOILER U # 02

BOILER U # 01

ESP UNIT 01

ESP UNIT 01

BOILER U # 02 ERECTION

BOILER U # 01 ERECTION

POWER HOUSE BUILDING

POWER HOUSE BUILDING

POWER HOUSE BUILDING

POWER HOUSE BUILDING

BOUNDARY WALL

CHIMNEY

CANTEEN BLG

Chemical Dozing Building

CHP-JNT 09 -EXCAVATION

CHP-JNT 03 EXCAVATION

CHP-JNT 02

DM TANK

VACCUM PUMP HOUSE UNIT # 02

NDCT # 01

TG UNIT 01

POWER HOUSE BUILDING

BOILER 02

BOILER 01

DESALINATED & FIRE WATER STORAGE TANK

CANTEEN BLG

ESP UNIT 02

ESP UNIT 02

ESP UNIT 01

TG UNIT # 02

POWER HOUSE BUILDING

BOTTOM ASH HOPPER - 02

BOTTOM ASH HOPPER - 01

Chemical Dozing Building

UFRODM SYSTEM

VACCUM PUMP HOUSE UNIT # 02

BOILER 02

BOILER 01

CHIMNEY

FIRE WATER TANK

NDCT # 01

NDCT # 01

BOUNDARY WALL

POWER HOUSE BUILDING

BOILER 01

POWER HOUSE BUILDING

DM TANK

CHP-JNT ,03, -EXCAVATION

CHP-JNT 02

BOILER 02

BOILER 01

CHP-JNT 12

BOTTOM ASH HOPPER - 02

BOTTOM ASH HOPPER - 01

VACCUM PUMP HOUSE UNIT # 02

DM TANK

UFRODM SYSTEM

Chemical Dozing Building

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

ESP UNIT 02

ESP UNIT 02

ESP UNIT 01

ESP UNIT 01

POWER HOUSE BUILDING

POWER HOUSE BUILDING

BOILER 02

BOILER 01

CANTEEN BLG

NDCT 1

DM TANK

UFRODM SYSTEM

Chemical Dozing Building

STACKER CUM RECLAIMER 01

CHP - JNT 12

CHIMNEY

POWER HOUSE BUILDING

ESP 02

ESP 02

BOILER 02

BOILER 02

ESP 01

BOILER 01

BOILER 01

BOUNDARY WALL

BOUNDARY WALL

BOUNDARY WALL

BOUNDARY WALL

ESP UNIT 02

ESP UNIT 01

UFRODM SYSTEM

Chemical Dozing Building

CHP - JNT 02

CHP - JNT 12

NDCT # 01

CHIMNEY

BOILER 02

BOILER 02

BOILER 01

BOILER 01

POWER HOUSE BUILDING

POWER HOUSE BUILDING

POWER HOUSE BUILDING

BOUNDARY WALL

POWER HOUSE BUILDING

ESP UNIT 02

SEA WATER INTAKE & OUTFALL SYSTEM

TURBINE GENERATOR-EXCAVATION.

TURBINE GENERATOR-EXCAVATION.

POWER HOUSE BUILDING

NDCT # 01

CHP-JNT 12

stacker cum Reclaimer 01

CHP-JNT 02

BOILER -02

BOILER 02

BOILER 01

BOILER 01

BOTTOM ASH HOPPER - 02

ESP UNIT 01

CHIMNEY

ESP UNIT 01

CHEMICAL DOSING BUILDING

UFRODM BUILDING

BOILER U # 01

BOILER U # 02

POWER HOUSE BUILDING

BOTTOM ASH HOPPER # 01

BOTTOM ASH HOPPER # 02

POWER HOUSE BUILDING

BOILER U # 02 ERECTION

BOILER U # 02 ERECTION

BOILER U # 01 ERECTION

NDCT U # 01

NDCT 1

NDCT 2

POWER HOUSE BUILDING

TG RAFT EXCAVATION UNIT 1

POWER HOUSE BUILDING

BOTTOM ASH HOPPER 02

CHP - JNT 12

DM TANK

Chemical Dozing Building

BOUNDARY WALL

BOUNDARY WALL

BOILER 02 - ERECTION

BOILER 01- ERECTION

BOILER 02

BOILER 01

NDCT # 01

BOILER 01

BOILER 01

CHP-JNT 09 & 10 -EXCAVATION

DM TANK

UFRODM SYSTEM

BOILER 02

BOTTOM ASH HOPPER 02

POWER HOUSE BUILDING

POWER HOUSE BUILDING

POWER HOUSE BUILDING

BOTTOM ASH HOPPER 01

POWER HOUSE BUILDING

POWER HOUSE BUILDING

POWER HOUSE BUILDING

BOTTOM ASH HOPPER - 02

BOTTOM ASH HOPPER - 01

CHP-JNT 02

UFRODM SYSTEM

Chemical Dozing Building

PH-STRUCTURAL FABRICATION YARD

CANTEEN BLG

POWER HOUSE BUILDING

ESP UNIT 02

ESP UNIT 02

BOILER 02

BOILER 02

ESP UNIT 01

ESP UNIT 01

BOILER 01

BOILER 01

BOILER 02

BOILER 01

NDCT # 01

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

POWER HOUSE BUILDING

ESP UNIT 02

ESP UNIT 01

BOUNDARY WALL

BOUNDARY WALL

CHIMNEY

BOTTOM ASH HOPPER - 02

PH-STRUCTURAL FABRICATION YARD

PH-STRUCTURAL FABRICATION YARD

BOTTOM ASH HOPPER - 02

BOTTOM ASH HOPPER - 01

BOILER 02

POWER HOUSE BUILDING

POWER HOUSE BUILDING

POWER HOUSE BUILDING

NDCT # 01

CHIMNEY

ESP UNIT 02

ESP UNIT 02

ESP UNIT 01

ESP UNIT 01

CANTEEN BLG

BOILER 02

BOILER 01

NDCT # 01

NDCT # 01

ESP UNIT 01

BOILER 02

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

UFRODM SYSTEM

PH-STRUCTURAL FABRICATION YARD

PH-STRUCTURAL FABRICATION YARD

NDCT # 01

NDCT # 01

NDCT # 01

NDCT # 01

ASH DYKE

ASH DYKE

BOTTOM ASH HOPPER - 02

BOTTOM ASH HOPPER - 02

BOTTOM ASH HOPPER - 01

BOTTOM ASH HOPPER - 01

Chemical Dozing Building

FIRE STATION

CANTEEN BLG

stacker cum Reclaimer 02

CHP-JNT 09 -EXCAVATION

CHP-JNT ,03,09, -EXCAVATION

CHP-JNT 02, -EXCAVATION

CHP-JNT 02, -EXCAVATION

POWER HOUSE BUILDING

POWER HOUSE BUILDING

POWER HOUSE BUILDING

CHIMNEY

CHIMNEY

CHIMNEY

ESP UNIT 02

ESP UNIT 02

BOILER 02

BOILER 02

ESP UNIT 01

ESP UNIT 01

BOILER 01

BOILER 01

NDCT 1

NDCT 1

POWER HOUSE BUILDING

POWER HOUSE BUILDING

CHIMNEY

CHIMNEY

ESP 02

ESP 02

BOILER 02

BOILER 02

ESP 01

ESP 01

BOILER 01

BOILER 01

ESP 02

ESP 02

Chemical Dozing Building

ESP 01

ESP 01

POWER HOUSE BUILDING

POWER HOUSE BUILDING

CHIMNEY

CHIMNEY

BOILER 02

BOILER 02

BOILER 01

BOILER 01

Chemical Dozing Building

SEA WATER INTAKE AND OUTFALL SYSTEM

CHIMNEY

BOILER 02

POWER HOUSE BUILDING

Canteen Blg

ESP 02

NDCT 1

ESP 02

SEA WATER INTAKE AND OUTFALL SYSTEM

BOILER 01

BOILER 02

CHIMNEY

CHIMNEY

CHIMNEY

CHIMNEY

NDCT # 01

NDCT # 01

POWER HOUSE BUILDING

POWER HOUSE BUILDING

BOILER 02

CHIMNEY

CHIMNEY

ESP UNIT 02

ESP UNIT 02

ESP UNIT 02

ESP UNIT 01

ESP UNIT 01

BOILER 02

BOILER 02

BOILER 02

BOILER 02

BOILER 01

BOILER 01

BOILER 01

ESP UNIT 02

ESP UNIT 02

ESP UNIT 02

ESP UNIT 01

ESP UNIT 01

ESP UNIT 01

ESP UNIT 01

POWER HOUSE BUILDING

POWER HOUSE BUILDING

POWER HOUSE BUILDING

POWER HOUSE BUILDING

BOILER 02

BOILER 02

BOILER 02

BOILER 02

CHIMNEY

CHIMNEY

BOILER 01

BOILER 01

BOILER 01

NDCT 1

NDCT 1

ASH DYKE

ASH DYKE

SEA WATER INTAKE AND OUTFALL SYSTEM

SEA WATER INTAKE AND OUTFALL SYSTEM

CCR BLG / PH

ESP 02

ESP 02

ESP 01

ESP 01

ESP 01

ESP 01

NDCT 1

NDCT 1

NDCT 1

CHP -CIVIL JNT-09 EXC

CHP -CIVIL JNT-09 EXC

CHIMNEY

CHIMNEY

CANTEEN BLG

CANTEEN BLG

CANTEEN BLG

BOILER 02

BOILER 02

BOILER 02

BOILER 02

BOILER 02

BOILER 01

BOILER 01

BOILER 01

CHIMNEY

CHIMNEY

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

PH-STRUCTURAL FABRICATION YARD

PH-STRUCTURAL FABRICATION YARD

PH-STRUCTURAL FABRICATION YARD

FIRE STATION

FIRE STATION

CWPH& FEEDPOOL

CWPH& FEEDPOOL

COOLING TOWER 01

COOLING TOWER 01

CCR BLG / PH

CCR BLG / PH

CCR BLG / PH

TG

TG

TG

CHP-JNT 02,03, -EXCAVATION

CHP-JNT 02,03, -EXCAVATION

CHP-JNT 09 -EXCAVATION

CHP-JNT 09 -EXCAVATION

ESP UNIT 02

ESP UNIT 02

ESP UNIT 02

BOILER 02

BOILER 02

BOILER 02

BOILER 02

ESP UNIT 01

ESP UNIT 01

ESP UNIT 01

BOILER 01

BOILER 01

BOILER 01

BOILER 01

CHP-JNT 02,03, -EXCAVATION

CHP-JNT 02,03, -EXCAVATION

CANTEEN BLG

CANTEEN BLG

POWER HOUSE BUILDING

TG /CCR BLG

TG /CCR BLG

ESP UNIT 02

ESP UNIT 02

CHIMNEY

CHIMNEY

CHIMNEY

BOILER 02

BOILER 02

BOILER 01

BOILER 01

BOILER 01

BOILER 02

BOILER 02

CHIMNEY

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

TURBINE GENERATOR-EXCAVATION.

CHIMNEY

CHIMNEY

TURBINE GENERATOR-EXCAVATION.

POWER HOUSE BUILDING

POWER HOUSE BUILDING

POWER HOUSE BUILDING

ESP UNIT 02

ESP UNIT 02

BOILER 02

BOILER 02

BOILER 02

ESP UNIT 01

ESP UNIT 01

BOILER 01

BOILER 01

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

TURBINE GENERATOR-EXCAVATION.

TURBINE GENERATOR-EXCAVATION.

TURBINE GENERATOR-EXCAVATION.

DISPENSARY BUILDING

DISPENSARY BUILDING

FIRE STATION

FIRE STATION

CANTEEN BLG

CANTEEN BLG

PH-STRUCTURAL FABRICATION YARD

PH-STRUCTURAL FABRICATION YARD

POWER HOUSE BUILDING

POWER HOUSE BUILDING

POWER HOUSE BUILDING

POWER HOUSE BUILDING

CHP-JNT 02,03, -EXCAVATION

CHP-JNT 02,03, -EXCAVATION

CHIMNEY

CHIMNEY

ESP UNIT 02

ESP UNIT 02

BOILER 02

BOILER 02

BOILER 02

ESP UNIT 01

ESP UNIT 01

ESP UNIT 01

BOILER 01

BOILER 01

BOILER 01

CHIMNEY

CHIMNEY

POWER HOUSE BUILDING U # 01

POWER HOUSE BUILDING U # 01

ESP UNIT 02

ESP UNIT 02

BOILER 02

BOILER 02

BOILER 02

ESP UNIT 01

ESP UNIT 01

BOILER 01

BOILER 01

POWER HOUSE BUILDING

CHIMNEY

CHIMNEY

POWER HOUSE BUILDING

ESP UNIT 02

ESP UNIT 02

ESP UNIT 02

BOILER 02

BOILER 02

BOILER 02

ESP UNIT 01

ESP UNIT 01

BOILER 01

BOILER 01

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

CANTEEN BLG

CANTEEN BLG

DISPENSARY BUILDING

DISPENSARY BUILDING

CHIMNEY

CHIMNEY

CHIMNEY

CHP-JNT 03 EXCAVATION

CHP-JNT 03 EXCAVATION

POWER HOUSE BUILDING

POWER HOUSE BUILDING

ESP UNIT 02

ESP UNIT 02

ESP UNIT 01

ESP UNIT 01

BOILER UNIT 02

BOILER UNIT 02

BOILER 01

BOILER 01

COOLING TOWER 01& 02

COOLING TOWER 01& 02

DISPENSARY BUILDING

DISPENSARY BUILDING

DISPENSARY BUILDING

CWPH& FEEDPOOL

CWPH& FEEDPOOL

FIRE STATION

FIRE STATION

CANTEEN BLG

CANTEEN BLG

PH-STRUCTURAL FABRICATION YARD

PH-STRUCTURAL FABRICATION YARD

PH-STRUCTURAL FABRICATION YARD

ASH DYKE

ASH DYKE

POWER HOUSE BUILDING

POWER HOUSE BUILDING

BOUNDARY WALL

BOUNDARY WALL

BOUNDARY WALL

CHP-JNT 02,03,09 -EXCAVATION

CHP-JNT 02,03,09 -EXCAVATION

CHP-JNT 02,03,09 -EXCAVATION

CHIMNEY

CHIMNEY

ESP UNIT 02

ESP UNIT 02

BOILER 02

BOILER 02

ESP UNIT 01

ESP UNIT 01

BOILER 01

BOILER 01

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

POWER HOUSE BUILDING

POWER HOUSE BUILDING

CHIMNEY

CHIMNEY

CHIMNEY

CHIMNEY

ESP UNIT 02

ESP UNIT 02

ESP UNIT 02

ESP UNIT 02

BOILER 02

BOILER 02

BOILER 02

BOILER 02

ESP UNIT 01

ESP UNIT 01

ESP UNIT 01

ESP UNIT 01

BOILER 01

BOILER 01

BOILER 01

BOILER 01

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

POWER HOUSE BUILDING

POWER HOUSE BUILDING

POWER HOUSE BUILDING

DISPENSARY BUILDING

DISPENSARY BUILDING

CHIMNEY

CHIMNEY

CHIMNEY

ESP UNIT 02

ESP UNIT 02

ESP UNIT 02

ESP UNIT 02

BOILER 02

BOILER 02

BOILER 02

BOILER 02

BOILER 02

ESP UNIT 01

ESP UNIT 01

ESP UNIT 01

ESP UNIT 01

ESP UNIT 01

BOILER 01

BOILER 01

BOILER 01

BOILER 01

BOUNDARY WALL

BOUNDARY WALL

BOUNDARY WALL

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

POWER HOUSE BUILDING

POWER HOUSE BUILDING

POWER HOUSE BUILDING

POWER HOUSE BUILDING

CHIMNEY

CHIMNEY

CHIMNEY

ESP UNIT 02

ESP UNIT 02

ESP UNIT 02

ESP UNIT 02

ESP UNIT 02

BOILER 02

BOILER 02

BOILER 02

BOILER 02

BOILER 02

ESP UNIT 01

ESP UNIT 01

ESP UNIT 01

ESP UNIT 01

BOILER 01

BOILER 01

BOILER 01

BOILER 01

BOILER 01

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

POWER HOUSE BUILDING

POWER HOUSE BUILDING

POWER HOUSE BUILDING

CHIMNEY

CHIMNEY

CHIMNEY

ESP UNIT 02

ESP UNIT 02

ESP UNIT 02

ESP UNIT 02

ESP UNIT 02

BOILER 02

BOILER 02

BOILER 02

BOILER 02

BOILER 02

ESP UNIT 01

ESP UNIT 01

ESP UNIT 01

BOILER 01

BOILER 01

BOILER 01

BOILER 01

BOILER 01

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

POWER HOUSE BUILDING

POWER HOUSE BUILDING

POWER HOUSE BUILDING

POWER HOUSE BUILDING

POWER HOUSE BUILDING

CHIMNEY

CHIMNEY

CHIMNEY

ESP 02

ESP 02

ESP 02

ESP 02

ESP 02

BOILER 02

BOILER 02

BOILER 02

BOILER 02

ESP 01

ESP 01

ESP 01

ESP 01

ESP 01

BOILER 01

BOILER 01

BOILER 01

BOILER 01

BOILER 01

SEA WATER INTAKE AND OUTFALL SYSTEM

SEA WATER INTAKE AND OUTFALL SYSTEM

SEA WATER INTAKE AND OUTFALL SYSTEM

SEA WATER INTAKE AND OUTFALL SYSTEM

POWER HOUSE BUILDING

POWER HOUSE BUILDING

POWER HOUSE BUILDING

POWER HOUSE BUILDING

CHIMNEY

CHIMNEY

CHIMNEY

CHIMNEY

ESP 02

ESP 02

ESP 02

ESP 02

BOILER 02

BOILER 02

BOILER 02

ESP 01

ESP 01

ESP 01

BOILER 01

BOILER 01

BOILER 01

BOILER 01

SEA WATER INTAKE AND OUTFALL SYSTEM

SEA WATER INTAKE AND OUTFALL SYSTEM

SEA WATER INTAKE AND OUTFALL SYSTEM

CHIMNEY

CHIMNEY

CHIMNEY

ESP 02

ESP 02

ESP 02

ESP 02

ESP 01

ESP 01

ESP 01

ESP 01

BOILER 01

BOILER 01

BOILER 01

BOILER 01

BOILER 01

BOILER 01

BOILER 01

DISPENSARY BLG

DISPENSARY BLG

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

POWER HOUSE BUILDING

POWER HOUSE BUILDING

CHIMNEY

CHIMNEY

ESP 02

ESP 02

BOILER 02

BOILER 02

ESP 01

ESP 01

BOILER 01

BOILER 01

BOILER 01

SEA WATER INTAKE AND OUTFALL SYSTEM

SEA WATER INTAKE AND OUTFALL SYSTEM

SEA WATER INTAKE AND OUTFALL SYSTEM

POWER HOUSE BUILDING

POWER HOUSE BUILDING

CHIMNEY

CHIMNEY

ESP 02

ESP 02

BOILER 02

BOILER 02

ESP 01

ESP 01

BOILER 01

BOILER 01

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

DISPENSARY BLG

DISPENSARY BLG

POWER HOUSE BUILDING

POWER HOUSE BUILDING

CHIMNEY

CHIMNEY

ESP 02

ESP 02

BOILER 02

BOILER 02

BOILER 02

ESP 01

ESP 01

BOILER 01

BOILER 01

BOILER 01

SEA WATER INTAKE AND OUTFALL SYSTEM

SEA WATER INTAKE AND OUTFALL SYSTEM

SEA WATER INTAKE AND OUTFALL SYSTEM

CHIMNEY

CHIMNEY

CHIMNEY

POWER HOUSE BUILDING

POWER HOUSE BUILDING

POWER HOUSE BUILDING

ESP 02

ESP 02

ESP 02

BOILER 02

BOILER 02

ESP 01

ESP 01

BOILER 01

BOILER 01

SEA WATER INTAKE SYSTEM

SEA WATER INTAKE SYSTEM

CHIMNEY

CHIMNEY

ESP UNIT 02

ESP UNIT 02

BOILER 02

BOILER 02

ESP UNIT 01

BOILER 01

BOILER 01

CHIMNEY

CHIMNEY

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

CHP-JNT 09 & 10 -EXCAVATION

CHP-JNT 09 & 10 -EXCAVATION

CHP-JNT 09 & 10 -EXCAVATION

POWER HOUSE BUILDING

POWER HOUSE BUILDING

ESP UNIT 02

ESP UNIT 02

BOILER 02

BOILER 02

ESP UNIT 01

ESP UNIT 01

BOILER 01

BOILER 01

CHIMNEY

CHIMNEY

DISPENSARY BLG

ESP 02

ESP 02

BOILER 02

BOILER 02

ESP 01

ESP 01

BOILER 01

BOILER 01

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTEM

CHIMNEY

ESP 02

ESP 02

BOILER 02

BOILER 02

ESP 01

ESP 01

BOILER 01

BOILER 01

POWER HOUSE BUILDING

POWER HOUSE BUILDING

POWER HOUSE BUILDING

SEA WATER INTAKE & OUTFALL SYSTEM

SEA WATER INTAKE & OUTFALL SYSTE