Home   

ROURKELA TPP (1X250 MW)


CW-C pump discharge valve commissioned from local

RWPH LT switchgear charged by construction power.

24V charger for RWPH charged

Erection of 33kV extension panel completed at Tark

CWPH: pump and motor part grouting complete

Sulphuric acid unloaded in tank

Ash Slurry pump house

Wagon Tippler

IA Silo

Interconnecting Channel

HRSCC B

HRSCC A

Chemical Room

Pass-A and B illumination at HVR and Hopper Area.

back filling work under progress

Pipe laying work

Raw water system

Raw water system

Raw water system

Boiler and Auxilieries

BFP-A Motor with hydraulic coupling trial run completion

BCN 8D drive alignment completed

BCN-6A scoop coupling panel charged,pump&fan trial

Site photographs of 1X250MW Rourkela Project

Site photographs of 1X250MW Rourkela Project

Site photographs of 1X250MW Rourkela Project

Site photographs of 1X250MW Rourkela Project

Site photographs of 1X250MW Rourkela Project

PIPE RACK FDN NEAR INTERMEDIATE SILO AREA

ASPH WATER TANK AREA MECHANICAL WORK

DSPH BLDG GRADE SLAB WORK IN PROGRESS

WT RCC WORK IN PROGRESS

TP-1 EXCAVATION WORK IN PROGRESS

FA SILO -2 13.500M FLOOR RCC STAGING WORK IN PROG.

SERVICE WATER TANK FABRICATION & ERECTION WORK

CLARIFIED WATER TANK ROOF WORK

IDCT CELL-4 WALL RCC WORK

IDCT CELL -8 GEAR BOX ERECTION WORK

IDCT HAND RAILING WORK AT TOP DECK

ROAD WORK OF IDCT NORTH SIDE

CW TREATMENT PLANT 0.00M FLOOR WORK

DG BLDG FND WORK IN PROGRESS

CHLORINE DIOXIDE DOSING SYSTEM BACK FILLING WORK

CW PH STR ERECTION WORK

PH AXIS-1 STAIR CASE STR WORK

TG ERECTION WORK

PH CONT. ROOM C-D BAY PANEL CONNECTION WORK

PH CONTROL ROOM B-C BAY PARTITION GLASS WORK

CW ANNEX BLDG BRICK WORK

0.00M FLOOR NEAR BOILER AREA

DUCT ERECTION BETWEEN BUNKER TO BOILER SCR

CONV-8A/B STR COLUMN ERECTION WORK

ESP AREA MECHANICAL ERECTION WORK IN PROGRESS

CONV-8A/B GALLERY GR-5 FABRICATION WORK

CONV-8A/B GALLERY GR-1 FABRICATION WORK

CHIMNEY FLUE CAN ERECTION WORK IN PROGRESS

FOPH ROOF WORK

ID FAN -B STAGING WORK FOR DECK

PIPE RACK ERECTION WORK NEAR PH

BOILER TO BUNKER 0.00M BALANCE FLOOR WORK

PH AXIS-1 STR WORK

COMPRESSOR PH PLASTER & BRICK WORK

CHIMNEY PAINTING WORK

FWPH COLUMN WORK IN PROGRESS

IDCT CELL -4 COLUMN & WALL WORK IN PROGRESS

SERVICE WATER TANK FABRICATION & ERECTION WORK

PT PLANT COLUMN WORK

PT PLANT AREA SLUDGE PUMP WORK

CHP AREA ROAD WORK IN PROGRESS

TP-1 EXCAVATION WORK IN PROGRESS

WT RCC WORK IN PROGRESS

FA SILO -2 13.500M FLOOR RCC STAGING WORK IN PROG.

O&M LIGHT METAL STORE RCC WORKWBM FILLING WORK

GIS ERECTION

GIS ERECTION

GIS ERECTION

GIS ERECTION

GIS ERECTION

GIS ERECTION

GIS ERECTION

GIS ERECTION

ESP PASS C

ESP PASS B

ESP PASS A

ERH 2 VIBRO FEEDER

ERH 1 VIBRO FEEDER

ECO PLATFORM

COMPRESSOR HOUSE

BOTTOM ASH OVER FLOW TANK

ASH WATER PUMP HOUSE

ASH SLURRY PUMP HOUSE

COMPRESSOR HOUSE

BOTTOM ASH HOPPER

ASH SLURRY SUMP TANK

AHP MCC 1 TRANSFORMERS

AHP MCC I DCS

AHP MCC I

CHP MCC III

CHP MCC II

CHP MCC II DCS

BCN 10 HEAD FRAME & CHUTE AT TP II

BCN 10 ERH 2 TUNNEL

BCN 9 ERH 1 TUNNEL

BCN 9 A/B GALLARY

BCN 9A/B AT TP II

BCN 5 A/B

RAW WATER INTAKE WELL WORK

RAW WATER INTAKE SG BLDG FDN COLUMN WORK

FWPH CABLE TRENCH WORK

CLARIFIED WATER TANK ROOF WORK

PT PLANT AREA SLUDGE PUMP EXCAVATION WORK

PT PLANT COLUMN WORK IN PROGRESS

SERVICE WATER TANK FABRICATION & ERECTION WORK

IDCT SG ROOM 0.00M FLOOR WORK

IDCT I BEAM ERECTION WORK CELL-10

PIPE RACK COLUMN WORK NEAR PH CONTROL ROOM

PH 15.00M B-C BAY CONT. ROOM WALL FINISHING WORK

PH 12.500M FLOOR 1DG PANEL TEMPORARY CHARGED WORK

PH A-B BAY GRID-10-9 12.500M FLOOR BALANCE WORK

ST ERECTION WORK IN PROGRESS

COMPRESSOR PH OUT SIDE PLASTER WORK

PH AXIS-1 A-B BAY 0.00M FLOOR WITH RAIL

CW PIPE ENCASING NEAR AXIS-1 WORK IN PROGRESS

AIR RECEIVER CABLE PULL PIT WORK IN PROGRESS

BOILER SCR TO BUNKER 0.00M FLOOR WORK

ESP CONT. BLDG OUT SIDE PLASTER WORK

PAVING WORK ESP TO ID FAN

CONV-8A/B GALLERY FABRICATION WORK

CHIMNEY FLUE CAN ERECTION WORK IN PROGRESS

CHIMNEY PAINTING WORK

FOPH WORK IN PROGRESS

O&M LIGHT METAL STORE WBM FILLING WORK

FA SILO DRAIN WALL WORKIN PROGRESS

FA SILO HCSD PH BLDG (-) 4.5M FLOOR WORK

CHP AREA ROAD WORK

CONV.6A/B GALLERY FABRICATION WORK

CRUSHER HOUSE STR WORK

CONV-3A/B GALLERY ERECTION WORK NEAR TP-2

WT PCC WORK IN PROGRESS

COMPRESSOR PH SAR/IAR FOUNDATION WORK

FA SILO B-WALL COLUMN WORK IN PROGRESS

FA SILO DRAIN WALL WORKIN PROGRESS

FA SILO HCSD PH BLDG (-) 4.5M FLOOR WORK

CHP ROAD WORK NEAR TP -3

CONV-6A/B GALLERY FABRICATION WORK

PENT HOUSE-1 GRADE SLAB WORK

CONV-10 GALLERY ERECTION

ERH-2 IRONITE WORK

WT PCC WORK STARTING

WT & TP-1 EXCAVATION WORK

IDCT SWITCH GEAR BLDG 0.00M FLOOR WORK

FOPH WORK IN PROGRESS

CW PH STR ERECTION WORK

CW ANNEX BLDG CABLE TRENCH WORK

PH A-B BAY AXIS-1 0.00M FLOOR WORK IN PROGRESS

TG STEM PIPE ERECTION WORK

PH CR (C-D BAY) 15.00M FLOOR WALL PUTTY WORK

PH CONTROL ROOM 15.00M FLOOR CEILING & LIGHT WORK

1DA PANEL TEMPORARY CHARGED AT EL 3.500M FLOOR

0DA PANEL TEMPORARY CHARGED AT EL 3.500M FLOOR

PH A-B BAY 3.500M FLOOR BALANCE STR BEAM WORK

ST ERECTION WORK

PH A-ROW VENTILATION AND CABLE RACK STR FRAMING

COMPRESSOR PH BRICK WORK

STR COLUMN ERECTION FOR PH AXIS-1 LIFT

EXISTING CW PIPE ENCASING NEAR AXIS-1

CABLE TRENCH IN BOILER SCR

TP-5 0.00M FLOOR MISC FDN WORK

CONV.-8A/B GALLERY FABRICATION WORK

GRADE SLAB WORK BET. ESP TO ID FAN

ID FAN -B STAGING WORK FOR DECK

O&M LIGHT METAL STORE WBM FILLING WORK

IDCT CELL-8 STAGING WORK FOR GRID FILL

IDCT CELL-5 FAN STAGE WALL WORK IN PROGRESS

PT PLANT AREA SLUDGE PUMP WORK

PT PLANT WORK IN PROGRESS

IDCT CELL-1 COLUMN, BEAM & PARTITION WALL

SERVICE WATER TANK FABRICATION & ERECTION WORK

CLARIFIED WATER TANK STAIR WORK

INTERMEDIATE SILO TO FA SILO PIPE RACK COLUMN WORK

CLARIFIED WATER TANK ROOF WORK

FA SILO HCSD PH BLDG (-) 4.5M FLOOR WORK

FA SILO DRAIN WORK IN PROGRESS

FA SILO BOUNDARY WALL WORK

CHIMNEY PAINTING WORK

FOPH WORK IN PROGRESS

CONV.-8A/B GALLERY FABRICATION WORK

GRADE SLAB WORK BETWEEN ESP TO ID FAN

BUNKER 0.00M FLOOR WORK NEAR MILL-3

WBM FILLING BOILER SCR TO BUNKER

EXISTING CW PIPE ENCASING NEAR AXIS-1

PH AXIS-1 STR WORK OF CLADDING

COMPRESSOR PH BRICK WORK

CONV.6A/B GALLERY FABRICATION WORK

DSPH WATER TANK ROOF SLAB WORK

CONV. -10 GALLERY FABRICATION WORK

CRUSHER HOUSE STR WORK

PENT HOUSE -3 IN SIDE PLASTER WORK

WT & TP-1 EXCAVATION WORK

OUTDOOR SWITCHYARD

GIS BUILDING -OUTSIDE VIEW

GIS Building -U.S Crane

SWITCHYARD-ACID RESISTANCE TILE IN BATTERY ROOM

SWITCHYARD-MARBLE WORK IN CRB STAIRCASE

SWITCHYARD-ROAD WORK

GIB DUCT FOUNDATION

ACDB/DCDB -Panel Testing done

Switchyard-ACDB/DCDB ROOM-CRB

TILES IN TOILET/PANTRY-CRB

False ceiling in Panel room of CRB

INTERMEDIATE SILO TO FA SILO PIPE RACK STR WORK

AHP ASH WATER TANK BLDG OUT SIDE PLASTER WORK

ASH SLURRY PH PUMP ERECTION WORK

GIS Building -P.U.paint in GIS Floor

CW ANNEX BLDG CABLE TRENCH WORK

CW PH STR ERECTION WORK

CHLORINE DIOXIDE DOSING SYSTEM BACK FILLING WORK

IDCT CELL-10 MONORAIL I BEAM ERECTION WORK

INTERMEDIATE SILO TO FA SILO PIPE RACK COLUMN WORK

FA SILO HCSD PH BLDG (-) 4.5M FLOOR WORK

FA SILO -2 13.500M FLOOR RCC STAGING WORK IN PROG.

FA SILO BOUNDARY WALL WORK

DSPH WATER TANK WALL WORK

CONV.6A/B GALLERY FABRICATION WORK

WT & TP-1 EXCAVATION WORK

O&M LIGHT METAL STORE BACK FILLING WORK

FWPH CABLE TRENCH AND PB WORK

SERVICE WATER TANK FABRICATION WORK

IDCT SCARED CONCRETE WORK FOR CELL-8 & 7

CW PH STR ERECTION WORK

TP-5 STR COLUMN ERECTION WORK

TG ERECTION WORK

PH 21.00M AIR WASHER ROOM CENTRIFUGAL FAN ERECTION

UT FB WALL COLUMN & BEAM WORK

TG CONDENSER AREA WORK

ESP CONT. BLDG AHU DUCT ERECTION WORK

BOILER SCR TO BUNKER SOIL COMPACTION FOR FLOORWORK

CHIMNEY WALL SURFACE CLEANING WORK IN PROGRESS

FOPH WORK IN PROGRESS

DM TANK PIPE ERECTION WORK

FA SILO DRAIN RAFT WORK IN PROGRESS

FA SILO DRAIN WALL WORKIN PROGRESS

FA SILO ROAD WORK

CHP AREA ROAD WORK

TP-3 BEAM ERECTION WORK

CHP AREA DRAIN WORK NEAR TP-3

CONV-6A/B GALLERY ERECTED

DSPH WATER TANK WALL WORK

CONV.6A/B GALLERY FABRICATION WORK

WT & TP-1 EXCAVATION WORK

IDCT CELL-1 TO 4 COLUMN, BEAM & PARTITION WALL

PH SELF CLEANING TRAINER PUMP ERECTION

BFP ERECTION WORK

BOILER SCR TO BUNKER SOIL COMPACTION WORK

TP-5 0.00M FLOOR WORK

TP-5 STR COLUMN & BEAM ERECTION WORK

TP-4 STR COLUMN ERECTION WORK

WT & TP-1 EXCAVATION WORK

PT PLANT HRSCC-B SHUTTERING WORK FOR WALL

PT PLANT AREA SLUDGE PUMP WORK

FA SILO ROAD WORK

FA SILO BOUNDARY WALL FDN WORK

FWPH PB WORK IN PROGRESS

PT PLANT HRSCC-B SHUTTERING WORK FOR WALL

SERVICE WATER TANK FABRICATION WORK

IDCT CELL-1 TO 4 COLUMN, BEAM & PARTITION WALL

UT FB WALL COLUMN WORK

CW PH EOT CRANE ERECTION WORK

PH CONT. ROOM 15.00M C-D BAY WALL TILES WORK

PH 15.00M B-C BAY CONT. ROOM WALL FINISHING WORK

PH 15.00M B-C BAY CONT. ROOM WALL FINISHING WORK

PH AXIS-1 STR WORK FOR CLADDING WORK

TG ERECTION WORK

BFP ERECTION WORK

MILL & BUNKER 0.00M FLOOR NEAR MILL-5

TP-5 0.00M FLOOR WORK

TP-5 STR COLUMN ERECTION WORK

CHIMNEY PAINTING WORK

CHP AREA DRAIN WORK NEAR TP-3

CONV-6A/B GALLERY FABRICATION WORK

CONV-6A/B GALLERY FABRICATION WORK

CONV. -10 GALLERY FABRICATION WORK

TP-2 STR WORK IN PROGRESS

CRUSHER HOUSE STR WORK

WT & TP-1 EXCAVATION WORK

FA SILO HCSD PH BLDG (-) 4.5M FLOOR WORK

FA SILO DRAIN WALL WORKIN PROGRESS

FA SILO ROAD WBM FILLING WORK IN PROGRESS

SSY ROAD OF IDCT SOUTH SIDE

CW ANNEX BLDG CABLE TRENCH WORK

TG ERECTION WORK

CHP MCC-3 ROOF TREATMENT FINISHING WORK

PH 21.00M FLOOR STR COLUMN WORK FOR LIFT

PH BLDG AC WATER COOLING SYSTEM WORK

PIPE RACK STR COLUMN ERECTION WORK

CW PH STR ERECTION WORK

PH CONTROL ROOM 15.00M FOALS CEILING & LIGHT WORK

PH CONTROL ROOM 15.00M PARTITION GLASS WALL WORK

BOILER ERECTION WORK

BOILER SCR DUCT ERECTION WORK

CONV-8A/B GALLERY ERECTION WORK

ID DUCT CABLE TRAY WORK NEAR ID FAN

TP-5 0.00M FLOOR WORK

COMPRESSOR PUMP HOUSE CABLE TRENCH WORK

UT FB WALL COLUMN WORK

PENT HOUSE -3 BRICK WORK

CONV-4A FOUNDATION WORK

WT & TP-1 EXCAVATION WORK

FA SILO-2 STAGING WORK FOR DECK

FA SILO ROAD & DRAIN WORK IN PROGRESS

FA SILO HCSD PH BLDG (-) 4.5M FLOOR WORK

RAW WATER INTAKE WELL RAFT WORK

RAW WATER SG ROOM FDN & COL WORK

PIPE RACK COLUMN WORK INT SILO TO FA SILO

CONV.-3A/B STR COLUMN ERECTION WORK

CONV-6A/B GALLERY ERECTION WORK

CRUSHER HOUSE STR WORK

WT & TP-1 EXCAVATION WORK

ESP CONT. BLDG WINDOW ERECTION WORK

PIPE RACK STR ERECTION WORK

INTERMEDIATE SILO HOPPER WORK

CLARIFIED WATER TANK ROOF WORK

IDCT CELL-1 TO 4 COLUMN, BEAM & PARTITION WALL

CW PIPE LINE WORK IN PROGRESS

SERVICE WATER TANK FABRICATION WORK

FA SILO -2 13.500M FLOOR RCC STAGING WORK IN PROG.

FA SILO ROAD & DRAIN WORK IN PROGRESS

SSY ROAD OF IDCT SOUTH SIDE

FOPH CABLE TRENCH WORK

TG GENERATOR WORK

COMP. HOUSE +9.00M FLOOR WORK

PH B-C BAY 0.00M FLOOR WORK

CONV-8A/B GALLERY FABRICATION WORK

CONV-8A/B GALLERY ERECTION WORK

CHIMNEY 0.00M GRADE SLAB WORK

CHIMNEY PAINTING WORK

TP-2 FLOOR WORK AT EL + 10.675M

CRUSHER HOUSE STR WORK

CONV.-4A GRADE SLAB WORK IN PROGRESS

CONV. 4A GALLERY ERECTION WORK

CONV. 9 BELT ERECTION WORK

CONV. 9 BELT ERECTION WORK

WT & TP-1 EXCAVATION WORK

FA SILO ROAD & DRAIN WORK IN PROGRESS

O&M GENERAL STORE COLUMN & BEAM WORK

DM TANK PAINTING COMPLETE

ESP CONT. BLDG OUT SIDE PLASTER WORK

ID DUCT CABLE TRAY WORK NEAR ID FAN

CONV-8A/B GALLERY FABRICATION WORK

ID FAN AREA DRAIN WOK

ESP HOPPER INSULATION WORK

TP-5 0.00M FLOOR WORK

SSY ROAD OF IDCT SOUTH SIDE

CW PIPE LINE WORK IN PROGRESS

IDCT ROOF SCREED CONCRETE WORK IN PROGRESS

SEAL OIL TANK AT 0.00M PH WORK COMPLETE

VACUUM PUMP ERECTION COMPLETE

PH B-C BAY NEAR AXIS-1 SOIL WORK FOR 0.00M FLOOR

MILL & BUNKER SAND FILLING FOR GRADE SLAB

ESP HOPPER INSULATION WORK

TP-5 SOIL COMPACTION FOR GRADE SLAB WORK

WT & TP-1 EXCAVATION WORK

CONV.6A/B GALLERY FABRICATION WORK

DSPH WATER TANK WALL WORK

FA SILO BOUNDARY WALL PLASTER WORK

FA SILO ROAD & DRAIN WORK IN PROGRESS

FA SILO MCC-2 BLDG WORK

SSY ROAD OF IDCT SOUTH SIDE

CW TREATMENT PLANT ROOF P.WALL WORK

CHLORINE DIOXIDE DOSING SYSTEM BACK FILLING WORK

IDCT CELL-8 PAINTING COMPLETE

IDCT CELL-6 FAN STAGE WORK IN PROGRESS

IDCT CELL-1 TO 4 COLUMN, BEAM & PARTITION WALL

PT PLANT AREA SLUDGE PUMP WORK

CLARIFIED WATER TANK ROOF WORK

PT PLANT HRSCC-B SHUTTERING WORK FOR WALL

CW PIPE LINE WORK IN PROGRESS

CHLORINE DIOXIDE DOSING SYSTEM FDN BACK FILLING

PH AREA PUMP AND MOTOR ERECTION WORK

PH 15.00M CONTROL ROOM LIGHT FETING WORK

TG ERECTION WORK

COMP. HOUSE +9.00M FLOOR WORK

MILL & BUNKER ERECTION WORK

TP-4 STR & CONV-7A-B GALLERY ERECTION WORK

ESP CONT. BLDG BATTERY ROOM PAINTING WORK

ESP TOP ROOF SADE STR ERECTION WORK

ESP CONT. BLDG AHU ERECTION WORK FOR AC COOLING

BUNKER AREA COMPACTION FOR 0.00M FLOOR

PA FAN AIR IN LATE STR FABRICATION WORK

CABLE RACK ERECTION WORK OF BOILER

PH B-C ROW GRI-2 TO 3 MISC FDN WORK

PH A-ROW VENTILATION AND CABLE RACK STR FRAMING

UT FB WALL BEAM WORK

DSPH WATER TANK WALL WORK

CONV-6A/B GALLERY FABRICATION WORK

CW PH STR ERECTION WORK

CONV-9 GALLERY FEBRICATION WORK

TP-2 FLOOR SHUTTERING WORK AT EL+ 11.00M

WT & TP-1 EXCAVATION WORK

FA SILO MCC-2 BLDG WORK

FA SILO ROAD & DRAIN WORK IN PROGRESS

O&M GENERAL STORE COLUMN & BEAM WORK

FWPH CABLE TRENCH WORK NEAR CLARIFIED TANK

CW PIPE LINE WORK IN PROGRESS

IDCT STAIR HANDRAIL WORK IN PROGRESS

CW PH STR COLUMN ENCASING WORK

TG CONDENSER COLD WATER TUBE ERECTION WORK COMP.

PH A-ROW VENTILATION AND CABLE RACK STR FRAMING

DSPH WATER TANK WALL WORK

CONV-10 GALLERY FABRICATION WORK

CONV-6A/B STR GALLERY WORK

CRUSHER HOUSE STR WORK

WT & TP-1 EXCAVATION WORK

PT PLANT HRSCC-B SAND FILLING WORK IN PROGRESS

PT PLANT BACK FILLING WORK IN PROGRESS

PT PLANT AREA SLUDGE PUMP EXCAVATION WORK

FA SILO ROAD WORK

FA SILO-2 ART COLUMN WORK

FA SILO BOUNDARY WALL WORK

FA SILO MCC-2 BLDG WORK

IDCT STAIR HANDRAIL WORK STARTED

PT PLANT AREA SLUDGE PUMP EXCAVATION WORK

CW TREATMENT PLANT ROOF P.WALL WORK

CW PIPE LINE WORK IN PROGRESS

CHLORINE DIOXIDE DOSING SYSTEM FDN WORK

CW ANNEX BLDG CABLE TRENCH WORK

PH A-ROW VENTILATION AND CABLE RACK STR FRAMING

ST RAIL TRACK WORK IN PROGRESS

PH A-ROW CLADDING STR WORK

PH GAS CYLINDER ROOM FDN & COLUMN WORK

PH 0.00M FLOOR B-C BAY NEAR GRID 2-3

FA FAN AIR RECEIVER WORK

BOILER SCR STR COLUMN ERECTION WORK

ESP DECK ROOF STR ERECTION WORK

CHP MCC-3 IN SIDE PLASTER WORK

CABLE RACK STR FABRICATION WORK FOR BOILER

MILL REJECT PIT & SUMP WORK

0.00M FLOOR WORK NEAR ESP

CONV-8A/B GALLERY PAINTING WORK

ID FAN LUBE OIL TANK ERECTION WORK

ESP CONT. BLDG OUT SIDE PLASTER WORK

ID DUCT STR ERECTION WORK NEAR ID FAN

SSY ROAD OF IDCT SOUTH SIDE

PT PLANT AREA SLUDGE PUMP EXCAVATION WORK

PT PLANT BACK FILLING WORK IN PROGRESS

IDCT CELL-6 FAN STAGE WORK IN PROGRESS

IDCT CELL-5 ROOF WORK IN PROGRESS

CW PIPE LINE WORK IN PROGRESS

CHLORINE DIOXIDE DOSING SYSTEM FDN WORK

PH A-ROW VENTILATION AND CABLE RACK STR FRAMING

CW PH STR ERECTION WORK

ST RAIL TRACK WORK IN PROGRESS

UT ERECTION WORK

COMPRESSOR PUMP HOUSE COLUMN WORK

MOTOR ERECTION WORK 0.00M BOILER AREA

BOILER SCR STR ERECTION WORK

MILL REJECT SUMP PUMP PIT WORK

0.00M FLOOR WORK NEAR ESP

CONV.-8A/B GALLERY FABRICATION WORK

TP-4 STR COLUMN ERECTION WORK

ESP CONT. BLDG OUT SIDE PLASTER WORK

ID DUCT STR ERECTION WORK NEAR ID FAN

ASPH OUTER SIDE PLASTER WORK

DM TANK PAINT AND PUMP PIPE WORK

FOPH CABLE TRENCH WORK

O&M GENERAL STORE COLUMN & BEAM WORK

PH A-ROW VENTILATION AND CABLE RACK STR FRAMING

CRUSHER HOUSE STR WORK

FA SILO BOUNDARY WALL BRICK WORK

ST RAIL TRACK WORK IN PROGRESS

FWPH CABLE TRENCH WORK NEAR CLARIFIED TANK

FA SILO MCC-2 BLDG WORK

WT & TP-1 WORK

PH B-C BAY GRID-2 TO 4 BALANCE 0.00M FLOOR WORK

EXISTING CW PIPE ENCASING BACK FILLING NEAR AXIS-1

CONV-8A/B GALLERY FABRICATION WORK

ESP PD PUMP ERECTION WORK IN PROGRESS

ESP HOPPER INSULATION WORK

GRADE SLAB WORK BETWEEN ESP TO ID DUCT

MILL REJECT PIT WORK IN PROGRESS

CHP MCC-3 OUT SIDE PLASTER WORK

PH AXIS-1 STR WORK

IDCT PIPELINE WORK NEAR CELL-1

IDCT CELL-1 TO 4 COLUMN, BEAM & PARTITION WALL

CW PH EOT CRANE ERECTION WORK

CHLORINE DIOXIDE DOSING SYSTEM FDN WORK

CW PIPE LINE BACK FILLING WORK IN PROGRESS

CW PIPE LINE WORK IN PROGRESS

IDCT CELL-6 FAN STAGE WORK IN PROGRESS

IDCT CELL-5 ROOF WORK IN PROGRESS

SERVICE WATER TANK FABRICATION WORK

O&M LIGHT METAL STORE PB WORK IN PROGRESS

CLARIFIED WATER TANK FLOOR SCREED CONCRETE

FWPH BEAM WORK IN PROGRESS

IDCT CELL-2 COLUMN & BEAM WORK

IDCT SWITCH GAR ROOM CABLE TRENCH WORK

CHLORINE DIOXIDE DOSING SYSTEM FDN WORK

UT ERECTION WORK

ST RAIL TRACK WORK IN PROGRESS

CW PH STR ERECTION WORK

IDCT FAN DECK WORK

PH CONTROL ROOM FALSE CEILING WORK

BUNKER CABLE TRENCH WORK

0.00M FLOOR WORK NEAR ESP

BOILER SCR DUCT ERECTION WORK

ESP CONT. BLDG OUT SIDE PLASTER WORK

ID DUCT STR ERECTION WORK NEAR ID FAN

FA SILO MCC-2 BLDG FLOOR WORK IN PROGRESS

FA SILO ART COLUMN WORK IN PROGRESS

FA SILO BOUNDARY WALL BRICK WORK

CONV-4A FOUNDATION WORK

PENT HOUSE -3 BRICK WORK

WT & TP-1 WORK

APH WASH PUMP AREA WALL WORK AT CWT COMP.

FWPH BACK FILLING AND COMPACTION WORK

SERVICE WATER TANK FABRICATION WORK

IDCT CELL-1 & 2 BEAM AND WALL WORK

IDCT CELL-5 ROOF BEAM WORK

CHLORINE DIOXIDE DOSING SYSTEM EXCAVATION WORK

CW TREATMENT FLOOR WORK

ST RAIL TRACK WORK IN PROGRESS

TG ERECTION WORK

IDCT FAN STAG WORK

PH 21.00M AHU ERECTION WORK

PH CONTROL ROOM 15.00M FLOOR TILES WORK

CW PIPE LINE BACK FILLING

CW PH EOT CRANE ERECTION WORK

TG CONDENSER COLD WATER TUBE ERECTION WORK

UT BUS DUCT & FB WALL COLUMN BACK FILLING WORK

COMP. HOUSE 0.00M FLOOR WORK

ESP HOPPER WORK OF D-PASS

DRAIN WORK NEAR ESP

ROAD WORK BET. BUNKER TO ID DUCT

MILL COAL PIPE ERECTION WORK FROM BOILER TO MILL

BUNKER CABLE TRENCH WORK

PH STR COLUMN WORK AT AXIS-1

CON-4A 0.00M FLOOR WORK

CRUSHER HOUSE STR WORK

RAMP FOR WT & TP-1 EXCAVATION WORK

WT & TP-1 WORK

FA SILO BOUNDARY WALL COLUMN WORK

FA SILO-2 ART COLUMN WORK

FA SILO BOUNDARY WALL BRICK WORK

FA SILO MCC-2 BLDG +0.500M FLOOR WORK

PIPE RACK WORK FROM IM SILO TO FA SILO

O&M GENERAL STORE COLUMN & BEAM WORK

IDCT CELL-55 WALL & COLUMN WORK AT DECK LEVEL

CW TREATMENT PLANT RB WORK

WBM FILLING FOR ST RAIL TRACK

PH 0.00M GRID 9-8 IRONITE WORK

PAVING WORK ESP TO ID DUCT

INTERMEDIATE SILO HOPPER WORK

ESP CONT. BLDG AC WATER COOLER ERECTION

ESP CONT. BLDG LAST FLOOR ROOF INSULATION WORK

ID FAN DUCT ERECTION WORK

ESP HOPPER INSULATION WORK

CONV-8A/B GALLERY FABRICATION WORK

ROAD WORK BET. BUNKER TO ID DUCT

BOILER SCR DUCT ERECTION WORK

CHP MCC-3 OUT SIDE PLASTER WORK

PH LIFT ROOM FOUNDATION WORK

PH LIFT ROOM FOUNDATION WORK .

COMPRESSOR PUMP HOUSE WBM FILLING FOR GRADE SLAB W

CONV-5A/B GRADE SLAB WORK

CRUSHER HOUSE STR WORK

CONV-4A GRADE SLAB WORK

WT & TP-1 WORK

FA SILO MCC-2 BLDG ROOF WORK IN PROGRESS

FA SILO MCC-2 BLDG FDN WORK

FA SILO BOUNDARY WALL PB WORK

CHLORINE DIOXIDE DOSING SYSTEM EXCAVATION WORK

CW PIPE PITOT TUBE PIT & CW PIPE WORK

IDCT CELL-1 BEAM WORK

SSY ROAD OF IDCT SOUTH SIDE

FA SILO MCC-2 BLDG FDN WORK

FA SILO MCC-2 BLDG ROOF WORK IN PROGRESS

FA SILO BOUNDARY WALL WORK

CHP MCC-2 ROOF SCREED CONCRETE WORK COMPLETE

CRUSHER HOUSE WORK FOR RCC SLAB AT EL +10.75

CONV-6A/B STR PAINTING WORK

CONV-5A/B WBM FILLING FOR 0.00M FLOOR

CONV-09 GALLERY ERECTION WORK

ID DUCT ERECTION NEAR ID FAN

ESP CRM 2ND FLOOR AC DUCT ERECTION WORK

ID DUCT 0.00M FLOOR & ROAD WORK NEAR BUNKERNEAR

MILL PIPE ERECTION WORK

PH CRM WATER CHILLER ERECTION WORK COMPLETE

BOILER FEED PUMP ERECTION WORK

TG

AHU ERECTION WORK AT 21.00M AHU ROOM

BOILER

IDCT FAN STAG CELL-10 WORK

PH CONTROL ROOM FLOOR TILES WORK

TG CONDENSER COLD WATER TUBE ERECTION WORK

COMPRESSOR PUMP HOSE 5.00M ROOF WORK COMPLETE

UT FB WALL COLUMN WORK

WBM FILLING FOR ST RAIL TRACK

PH 0.00M FLOOR IRONITE WORK AT GRID 10 -9 A-B BAY

CW PIPE PITOT TUBE PIT WORK

CW TREATMENT PLANT RB WORK

IDCT CELL-7 WATER BASIN CLEANING WORK FOR SCREED

IDCT CELL-8 PAINTING WORK IN PROGRESS

SSY ROAD OF IDCT SOUTH SIDE

CWTPH APH CLEANING WALL WORK

RAW WATER PIPE LINE THRUST BLOCK WORK

RAW WATER PIPE LINE WORK

CHLORINE DIOXIDE DOSING SYSTEM FDN WORK

CW TREATMENT PLANT LB WORK

CW PIPE PITOT TUBE PIT WORK

IDCT CELL-1 BEAM WORK

IDCT CELL-2 BEAM WORK

SSY ROAD OF IDCT SOUTH SIDE

APH WASH PUMP AREA WALL WORK AT CWT AREA

FA SILO BOUNDARY WALL FDN WORK

FA SILO MCC-2 BLDG WORK

FA SILO BOUNDARY WALL FDN WORK

CONV-4A EXCAVATION FOR FOUNDATION WORK

EXCAVATION FOR RAMP OF WT & TP-1

TP-2 FLOOR CASTING WORK AT EL + 10.675M

CONV-5A/B GALLERY PAINTING WORK COMPLETE

CONV-6A/B STR PAINTING WORK

CRUSHER HOUSE STR WORK

CONV-6A/B GALLERY FABRICATION WORK

DSPH WATER TANK WALL WORK

FIRE WATER PH CABLE TRENCH WORK NEAR CLARIFIED

SSY ROAD OF IDCT SOUTH SIDE

IDCT ROOF DECK WORK OF CELL 6

IDCT CELL-8 PAINTING WORK

CW PIPE PITOT TUBE PIT WORK

CHLORINE DIOXIDE DOSING SYSTEM FDN WORK

COMPRESSOR PUMP HOSE 5.00M ROOF WORK

IDCT FAN STAG CELL 10 WORK

PH 15.00M CONTROL ROOM FLOOR TAILS WORK

CRUSHER HOUSE STR WORK

CHP MCC-2 ROOF SCREED CONCRETE WORK

CONV-5A/B GALLERY PAINTING WORK

CONV-9A/B GALLERY ERECTION NEAR TP-2

CONV-4C 0.00M FLOOR RCC WORK

PH 0.00M FLOOR AT GRID 10 -9 A-B BAY

ID DUCT 0.00M FLOOR WORK NEAR BUNKER

INTERMEDIATE SILO HOPPER WORK

FA SILO BOUNDARY WALL WORK

FA SILO BOUNDARY WALL WORK

FA SILO MCC-2 BLDG WORK

RAW WATER PIPE LINE THRUST BLOCK WORK

RAW WATER PIPE LINE WORK

FA SILO MCC-2 BLDG WORK

FA SILO BOUNDARY WALL WORK

O&M GENERAL STORE COLUMN & BEAM WORK

CLARIFIED WATER TANK ROOF CASTING 1ST PART WORK

FWPH BACK FILLING WORK

SSY ROAD OF IDCT SOUTH SIDE

IDCT BEAM WORK OF CELL NO-1

IDCT ROOF DECK WORK OF CELL 6

CW TREATMENT PLANT LB WORK

CHLORINE DIOXIDE DOSING SYSTEM FDN WORK

PH 0.00M FLOOR AT GRID 10 -9 A-B BAY

IDCT FAN STAG CELL-10 WORK

BOILER TO MILL COAL PIPING ERECTION WORK

PH 21.00M MCC ROOM BRICK WORK

COMPRESSOR PUMP HOUSE BLDG EQUIPMENT FDN WORK

COMPRESSOR PUMP HOSE 5.00M ROOF WORK

TG ERECTION WORK

PH 21.00M AIR WASHER ROOM FDN WORK

PH CONTROL ROOM 15.00M FLOOR TILES WORK

TG CONDENSER COLD WATER TUBE ERECTION WORK

UT BUS DUCT & FB WALL COLUMN WORK

ESP CONTROL ROOM WINDOW ERECTION WORK

ID DUCT STR ERECTION WORK NEAR ID FAN

ESP CONTROL ROOM OUT SIDE PLASTER WORK

INTERMEDIATE SILO HOPPER WORK

ESP HOPPER WORK OF D-PASS

ESP HOPPER INSULATION WORK

ID DUCT BADE COMPACTION FOR 0.00M FLOOR RCC WORK

CHP MCC-3 BRICK WORK

BOILER 0.00M FLOOR BALANCE WORK

COMPRESSOR PUMP HOUSE LINTEL BEAM WORK

FA SILO MCC-2 BLDG WORK

FA SILO BOUNDARY WALL WORK

CONV-6A/B GALLERY ERECTION WORK

DSPH WATER TANK WALL WORK

TP-2 FLOOR WORK AT EL + 10.675M

CONV-9 GALLERY FEBRICATION WORK

TP-2 STR WORK

CHP MCC-2 ROOF SCREED CONCRETE WORK

CRUSHER HOUSE STR WORK

ERH-2 STR PANTING WORK

WT & TP-1 WORK

O&M GENERAL STORE COLUMN & BEAM WORK

FOPH PB WORK STARTED

FWPH BACK FILLING WORK

CLARIFIED WATER TANK ROOF WORK

FWPH CABLE TRENCH WORK NEAR CLARIFIED TANK

IDCT PANTING WORK CELL NO -8

CHLORINE DIOXIDE DOSING SYSTEM EXCAVATION WORK

IDCT WHAT WATER DUCT WORK

CW PIPE PITOT TUBE PIT WORK

UT BUS DUCT FINAL LIFT WORK

IDCT FAN STAG CELL-9 & 10 WORK

PH CONTROL BLDG AC WATER COOLING EQUIPMENT

PH CONTROL BLDG MCC ROOM AT EL +23.00M FLOOR

PH AIR WASHER ROOM STR BEAM WORK

COMPRESSOR PUMP HOUSE LINTEL BEAM WORK

TG ERECTION WORK

DUCT ERECTION BETWEEN ESP TO ID FAN

ESP HOPPER INSULATION WORK

FIRE TRENCH RCC IN ID DUCT WORK

CONV-7A/B FDN BEAM WORK IN PROGRESS

DSPH WATER TANK WALL & CABLE TRENCH WORK

CONV GALLERY FABRICATION PAINTING WORK

CRUSHER HOUSE STR WORK

ERH-2 STR PANTING WORK

ERH-1 STR PANTING WORK

CONV GALLERY FABRICATION WORK

CONV-6C FLOOR WORK

CLARIFIED WATER TANK ROOF WORK

IDCT CELL PARTITION WORK OF CELL NO-1

IDCT FAN STAG CELL-9 & 10 WORK

IDCT STAIR CASE WORK

CW PH STR ERECTION WORK

IDCT DECK SLAB WORK OF CELL NO-6

CW PIPE PITOT TUBE PIT WORK

PH CCR 0.00M PUMP AND PIPE WORK

PH AXIS-1 BACK FILLING WORK

BOILER SCR DUCT ERECTION WORK

FIRE TRENCH RCC IN ID DUCT WORK

ESP HOPPER INSULATION WORK

CHP MCC-3 CABLE TRENCH RCC WORK

COMPRESSOR PUMP HOUSE LINTEL BEAM WORK

UT BUS DUCT & FB WALL COLUMN WORK

CONV-6C FLOOR WORK

CRUSHER HOUSE STR WORK

PENT HOUSE -3 BRICK WORK

WT & TP-1 WORK

CONV-2A/B GALLERY ERECTION WORK

ERH-2 STR PANTING WORK

FA SILO BOUNDARY WALL FDN WORK

FA SILO MCC-2 BLDG FDN WORK

FA SILO MCC-2 BLDG WORK

CLARIFIED WATER TANK ROOF WORK

FWPH CABLE TRENCH WORK NEAR CLARIFIED TANK

IDCT ROOF DECK WORK OF CELL 6

IDCT SWITCH GEAR ROOM PLASTER WORK

IDCT FAN STAG CELL-9 & 10 WORK

IDCT STAIR CASE WORK

CW PIPE PITOT TUBE PIT WORK

CW PH & ANNEX BLDG WORK

IDCT WHAT WATER DUCT WORK

UT BUS DUCT & FB WALL COLUMN BACK FILLING WORK

PH SUMP PIT FINAL LIFT NEAR AXIS-1

BOTTOM ASH HOPPER STAIR CASE WORK

COMPRESSOR PUMP HOUSE LB WORK

CHP MCC-3 TRENCH BACK FILLING WORK

FIRE TRENCH RCC IN ID DUCT WORK

ESP INSULATION WORK

ESP A-PASS DUCT GATE ERECTION WORK

ESP HOPPER WORK OF D-PASS

AHP MCC-1 PLASTER WORK

PIPE RACK STR ERECTION WORK

O&M GENERAL STORE COLUMN & BEAM WORK

FA SILO UTILITY BLDG WORK

FA SILO BOUNDARY WALL PLASTER WORK

FA SILO MCC-2 BLDG WORK

ERH-1 STR PANTING WORK

CRUSHER HOUSE STR WORK

ERH-2 STR PANTING WORK

CONV-2A/B GALLERY ERECTION WORK

IDCT FIRST CELL WORK IN PROGRESS

IDCT ROOF DECK WORK OF CELL 6

IDCT SWITCH GEAR ROOM PLASTER WORK

CW PIPE PITOT TUBE PIT WORK

TG CONDENSER COLD WATER TUBE ERECTION WORK

UT BUS DUCT & FB WALL COLUMN WORK

PH AXIS-1 BRICK WORK UP-TO 0.00M

COMPRESSOR PUMP HOUSE LINTEL BEAM WORK

CW PH STR ERECTION WORK

IDCT FAN STAG WORK

PH CONTROL ROOM 15.00M FOALS CEILING WORK

PH CONTROL ROOM 0.00M MACHINE ERECTION WORK

BOILER TO MILL COAL PIPING ERECTION WORK

FIRE TRENCH RCC IN ID DUCT WORK

INTERMEDIATE SILO HOPPER WORK

FOPH BACK FILLING WORK

O&M GENERAL STORE COLUMN, FLOOR & BEAM WORK

ID DUCT STR ERECTION WORK NEAR ID FAN

CONV-7A/B STR WORK IN PROGRESS

ROAD WORK NEAR DSPH AT CHP

TP-2 FLOOR WORK AT EL + 10.675M

CONV-2A/B STR COLUMN ERECTION WORK

CRUSHER HOUSE BRICK WORK FROM 0.00MM

CRUSHER HOUSE STR WORK

IDCT FIRST SEGMENT WALL WRK

IDCT SG ROOM CABLE RACK PCC WORK

CW PIPE PITOT TUBE PIT WORK

CW PH STR ERECTION WORK

IDCT FAN STAG WORK

PH B-ROW NEAR AXIS-1 WALL BEAM ERECTION WORK

TG ERECTION WORK

TG CONDENSER COLD WATER TUBE ERECTION WORK

UT BUS DUCT & FB WALL COLUMN WORK

BFP ERECTION WORK

PH CONTROL ROOM DOOR FITTING WORK OF ALL FLOOR

COMPRESSOR PUMP HOUSE FDN WORK

CHP MCC-3 OUT SIDE PLASTER WORK

BOILER & SCR WORK IN PROGRESS

FIRE TRENCH EXCAVATION IN ID DUCT WORK

ESP SAMP FOUNDATION WORK

ESP HOPPER WORK OF D-PASS

ID DUCT STR ERECTION WORK NEAR ID FAN

INTERMEDIATE SILO HOPPER WORK

ASPH INSIDE PLASTER WORK

FOPH BACK FILLING WORK

O&M GENERAL STORE COLUMN & BEAM WORK

CLARIFIED WATER TANK ROOF WORK

PH AXIS-1 BEAM WORK BELOW 0.00M

ASH OVER FLOW TANK ERECTION WORK

SEAL AIR FAN FOUNDATION WORK

TP-5 STR COLUMN ERECTION WORK

TP-5 STR COLUMN ERECTION WORK

MILL HOPPER ERECTION WORK

ESP CONT. BLDG LAST FLOOR ROOF INSULATION WORK

ESP CONTROL ROOM AC DUCTING INSULATION WORK

ESP D-PASS HOPPER STR ERECTION WORK

INTERMEDIATE SILO WORK

ESP DUCT WORK NEAR ID FAN DUCT

FOPH BACK FILLING WORK

CONV-7A/B STR WORK IN PROGRESS

CONV-6C FOUNDATION WORK

TP-3 0.00M FLOOR WORK COMPLETE

TP-2 FLOOR WORK AT EL + 10.675M

CRUSHER HOUSE STR WORK

TP-2 STR WORK

WT & TP-1 WORK

FA SILO MCC-2 BLDG WORK

FA SILO UTILITY BLDG WORK

O&M HEAVY METAL STORE PAINTING WORK

ASPH OUTER SIDE PLASTER WORK

PH AXIS -1 DECK SHEET WORK COMPLETE

IDCT FIRST SEGMENT WALL WORK

IDCT WHAT WATER DUCT WORK

PH A-ROW DOOR FRAME ERECTION BETWEEN GRID 9-8

TG CONDENSER COLD WATER TUBE ERECTION WORK

UT BUS DUCT WORK

BFP ERECTION WORK

BOILER TO MILL COAL PIPING ERECTION WORK

CABLE TRENCH NEAR BUNKER

ASPH MCC-1 BRICK WORK

ASPH 0.00M FLOOR WORK

ASPH OUTER SIDE PLASTER WORK

FA SILO MCC-2 BLDG WORK

FA SILO UTILITY BLDG WORK

TP-3 0.00M FLOOR WORK

DSPH WATER TANK WALL WORK

CONV-6A/B STR COLUMN WORK

CONV-2A/B STR COLUMN ERECTION WORK

TP-2 FLOOR WORK AT EL + 7.00M

CRUSHER HOUSE STR WORK

TP-2 FLOOR WORK AT EL + 10.675M

TP-2 STR WORK

BRICK WORK BELOW CRUSHER HOUSE AT EL 0.00M

O&M GENERAL STORE COLUMN & BEAM WORK

ID DUCT STR ERECTION WORK NEAR ID FAN

ASPH OUTER SIDE PLASTER WORK

INTERMEDIATE SILO WORK

ID DUCT LEVELING BET. BUNKER TO ESP

BOILER ERECTION WORK

PH AXIS-1 STR DECK SHEET ERECTION WORK

COMPRESSOR PUMP HOUSE FDN WORK

UT BUS DUCT COLUMN WORK

BFP ERECTION WORK

BOILER TO MILL COAL PIPING ERECTION WORK

PH CCR 0.00M FLOOR IRONITE WORK

PIPE RACK COLUMN WORK NEAR PH CONTROL ROOM

IDCT WHAT WATER DUCT WORK

CW PH & ANNEX BLDG WORK

CW PIPELINE WORK

IDCT SWITCH GEAR ROOM PLASTER WORK

IDCT 4TH SEGMENT SCREED CONCRETE AT RL213.500M

IDCT 3RD SEGMENT BEAM WORK

IDCT 1ST SEGMENT BEAM WORK

FWPH FOOTING AND PIPE RACK FDN WORK

CLARIFIED WATER TANK WALL WORK

PH 21.00M AHU ROOM INSULATION WORK COMPLETE

PH 21.00M MCC ROOM BRICK WORK

PIPE RACK FDN BACK FILLING AT MAIN PLANT AREA

CW PIPELINE EXCAVATION WORK

CW PH & ANNEX BLDG WORK

CABLE PULL PIT FDN. AT UT AREA

CHP MCC-3 IN SIDE PLASTER WORK

CABLE TRENCH NEAR BUNKER

ID DUCT LEVELING BET. BUNKER TO ESP

TP-4 STR COLUMN ERECTION WORK

CHIMNEY PAINTING WORK

CONV. 7A/B STR ERECTION WORK

CULVERT NEAR CONV. 7A/B

CULVERT NEAR TP-3

TP-3 0.00M FLOOR WORK

FA SILO BOUNDARY WALL WORK

FA SILO UTILITY BLDG PLASTER WORK

TG ERECTION WORK

TG ERECTION WORK

COMPRESSOR PUMP HOUSE COLUMN WORK

PH 21.00M AXIS-1 FLOOR RCC WORK

DEAERATING TANK WALK WAY ERECTION WORK

PH 21.00M AHU ROOM INSULATION WORK

CW PH & ANNEX BLDG WORK

PH 21.00M MCC ROOM BRICK WORK

ASH OVER FLOW TANK ERECTION WORK

PH AXIS-1 C-ROW WALL BEAM WORK

CHP MCC-3 IN SIDE PLASTER WORK

CABLE TRENCH NEAR BUNKER

ID DUCT LEVELING WORK FOR 0.00M FLOOR NEAR ESP

ID DUCT STR ERECTION NEAR ID FAN RHS

ESP INSULATION WORK

TP-4 STR COLUMN ERECTION WORK

CHIMNEY PAINTING WORK

CONV-6C FOUNDATION & PIPE RACK WORK

CONV. - 4B BACK FILLING WORK

TP-3 0.00M FLOOR WORK

DSPH WATER TANK WALL WORK

TP-2 STR WORK

WT & TP-1 WORK

CRUSHER HOUSE STR WORK

PH A-B BAY 8.500M ELECTRICAL WORK

PH 21.0M MCC ROOM BRICK WORK

PH A-B BAY 12.00M FLOOR BRICK WORK A-ROW

CHP MCC-3 BEAM WORK

ESP INSULATION WORK

TP-2 STR WORK

FA SILO MCC-2 BLDG WORK

FA SILO BOUNDARY WALL WORK

FA SILO UTILITY BLDG WORK

MAIN PLANT PIPE RACK WORK

BOILER

ASPH 0.00M FLOOR AND BACK FILLING WORK

PIPE RACK FDN FROM INTERMEDIATE SILO TO FA SILO

IDCT SWITCH GEAR ROOM INNER SIDE PLASTER WORK

BOILER TO MILL COAL PIPING ERECTION WORK

TG ERECTION WORK

PH 21.00M AHU ROOM INSULATION WORK

GT BUS DUCT COLUMN WORK

PH 21.00M MCC ROOM BRICK WORK

COMPRESSOR PUMP HOUSE FDN WORK

PH B-C BAY 9.00M FLOOR IRONITE WORK

PH 9.00M SWAS EQUIPMENT ERECTION WORK

CW PH STR ERECTION WORK

PH BFP AREA ERECTION WORK

BOILER AREA 0.00M GRADE SLAB WORK

PH C-ROW CLADDING STR WORK

CHP MCC-3 0.00M FLOOR SLAB WORK

ESP HOPPER INSULATION WORK

MILL & BUNKER CLADDING STR WORK

ID FAN AREA BACK FILLING

ESP CONT. ROOM 18.1M AHU ROOM IRONITE FLOOR WORKE

ESP CONT. BLDG 12.4M FLOOR AC DUCT WORK

ESP CONT. BLDG 3.7M FLOOR PAINTING WORK

ESP CONTROL ROOM 3.7M FLOOR DOOR FIXING

ID DUCT STR ERECTION WORK NEAR ID FAN

PIPE RACK STR ERECTION WORK

DM TANK MOTOR ERECTION WORK

O&M HEAVY METAL STORE WINDOWS WORK

CLARIFIED WATER TANK COLUMN WORK

FWPH PUMP BITUMINOUS PAINT WORK

IDCT SWITCH GEAR ROOM BRICK WORK

CHP MCC-3 OUT SIDE PLASTER WORK

TG ERECTION WORK

MILL & BUNKER ERECTION WORK

CW PH STR ERECTION WORK

IDCT WORK

PH 21.00M AHU ROOM INSULATION WORK

PH 21.00M MCC ROOM CLADDING STR WORK

PH 12.00M AC DUCT WORK

PH A-B BAY 12.00M FLOOR BRICK WORK A-ROW

PH 8.500M A-B BAY IRONITE FLOOR WORK

COMPRESSOR PUMP HOUSE COLUMN WORK

GT BUS DUCT COLUMN WORK

PIPE RACK FDN AT MAIN PLANT AREA

CONV-7A/B STR WORK IN PROGRESS

CONV-6C FOUNDATION WORK

PIPE RACK AT CHP NEAR CONV-6C

TP-3 0.00M FLOOR WORK

CONV-6A/B STR COLUMN WORK

WT & TP-1 WORK

PENT HOUSE-1 WORK

TP-5 STR COLUMN ERECTION WORK

CONV-6A/B 0.00M FLOOR WORK

CRUSHER HOUSE STR WORK

CHP ROAD WORK NEAR DSPH

FA SILO BOUNDARY WALL WORK

FA SILO MCC-2 BLDG WORK

FA SILO UTILITY BLDG WORK

BOILER

IDCT WORK

MILL HOPPER ERECTION WORK

ASPH 0.00M FLOOR AND BACK FILLING WORK

CHP TP-5 STR COLUMN AND BEAM WORK

ESP INSULATION WORK

CHP MCC-3 OUT SIDE PLASTER WORK

SEAL AIR FAN FOUNDATION WORK

BOILER 0.00M SAND FILLING FOR FLOOR WORK

IDCT STARI CASE AND STOP LOG GATE WORK

PH A-ROW AXIS -1 STR ERECTION WORK

COMPRESSOR PUMP HOUSE BLDG EQUIPMENT FDN WORK

PH 9.00M AXIS-1 FLOOR IRONITE WORK COMPLETE

CW PH STR ERECTION WORK

CW ANNEX BLDG ROOF WORK

PH 8.5M FLOOR BRICK WORK NEAR GRID 10-8

PH GRID 10 BRICK WORK

FA SILO BOUNDARY WALL WORK

FA SILO UTILITY BLDG WORK

ASPH 0.00M FLOOR WORK

PIPE RACK STR ERECTION WORK

PIPE RACK WORK FROM IM SILO TO FA SILO

FWPH EQUIPMENT FOUNDATION WORK

BOILER

BOILER TO MILL COAL PIPING ERECTION WORK

MILL HOPPER ERECTION WORK

IDCT WORK

PH C-D BAY AFTER 21.00M PANEL ERECTION WORK

PH AXIS-1 15.00M FLOOR RCC COMPLETE

TG ERECTION WORK

IDCT STOP LOG GATE WORK

PH AXIS-1 9.00M FLOOR COMPLETE RCC WORK

COMPRESSOR PUMP HOUSE BLDG EQUIPMENT FDN WORK

CW ANNEX BLDG ROOF WORK

CW PH STR ERECTION WORK

CHIMNEY IN SIDE STR WORK

TP-5 STR COLUMN ERECTION WORK

CHIMNEY PAINTING WORK

ID DUCT STR ERECTION WORK NEAR ID FAN

PAVING WORK ESP TO ID FAN

PAVING WORK ESP TO ID FAN

ESP INSULATION WORK

CHP MCC-3 OUT SIDE PLASTER WORK

FD FAN FLU DUCT STR ERECTION WORK

SEAL AIR FAN FOUNDATION WORK

BOILER 0.00M FLOOR WORK

PH C-ROW STR FRAMING FOR CLADDING WORK

PH AXIS-1 15.00M FLOOR READY FOR RCC WORK

PH 9.00M SWAS ROOM WORK

PH 9.00M FLOOR A-B BAY IRONITE WORK

UT FOUNDATION FB COLUMN AND PIP18 WORK

GT BUS DUCT COLUMN BACK FILLING WORK

COMPRESSOR PUMP HOUSE BLDG EQUIPMENT FDN WORK

PH AXIS-1 9.00M FLOOR READY FOR RCC WORK

CW PH STR ERECTION WORK

CW ANNEX BLDG ROOF BEAM WORK

IDCT STOP LOG GATE COLUMN WORK

IDCT FAN DECK WORK

IDCT FIRST SEGMENT BEAM WORK

IDCT WHAT WATER DUCT WORK

BOILER COAL PIPE ERECTION WORK

ESP CONTROL BLDG STAIR CASE WORK

BUNKER AND MILL HOPPER ERECTION WORK

COMPRESSOR PUMP HOUSE BLDG EQUIPMENT FDN WORK

PH AXIS-1 STR BEAM WORK

PH 9.00M AXIS-1 FLOOR WORK

PH 8.500M A-B BAY IRONITE FLOOR WORK

CW PH STR ERECTION WORK

CW ANNEX BLDG WORK

PH AXIS-1 STR WORK

SEAL AIR FAN FOUNDATION WORK

CHP MCC-3 OUT SIDE PLASTER WORK

SWAS ROOM BRICK WORK

ESP INSULATION WORK

PAVING WORK ESP TO ID FAN

ESP INSULATION WORK

PIPE RACK STR ERECTION WORK

ID DUCT STR ERECTION WORK NEAR ID FAN

DM TANK STR WORK

FOPH FOUNDATION WORK

ASPH CABLE TRENCH WORK

FWPH EQUIPMENT FOUNDATION WORK

INTERMEDIATE SILO WORK

ESP CONTROL BLDG STAIR CASE WORK

TG ROTTER ERECTION WORK

GT BUS DUCT COLUMN WORK

PH B-C BAY 9.00M AXIS -1 FLOOR STARTING

PH A-B BAY 9.00M FLOOR IRONAITE WORK

PA FAN ERECTION WORK

CHP MCC-3 BEAM WORK

IDCT WHAT WATER DUCT WORK

CLARIFIED WATER TANK WALL WORK

CW ANNEX BLDG WORK

PH BRICK WORK GRID-10

PH CLADDING WORK

PH AXIS-1 STR WORK

CHP MCC-3 BEAMWORK

CABLE TRENCH NEAR BUNKER

CONV-8A/B BACK FILLING NEAR TP-5

ESP INSULATION WORK

CHIMNEY PAINTING WORK

FA SILO MCC-2 BLDG WORK

FA SILO BOUNDARY WALL WORK

FA SILO UTILITY BLDG WORK

CLARIFIED WATER TANK WALL WORK

IDCT WHAT WATER DUCT WORK

TG CONDENSER TUBE ERECTION WORK

GT BUS DUCT COLUMN WORK

COMPRESSOR PUMP HOUSE COLUMN WORK

PH AXIS-1 STR WORK

TP-2 STR WORK

CRUSHER HOUSE STR WORK

CONV-6A/B BACK FILLING FOR 0.00M FLOOR WORK

DSPH BRICK WORK

ROAD WORK NEAR DSPH AT CHP

CHP CONV-6A\B STR COLUMN WORK

SOUTH SIDE ROAD OF IDCT

IDCT STOP LOG GATE COLUMN WORK

NORTH SIDE ROOD OF IDCT

CW PH STR ERECTION WORK

BOILER

PH CLADDING WORK

IDCT SG ROOM FLOOR PARAPET WALL WORK

FWPH PUMP FOUNDATION WORK

CLARIFIED WATER TANK WALL WORK

SERVICE WATER TANK FOUNDATION WORK COMPLETE

IDCT 3RD SEGMENT WALL WORK

IDCT NORTH SIDE ROAD WORK

TG CONDENSER TUBE ERECTION WORK

GT BUS DUCT COLUMN WORK

CW ANNEX BLDG WORK

CW PH STR ERECTION WORK

PH B-ROW PLASTER WORK AFTER 21.00M

BOILER ERECTION WORK

PH A-ROW INSIDE CLADDING WORK

TG ERECTION WORK

PIPE RACK EXCAVATION WORK

IDCT WORK

PH 29.00M FLOOR WORK

MILL HOPPER ERECTION WORK

BOILER SCR 0.00M FLOOR BALANCE WORK

ID DUCT STR ERECTION WORK NEAR ID FAN

INTERMEDIATE SILO WORK

ASH WATER TANK BLDG PLASTER WORK

AHP MCC-1 PANEL ERECTION WORK

CLARIFIED WATER TANK WALL WORK

SERVICE WATER TANK FOUNDATION WORK

TG ERECTION WORK

BOILER STR WORK

PH C-ROW CLADDING WORK

PH 21.00M BRICK WORK

PH INSIDE CLADDING GRID 10

PH 15.00M FLOOR A-B BAY GRID 10

IDCT WORK

CW PH STR ERECTION WORK

CW PIPE LINE BACK FILLING

TG CONDENSER TUBE ERECTION WORK

GT BUS DUCT COLUMN WORK

BOILER SCR 0.00M FLOOR WORK

BOILER 0.00M FLOOR WORK

ESP INSULATION WORK

MILL HOPPER ERECTION WORK

INTERMEDIATE SILO WORK

ESP CONTROL ROOM LIFT ERECTION WORK

ESP CONTROL ROOM 3RD FLOOR PLASTER WORK

ID DUCT STR ERECTION WORK NEAR ID FAN

FUEL OIL PUMP HOUSE BUILDING

PIPE RACK STR ERECTION WORK

AHP MCC-1 PLASTER WORK

ESP PASS B -ADEPTER FIXING

BOTTOM ASH HOPPER

SLURRY SUMP

SLURRY PUMP HOUSE

ASH WATER PUMP HOUSE

COMP PUMP HOUSE

AHP MCC CABLE TRAY WORK

CH MCC

ERH-1 VIBROFEEDER FLOOR

CABLE TRAY WORK ERH-1 TUNNEL

CABLE TRAY WORK ERH-2 TUNNEL

ASSEMBLY OF BOOM CONVEYOR

ASSEMBLY OF HORIZONTAL MAST

ASSEMBLY OF VERTICAL MAST

ASSEMBLY OF TRIPPER CAR STRUCTURE

ASSEMBLY OF E HOUSE PLATFORM

ASSEMBLY OF UNDER CARRIAGE

ASSEMBLY OF SLEW SUPER STRUCTURE

ASSEMBLY OF SCR

CLARIFIED WATER TANK WALL WORK

SERVICE WATER TANK FOUNDATION WORK

ST BUS-DUCT ERECTION

CW PH STR ERECTION WORK

IDCT WORK

PH INSIDE CLADDING WORK

BOILER SCR AND FAN GRADE SLAB WORK

ESP INSULATION WORK

CHPMCC-3 WALL PLASTER WORK

BOILER

CHIMNEY PAINTING WORK

CONV-6A/B STR COLUMN WORK

CRUSHER HOUSE STR WORK

TP-2 STR WORK

CHP MCC-2 0.00M FLOOR FINISHING WORK

WT & TP-1 WORK

TUNNEL 2A/B WORK

CONV-7A/B GRADE SLAB WORK IN PROGRESS

FA SILO PIPE RACK NEAR INTERMEDIATE SILO

SEAL WATER TANK WORK

FA SILO WORK

HCSD CUM MCC-2 BLDG FOUNDATION WORK

FA SILO UTILITY BLDG WORK

SERVICE WATER TANK FOUNDATION WORK

GT WORK

CW ANNEX BLDG COLUMN WORK

CHP MCC-3 3.00M PARAPET WALL WORK

TG CONDENSER WORK

BRICK WORK AT 21.0M PH C-ROW

CW PH STR ERECTION WORK

IDCT FAN DECK & DECK SLAB ORK

CHIMNEY PAINTING WORK

MILL HOPPER ERECTION WORK

PH CLADDING WORK AT C-ROW

CABLE RACK STR WORK AT PH C-ROW

WBM FILLING AT BOILER FOR GRADE SLAB

STR WORK BETWEEN BUNKER TO BOILER SCR

BOILER & BOILER SCR WORK

ID DUCT ENCASING BETWEEN ESP TO BUNKER

FUEL OIL PUMP HOUSE BUILDING

SERVICE WATER TANK FOUNDATION WORK

IDCT FAN DECK WORK

IDCT SWITCH GEAR ROOM FLOOR WORK

CW PH STR ERECTION WORK

CW ANNEX BLDG COLUMN WORK

PH CONTROL ROOM 15.00M WORK

TG ROTOR CLEANING WORK

CHP CONV-8A/B STR FABRICATION WORK

ESP INSULATION WORK

BOILER SCR 0.00M FLOOR WORK

PH AXIS -1 COLUMN ENCASING WORK

BOILER & SCR DUCT WORK

PH CLADDING WORK

MILL HOPPER ERECTION WORK

BUNKER FEEDER FLOOR WORK COMPLETE

AHP INTERMEDIATE SILO HOPPER WORK

ESP CONTROL ROOM AC DUCTING WORK

ESP CONT. BLDG STAIR CASE WORK

PIPE PEDESTAL WORK

FUEL OIL PUMP HOUSE BUILDING

PIPE RACK STR ERECTION WORK

RAW WATER PIPE LINE THRUST BLOCK WORK

IDCT SWITCH GEAR ROOM FLOOR WORK

TG ROTTER ERECTION WORK

TG ROTTER ERECTION WORK

CLADDING ANGLE FIXING AT PARAPET WALL

PH AFTER 21.00M BRICK WORK

CW ANNEX BLDG WORK

CW PH STR ERECTION WORK

PH INSIDE CLADDING WORK STARTED

IDCT FAN DECK WORK

PH OUTER CLADDING WORK

BOILER SCR STR COLUMN ERECTION WORK

BOILER INSULATION WORK

ID DUCT STR ERECTION WORK NEAR CHIMNEY

BUNKER FEEDER FLOOR WORK

MILL HOPPER ERECTION WORK

AHP INTERMEDIATE SILO HOPPER WORK

ESP CONTROL ROOM STAIR CASE WORK

ESP CONTROL ROOM AC DUCTING WORK

PIPE RACK STR ERECTION WORK

SWACHHTA PAKHWAD AT PH 12.00M FLOOR

MILL HOPPER ERECTION WORK

BUNKER FEEDER FLOOR WORK

PH B-C BAY 29.00M STR WORK

CHP MCC-3 3.00M FLOOR SLAB WORK

CHP TP-5 STR WORK

IDCT FAN DECK WORK

CW ANNEX BLDG WORK

CW PH STR ERECTION WORK

TG CONDENSER WORK

PH AXIS-1 STR WORK

BOILER SCR 0.00M FLOOR WORK

BOILER & BOILER SCR WORK

ESP CONT. BLDG STAIR CASE WORK

FA SILO UTILITY BLDG WORK

FA SILO WORK

CHIMNEY PAINTING WORK

WT & TP-1 WORK

CONV-2A/B TUNNEL WORK

CONV-2A/B STR FABRICATION WORK

CRUSHER HOUSE STR WORK

CONV-9 STR PAINT WORK

CRUSHER HOUSE CHECKER PLATE FIXING FOR FLOOR WORK

PENT HOUSE-2 FLOOR WORK

CHP TP-2 STR WORK

MISC FOUNDATION WORK OF BOILER

CRUSHER HOUSE CHECKER PLATE FIXING FOR FLOOR WORK

PH A-C BAY 8.500M FLOOR WORK

PH A-C BAY 12.00M FLOOR FINISHING WORK

CHP MCC-3 3.00M FLOOR SLAB WORK

IDCT WORK

CW PH & ANNEX BLDG WORK

FA SILO UTILITY BLDG WORK

FA SILO WORK

TP1 & WT ROCK BRAKING WORK

CONV-2A/B TUNNEL WORK

TG ERECTION WORK

CHP TP-4 STR ERECTION WORK

PIPE RACK STR COLUMN ERECTION WORK

CHIMNEY PAINTING WORK

INTERMEDIATE SILO WORK

MILL HOPPER ERECTION WORK

BOILER INSULATION WORK

PH CLADDING WORK

BUS DUCT FOUNDATIONS

ERECTION OF PANELS IN CRB

PUTTY WORK IN ACDB/DCDB ROOM

EQUIPMENT FOUNDATIONS

GIS BRICK WORK

CONV-4A/B STR WORK

ERH-2 STR WORK

CRUSHER HOUSE STR WORK

CHP MCC-3 3.00M FLOOR SLAB WORK

PH 15.00M CONTROL ROOM WORK

CW ANNEX BLDG PB WORK

CW PH STR ERECTION WORK

MILL HOPPER ERECTION WORK

PH CONTROL ROOM 5.0M FLOOR FINISH WORK

BOILER SCR 0.00M FLOOR WORK

GRADE SLAB WORK BETWEEN ESP TO IN FAN

ESP TOP CLADDING SADE STR ERECTION WORK

CONV. 8A/B STR ERECTION WORK

CHP TP-4 STR ERECTION WORK

DM TANK STR ERECTION WORK

PIPE RACK STR COLUMN ERECTION WORK

AHP MCC-1 PLASTER WORK

IDCT SWITCH GEAR ROOM WORK

PH CLADDING WORK IN PROGRESS

CHP TP-5 AND CONV. 8A/B STR WORK

CHP MCC-3 WORK IN PROGRESS

TG ERECTION WORK IN PROGRESS

CW ANEX BLDG PB WORK

CW PH STR ERECTION WORK

PH AXIS-1 STR WORK

BOILER

BOILER SCR STR DUCT WORK

BOILER SCR 0.00M FLOOR WORK

BUNKER FEEDER FLOOR RCC WORK IN PROGRESS

ID DUCT BUNKER TO ESP

AHP WATER TANK BLDG PLASTER WORK

O&M HEAVY METAL STORE 0.00M FLOOR WORK

O&M GENERAL LITE METAL STORE COLUMN WORK

ASSEMBLY OF TRIPPER CAR STRUCTURE

CABLE TRAY WORK ERH - 2

CHP MCC - 2

ASSEMBLY OF STACKER RAIL

ASSEMBLY OF BOOM CONVEYOR

ASSEMBLY OF E HOUSE PLATFORM

ASSEMBLY OF HORIZONTAL MAST

ASSEMBLY OF VERTICAL MAST

ASSEMBLY OF UNDERCARRIAGE

ASSEMBLY OF SLEW SUPER STRUCTURE

ASH SLURRY SUMP TANK

ASH SLURRY PUMP HOUSE

COMPRESSOR HOUSE

ASH WATER PUMP HOUSE

BOTTOM ASH HOPPER

EXITING ROAD WORK FOR MONSOON SEASON

CW ANNEX BUILDING WORK

CW PIPE LINE WORK

PH CLADDING WORK IN PROGRESS

PH 12.00M FLOOR WORK

PH 3.00M FLOOR WORK GRID 10-9

TG

BOILER

MILL HOPPER ERECTION WORK IN PROGRESS

IDCT

CW PH

PH AXIS -1 STR WORK

BOILER SCR 0.00M GRADE SLAB WORK

BUNKER FEEDER FLOOR RCC WORK

CONVEYOR -8A/B BOLT LIFT WORK

ESP STR ERECTION WORK

CHINMEY WORK IN PROGRESS

WT & TP-1 ROCK BLASTING WORK

TUNNEL 2A/B EXCAVATION WORK

TUNNEL 2A/B WORK

ERH-1 WORK

TP-2 STR COLUMN WORK

CRUSHER HOUSE STR COLUMN ERECTION

IDCT SWITCH GEAR ROOM WORK

CW ANNEX BUILDING WORK

PH GROD -10 CLADDING WOK

CW PH

TG

TG WORK IN PROGRESS

PH 3.00M FLOOR WORK GRID 10-9

PH CLADDING WORK IN PROGRESS

BOILER

PH AXIS-1 STR WORK

BOILER SCR STR ERECTION WORK

ID DUCT BUNKER TO ESP

ASH WATER TANK BLDG PLASTER WORK

ASH SLURRY EQUIPMENT PIPE SUPPORT FDN

PIPE RACK FDN

FA SILO MCC-2 FDN WORK

SILO UTILITY BLDG WORK IN PROGRESS

FA SILO-2 WORK

TP-3 STR WORK

ERH-2

ERH-1

CRUSHER HOUSE 0.00M FLOOR WORK

IDCT SWITCH GEAR ROOM WORK

PH CLADDING WORK IN PROGRESS

PH A-B BAY GRID 10-9 12.00M STR WORK

TG

CW PH

MILL HOPPER ERECTION WORK IN PROGRESS

PH CCR 0.00M BEAM WORK

BOILER PIPING WORK

PH AXIS-1 STR WORK

CHP MCC-3 PB WORK

BOILER SCR BALLAST FILLING

ID DUCT BUNKER TO ESP

BUNKER FEEDER FLOOR RCC WORK

CONVEYOR -8A/B BOLT LIFT WORK

CONVEYOR -8A/B WORK

TP-4 ERECTION WORK

ID FAN -A STAIR CASE

PIPE RACK AND DM TANK

PIPE RACK STR COLUMN ERECTION

AHP MCC-1 CABLE TRENCH WORK

IDCT SWITCH GEAR ROOM WORK

CW PIPE LINE WORK

CW ANNEX BUILDING WORK

MILL HOPPER ERECTION WORK IN PROGRESS

PH CLADDING WORK IN PROGRESS

BOILER

BUNKER FEEDER FLOOR RCC WORK

CHP MCC-1 WORK

ST WORK

TG

PH 15.00M CONTROL ROOM A DUCTING WORK

PH A-C BAY 12.500M FLOOR WORK

UT FOUNDATION WORK COMPLETE

EXISTING PIPE ENCASING WORK NEAR AXIS-1

TG CONDENSER ERECTION WORK

PH CONTROL ROOM 9.00M AAC BLOCK WORK

PH CONTROL ROOM 0.00M BRICK WORK

BOILER DUCT ERECTION WORK

BOILER SCR DUCT ERECTION

ID DUCT BUNKER TO ESP

ID DUCT FAN FDN TO CHIMNEY

ESP CONTROL ROOM

ESP STR ERECTION WORK

PIPE RACK STR COLUMN ERECTION

AHP ASH WATER TANK BLDG PLASTER WORK

AHP MCC-1 CABLE TRENCH ERECTION WORK

CHP TP-4

BOTTOM ASH HOPPER

ASH SLURRY PUMP HOUSE

ASH WATER PUMP HOUSE & COMPRESSOR HOUSE

AHP MCC-1

Assembly of Under carriage(Stacker Reclaimer)

Assembly of E HOUSE PLATFORM(Stacker Reclaimer)

Assembly of VERTICAL MAST(Stacker Reclaimer)

Assembly of HORIZONTAL MAST(Stacker Reclaimer)

Assembly of BOOM CONVEYOR(Stacker Reclaimer)

Assembly of SLEW SUPER STRUCTURE(Stacker Reclaimer)

STACKER RECLAIMER RAIL & WHEEL BOGGIE

CHP-MCC 2

WT & TP-1

TP-4

CRUSHER HOUSE 0.00M FLOOR WORK

TP-2 STR WORK

ERH-1

CONV-2A/B STR WORK

CWPH

CONVEYOR -2A/B TUNNEL WORK

TP-5 & CONV-8 WORK

DM TANK STR WORK

ID DUCT BUNKER TO ESP

BOILER SCR BACK FILLING

BUNKER FLOOR WORK

CHP MCC-1 WORK

PH B-C BAY 29.00M STR WORK

IDCT

ESP CONTROL ROOM

MILL & BUNKER BAY WORK IN PROGRESS

PH C-F BAY 21.00M MISC FOUNDATION WORK

PH B-C BAY 21.00M BALANCE FLOOR WORK

PH 15.00M CONTROL ROOM AC WORK

PH A-C BAY 8.500M FLOOR WORK

FD & PA FAN BACK FILLING

UT RAIL FIXING WORK

EXISTING PIPE ENCASING WORK NEAR AXIS-1

PH AXIS -1 15.00M STR FLOOR WORK

PH AXIS-1 9.00M FLOOR STR WORK

PH CONTROL ROOM 0.00M

PH A-ROW CLADDING WORK

PH GRID 10

CW PIPE LINE WORK

IDCT SWITCH GEAR ROOM WORK

FWPH FOUNDATION

CW PIPE LINE WORK

UT FOUNDATION WORK

PH 15.00M CLADDING WORK

CW PUMP HOUSE

PH 21.00M BRICK WORK

EXISTING PIPE ENCASING WORK NEAR AXIS-1

PH C-A ROW AXIS-1 STR ERECTION WORK

ID DUCT (ID FAN TO CHIMNEY) WORK IN PROGRESS

TP -4 WORK

CRUSHER HOUSE BELOW 0.00M RCC WORK

CRUSHER HOUSE STR ERECTION WORK

TP-3 STR COLUMN WORK IN PROGRESS

CONVEYOR -4A STR WORK

CONVEYOR -10 STR WORK

CONVEYOR -4A/B STR WORK

CONVEYOR -2A/B STR WORK

ERH-2 STR ERECTION WORK IN PROGRESS

FIRE WATER PH WORK

PT PLANT CASCADE AERATOR WORK

IDCT WORK IN PROGRESS

IDCT SLAB CASTING WORK

CW ANNEX BUILDING WORK

CW PIPE LINE WORK NEAR CW ANNEX BLDG

PH A-B BAY GRID 10 STR CLADDING WORK

PH A-B BAY GRID 10-9 FLOOR WORK

PH B-E BAY 15.00M FLOOR BRICK WORK

PH FLOOR WORK NEAR TG

CW PUMP HOUSE STR ERECTION WORK

ST WORK

UT FOUNDATION WORK

COMPRESSOR HOUSE BLDG FDN WORK

BOTTOM ASH HOPPER MISC FOUNDATION WORK

PIPE ENCASING NEAR PH AXIS-1

PH AXIS -1 FOUNDATION WORK

TP-5 STR COLUMN WORK IN PROGRESS

CONVEYOR -8A/B WORK

TP-5 STR COLUMN WORK IN PROGRESS

ESP CONT.ROOM 12.40M PLASTER WORK

ESP CONT. ROOM 3.7M FLOOR FINISH WORK

ID DUCT STR ERECTION

ASH WATER PH CABLE RACK

AHP MCC-1 CABLE TRENCH WORK

DM TANK WORK IN PROGRESS

MILL HOPPER ERECTION WORK IN PROGRESS

CW PIPE LINE WORK

CW ANNEX BUILDING WORK

CHP MCC-1 WORK

TP-5 STR COLUMN WORK IN PROGRESS

ST WORK

ESP CONTROL ROOM WORK

TG ERECTION WORK IN PROGRESSS

PH A-B ROW GRID 10 STR CLADDING FRAMING WORK

PH CONTROL ROOM 15.00M BRICK WORK

AHP MCC-1 CABLE TRENCH WORK

TP -4 WORK

ASH SLURRY PUMP HOUSE

O&M GENERAL LIGHT METAL STORE

CRUSHER HOUSE STR COLUMN ERECTION

CONVEYOR -2A/B BACK FILLING WORK

CONVEYOR -2A/B STR COLUMN WORK

ERH-1

CABLE TRENCH WORK AT MCC-3

CABLE TRENCH WORK AT MCC-3

PIPE RACK FDN AT CHP AREA

CRUSHER HOUSE COLUMN ENCASING WORK

CRUSHER HOUSE 0.00M FLOOR WORK

CRUSHER HOUSE BELOW 0.00M BRICK WORK

SILO UTILITY BLDG WORK IN PROGRESS

FA SILO -1 PLATFORM SLAB WORK

FIRE WATER PH BACK FILL STARTED

FIRE WATER PH WORK

PIPE RACK FDN NEAR FIRE WATER PH

PT PLANT CLARIFIER -2 WORK

PT PLANT CLARIFIER WORK

PT PLANT CASCADE AERATOR WORK

CW PIPE LINE WORK

CW ANNEX BUILDING WORK

UT FOUNDATION WORK

ST WORK

CW PH STR COLUMN WORK

CHP MCC-3 WORK IN PROGRESS

TP-5 STR COLUMN WORK IN PROGRESS

MILL HOPPER ERECTION WORK IN PROGRESS

PH GRID10 A-B BAY STR CLADDING WORK

PH 15.00M B-E AC DUCTING WORK

PH C-E BAY 15.00M FLOOR STR CLADDING & BRICK WORK

PH A-C BAY PARTITION WALL PLASTER WORK

PH CONT. ROOM 0.00M FLOOR WORK

PH CONT. ROOM 1ST FLOOR BRICK WORK

EXISTING PIPE ENCASING WORK NEAR AXIS-1

PH AXIS -1 FOUNDATION WORK

ID DUCT ESP TO MILL

TP-5 STR COLUMN WORK IN PROGRESS

TP -4

ESP CONT. ROOM

PIPE RACK FDN

ASPH MCC-1 CABLE RACK

ASPH EQUIPMENT FOUNDATION

PIPE RACK STR COLUMN ERECTION

DM TANK

O&M HEAVY METAL STORE

O&M GENERAL LIGHT METAL STORE

CONVEYOR -5A/B WORK

CONVEYOR -6A/B WORK

CONVEYOR -5A/B WORK

TP-2 STR COLUMN WORK

CRUSHER HOUSE STR ERECTION WORK

CONVEYOR 2A/B STR WORK

ERH-2 WORK

CONVEYOR -9 STR WORK

PH GRID-10 STR WORK

PH A-B BAY FLOOR WORK

PH A-ROW CLADDING STR WORK

CW ANX. BLDG FOUNDATION WORK

CW PIPE LINE WORK

PH AXIS -1 EXCAVATION WORK

CHP -MC 3 WORK IN PROGRESS

ST WORK

PH A-B BAY GRID 10TO 9 FLOOR WORK

CW PUMP HOUSE

UT FOUNDATION WORK

PH A-ROW CLADDING STR WORK

PH A-B BAY STR ERECTION WORK

PH 0.00M B-C BAY FLOOR WORK

MILL HOPPER ERECTION WORK IN PROGRESS

ID DUCT STR COLUMN ERECTION

TP-5 STR COLUMN WORK IN PROGRESS

CONVEYOR -8A/B WORK

TP -4

CHIMNEY STR WORK IN PROGRESS

DM TANK