Unit#1 boiler RHS backfilling under progress
|
Unit#1 boiler RHS backfilling under progress
|
Unit 1 Boiler Pedestal Concreting..
|
Unit-1 boiler Mill wall B 1st lift pouring u/p.
|
Unit-1 mph
|
Unit-1 boiler
|
Unit-1 Esp.
|
Unit#1 power house backfilling
|
Backfilling Unit 1 MPH BC bay
|
Unit 2 ESP foundations
|
Unit 2 Boiler foundation
|
Unit 1 FD fan foundations
|
Unit 2 MPH Aux Column foundations
|
Unit 2 Duct foundations
|
ESP erection unit 2
|
ESP Unit 1 Foundations E and F pass
|
ESP erection unit 1
|
MPH foundation Unit 1
|
Boiler foundation LHS Unit 1 backfilling
|
Boiler foundation RHS unit 2
|
TG raft Shuttering works
|
TG raft Shuttering works
|
Unit-2 Power house
|
Unit-1 Boiler near power house
|
Unit#1 ESP
|
Unit-1 Boiler
|
Unit#2 Service building
|
Unit#2 TG
|
Unit-2 TG reinforcement
|
Unit#2 PA FAN
|
Unit#2 ID duct chimney Area & ID FAN
|
Unit#2 ESP Control Room
|
Unit#2 ESP
|
Unit-1 esp pass D pedestal bitumen paint applying
|
Unit #1 cube testing boiler pilecap S5R&S6R
|
Unit 1 Boiler Pile Cap Curing
|
Unit 1 Boiler Pedestal Curing
|
Unit 1 Power House B & C row Backfilling started
|
Unit-1 ID fan wall shuttering under progress
|
Boiler-1 pile chipping u/p
|
Unit#2 ESP h&j pass core test under progress
|
Unit#2 ESP dozzing under progress
|
Unit#1 ESP rolling under progress
|
Unit 2 Fabrication works
|
Unit 2 Fabrication works
|
Unit 2 Service Building foundations
|
Unit 2 Boiler Rear side view
|
Unit 2 TG Reinforcement works
|
Unit 2 TG load test
|
Unit 2 Power House A row
|
Unit 2 Power House B and C row
|
Unit 1 TG excavation and chipping
|
Unit 1 Power House A row
|
Unit 1 Power House B and C row
|
Unit 1 Boiler LHS Foundation
|
Unit 1 ESP Erection
|
Unit 1 ESP Erection
|
Unit 1 ESP D pass backfilling
|
Unit 1 ESP D to E pass
|
Unit 1 Boiler LHS
|
Unit 2 ESP foundations
|
Unit 2 Boiler LHS
|
Unit 1 FD and PA fan foundations
|
Unit 2 Boiler RHS foundation
|
Unit 2 ESP backfilling under progress
|
Unit#1 AC-13 complete
|
Unit#1 BC-14 fit-up
|
Unit#1 ESP backfilling
|
Unit#2 ESP backfilling
|
Feild maintenance building 2
|
Unit 2 ID duct and ID fan
|
Unit 2 ESP
|
Unit 2 Duct foundation
|
Unit 2 Boiler LHS
|
Unit 2 FD fan
|
Unit 2 PA fan foundation
|
Unit 2 Boiler RHS
|
Unit 2 Power House A row and Aux column
|
Unit 2 Power House BC row
|
Unit 2 Boiler Rear side view
|
Unit 2 TG works
|
Unit 2 TG Reinf work inspection
|
Unit 2 TG Reinforcement works
|
Unit 1 TG excavation and chipping
|
Unit 1 Power House A row
|
Unit 1 Power House BC row
|
Unit 1 PA fan and ID duct foundation
|
Unit 1 Boiler RHS foundations
|
Unit 1 ESP D pass
|
Unit 1 ESP E and F pass
|
Unit 1 TG pile Chipping with breaker
|
Unit 1 Boiler LHS Foundation
|
Unit 1 ESP Erection
|
Unit#1 BC-02 dark grey painded
|
Field maintenance building 2
|
Unit-1 Boiler LHS
|
Unit-1 Boiler LHS
|
Unit-1 ESP
|
Unit#1 BC-02 column painted
|
Unit#1 CC-12a column fit-up
|
Feild maindanence building 2
|
Unit-1 PA Fan "B" Foundation
|
Unit-1 ID Fan "A"Foundation
|
Unit-1 ID Fan "B" Foundation
|
Unit-1 ID duct Pile cap reinforcement in progress
|
Unit-1 MPH Pile cap soil levelling work
|
Unit-1 TG Foundation excavation
|
Unit-1 Boiler pedestal reinforcement in progress
|
Unit-1 Boiler bitumen paint applying progress
|
Unit-1 Boiler pile cap Reinforcement is in progres
|
Unit#1 auxiliary column 4ns final inspection
|
Unit-1 PA &FD fan-"B" Raft foundation
|
Unit-1 Boiler RHS
|
Unit-1 ESP Area
|
Unit-1 TG Foundation Area
|
Unit-1 MPH
|
Unit-1 ESP Area
|
Unit-1 Boiler LHS
|
Unit-1 Auxiliary boiler vertical load test
|
Unit#1 BC-07 column second part final inspection
|
Unit-2 ID duct pile cap reinforcement work
|
Unit-1 ESP area
|
Uunit-2
|
Unit-2 Power house & Boiler
|
Unit-1 Boiler
|
Unit-1 Boiler LHS
|
Unit-1 ESP area
|
Unit 1 Boiler LHS Foundation
|
Unit 1 ESP Erection
|
Unit 2 MPH A16 Shuttering works
|
Unit 1 ESP Erection
|
Unit 1 ESP Erection
|
Uit-2 TG de-watering
|
Unit-2 service building reinforcement work
|
Unit-2 power house reinforcement work
|
Unit-2 power house A-16
|
Unit-1 PA fan Raft concrete done
|
Unit-1 ID duct pile chipping
|
Unit-1 Boiler S23
|
Unit-1 Cement test
|
Unit-2 ID duct support
|
Unit-2 ID duct support
|
Unit-2 service building
|
Unit-2 FD fan
|
Unit-2 Boiler LHS
|
Unit-2 Boiler RHS
|
Unit-1 Boiler S20R pedestal shuttering
|
Unit-1 Pa fan shuttering
|
Unit-1 ESP area
|
Unit-2 power house curing work
|
Unit-2 service building reinforcement work
|
Unit-1 bitumen painting
|
Unit-2 bitumen painting
|
Unit-2 Boiler Mill ready fo concrete
|
Unit-2 power house c row
|
Unit-2 Cube test
|
Unit-1 power house pile chipping work
|
Unit-1 FD fan Vertical load test
|
Unit-2 Boiler
|
Unit-2 TG
|
Unit-1 PA fan
|
Unit-1 power house pile cap shuttering work
|
Unit-1 Boiler
|
Unit 1 Boiler S23R Reinforcement works
|
Unit 2 Boiler Lateral load test
|
Unit 1 FD fan B load test arrangements
|
Unit 1 ID Fan B pile cap works
|
Unit 1 ESP bolt lift works
|
Unit 2 Power House B24 PCC work
|
Unit 1 Boiler S12L Pedestal works
|
Unit 2 Power House Pile Cap B 25
|
Unit 1 Boiler S9L Pedestal
|
Unit 1 Boiler S12 L Reinforcement works
|
Unit 1 Power House Pedestal Shuttering
|
Unit 1 Boiler Pile Cap S38R S39R
|
Pile chipping Power House C row Unit1
|
Unit 1 Power House PC B4 Reinforcement
|
Unit 1 Boiler S12 L Reinforcement works
|
Unit 1 Boiler pedestal S3R shuttering
|
Unit 1 Boiler Pile chipping using Breaker
|
Unit 2 Boiler S38R S39R Reinforcement works
|
Unit 1 PH PCA4 Reinf works
|
Unit 1 TG Dewatering
|
Unit 2 Boiler VLT Pile no:83
|
POwer House Excavation works Unit 1
|
Unit 2 ID duct PC 5A
|
Unit 1 Boiler S20R Pile cap Concreting
|
Unit 1 Pile Chipping works under progress
|
Unit 2 Boiler S35L Shuttering works
|
Unit 1 Boiler S12L Reinforcement Work in Progress
|
Unit 1 Power House PC C4 Pile chipping
|
Unit 2 Boiler S38R S39R PIT test completed
|
Unit 2 Boiler S35L Concreting completed
|
Unit 1 PH Pedestal C1 Shuttering works in progres
|
Unit1 PH PCA4 reinforcement works
|
Unit 1 POwer House PC B4 Reinforcement works
|
Unit 1 ID duct Pile Chipping
|
Unit 2 S35R Pedestal Reinforcement Works
|
Unit 2 Mill Wall Reinforcement Works
|
Unit 1 Power House B4 reinforcement works
|
Unit 2 Boiler Reinforcement works
|
Unit 2 Power House Bolt fixing
|
Unit 2 Boiler Pedestal Curing
|
Unit 1 Boiler S12L Reinforcement Work in Progress
|
Unit 1 Boiler S13R S14R Curing
|
UNit 1 ID duct Pile load test preparatory works
|
Unit 1 Power House PCA4 Pile Cap Concrete works
|
Unit 2 ID duct shuttering work under progress
|
Unit 1 ESP Bolt lift under progress
|
Unit 2 PA fan B shuttering under progress
|
ESP Unit 1 Bolt lift E1 EA
|
Unit 2 Boiler S35R Concreting Complete
|
Unit 2 ESP CR shuttering works
|
Unit 2 Batching plant Calibration
|
Unit 2 ESP Bolt lift Shuttering works
|
Unit 2 ESP Pedestal Curing
|
Unit 2 ESP CR A4
|
Unit 2 ESP CR A5
|
Unit 1 Boiler S9L S10L Reinforcement works
|
Unit 1 ID Fan A Concreting
|
Unit 1 ID Fan A Concrete Completed
|
Unit 1 TG area dewatering under progress
|
Unit 1 ID Fan Pile Cap work
|
Unit 1 MPH foundation
|
Unit 1 MPH foundation
|
Unit 1 Boiler Foundation
|
Unit 1 Boiler Foundation
|
Unit 1 ESP Erection
|
Unit 1 ESP foundations
|
Service Building Pile Cap Excavation
|
Unit 2 MPH Pile Cap C row
|
Unit 2 MPH Pile Cap
|
Unit 2 TG Piles
|
Unit 2 Boiler foundations
|
Unit 2 ESP Control room
|
Unit 2 ESP column erection
|
Unit 2 ID fan foundation 2
|
Unit 2 ID fan foundation
|
Unit 2 ESP foundations
|
Unit 2 ESP foundations
|
Unit 2 ID duct foundations
|
Unit 1 ID Fan A pile cap works
|
Unit 1 TG area dewatering under progress
|
Unit 2 Power House Dewatering
|
Unit 2 Boiler Dewatering Work Under Progress
|
Unit 1 Boiler RHS
|
Unit 1 Boiler S9L S10L reinforcement works
|
Unit 2 PA fan area after heavy rain
|
Unit 2 ESP Pedestal Welding and Cleaning
|
Unit 2 ESP CR pile cap shuttering works
|
Unit 1 Boiler S12L Pile Chipping work
|
Unit 1 PA fan and ID duct
|
Unit 1 TG area dewatering under progress
|
Unit 1 ID Fan A pile cap works
|
Unit 1 BunkerVertical bracings final inspection
|
Unit 2 PA fan B shuttering work
|
Unit 2 Cube test
|
Unit 1 Boiler S12L Pile Chipping work
|
Unut 1 Boiler S9L S10L Reinforcement works
|
Unit 1-ID Duct-pile chipping works in progress
|
FD Fan A-Unit1
|
Field Maintenance Building 2
|
Boiler 1 pilecap- S9L and S10L
|
ESP -Unit1
|
Unit 2 Boiler RHS Column erection
|
Unit 2 Boiler RHS
|
Unit 2 Boiler LHS Shuttering works
|
Unit 1 ESP Erection Side view
|
Unit 1 Boiler Foundation LHS
|
Unit 1 Boiler Foundation LHS
|
Unit 1 ID Duct Pile Chipping
|
Unit 1 ESP Bitumen Painting
|
Unit 2 ESP Pedestal Concreting
|
Unit 1 PH Column Fabrication
|
Excavation in Boiler & Power House Unit1
|
TG area Unit1
|
Power House Unit 2
|
TG Area Unit 2
|
Boiler Foundations Unit 1
|
Boiler Unit 1 LHS
|
Boiler Unit 1 RHS
|
Boiler Unit 1 RHS
|
Boiler Unit 1 RHS
|
Boiler Unit 2 LHS
|
Boiler Foundation Unit 2
|
ESP Foundation Unit 2
|
ESP Foundation Unit I
|
Boiler Unit 2
|
ESP Unit 1
|
MM Yard near BTG
|
MM Yard Phase I
|
MM Yard Phase I
|
MM Store sheds
|
Boiler foundation Unit 2 Aerial View
|
Boiler foundations Unit 1 Aerial View
|
MM Storage Yard
|
ESP Unit1 & 2 Aerial View
|
Boiler Unit 2 Aerial View
|
ESP Unit 2 Aerial View
|
UNIt 1 Boiler LHS Pile chipping work
|
Unit1 Boiler Foundation LHS
|
Unit 1 Boiler S7R S8R form works in progress
|
Unit 1 Boiler LHS
|
Unit 1 Boiler RHS
|
Unit 1 PA fan excavation
|
UNit 1 ESP Erection A and B Pass
|
Unit 1 ESP foundations
|
Unit 1 ESP foundation E and F pass
|
Unit 1 ESP F pass
|
Unit 2 ID duct and ID fan Foundations
|
Unit 2 ID duct and ID fan Foundations
|
Unit 2 ESP foundations D to F Pass
|
Unit 2 ESP foundations
|
Unit 2 Boiler foundation
|
Unit 2 Boiler LHS
|
Unit 2 PA Fan 2 Pile Cap
|
Unit 2 Boiler LHS
|
Unit 2 Load Test Boiler J to K Row
|
Unit 2 Boiler Foundation RHS
|
Unit 2 Boiler foundation RHS
|
Unit 2 Vertical Load test Power House Pile no 535
|
Unit 2 TG excavation
|
Unit 2 Sandblasting works
|
Unit 2 Power House Column Fabrication
|
Unit 1 Boiler Foundation LHS
|
Unit 1 TG excavation
|
Unit 1 Power House A row
|
Unit 1 TG excavation
|
Unit 1 Power House A row
|
Unit 1 Power House Pile Cap and Pedestal works B and C row
|
Unit 1 Power House B and C Row
|
BTG Boundary Wall Works
|
Unit 1 Fabrication works
|
Unit 1 Fabrication works
|
Unit 1 Fabrication works
|
Unit 2 TG excavation
|
Unit 1 Power House Column Sandblasting works
|
Unit 2 Power House A and B row
|
Unit 1 Fabrication works
|
Unit 1 Fabrication works
|
Unit 2 Power House A and B row
|
Unit 2 Power House A and B row
|
Boiler Erection Unit 2
|
Unit 2 Boiler LHS Reinforcement work
|
Unit 2 Boiler Erection Start
|
Unit 2 Boiler Erection Start
|
Unit 2 Boiler Erection Start
|
Unit 2 Boiler Erection Start
|
Unit 2 TG excavation
|
Unit 2 Power House foundation
|
Unit 2 ID duct and ID fan foundation
|
Unit 2 Boiler Erection Preparatory Works
|
Unit 1 Power House A row
|
Unit 2 Boiler foundation Barbending works
|
Unit 2 Boiler foundation LHS
|
UNit 2 Boiler foundation RHS
|
Unit 2 Boiler Column moved for Erection
|
Unit 2 PA fan foundation
|
Unit 2 ESP foundation
|
Unit 2 ESP foundation
|
Unit 1 Boiler Foundation LHS
|
Unit 1 Power House B and C row
|
Unit 1 Boiler foundation LHS
|
Unit 1 Boiler foundation RHS
|
Unit 1 Boiler Foundation LHS
|
Unit 1 Boiler Foundation LHS
|
ESP foundations C to F Pass Unit 1
|
ESP Unit 1 A and B Pass
|
Unit 2 TG excavation
|
Unit 2 Power house A row
|
Unit 2 PA fan 2 foundation
|
Unit 2 Power House C row
|
Unit 2 PA fan 1
|
Unit 2 Power House C row
|
Unit 2 Boiler foundation bolt fixing and pedestal
|
Unit 2 ID fan 1 foundation
|
Unit 2 Boiler RHS Bolt fixing
|
Unit 2 Boiler foundation LHS
|
Unit 2 Boiler J to K row load test and chipping
|
Unit 2 Boiler foundation RHS bolt fixing
|
Unit 2 Boiler foundation RHS
|
Unit 2 ESP foundation D and E pass
|
Unit 2 ID fan 2 foundation
|
Unit 2 ESP Control room foundation
|
Unit 2 ID duct foundation
|
Unit 2 ESP F pass rear view
|
Unit 2 ESP CR foundation
|
ESP Unit 2 foundation rear view
|
Unit 2 Boiler foundation
|
Unit 1 ESP C Pass
|
Unit 1 ESP D Pass
|
Unit 1 ESP A and B pass Erection
|
Unit 1 ID fan 2 PCC
|
Unit 1 ID duct and Fan excavation
|
Unit 1 ESP Erection A pass
|
Unit 1 Boiler LHS pedestal works
|
Unit 1 Boiler LHS bolt fixing
|
Unit 1 Boiler Excavation
|
Unit 1 Boiler LHS pedestal works
|
Unit 1 Boiler Pedestal and Bolt fixing
|
Unit 1 Boiler RHS - Shuttering works
|
Unit 1 Boiler LHS
|
Unit 1 Boiler LHS
|
ESP Unit 1 F pass
|
ESP Unit 2 E Pass
|
ESP Unit 2 foundation
|
Unit 2 Power House B row
|
Boiler Foundation Unit 1
|
Power House A row Unit 2
|
Unit 2 Boiler foundation
|
Unit 2 Boiler foundation
|
Unit 2 Boiler foundation
|
ESP Unit 2 foundation
|
ESP Unit 2 C and D pass
|
ESP Unit 1 E pass
|
ESP Erection Unit 1 A and B pass
|
ESP Unit 1 C pass
|
ESP Unit 1 side view
|
Load test ID duct Unit 1
|
ESP foundation Unit 2 Side view
|
ID duct & fan foundations Unit 2
|
Unit 2 ESP backfilling
|
Unit 2 ESP Erection
|
Unit 2 PA fan 2
|
Unit 2 PA fan foundation
|
Unit 2 ESP backfilling
|
Unit 2 ESP Foundation
|
Unit 2 ESP E pass bolt fixing
|
Unit 2 ESP C and D pass
|
Unit 2 ID fan foundation
|
Unit 2 ID duct foundation
|
Unit 2 ID duct foundation
|
Unit 2 ID duct foundation
|
Unit 1 ESP E and F pass
|
Unit 1 ID Fan Excavation
|
Unit 1 C pass ESP
|
Unit 1 ESP Erection
|
Unit 1 ESP Erection
|
Unit 1 ESP Erection
|
Unit 1 ESP Erection
|
Unit 1 Boiler LHS
|
Unit 1 Boiler S7L S8L Concreting
|
Boiler Unit 1 S7L S8 L Pedestal Concreting
|
Unit 1 Boiler LHS reinforcement work
|
Unit 1 Boiler RHS pile chipping
|
Unit 1 Boiler RHS excavation
|
Unit 1 Boiler RHS excavation
|
Unit 1 Boiler RHS excavation
|
Unit 1 ESP Erection
|
Unit 1 Boiler LHS
|
Unit 1 Boiler LHS pedestal
|
Unit 1 Boiler LHS
|
Unit 1 Power House B and C row
|
Unit 1 Power House A row load test
|
Unit 1 TG excavation
|
Unit 2 TG excavation
|
Unit 2 Power House A row PCC work
|
Unit 2 Powee House excavation
|
Unit 2 Boiler RHS rear view
|
Unit 2 Power House A and B row
|
Unit 2 Power House C row
|
Unit 2 Power House C row
|
Unit 2 Boiler RHS
|
Unit 2 Boiler RHS Pedestal Works
|
Unit 2 Boiler RHS
|
Unit 2 Boiler RHS
|
Unit 2 Boiler RHS
|
Unit 2 APH Building excavation
|
UNIT 2 POWER HOUSE FOUNDATIONS
|
UNIT 2 POWER HOUSE FOUNDATIONS A AND B ROW
|
POWER HOUSE PILE CAP UNIT 2
|
UNIT 2 TG AREA EXCAVATION
|
UNIT 1 TG AREA PILE CHIPPING WORKS
|
UNIT 2 TG AREA EXCAVATION
|
UNIT 1 TG AREA EXCAVATION
|
UNIT 1 TG AREA EXCAVATION
|
UNIT 1 POWER HOUSE C ROW
|
UNIT 1 POWER HOUSE C ROW LOAD TEST
|
UNIT 1 POWER HOUSE C ROW PILE CAP WORKS
|
UNIT 1 POWER HOUSE AND TG EXCAVATED AREA
|
UNIT 1 POWER HOUSE A ROW
|
UNIT 1 BOILER PEDESTAL WORKS
|
UNIT 1 BOILER PILE CAP
|
UNIT 1 BOILER FDN REINFORCEMENT WORKS
|
UNIT 1 BOILER FDN RHS
|
UNIT 1 BOILER PEDESTAL AND BOLT FIXING WORK
|
UNIT 1 BOILER RHS
|
UNIT 1 BOILER LHS
|
UNIT 1 BOILER FDN RHS
|
ESP FDN D TO F PASS UNIT 1
|
ESP UNIT 1 A AND B PASS ERECTION
|
ESP UNIT 1 C PASS
|
ESP UNIT 1 C PASS
|
ESP UNIT 1 D PASS
|
ESP UNIT 1 F PASS WORK UNDER PROGRESS
|
ESP UNIT 1 F APSS
|
UNIT 1 ESP F ROW
|
UNIT 2 BOILER FDN LHS
|
UNIT 2 BOILER REINFORCEMENT WORKS
|
UNIT 2 BOILER LHS
|
BOILER FFDN UNIT 2 PEDESTAL AND BOLT FIXING WORK
|
UNIT 2 BOILER LHS PILE CAP AND EXCAVATION
|
UNIT 2 BOILER FDN REINFORCEMENT WORK IN PROGRESS
|
UNIT 2 BOILER FOUNDATION
|
UNIT 2 PA FAN FOUNDATION
|
UNIT 2 ID FAN AND ID DUCT FOUNDATION
|
UNIT 2 ESP BACKFILLING C AND D PASS
|
UNIT 2 PA FAN EXCAVATION AND REINFORCEMENT WORK
|
UNIT 2 ID DUCT FOUNDATION
|
ID DUCT EXCAVATION UNIT 2
|
UNIT 2 ID FAN FOUNDATION
|
BACKFILLING ESP UNIT 2
|
ESP UNIT 2 D PASS
|
ESP UNIT 2 BACKFILLING UNDER PROGRESS
|
ESP ERECTION UNIT 1
|
ESP ERECTION A AND B PASS
|
EXCAVATION TG UNIT 2
|
EXCAVATION TG UNIT 1
|
UNIT 1 ESP D PASS
|
UNIT 1 BOILER REINFORCEMENT WORKS
|
ESP UNIT 2 BACKFILLING IN PROGRESS
|
ESP UNIT 2 B PASS
|
UNIT 2 BOILER FOUNDATION
|
STRUCTURAL FABRICATION UNIT 2
|
UNIT 2 STRUCTURAL FABRICATION WORKS UNDER PROGRESS
|
UNIT 2 STRUCTURAL FABRICATION
|
ESP UNIT 1 ERECTION
|
UNIT 1 SUPERSTRUCTURE FABRICATION
|
UNIT 1 SUPERSTRUCTURE PAINTING
|
UNIT 1 SUPERSTRUCTURE PAINTING
|
UNIT 1 SUPERSTRUCTURE PAINTING
|
TEMPORARY ROAD UNDER CONSTRUCTION
|
BOILER FOUNDATION UNIT 1
|
BOILER FOUNDATION UNIT 1
|
UNIT 1 POWER HOUSE A ROW PILE CHIPPING IN PROGRESS
|
UNIT i BOILER FOUNDATION
|
TG EXCAVATION UNIT 1
|
TG EXCAVATION UNIT 1
|
TG EXCAVATION UNIT 2
|
UNIT 1 POWER HOUSE LOAD TEST
|
UNIT 2 POWER HOUSE B ROW
|
UNIT 2 POWER HOUSE A ROW
|
UNIT 2 BOILER FOUNDATION
|
UNIT 2 BOILER FOUNDATION RHS
|
UNIT 2 BOILER FOUNDATION
|
PA FAN EXCAVATION UNIT 2
|
ESP UNIT 1 FOUNDATIONS
|
ID DUCT FOUNDATION UNIT 2
|
ID FAN EXCAVATION UNIT 2
|
ESP ERECTION UNIT 1
|
ESP B PASS UNIT 1
|
ESP ERECTION UNIT 1
|
ESP UNIT 1 D PASS
|
ESP UNIT 1 E PASS
|
ESP UNIT 1 F PASS
|
ESP UNIT 2 A AND B PASS
|
ESP UNIT 2 C PASS
|
ESP FOUNDATION UNIT 2
|
ESP FOUNDATION UNIT 2
|
BOILER UNIT 1 CONCRETING FOR PILE CAP IN PROGRESS
|
BOILER UNIT 2 PILE CAP CONCRETING
|
BOILER FOUNDATION UNIT 1
|
BOILER FOUNDATION UNIT 1
|
TG AREA EXCAVATION UNIT 1
|
UNIT 1 BOILER PILE CAP
|
PILING WORKS DG BUILDING UNIT 2
|
SUPER STR FABRICATION UNIT 2
|
Unit II Boiler Foundation
|
ESP ERECTION UNIT 1
|
BOILER FOUNDATION UNIT 1
|
Unit I Power House C Row
|
Unit 1 Power House Pile Cap B row
|
Vertical Load test Unit I Power House
|
ESP Foundation Unit 2 B Pass
|
ESP ERECTION UNIT 1
|
BTG Boundary Wall
|
Unit I Pile Cap & Pedestal Boiler area
|
Unit I Boiler Pile cap & Pedestal
|
Unit 2 str fabrication works
|
Unit 2 str fabrication works
|
BOILER FOUNDATION UNIT 1
|
ESP FOUNDATION UNIT 2
|
ESP FOUNDATION UNIT 2 A PASS
|
POWER HOUSE UNIT 2 FOUNDATION
|
VERTICAL LOAD TEST ESP UNIT 1 F PASS
|
BOILER FOUNDATION UNIT 2
|
SUPER STR FAB UNIT 1
|
ESP FOUNDATION UNIT 2
|
SUPER STR FAB UNIT 1
|
ESP ERECTION UNIT 1
|
ESP ERECTION UNIT 1
|
ESP ERECTION UNIT 1
|
UNIT 1 ESP ERECTION A PASS
|
UNIT 2 FABRICATION WORKS
|
UNIT 2 STR FABRICATION
|
UNIT 1 BOILER PILE CAP
|
UNIT 1 BOILER FOUNDATION
|
UNIT 1 BOILER PILE CHIPPING
|
UNIT 2 ESP A PASS
|
UNIT 2 BOILER FOUNDATION
|
UNIT 1 ESP E PASS
|
UNIT 2 BOILER FOUNDATION
|
UNIT 2 ESP AND ID FAN
|
UNIT 2 ESP FOUNDATION
|
UNIT 2 ID FAN B RAFT PILE CAP
|
UNIT1 FABRICATION OF BEAMS
|
i) Power House # 1 Fabrication
|
h) Power House # 1 Fabrication
|
g) ESP # 2 Foundation
|
f) Boiler # 2 Foundation
|
e) ESP # 1 Foundation
|
d) Boiler # 1 Foundation
|
c) ESP # 1 Column Erection
|
b) Customer Office
|
a) Customer Office
|
Unit 2 Overall ESP foundation
|
Unit 1 ESP A Pass
|
Unit 2 Boiler Vertical Load test
|
Unit 1 Boiler Pile Cap
|
Unit 1 ESP foundation
|
Unit 1 ESP foundation D Pass
|
ESP UNIT 2 A PASS
|
Unit 2 ESP Foundation A and B Pass
|
Unit 2 ESP B Pass
|
Unit 2 ESP foundation
|
Unit 2 ESP foundation
|
Unit 2 ESP Foundation
|
ESP FOUNDATION UNIT 2
|
unit 2- boiler- pile chipping
|
unit 2- pilecap 2nd lift completed
|
unit1-Boiler-pile chipping
|
Unit 1- ESP pilecap-2nd lift
|
Unit1-ESP PILECAP-3rd LIFT
|
Unit 1 fabrication
|
Unit 1 St Steel fabrication
|
Unit 2 ESP E and F pass
|
Unit 2 ESP foundation
|
Unit 2 ESP C and D pass
|
Unit 2 ESP pedestal and bolt fixing
|
Unit 2 ESP foundation
|
Unit 2 ESP Load Test
|
Unit 1 ESP E and F row foundation
|
Unit 1 ESP foundation
|
Unit 1 ESP Pile foundation
|
Unit 2 Boiler Pile Cap
|
Unit 2 Boiler Load test arrgt
|
UNIT 1 BOILER AREA EXCAVATION
|
UNIT 1 BOILER AREA EXCAVATION
|
Unit 1 Boiler Pile Cap
|
Unit 1 Boiler area Vertical Load test
|
Unit 1 ESP bolt fixing 2
|
Unit 1 ESP Bolt fixing
|
Unit 1 Fabrication works
|
UNIT 1 FABRICATION
|
UNIT 1 FABRICATION WORKS
|
BARBENDING WORKS UNIT 2
|
UNIT 2 BOILER EXCAVATION
|
UNIT 1 BOILER AREA EXCAVATION
|
ESP UNIT 1 E AND F PASS
|
ESP UNIT 1 A PASS
|
ESP UNIT 1 C D PASS
|
ESP UNIT 1 C AND D PASS
|
VERTICAL LOAD TEST ESP UNIT 1
|
ESP UNIT 1 PILE CAP
|
ESP FOUNDATION A PASS UNIT 2
|
ESP UNIT 2 BITUMUN PAINTING A PASS
|
ESP UNIT 2 A PASS
|
ESP UNIT 2 D PASS
|
ESP UNIT 2 PILE CAP E AND F PASS
|
UNIT 2 PILE CAP ESP E AND F PASS
|
Unit 2 Boiler pile area
|
Unit 1 Boiler Pile foundation
|
Unit 1 ESP Pile cap
|
Unit 1 ESP A pass area
|
Unit 1 ESP C Pasas area
|
Unit 1 ESP Pile cap B Pass
|
Unit 1 ESP Load test
|
Unit 2 ESP A Pass area
|
Unit 2 ESP D Pass area
|
Unit 2 ESP F Pass area
|
Vertical load test Unit 2 ESP area
|
Unit 1 superstructure fit up and welding
|
Steel fabrication Unit 1 superstructure
|
UNIT 2-BOILER PILING
|
UNIT 2- ESP PILECAP WORKS
|
North side Boundary Wall
|
North side Boundary Wall
|
Unit 1- pile chipping and pile cap works
|
Unit 1- ESP pile cap
|
Unit 1- ESP pile cap
|
Unit 2- Piling
|
Unit 2- ESP pile cap
|
Unit 2- ESP pile cap
|
Unit 2- ESP pile cap
|
ESP unit 2 pile cap works
|
ESP unit 2 pile cap works
|
ESP Unit 1 pile cap works
|
ESP Unit 2 pile cap works
|
Boiler Unit 2 piling works
|
Boiler 2 piling Works
|
UNIT 1 BOILER AREA PILING2
|
UNIT 2 ID DUCT AREA PILING
|
UNIT 2 ESP AREA PILING
|
UNIT 2 BOILER AREA PILING
|
UNIT 1 ID DUCT PILING
|
UNIT 1 ESP AREA PILING
|
UNIT 1 BOILER AREA PILING
|
TANGEDCO OFFICE EXTERIOR 3
|
TANGEDCO OFFICE CAR SHED
|
TANGEDCO OFFICE BUILDING INTERIOR 2
|
INTERIOR TANGEDCO OFFICE BUILDING
|
TANGEDCO OFFICE BLDG1
|
MATERIAL STORAGE
|
TG PACKAGE ITEMS UNLOADED
|
STATOR UNLOADING PLATFORM
|
WEIGH BRIDGE
|
TANGEDCO OFFICE BLDG
|
DIR/PROJECTS TANGEDCO VISITING OFFICE AREA
|
ED/PMG VISITING BHEL STORAGE YARD
|
TREE PLANTATION BY GM/PMG
|
TREE PLANTATION BY GM/PROJECTS
|
ED/PMG ADDRESSING BHEL SITE EMPLOYEES
|
ED/PMG VISITING BHEL OFFICE AREA
|
ED/PMG INAUGURATING STORE SHED 3
|
REVIEW MEETING AT UPPUR SITE
|
CMD/TANGEDCO INAUGURATING BHEL STORE SHED NO 2
|
CMD/TANGEDCO FLAGS OF PILING WORK IN BOILER UNIT 2
|
FIRST PILE IN UNIT 1 BOILER AREA
|
CMD/TANGEDCO FLAGS OF PILING WORK IN BOILER UNIT 1
|
GM/UPPUR EXPLAINING WORK PROGRESS TO DIGNITARIES
|
GM/UPPUR WELCOMES CMD/TANGEDCO AT SITE
|
ED/PMG WELCOMES CMD/TANGEDCO
|
Piling area Boiler Unit-1
|
Piling area ESP Unit-1
|
Piling area Boiler Unit-2
|
Piling area ESP Unit-2 area
|
Bar Bending area
|
TANGEDCO Office Building -2
|
TANGEDCO Office Building -1
|
BHEL Office Building
|
BHEL Store Shed
|
Unit - 2: Pile Excavation for Pile Cap
|
Unit - 1: Vertical Load Test for ESP area
|
Stator Unloading Platform
|
Boiler Unit 2 Piling
|
Piling Boiler Unit 1
|
Piling ESP Unit 1
|
Tree plantation by ED PMG
|
Stator Unloading platform
|
Piling ESP Unit 2
|
Tangedco Office Building interior
|
Tangedco Office Building
|
Boiler Piling work
|
BHEL Storage Yard
|
BHEL Storage Shed
|
Customer Office Building works in progress
|
Approach Road for Stator
|
ESP piling
|
Cage inserting
|
Pile
|
Piling in ESP area
|
ESP piling
|
ESP piling
|
Unit-2 Piling works
|
Piling Works in progress
|
Unit 2- Batching plant foundation
|
Unit 1-Batching plant foundation
|
BHEL office building
|
BHEL storage Shed
|
Customer Office
|
Poles erected- Construction Power BHEL Scope
|
Customer office
|
Pit excavated for Batching plant erection
|
|
|
|
|
|
|