UPPUR (2X800 MW)


Unit#1 boiler RHS backfilling under progress

Unit#1 boiler RHS backfilling under progress

Unit 1 Boiler Pedestal Concreting..

Unit-1 boiler Mill wall B 1st lift pouring u/p.

Unit-1 mph

Unit-1 boiler

Unit-1 Esp.

Unit#1 power house backfilling

Backfilling Unit 1 MPH BC bay

Unit 2 ESP foundations

Unit 2 Boiler foundation

Unit 1 FD fan foundations

Unit 2 MPH Aux Column foundations

Unit 2 Duct foundations

ESP erection unit 2

ESP Unit 1 Foundations E and F pass

ESP erection unit 1

MPH foundation Unit 1

Boiler foundation LHS Unit 1 backfilling

Boiler foundation RHS unit 2

TG raft Shuttering works

TG raft Shuttering works

Unit-2 Power house

Unit-1 Boiler near power house

Unit#1 ESP

Unit-1 Boiler

Unit#2 Service building

Unit#2 TG

Unit-2 TG reinforcement

Unit#2 PA FAN

Unit#2 ID duct chimney Area & ID FAN

Unit#2 ESP Control Room

Unit#2 ESP

Unit-1 esp pass D pedestal bitumen paint applying

Unit #1 cube testing boiler pilecap S5R&S6R

Unit 1 Boiler Pile Cap Curing

Unit 1 Boiler Pedestal Curing

Unit 1 Power House B & C row Backfilling started

Unit-1 ID fan wall shuttering under progress

Boiler-1 pile chipping u/p

Unit#2 ESP h&j pass core test under progress

Unit#2 ESP dozzing under progress

Unit#1 ESP rolling under progress

Unit 2 Fabrication works

Unit 2 Fabrication works

Unit 2 Service Building foundations

Unit 2 Boiler Rear side view

Unit 2 TG Reinforcement works

Unit 2 TG load test

Unit 2 Power House A row

Unit 2 Power House B and C row

Unit 1 TG excavation and chipping

Unit 1 Power House A row

Unit 1 Power House B and C row

Unit 1 Boiler LHS Foundation

Unit 1 ESP Erection

Unit 1 ESP Erection

Unit 1 ESP D pass backfilling

Unit 1 ESP D to E pass

Unit 1 Boiler LHS

Unit 2 ESP foundations

Unit 2 Boiler LHS

Unit 1 FD and PA fan foundations

Unit 2 Boiler RHS foundation

Unit 2 ESP backfilling under progress

Unit#1 AC-13 complete

Unit#1 BC-14 fit-up

Unit#1 ESP backfilling

Unit#2 ESP backfilling

Feild maintenance building 2

Unit 2 ID duct and ID fan

Unit 2 ESP

Unit 2 Duct foundation

Unit 2 Boiler LHS

Unit 2 FD fan

Unit 2 PA fan foundation

Unit 2 Boiler RHS

Unit 2 Power House A row and Aux column

Unit 2 Power House BC row

Unit 2 Boiler Rear side view

Unit 2 TG works

Unit 2 TG Reinf work inspection

Unit 2 TG Reinforcement works

Unit 1 TG excavation and chipping

Unit 1 Power House A row

Unit 1 Power House BC row

Unit 1 PA fan and ID duct foundation

Unit 1 Boiler RHS foundations

Unit 1 ESP D pass

Unit 1 ESP E and F pass

Unit 1 TG pile Chipping with breaker

Unit 1 Boiler LHS Foundation

Unit 1 ESP Erection

Unit#1 BC-02 dark grey painded

Field maintenance building 2

Unit-1 Boiler LHS

Unit-1 Boiler LHS

Unit-1 ESP

Unit#1 BC-02 column painted

Unit#1 CC-12a column fit-up

Feild maindanence building 2

Unit-1 PA Fan "B" Foundation

Unit-1 ID Fan "A"Foundation

Unit-1 ID Fan "B" Foundation

Unit-1 ID duct Pile cap reinforcement in progress

Unit-1 MPH Pile cap soil levelling work

Unit-1 TG Foundation excavation

Unit-1 Boiler pedestal reinforcement in progress

Unit-1 Boiler bitumen paint applying progress

Unit-1 Boiler pile cap Reinforcement is in progres

Unit#1 auxiliary column 4ns final inspection

Unit-1 PA &FD fan-"B" Raft foundation

Unit-1 Boiler RHS

Unit-1 ESP Area

Unit-1 TG Foundation Area

Unit-1 MPH

Unit-1 ESP Area

Unit-1 Boiler LHS

Unit-1 Auxiliary boiler vertical load test

Unit#1 BC-07 column second part final inspection

Unit-2 ID duct pile cap reinforcement work

Unit-1 ESP area

Uunit-2

Unit-2 Power house & Boiler

Unit-1 Boiler

Unit-1 Boiler LHS

Unit-1 ESP area

Unit 1 Boiler LHS Foundation

Unit 1 ESP Erection

Unit 2 MPH A16 Shuttering works

Unit 1 ESP Erection

Unit 1 ESP Erection

Uit-2 TG de-watering

Unit-2 service building reinforcement work

Unit-2 power house reinforcement work

Unit-2 power house A-16

Unit-1 PA fan Raft concrete done

Unit-1 ID duct pile chipping

Unit-1 Boiler S23

Unit-1 Cement test

Unit-2 ID duct support

Unit-2 ID duct support

Unit-2 service building

Unit-2 FD fan

Unit-2 Boiler LHS

Unit-2 Boiler RHS

Unit-1 Boiler S20R pedestal shuttering

Unit-1 Pa fan shuttering

Unit-1 ESP area

Unit-2 power house curing work

Unit-2 service building reinforcement work

Unit-1 bitumen painting

Unit-2 bitumen painting

Unit-2 Boiler Mill ready fo concrete

Unit-2 power house c row

Unit-2 Cube test

Unit-1 power house pile chipping work

Unit-1 FD fan Vertical load test

Unit-2 Boiler

Unit-2 TG

Unit-1 PA fan

Unit-1 power house pile cap shuttering work

Unit-1 Boiler

Unit 1 Boiler S23R Reinforcement works

Unit 2 Boiler Lateral load test

Unit 1 FD fan B load test arrangements

Unit 1 ID Fan B pile cap works

Unit 1 ESP bolt lift works

Unit 2 Power House B24 PCC work

Unit 1 Boiler S12L Pedestal works

Unit 2 Power House Pile Cap B 25

Unit 1 Boiler S9L Pedestal

Unit 1 Boiler S12 L Reinforcement works

Unit 1 Power House Pedestal Shuttering

Unit 1 Boiler Pile Cap S38R S39R

Pile chipping Power House C row Unit1

Unit 1 Power House PC B4 Reinforcement

Unit 1 Boiler S12 L Reinforcement works

Unit 1 Boiler pedestal S3R shuttering

Unit 1 Boiler Pile chipping using Breaker

Unit 2 Boiler S38R S39R Reinforcement works

Unit 1 PH PCA4 Reinf works

Unit 1 TG Dewatering

Unit 2 Boiler VLT Pile no:83

POwer House Excavation works Unit 1

Unit 2 ID duct PC 5A

Unit 1 Boiler S20R Pile cap Concreting

Unit 1 Pile Chipping works under progress

Unit 2 Boiler S35L Shuttering works

Unit 1 Boiler S12L Reinforcement Work in Progress

Unit 1 Power House PC C4 Pile chipping

Unit 2 Boiler S38R S39R PIT test completed

Unit 2 Boiler S35L Concreting completed

Unit 1 PH Pedestal C1 Shuttering works in progres

Unit1 PH PCA4 reinforcement works

Unit 1 POwer House PC B4 Reinforcement works

Unit 1 ID duct Pile Chipping

Unit 2 S35R Pedestal Reinforcement Works

Unit 2 Mill Wall Reinforcement Works

Unit 1 Power House B4 reinforcement works

Unit 2 Boiler Reinforcement works

Unit 2 Power House Bolt fixing

Unit 2 Boiler Pedestal Curing

Unit 1 Boiler S12L Reinforcement Work in Progress

Unit 1 Boiler S13R S14R Curing

UNit 1 ID duct Pile load test preparatory works

Unit 1 Power House PCA4 Pile Cap Concrete works

Unit 2 ID duct shuttering work under progress

Unit 1 ESP Bolt lift under progress

Unit 2 PA fan B shuttering under progress

ESP Unit 1 Bolt lift E1 EA

Unit 2 Boiler S35R Concreting Complete

Unit 2 ESP CR shuttering works

Unit 2 Batching plant Calibration

Unit 2 ESP Bolt lift Shuttering works

Unit 2 ESP Pedestal Curing

Unit 2 ESP CR A4

Unit 2 ESP CR A5

Unit 1 Boiler S9L S10L Reinforcement works

Unit 1 ID Fan A Concreting

Unit 1 ID Fan A Concrete Completed

Unit 1 TG area dewatering under progress

Unit 1 ID Fan Pile Cap work

Unit 1 MPH foundation

Unit 1 MPH foundation

Unit 1 Boiler Foundation

Unit 1 Boiler Foundation

Unit 1 ESP Erection

Unit 1 ESP foundations

Service Building Pile Cap Excavation

Unit 2 MPH Pile Cap C row

Unit 2 MPH Pile Cap

Unit 2 TG Piles

Unit 2 Boiler foundations

Unit 2 ESP Control room

Unit 2 ESP column erection

Unit 2 ID fan foundation 2

Unit 2 ID fan foundation

Unit 2 ESP foundations

Unit 2 ESP foundations

Unit 2 ID duct foundations

Unit 1 ID Fan A pile cap works

Unit 1 TG area dewatering under progress

Unit 2 Power House Dewatering

Unit 2 Boiler Dewatering Work Under Progress

Unit 1 Boiler RHS

Unit 1 Boiler S9L S10L reinforcement works

Unit 2 PA fan area after heavy rain

Unit 2 ESP Pedestal Welding and Cleaning

Unit 2 ESP CR pile cap shuttering works

Unit 1 Boiler S12L Pile Chipping work

Unit 1 PA fan and ID duct

Unit 1 TG area dewatering under progress

Unit 1 ID Fan A pile cap works

Unit 1 BunkerVertical bracings final inspection

Unit 2 PA fan B shuttering work

Unit 2 Cube test

Unit 1 Boiler S12L Pile Chipping work

Unut 1 Boiler S9L S10L Reinforcement works

Unit 1-ID Duct-pile chipping works in progress

FD Fan A-Unit1

Field Maintenance Building 2

Boiler 1 pilecap- S9L and S10L

ESP -Unit1

Unit 2 Boiler RHS Column erection

Unit 2 Boiler RHS

Unit 2 Boiler LHS Shuttering works

Unit 1 ESP Erection Side view

Unit 1 Boiler Foundation LHS

Unit 1 Boiler Foundation LHS

Unit 1 ID Duct Pile Chipping

Unit 1 ESP Bitumen Painting

Unit 2 ESP Pedestal Concreting

Unit 1 PH Column Fabrication

Excavation in Boiler & Power House Unit1

TG area Unit1

Power House Unit 2

TG Area Unit 2

Boiler Foundations Unit 1

Boiler Unit 1 LHS

Boiler Unit 1 RHS

Boiler Unit 1 RHS

Boiler Unit 1 RHS

Boiler Unit 2 LHS

Boiler Foundation Unit 2

ESP Foundation Unit 2

ESP Foundation Unit I

Boiler Unit 2

ESP Unit 1

MM Yard near BTG

MM Yard Phase I

MM Yard Phase I

MM Store sheds

Boiler foundation Unit 2 Aerial View

Boiler foundations Unit 1 Aerial View

MM Storage Yard

ESP Unit1 & 2 Aerial View

Boiler Unit 2 Aerial View

ESP Unit 2 Aerial View

UNIt 1 Boiler LHS Pile chipping work

Unit1 Boiler Foundation LHS

Unit 1 Boiler S7R S8R form works in progress

Unit 1 Boiler LHS

Unit 1 Boiler RHS

Unit 1 PA fan excavation

UNit 1 ESP Erection A and B Pass

Unit 1 ESP foundations

Unit 1 ESP foundation E and F pass

Unit 1 ESP F pass

Unit 2 ID duct and ID fan Foundations

Unit 2 ID duct and ID fan Foundations

Unit 2 ESP foundations D to F Pass

Unit 2 ESP foundations

Unit 2 Boiler foundation

Unit 2 Boiler LHS

Unit 2 PA Fan 2 Pile Cap

Unit 2 Boiler LHS

Unit 2 Load Test Boiler J to K Row

Unit 2 Boiler Foundation RHS

Unit 2 Boiler foundation RHS

Unit 2 Vertical Load test Power House Pile no 535

Unit 2 TG excavation

Unit 2 Sandblasting works

Unit 2 Power House Column Fabrication

Unit 1 Boiler Foundation LHS

Unit 1 TG excavation

Unit 1 Power House A row

Unit 1 TG excavation

Unit 1 Power House A row

Unit 1 Power House Pile Cap and Pedestal works B and C row

Unit 1 Power House B and C Row

BTG Boundary Wall Works

Unit 1 Fabrication works

Unit 1 Fabrication works

Unit 1 Fabrication works

Unit 2 TG excavation

Unit 1 Power House Column Sandblasting works

Unit 2 Power House A and B row

Unit 1 Fabrication works

Unit 1 Fabrication works

Unit 2 Power House A and B row

Unit 2 Power House A and B row

Boiler Erection Unit 2

Unit 2 Boiler LHS Reinforcement work

Unit 2 Boiler Erection Start

Unit 2 Boiler Erection Start

Unit 2 Boiler Erection Start

Unit 2 Boiler Erection Start

Unit 2 TG excavation

Unit 2 Power House foundation

Unit 2 ID duct and ID fan foundation

Unit 2 Boiler Erection Preparatory Works

Unit 1 Power House A row

Unit 2 Boiler foundation Barbending works

Unit 2 Boiler foundation LHS

UNit 2 Boiler foundation RHS

Unit 2 Boiler Column moved for Erection

Unit 2 PA fan foundation

Unit 2 ESP foundation

Unit 2 ESP foundation

Unit 1 Boiler Foundation LHS

Unit 1 Power House B and C row

Unit 1 Boiler foundation LHS

Unit 1 Boiler foundation RHS

Unit 1 Boiler Foundation LHS

Unit 1 Boiler Foundation LHS

ESP foundations C to F Pass Unit 1

ESP Unit 1 A and B Pass

Unit 2 TG excavation

Unit 2 Power house A row

Unit 2 PA fan 2 foundation

Unit 2 Power House C row

Unit 2 PA fan 1

Unit 2 Power House C row

Unit 2 Boiler foundation bolt fixing and pedestal

Unit 2 ID fan 1 foundation

Unit 2 Boiler RHS Bolt fixing

Unit 2 Boiler foundation LHS

Unit 2 Boiler J to K row load test and chipping

Unit 2 Boiler foundation RHS bolt fixing

Unit 2 Boiler foundation RHS

Unit 2 ESP foundation D and E pass

Unit 2 ID fan 2 foundation

Unit 2 ESP Control room foundation

Unit 2 ID duct foundation

Unit 2 ESP F pass rear view

Unit 2 ESP CR foundation

ESP Unit 2 foundation rear view

Unit 2 Boiler foundation

Unit 1 ESP C Pass

Unit 1 ESP D Pass

Unit 1 ESP A and B pass Erection

Unit 1 ID fan 2 PCC

Unit 1 ID duct and Fan excavation

Unit 1 ESP Erection A pass

Unit 1 Boiler LHS pedestal works

Unit 1 Boiler LHS bolt fixing

Unit 1 Boiler Excavation

Unit 1 Boiler LHS pedestal works

Unit 1 Boiler Pedestal and Bolt fixing

Unit 1 Boiler RHS - Shuttering works

Unit 1 Boiler LHS

Unit 1 Boiler LHS

ESP Unit 1 F pass

ESP Unit 2 E Pass

ESP Unit 2 foundation

Unit 2 Power House B row

Boiler Foundation Unit 1

Power House A row Unit 2

Unit 2 Boiler foundation

Unit 2 Boiler foundation

Unit 2 Boiler foundation

ESP Unit 2 foundation

ESP Unit 2 C and D pass

ESP Unit 1 E pass

ESP Erection Unit 1 A and B pass

ESP Unit 1 C pass

ESP Unit 1 side view

Load test ID duct Unit 1

ESP foundation Unit 2 Side view

ID duct & fan foundations Unit 2

Unit 2 ESP backfilling

Unit 2 ESP Erection

Unit 2 PA fan 2

Unit 2 PA fan foundation

Unit 2 ESP backfilling

Unit 2 ESP Foundation

Unit 2 ESP E pass bolt fixing

Unit 2 ESP C and D pass

Unit 2 ID fan foundation

Unit 2 ID duct foundation

Unit 2 ID duct foundation

Unit 2 ID duct foundation

Unit 1 ESP E and F pass

Unit 1 ID Fan Excavation

Unit 1 C pass ESP

Unit 1 ESP Erection

Unit 1 ESP Erection

Unit 1 ESP Erection

Unit 1 ESP Erection

Unit 1 Boiler LHS

Unit 1 Boiler S7L S8L Concreting

Boiler Unit 1 S7L S8 L Pedestal Concreting

Unit 1 Boiler LHS reinforcement work

Unit 1 Boiler RHS pile chipping

Unit 1 Boiler RHS excavation

Unit 1 Boiler RHS excavation

Unit 1 Boiler RHS excavation

Unit 1 ESP Erection

Unit 1 Boiler LHS

Unit 1 Boiler LHS pedestal

Unit 1 Boiler LHS

Unit 1 Power House B and C row

Unit 1 Power House A row load test

Unit 1 TG excavation

Unit 2 TG excavation

Unit 2 Power House A row PCC work

Unit 2 Powee House excavation

Unit 2 Boiler RHS rear view

Unit 2 Power House A and B row

Unit 2 Power House C row

Unit 2 Power House C row

Unit 2 Boiler RHS

Unit 2 Boiler RHS Pedestal Works

Unit 2 Boiler RHS

Unit 2 Boiler RHS

Unit 2 Boiler RHS

Unit 2 APH Building excavation

UNIT 2 POWER HOUSE FOUNDATIONS

UNIT 2 POWER HOUSE FOUNDATIONS A AND B ROW

POWER HOUSE PILE CAP UNIT 2

UNIT 2 TG AREA EXCAVATION

UNIT 1 TG AREA PILE CHIPPING WORKS

UNIT 2 TG AREA EXCAVATION

UNIT 1 TG AREA EXCAVATION

UNIT 1 TG AREA EXCAVATION

UNIT 1 POWER HOUSE C ROW

UNIT 1 POWER HOUSE C ROW LOAD TEST

UNIT 1 POWER HOUSE C ROW PILE CAP WORKS

UNIT 1 POWER HOUSE AND TG EXCAVATED AREA

UNIT 1 POWER HOUSE A ROW

UNIT 1 BOILER PEDESTAL WORKS

UNIT 1 BOILER PILE CAP

UNIT 1 BOILER FDN REINFORCEMENT WORKS

UNIT 1 BOILER FDN RHS

UNIT 1 BOILER PEDESTAL AND BOLT FIXING WORK

UNIT 1 BOILER RHS

UNIT 1 BOILER LHS

UNIT 1 BOILER FDN RHS

ESP FDN D TO F PASS UNIT 1

ESP UNIT 1 A AND B PASS ERECTION

ESP UNIT 1 C PASS

ESP UNIT 1 C PASS

ESP UNIT 1 D PASS

ESP UNIT 1 F PASS WORK UNDER PROGRESS

ESP UNIT 1 F APSS

UNIT 1 ESP F ROW

UNIT 2 BOILER FDN LHS

UNIT 2 BOILER REINFORCEMENT WORKS

UNIT 2 BOILER LHS

BOILER FFDN UNIT 2 PEDESTAL AND BOLT FIXING WORK

UNIT 2 BOILER LHS PILE CAP AND EXCAVATION

UNIT 2 BOILER FDN REINFORCEMENT WORK IN PROGRESS

UNIT 2 BOILER FOUNDATION

UNIT 2 PA FAN FOUNDATION

UNIT 2 ID FAN AND ID DUCT FOUNDATION

UNIT 2 ESP BACKFILLING C AND D PASS

UNIT 2 PA FAN EXCAVATION AND REINFORCEMENT WORK

UNIT 2 ID DUCT FOUNDATION

ID DUCT EXCAVATION UNIT 2

UNIT 2 ID FAN FOUNDATION

BACKFILLING ESP UNIT 2

ESP UNIT 2 D PASS

ESP UNIT 2 BACKFILLING UNDER PROGRESS

ESP ERECTION UNIT 1

ESP ERECTION A AND B PASS

EXCAVATION TG UNIT 2

EXCAVATION TG UNIT 1

UNIT 1 ESP D PASS

UNIT 1 BOILER REINFORCEMENT WORKS

ESP UNIT 2 BACKFILLING IN PROGRESS

ESP UNIT 2 B PASS

UNIT 2 BOILER FOUNDATION

STRUCTURAL FABRICATION UNIT 2

UNIT 2 STRUCTURAL FABRICATION WORKS UNDER PROGRESS

UNIT 2 STRUCTURAL FABRICATION

ESP UNIT 1 ERECTION

UNIT 1 SUPERSTRUCTURE FABRICATION

UNIT 1 SUPERSTRUCTURE PAINTING

UNIT 1 SUPERSTRUCTURE PAINTING

UNIT 1 SUPERSTRUCTURE PAINTING

TEMPORARY ROAD UNDER CONSTRUCTION

BOILER FOUNDATION UNIT 1

BOILER FOUNDATION UNIT 1

UNIT 1 POWER HOUSE A ROW PILE CHIPPING IN PROGRESS

UNIT i BOILER FOUNDATION

TG EXCAVATION UNIT 1

TG EXCAVATION UNIT 1

TG EXCAVATION UNIT 2

UNIT 1 POWER HOUSE LOAD TEST

UNIT 2 POWER HOUSE B ROW

UNIT 2 POWER HOUSE A ROW

UNIT 2 BOILER FOUNDATION

UNIT 2 BOILER FOUNDATION RHS

UNIT 2 BOILER FOUNDATION

PA FAN EXCAVATION UNIT 2

ESP UNIT 1 FOUNDATIONS

ID DUCT FOUNDATION UNIT 2

ID FAN EXCAVATION UNIT 2

ESP ERECTION UNIT 1

ESP B PASS UNIT 1

ESP ERECTION UNIT 1

ESP UNIT 1 D PASS

ESP UNIT 1 E PASS

ESP UNIT 1 F PASS

ESP UNIT 2 A AND B PASS

ESP UNIT 2 C PASS

ESP FOUNDATION UNIT 2

ESP FOUNDATION UNIT 2

BOILER UNIT 1 CONCRETING FOR PILE CAP IN PROGRESS

BOILER UNIT 2 PILE CAP CONCRETING

BOILER FOUNDATION UNIT 1

BOILER FOUNDATION UNIT 1

TG AREA EXCAVATION UNIT 1

UNIT 1 BOILER PILE CAP

PILING WORKS DG BUILDING UNIT 2

SUPER STR FABRICATION UNIT 2

Unit II Boiler Foundation

ESP ERECTION UNIT 1

BOILER FOUNDATION UNIT 1

Unit I Power House C Row

Unit 1 Power House Pile Cap B row

Vertical Load test Unit I Power House

ESP Foundation Unit 2 B Pass

ESP ERECTION UNIT 1

BTG Boundary Wall

Unit I Pile Cap & Pedestal Boiler area

Unit I Boiler Pile cap & Pedestal

Unit 2 str fabrication works

Unit 2 str fabrication works

BOILER FOUNDATION UNIT 1

ESP FOUNDATION UNIT 2

ESP FOUNDATION UNIT 2 A PASS

POWER HOUSE UNIT 2 FOUNDATION

VERTICAL LOAD TEST ESP UNIT 1 F PASS

BOILER FOUNDATION UNIT 2

SUPER STR FAB UNIT 1

ESP FOUNDATION UNIT 2

SUPER STR FAB UNIT 1

ESP ERECTION UNIT 1

ESP ERECTION UNIT 1

ESP ERECTION UNIT 1

UNIT 1 ESP ERECTION A PASS

UNIT 2 FABRICATION WORKS

UNIT 2 STR FABRICATION

UNIT 1 BOILER PILE CAP

UNIT 1 BOILER FOUNDATION

UNIT 1 BOILER PILE CHIPPING

UNIT 2 ESP A PASS

UNIT 2 BOILER FOUNDATION

UNIT 1 ESP E PASS

UNIT 2 BOILER FOUNDATION

UNIT 2 ESP AND ID FAN

UNIT 2 ESP FOUNDATION

UNIT 2 ID FAN B RAFT PILE CAP

UNIT1 FABRICATION OF BEAMS

i) Power House # 1 Fabrication

h) Power House # 1 Fabrication

g) ESP # 2 Foundation

f) Boiler # 2 Foundation

e) ESP # 1 Foundation

d) Boiler # 1 Foundation

c) ESP # 1 Column Erection

b) Customer Office

a) Customer Office

Unit 2 Overall ESP foundation

Unit 1 ESP A Pass

Unit 2 Boiler Vertical Load test

Unit 1 Boiler Pile Cap

Unit 1 ESP foundation

Unit 1 ESP foundation D Pass

ESP UNIT 2 A PASS

Unit 2 ESP Foundation A and B Pass

Unit 2 ESP B Pass

Unit 2 ESP foundation

Unit 2 ESP foundation

Unit 2 ESP Foundation

ESP FOUNDATION UNIT 2

unit 2- boiler- pile chipping

unit 2- pilecap 2nd lift completed

unit1-Boiler-pile chipping

Unit 1- ESP pilecap-2nd lift

Unit1-ESP PILECAP-3rd LIFT

Unit 1 fabrication

Unit 1 St Steel fabrication

Unit 2 ESP E and F pass

Unit 2 ESP foundation

Unit 2 ESP C and D pass

Unit 2 ESP pedestal and bolt fixing

Unit 2 ESP foundation

Unit 2 ESP Load Test

Unit 1 ESP E and F row foundation

Unit 1 ESP foundation

Unit 1 ESP Pile foundation

Unit 2 Boiler Pile Cap

Unit 2 Boiler Load test arrgt

UNIT 1 BOILER AREA EXCAVATION

UNIT 1 BOILER AREA EXCAVATION

Unit 1 Boiler Pile Cap

Unit 1 Boiler area Vertical Load test

Unit 1 ESP bolt fixing 2

Unit 1 ESP Bolt fixing

Unit 1 Fabrication works

UNIT 1 FABRICATION

UNIT 1 FABRICATION WORKS

BARBENDING WORKS UNIT 2

UNIT 2 BOILER EXCAVATION

UNIT 1 BOILER AREA EXCAVATION

ESP UNIT 1 E AND F PASS

ESP UNIT 1 A PASS

ESP UNIT 1 C D PASS

ESP UNIT 1 C AND D PASS

VERTICAL LOAD TEST ESP UNIT 1

ESP UNIT 1 PILE CAP

ESP FOUNDATION A PASS UNIT 2

ESP UNIT 2 BITUMUN PAINTING A PASS

ESP UNIT 2 A PASS

ESP UNIT 2 D PASS

ESP UNIT 2 PILE CAP E AND F PASS

UNIT 2 PILE CAP ESP E AND F PASS

Unit 2 Boiler pile area

Unit 1 Boiler Pile foundation

Unit 1 ESP Pile cap

Unit 1 ESP A pass area

Unit 1 ESP C Pasas area

Unit 1 ESP Pile cap B Pass

Unit 1 ESP Load test

Unit 2 ESP A Pass area

Unit 2 ESP D Pass area

Unit 2 ESP F Pass area

Vertical load test Unit 2 ESP area

Unit 1 superstructure fit up and welding

Steel fabrication Unit 1 superstructure

UNIT 2-BOILER PILING

UNIT 2- ESP PILECAP WORKS

North side Boundary Wall

North side Boundary Wall

Unit 1- pile chipping and pile cap works

Unit 1- ESP pile cap

Unit 1- ESP pile cap

Unit 2- Piling

Unit 2- ESP pile cap

Unit 2- ESP pile cap

Unit 2- ESP pile cap

ESP unit 2 pile cap works

ESP unit 2 pile cap works

ESP Unit 1 pile cap works

ESP Unit 2 pile cap works

Boiler Unit 2 piling works

Boiler 2 piling Works

UNIT 1 BOILER AREA PILING2

UNIT 2 ID DUCT AREA PILING

UNIT 2 ESP AREA PILING

UNIT 2 BOILER AREA PILING

UNIT 1 ID DUCT PILING

UNIT 1 ESP AREA PILING

UNIT 1 BOILER AREA PILING

TANGEDCO OFFICE EXTERIOR 3

TANGEDCO OFFICE CAR SHED

TANGEDCO OFFICE BUILDING INTERIOR 2

INTERIOR TANGEDCO OFFICE BUILDING

TANGEDCO OFFICE BLDG1

MATERIAL STORAGE

TG PACKAGE ITEMS UNLOADED

STATOR UNLOADING PLATFORM

WEIGH BRIDGE

TANGEDCO OFFICE BLDG

DIR/PROJECTS TANGEDCO VISITING OFFICE AREA

ED/PMG VISITING BHEL STORAGE YARD

TREE PLANTATION BY GM/PMG

TREE PLANTATION BY GM/PROJECTS

ED/PMG ADDRESSING BHEL SITE EMPLOYEES

ED/PMG VISITING BHEL OFFICE AREA

ED/PMG INAUGURATING STORE SHED 3

REVIEW MEETING AT UPPUR SITE

CMD/TANGEDCO INAUGURATING BHEL STORE SHED NO 2

CMD/TANGEDCO FLAGS OF PILING WORK IN BOILER UNIT 2

FIRST PILE IN UNIT 1 BOILER AREA

CMD/TANGEDCO FLAGS OF PILING WORK IN BOILER UNIT 1

GM/UPPUR EXPLAINING WORK PROGRESS TO DIGNITARIES

GM/UPPUR WELCOMES CMD/TANGEDCO AT SITE

ED/PMG WELCOMES CMD/TANGEDCO

Piling area Boiler Unit-1

Piling area ESP Unit-1

Piling area Boiler Unit-2

Piling area ESP Unit-2 area

Bar Bending area

TANGEDCO Office Building -2

TANGEDCO Office Building -1

BHEL Office Building

BHEL Store Shed

Unit - 2: Pile Excavation for Pile Cap

Unit - 1: Vertical Load Test for ESP area

Stator Unloading Platform

Boiler Unit 2 Piling

Piling Boiler Unit 1

Piling ESP Unit 1

Tree plantation by ED PMG

Stator Unloading platform

Piling ESP Unit 2

Tangedco Office Building interior

Tangedco Office Building

Boiler Piling work

BHEL Storage Yard

BHEL Storage Shed

Customer Office Building works in progress

Approach Road for Stator

ESP piling

Cage inserting

Pile

Piling in ESP area

ESP piling

ESP piling

Unit-2 Piling works

Piling Works in progress

Unit 2- Batching plant foundation

Unit 1-Batching plant foundation

BHEL office building

BHEL storage Shed

Customer Office

Poles erected- Construction Power BHEL Scope

Customer office

Pit excavated for Batching plant erection