Home   

TUTICORIN STG IV (1X525 MW)


ID Fan -B and ID to Chimney Ducts (RHS)

ID Fan -B and ID to Chimney Ducts (RHS)

ID to Chimney Ducts (RHS)

ID Fan-A and ID to Chimney Ducts

ESP to ID Ducts

Generator Seal Oil skid

Generator Seal Oil skid

FD Discharge Ducts and Fuel oil piping over racks

ESP Pass A, Fuel oil piping over racks

FD & PA Fan

CST Tank

C-D Bay

Mills (LHS), Pipe racks and Fuel oil piping

Condenser ( A - Row view)

MEIL Project

ESP FRONT VIEW

ESP REAR VIEW WITH INSULATION

COAL MILL LHS

Boiler Outlet duct LHS

ID fan

COAL MILL

Boiler Outlet duct

ESP outlet duct

ESP inlet duct

ESP with insulation

ESP

ID fan to Chimney duct

FD & PA fan

ESP TO CHIMNEY DUCTING

ESP TO CHIMNEY DUCTING

ESP

BOILER

Site Overview

CRITICAL PIPING

COAL MILL

BOILER DUCTING

ESP REAR

ESP

BOILER TO ESP DUCT STRUCTURE & FANS

BOILER

MEIL 1x525MW

DMCW Pump

Critical piping inside TG Hall

Tempering air duct

CEP area

Condenser area

TG Hall

LP casing

ESP to Chimney area

Mill cold air duct area

FD & PA fan area

ESP area

ESP Roof area

Ducting area

Piping area

Mill Duct area

Mill area

APH area

Boiler Rear View

Site overview

Site View

Generator Rotor Insertion

Generator Rotor Insertion

Generator Rotor Insertion

Site View

ECO HOPPER

Mill area

ECO DUCT PRE ASSY

Mill Duct area

BETWEEN BOILER AND POWER HOUSE

CST TANK

Mill & Coal bunker

ESP BOTTOM HOPPER

BOILER VIEW FROM ESP

FD FAN

ESP FRONT

ESP REAR VIEW

Boiler Rear View

Site View from Plant Main road

MDBFP oil cooler

LP heater 1

MDBFP

IP Turbine Alignment in progress

Generator Alignment In progress

Condenser Tube Insertion

ESP Outlet Duct

ESP Bottom Hopper

IV Valves area

Turbine Top View

IP ROTOR

Turbine area

Condenser Tube Insertion

CST tank area

Coal Bowl Mill

ESP front view

Boiler Rear View

Boiler Roof

LP Casing

Boiler

TG Hall 17 meter floor

IP Rotor preparatory works for erection

LP Heater-1 erection inside condenser

HP Turbine module erection

BFP Working oil cooler at 0 meter.

CEP Canister erection

SW & PW tank erection at 36 Meter.

TG Hall 17 Meter floor

LP Rotor lower casing erection

LP Rotor lower casing erection

ESP Pass D outlet duct erection

Boiler

Boiler

APH area

Boiler top suspensions

Boiler

ESP to ID Duct Structures

ESP to ID Duct structures

ESP Collecting electrodes

ESP Hoppers

ESP Inlet funnel

TG Hall 17 meter

LP Casing

Condenser area

CEP area

CST area

Heaters area

Heaters area

Piping area

Piping area

Piping area

Piping erection

Deaerator area

Deaerator area

TG Hall 17 Meter

Ducts Pre-assembly at site

TG Hall 17 Meter

CEP

Heaters and Piping

TG Floor

Generator end shield blue matching under progress

Condenser stiffener rods

Condensate Storage Tank(CST)

ESP Front view

Boiler Bottom Ring Header

ESP Rear and Duct Structures

Boiler-Backpass rear wall preassembly

Condensate storage tank

Boiler - Bottom Ring header

Deaerator