NORTH CHENNAI STAGE III (1X800 MW)


Boiler Chemical cleaning activity in progress

Boiler Light up before planned chemical cleaning

RHS PA Duct insulation

ECO handling structure

RHS lift structure work

PA duct Hot &Cold gate work

LHS Lift Erection works

compaction works

Sofa ducts LHS cladding work completed

Road works

Paving works

Fencing works

Economicer RHS cladding work under completion

Eco to aph duct pass A rear cladding completed

ECO to Aph duct pass A vertical duct completed

Boiler chemical cleaning arrangement

Boiler and ESP view

ESP Control room

Aux Boiler

Boiler RHS

Mill & Coal Piping

Boiler LHS

Pent house front side lagging work

Hot sec Air duct LHS cladding work under progress

BC Bay Air washer fans

CCR

Mill J Oil Flushing

Pipe rack

Aux Boiler

Boiler LHS

Turbine Hall

Bunker Painting works

PRDS Piping

Duct Pre-assembly works in progress

Mill Lube oil flushing

Aux Boiler Chimney Insulation

Power House Cladding works

Service Building 1st Floor False ceiling works

MRS Trench work

Spiral wall lhs 57-50m first 2 layers lagging comp

RHS hot air sec side cladding over. Top side under

Spiral wall 44 - 26 mtr front side lagging work un

PA fan pass A lagging completed

PA fan pass B lagging under progress

FD fan pass B lagging completed

ID fan pass B cladding work under progress

Inlet duct structure painting work

Heat flux Sensor tube work

1st pass to extd wall expansion piece attachment w

Coal pipe corner-1 connection

FD & SCAPH duct completed

LHS tempering duct completed

LHS Mill duct completed

1st pass RHS Enclosure

2nd Pass rear side Roof enclosure

Transformer yard and TG View

Boiler and ESP view

LHS Bunker Floor Clading works

Coal Pipe works

ESP Control room Ventilation Duct

Boiler LHS Duct

Aux Boiler

Main Battery room

Boiler LHS duct erection

Service Fans in AC system room

Ser AC system works in 4th Floor

UAT A , B

Transformer yard

Pipe rack between Boiler and ESP

PA Fan B & FD Fan B

TG Hall

TDBFP -A

Duct Pre-fabrication works

Boiler LHS

TG Hall

Boiler RHS

Aux Boiler

LHS Mill Ducts

Common Control room

ESP Control room

FOPH Building

FOPH MCC

Enclosure top deck sheeting

Vertical roof enclosure Frame Rear

Rear Arch support structure completed at 64 mts

64 Mtrs Floor work Completed

Grating and Handrail work RHS (Boiler 52 Mts)

LHS Duct support structure work

ID Fan B Boxed up

PA Fan B Boxed up

LHS Mills

RHS Mills

LHS Duct

PA fan to APH Duct pass B cladding work under progress

PA Fan to APH Duct pass A retainer cutting work under progress

Service Building

PA Fans & FD Fans

ESP Inlet

ESP Hoppers

Boiler RHS

Boiler RHS

415V Service building MCC #0DC Bus section B char

Auxiliay Boiler Safety valve Floating

FD Fan B

UT A and B

Bus Duct

MRS Building

Duct and Coal Pipe Pre-fabrication

GT R, GT Y , GT B

Boiler Front View

CPU Building

PH Roof Extractors

UAT A and B

Station Transformer

Auxiliary Boiler

Primary Water Flushing work in Progress

Turbine Hall

Pre-assembly

Power House B row

Mills area

MDBFP

HP Turbine area

PA Duct area

CST Tank with Forwarding pumps

Bunker LHS area

Boiler & PH Inter connecting area

Auxiliary Boiler

ID Fan A

ID Fan B

PA Fan B

FD Fan B

FD Fan A

PA Fan A

Boiler LHS Ducting

Boiler RHS

RHS Mills

Inlet funnel pass E1 scaffolding work

ESP inlet duct pass B top side cladding work

Boiler 84 mtr retainer fixing work after 2nd layer

AB bay final screed concrete works

Transformer yard fencing post fixing under progres

Seal oil drain oil collector and it`s associated

Service Building

AC Plant

Insulation of Turbine Integral Piping in progress

Main Boiler LDO and HFO Forwarding pumps

Aux Boiler HSD Forwarding Pumps

CPU Resin regeneration Vessels

CPU system Acid & Alkali Equipment

Auxiliary Boiler HSD Forwarding station

Oil FIlling in HSD Tank in progress

UT- B Oil Filling in progress

IPBD Bus Duct

RHS Pipe rack

Auxiliary Boiler Feed Water storage tank erected

Auxiliary Boiler Feed Water storage tank erected

Inlet duct module 17 erection under progress

Inlet Duct supporting Structure last frame P7R & R7R erection under progress

BOF to ESP PASS-A To PASSE Duct Erection Completed

Fan Casing erection in progress in Aux Boiler FD Fan

BOF TO ESP,PASS-A TO PASSE DUCT ERECTION COMPLETED

Termination of hopper heater cables at ESP(C-Pass)

Pass-E Inlet duct erection under progress

Hopper heater cable termination at ESP (B-Pass)

Aux boiler Upper drum erection completed

Control room false ceiling works

MDBFP booster pump erection in progress at 17M

Termination of cables from EC panels to LT SWGR

415V Aux.Boiler PMCCElectrical Numericalprotection

Cable testing at ECP panels in ESP control room

CPU vessels erected in position

MOT alignment and tank locking plate foundation

Lube Oil Piping works

MOT tank and Oil cooler erection

11 KV HT UNIT SWBD#1BD:VCB testing in progress..

Self Cleaning strainer erection

Piping erection in CD Bay

Truss welding in Progress

ESP Control room AC ducting works in Progress

Boiler oultet to ESP Duct Erection in progress

Lube Oil Cooler for MOT in progress

Flue gas Inlet Duct (D pass) in progress

C row Piping works

Boiler Corner-3 Upper windbox Erection

Bus Duct Erection in ESP Control Swgr

Inlet duct Module-9 (Raiser duct) erection under progress

LP Turbine-1 final box-up completed

Boiler Hydro Test sucessfully completed

IPDB Bus Duct Erection

Boiler to Esp (Duct Gate Erection)

FD Fan A Silencer Erection

Corner -1 Loose tube Welding

HT Panel works

HP & IP Turbine - Boxed up

LP Turbine works

Boiler LHS works

Aux Boiler & Aux Boiler MCC

FOPH & FOPH MCC

ESP to Chimney Duct works

ESP

Boiler to ESP Duct Erection

Pipe rack Works

CST Tank Erection works

Boiler LHS Bunker works

CPU regeneration Building

Generator Transformers works

Station Transformer Works

MRS Building brick works

DG Building

220 KV battery system works

LP-1 Turbine Trail Box Up

Main Steam Line Fit up below Turbine area

Boiler Spiral hopper

BoF to ESP Duct Module-03 LHS erection under progr

Duct Erection b/s Boiler and ESP

Boiler Rear spiral hopper panel erection

Unit Auxillary Transformer placed in Position

Pipe rack Erection on Boiler LHS

Boiler Front Hopper Panel Erection

Power House and Boiler Structure

Boiler works RHS

Power House Stucture works

Station Transformer works

Boiler Duct works LHS

Mills Coal Pipe works

Boiler works LHS

Generator Transformer

CST Tank Erection works

Boiler LHS Pipe Rack Erection

765 KV Gantry Tower Erection

BOF to ESP Module 3 Making ready for Erection

Front and Rear Spiral hopper Pre assembly works

BOF to ESP Duct Erection works

Erection of Rear Spiral panel assembly completed

Rear 2nd Spiral panel Assembly vertical done

Power House Cladding works

Station Transformer

GT Gantry Erection in Transformer yard

Station Transformer along with Bus Duct Erected

FOPH Pump house Equipment Erection under progress

DG Set Erection works

Gantry for GTs erection under progress

Station Transformer along with Bus Duct & Gantry

Station Transformer Bus Duct

LP Turbine works

LHS Mill works along with Coal Piping

LHS Bunker works

HT Switchgear

Generator Transformer Gantry works

Generator Transformer Erection works

Flue Gas Inlet to ESP - Duct works

DG Building Painting works

CW Piping work

CST Tank Erection works

Cable Tray works in ESP area

Bunker RHS works

Boiler Pressure Parts Erection

AC Ducting works in CCR - 17 Mts

TDBFP- A Main Oil Pump placement in progress at 0 Mtr

Conductor Stringing of 220 KV station Transformer tower to tower completed

TDBFP A Deck casting completed on 28.10.2019

Civil works for balance duct pedestals in progress

11KV Station Bus Duct from HT SWGR to Station Tran

Station Transformer with 11KV Bus Duct

Switchyard Side 220V Gantry Structure

Control Room Air Conditioning Works

2 Nos Gantry Towers at switch yard side completed

FD Fan - A Motor Erection Completed

Boiler works RHS

Boiler Works LHS

Condenser Works

Generator Stator Mechanical works

CST Tank works

Power House Structure

corner - 1 sofa panel Erection

Rear spiral 2nd Lift pre - assembly

FD Fan - B Diffuser assy erection in progress

FD Fan - A Erection works

Power House Structure

Boiler Works RHS

CST Tank Works

DG Building works

Tube Insertion works in Condenser - A

Boiler Works LHS

Power House and Service Building Structure

Stator works

Stator works

Stator Mechanical works

Stator Mechanical works

Power House Structure

Pressure parts works

Bunker Erection works RHS

ESP Control Room Works

Boiler Roof works

CW Pipe works

Generator Stator works

Station Transformer Erection works

Power House Floor Slab works

MRS Compressor Building Brick works

Mills Mechanical works RHS

ID Duct works betweenID Fan - A and Chimney

ID Duct works between ID Fan - B and Chimney

HT Switchgear panel positioned in placed.

Generator Transformer yard Brick works

Generator Stator works

Bunker Works LHS

CST Tank works

CPU Regin Building works

Condenser - B works

DMCW SG Work in Progress

Station Transformer works

Erection of LHS ESV in HPT

BFD Piping at 8.5 Mtr E.L

Power House Cladding fixing work

Station Transformer Radiator Erection

Economizer coils erection

Tube insertion works in condenser - B

Service Building Roof Concrete works

Pressure parts works

DMCW Motor placed in position

Front Tube Panel Erection works

Air Pre - heater duct works

IP turbine works

Boiler Works RHS

Power House BC Bay Roof works

LP Piping works

CEP mechanical works

Bunker Erection works RHS

Mills Mechanical works

Pipe Rack Cable tray Erection works

Pressure parts Erection works

Generator Stator works

Service Building Roof Concrete works

Transformer yard Brick works

CST Tank works

ESP Control Room Civil works

CPU Regenaration Building works

Bunker Erection works RHS

Condenser Tube insertion - B

Pressure Parts works

Mill Mechanical works

Duct Erection works in Boiler

Air Pre-heater

Bunker Erection works in RHS

Silencer

Generator Transformer Yard works

Duct Erection works in Boiler

IP Turbine mechanical works

FOPH Building Brick works

Mills Mechanical works

Pressure parts Erection works

Service Building Roof Works

Generator Stator Mechanical works

Bunker Erection works

CST Tank Fabrication Works

LT - 1 out casing front wall Erection

HT Switchgear Panel Erection works

Condenser A & B Erection works

Bunker Supporting Structure Works

ESP Insulation works

Station Transformer Yard Brick works

Mill Mechanical works

Generator Transformer Yard Brick works

Duct Erection works in Boiler

Day Oil Tank Fabrication works

Bunker Erection works

LPT -1 outer casing front wall erection

Mill C bunker Erection

Vaccum Pump A & B Placed in position

Duct Erection works in boiler

Bunker Erection works

Station Transformer Brick works

Mills Mechanical works

DG Building Brick works

Boiler Roof works

Air Duct Erection works

Pressure parts works

CST Tank Fabrication works

MRS Compressor Building Brick works

Duct Erection works in Boiler

ID Duct works between ID Fan - A and Chimney

ID Duct works between ID Fan - B and Chimney

Hopper Erection works

Neutrilization pit works

Power House Structure works

Pipe Rack Fabrication works

GT Transformer yard Brick works

Boiler Roof Works

Day Oil Tank Fabrication works

Bunker works

Mill Mechanical works

Pipe Rack Fabrication works

Pedestal Bearing works in TG Hall

Mills Mechanical Works

Insulation Works

FOPH MCC Building Works

CPU Regin Building Works

Generator Stator Positioned in TG Hall

FOPH Building Brick works

DG Building Brick works

Condenser Oil Pit Roof works

Condenser - B Erection works

Condenser - A Erection works

Bunker Erection works

Boiler Erection works

Stator Placed In TG Hall

Stator Placed in Position

Stator Lifting in TG Area

Flue Gas Duct (48386) Erection works

Flue Gas Duct (48386) Erection works

LTRH Coil Erection Under Progress

Tie bar fitup of front spiral panel fitup under pr

MS Line Erection works

Hopper Erection works

Front Spiral Panel joint grinding and fitup are under progress

FOPH Area Condensate Tank Erection

CRH fitup in TG Floor

DMCW Piping Erection

CEP - A Erected

Front spiral wall with intermediate header first lift u/p.

LT Switchgear Panel positioned in ESP

FOPH Building Brick works

CPU Regin Building Brick works

Day oil tank works

CST Tank Fabrication works

ESP Control Room Civil Works

CW Pipe Erection Works

DG Building Brick works

Transformer yard Brick works

Pipe Rack Erection works

Insulation Works

Condenser - B front left right lower dome wall ere

CRH line ELBOW fit up underprogress

TGDMCW line PHE connection under progress

LTRH Coils Erection under progress

Hopper checking progress

Bunker Ring Beam Erection works

Condenser - A Erection works

Condenser - B Erection works

CPU Regin Building works

Pipe Rack Erection works

Pressure parts Erection works

MRS Compressor Building Works

Mills Mechanical works

EOT Crane

Duct Erection works in Boiler

CST Tank Fabrication works

Bunker works

Neutrilization pit works

GT Transformer yard Brick works

FOPH Building brick works

ESP Control Room Civil works

DG Building Brick works

CPU regin Building Brick works

Condenser Oil Pit works

Condenser - A Erection works

Condenser - B Erection works

Bunker Ring Beam Erection works

CW Pipe Fabrication works

CST Tank fabrication works

Bunker works

Condenser - A Erection works

Condenser - B Erection works

Station Transformer works

Pipe Rack Erection works

MRS Compressor Building works

Mill Mechanical works

Front Tube panel Erection works

FOPH MCC Building works

Duct Erection works in Boiler

DG Building Brick works

Debris Pit works

Bunker Ring Beam Erection works

Flue Duct works near ESP

Condenser - A Erection works

Condenser - B Erection works

Insulation works in ESP

DG Building Brick works

Neutrilization pit works

FOPH MCC Building Brick works

MRS Compressor Building works

Pedestal Bearing works in TG Hall

Pipe Erection works in Power House

TG Works

ID Duct works between ID Fan - A and Chimney

ID Duct works between ID Fan - B and Chimney

FOPH Building Brick works

CST Tank fabrication works

CPU Regin Building works

Bunker works

Bunker Ring Beam Erection works

Aux Boiler MCC Building Brick works

Duct erection works in Boiler

Condenser - A Erection works

Condenser - B Erection works

CPU Regin Building Civil works

Front tube panel erection works in Boiler

CW Pipe Fabrication works

Pipe Rack Erection works

Power House 0 mtr platform works

Bunker Ring beam Erection works

MRS Compressor Building works

DG Building works

Mills Mechanical works

Mill Deck works

Power House Structure

PHE Placement on Foundation

Insulation works

Day Oil Tank works

Air Inlet Duct works

CST Tank fabrication works

Condenser - A TSP Erection works

Condenser - B TSP Erection works

CPU Regin Building works

CW Pipe Encasing works

DG Building Brick works

Duct Erection works in Boiler

Emergency Oil pit works

FOPH Building Brick works

ESP Control Room Civil works

MRS Compressor Building works

ID Duct works between ID Fan - A and Chimney

ID Duct works between ID Fan - B and Chimney

Air Duct works in Boiler

Pipe rack Fabrication works

CST Tank Fabrication works

Condenser - A TSP Erection works

Condenser - B TSP Erection works

Power House 17 mtr (CD bay )Brick works

Pedestal Bearing works in TG Hall

Duct Erection works in Boiler

Pressure parts Fabrication works

Neutrilization pit works

TG Hall Works

11 KV HT Panel positioning completed

Boiler Roof works

Bunker Ring Beam Erection works

Power House BC Bay (Axis 3 to 6 ) Roof works

MRS Compressor Building Civil works

Mills Mechanical works

Generator Transformer yard works

Front Tube panel works

DG Building works

CPU Regin Building works

Air ID Duct works

Air Duct works

Neutrilization Pit works

Mills Mechanical works

Bunker Ring Beam Erection works

CPU Regin building Civil works

DG Building Brick works

Bunker works

Duct works between ESP and ID Fan

CW Pipe Fabrication works

MRS Compressor Building works

FOPH MCC Building Brick works

ID Duct works between ID Fan - B and chimney

ID Duct works between ID Fan - B and chimney

Front tube panel erection works

FOPH Building Brick works

Duct Erection works in Boiler

Bunker works

Insulation works

ESP Control Room Civil works

FOPH Building works

Mill mechanical works

front panel erection works

Bunker Ring Beam Erection works

EOT Crane

Air Pre-heaters works

Condenser A TSP Erection works

Condenser B Erection works

Station Transformer Civil works

TG Works

CST Tank Fabrication works

Front Tube Panel Erection Works in Boiler

CPU Regin Building Civil works

Insulation works between A Pass & B Pass

Power House 8.5 Mtr Roof

Neutrilization Pit works

MRS Compressor Building Roof

ID Duct works Between ID Fan - A and Chimney

ID Duct works Between ID Fan - B and Chimney

ESP Control Room Civil Works

Duct Erection works in Boiler

DG Building Brick works

Boiler Roof Works

Aux Boiler Civil works

Air washer Building Pile works

Mill Deck Works

Condenser - A TSP Erection works

Diesel Generator Stack works

DMCW Pump works

MRS Compressor Building Roof works

Bunker Ring Beam Erection works in RHS

Condenser - A Erection works

Condenser - B TSP Erection works

Front Tube Panel Erection works in Boiler

Duct works between ESP and ID Fan

Duct Erection works in Boiler

FOPH MCC Building Brick works

FOPH Building Brick works

Generator Transformer Yard works

Insulation works

ID Duct works between ID Fan - A and Chimney

ID Duct works between ID Fan - B and Chimney

Power House Brick works

Neutrilization Pit works

Mills Mechanical works

Power House Ground Floor Grade slab casting works

Station Transformer Brick Works

Transformer Yard Oil Pit Works

TG Works

Bearing Pedestal mechanical works

DG Building Brick works

Day Oil Tank works

CPU Regin Building works

CST Tank works

Boiler Roof works

Burner works

Bunker Works

Aux Boiler MCC Building Brick works

Air Pre-heater works

Bunker Ring Beam Erection works

GT Transformer Yard works

Boiler and Power House Structure

Bunker works

Air Pre-heaters

Front tube panel erection works

Day Oil tank works

CW Pipe Erection Works

Bearing Pedestal Works

Condenser B works

CPU Regin Building works

Insulation works

Mills Mechanical works

MRS Compressor Building Roof Works

TG Hall Works

CST Tank works

FOPH MCC Building Brick works

FOPH Building works

Duct Erection works in Boiler

DG Building works

Air Duct works

Condenser - B TSP Erection works

Boiler Roof works

ESP Front works

Mill Mechanical works

MRS Compressor Building works

DMCW Pump works

CST Tank Works

CPU Regin Building works

Bunker Ring Beam Erection works

ID Duct works between ID Fan - A and Chimney

ID Duct works between ID Fan - B and Chimney

Front tube panel Erection works in Boiler

FOPH MCC Building Brick works

CW Pipe Erection works

Station Transformer Brick works

Transformer yard Oil pit works

Insulation works

Duct works between ESP and ID Fan - A

GT Transfomer Yard works

FOPH Building Civil works

ESP Control Room Brick works

Duct Erection works in Boiler

DG Building works

Day Oil tank works

Bunker works

Air Duct works

Bunker Ring Beam Erection works

Station Transformer Brick works

MRS Compressor Building Works

ID Duct works between ID Fan - A and Chimney

ID Duct works between ID Fan - B and Chimney

TG Works

Mill mechanical works

Duct Erection works in Boiler

DG Building works

CST Tank works

CPU Regin Building works

Condenser - B Erection Works

Aux Boiler MCC Building Brick works

Air Pre-heaters

Front Panel Erection works in Boiler

FOPH Building works

ESP Control Room civil works

Bearing Pedestal Mechanical works

Condenser - B Erection works

ESP Control Room fourth floor Roof Works

Front tube panel erection works in Boiler

CST Tank works

Mill Mechanical works

Transformer yard oil pit works

Power House 8.5 Mtr floor Roof works

MRS Compressor building works

Insulation works

DG Building works

CW Pipe Erection works

CPU Regin Building Works

Burner works

Aux Boiler MCC Building Brick works

Mill Mechanical works

Duct Erection works in Boiler

Condenser wall Erection works

Bunker Ring Beam Erection works

Air Pre-Heaters

Front Panel Erection works

Aux Boiler MCC Building works

GT Transformer Yard works

CST Tank works

Burner works

ESP Structure

ESP Control Room Civil works

FOPH MCC Building Brick works

MRS Compressor Building Column works

Aux Boiler MCC Building Brick works

Front tube Panel Erection Works in Boiler

CPU Regeneration Building works

DMCW Pumps works

Mill Mechanical works

Air - Preheater works

ID Duct works between ID Fan - A and Chimney

ID Duct works between ID Fan - B and Chimney

Duct Erection works in Boiler

Day Oil Tank civil works

Emergency oil pit works

ESP Control Room Civil works

CW Pipe Erection works

Bunker Works

Air Duct works

Duct works between ESP and ID Fan

GT Transformer yard wall beam works

ESP Front Works

Bearing Pedestal Grouting works

GT Transformer yard

Bunker Ring Beam Erection works

MRS Compressor Building works

Neutrilization Pit works

DG Building

CST Tank works

Aux Boiler MCC Building works

Power House Roof casting works

Boiler roof works

GT Transformer Assembling works

Power House Roof works

DMCW Pump

Duct erection works in boiler

CPU Regin Building

Mill Mechanical works

CST Tank works

Power House ground floor Brick works

Oil pit wall concrete works

MRS Compressor Building

Condenser - A Erection works

Boiler Structure

ESP Structure

Insulation Works

ESP Control Room Civil works

DG Building

FOPH Building Works

ID Duct works between ID Fan - A and Chimney

MRS Compressor Building works

Neutrilization pit works

Oil Pit works

GT Transformer works

FOPH MCC Building works

CPU Regin Building Works

Aux Boiler MCC Building Brick works

Power House Structure

DMCW Pumps placed on foundation

Service Building First floor Brick works

DMCW Pump placed in position

ESP Control Room Civil works

Aux Boiler MCC building Brick Works

ESP Duct works

Bunker Ring Beam erection works

EOT Crane

FOPH Building Civil works

Insulation works

Service Building Fourth Floor Column raising Works

Power House Structure

FOPH MCC Building Brick works

CW Pipe Erection Works

Boiler and Power House Structure

DG Building Brick works

Duct Erection works in Boiler

Bunker Works

Radiant Roof tube with outlet header erection under progress

Tube Panel Erection works

Bunker Ring Beam Erection Works

GT Transformer Yard works

CW Pipe Works

Condenser pit works

Air Duct Works

Air Pre-Heaters

Bunker Shell erection Works

Piping works

MRS Compressor Building Roof

Duct Works in Boiler

Front Panel Erection works

Silencer works

Neutrilization Pit works

Aux Boiler MCC Building Brick Works

Aux Boiler Works

CPU Regin Building Works

Burner Works

Power House Roof works

MRS Compressor Building Roof

TG Bearing Pedestal erection works

CST Tank erection works

Air Duct Works in Boiler

Air pre-heater works

Duct Erection Works in Boiler

Duct works between ESP and ID Fan - A

ESP Structure Works

FOPH Building Works

ID Duct works between ID Fan - B and Chimney

ID Duct works between ID Fan - A and Chimney

Front panel erection works

Insulation works

CEP Pit Works

Bunker Ring Beam Erection Works

CST Tank Works

CW Pipe Erection Works

Bunker Works

DG Building Brick Works

ESP Control Room Civil Works

CPU Regin Building Works

Transformer Yard Oil Pit Works

Station Transformer Civil Works

MRS Compressor Building Roof Casted

Mill Mechanical Works

Mill Foundation Works

DMCW Mechanical Works

FOPH Building Roof Casting Works

FOPH Building Roof Works

Insulation Works

Neutrilization Pit Works

Mill Mechanical Works

Pressure Parts Works

ESP Control Room Works

FOPH Building Works

Bunker Ring Beam Erection Works

Hopper Painting Works

Day Oil Tank Works

Duct Erection works in Boiler

MRS Compressor Building Works

Transformer yard oil pit works

Fabrication Works

EOT Crane

CW Pipe Casting Works

Bunker Erection Works

Aux Boiler MCC Building Works

Air Pre-Heaters Works

BP Front Screen tube Panel Erection in Progress

BP Front lower Panel Preassembly Works

Neutrilization Pit Works

Feed Water Storage Tank Erection Works

Pressure parts Erection in Boiler

Deaerator Heater Assembly Erection in progress

Power House Structure

Power House Structure

Air Pre-Heaters

Power House 3.5 mtr floor Works

Flash Tank Works

Bunker Ring Beam Erection Works

Insulation Works

Mill Mechanical Works

Generator Transformer works

Duct Erection Works in Boiler

Bunker Shell Erection Works

BC Bay Crane - Rail Fixing works

Pipe Rack Structure Works

CPU Neutralization Pit Civil works

CPU Regin Building Brick Works

ESP Control Room

ESP Structure

Boiler and Power house Structure

ESP Control Room Second Floor Brick Works

DG Building Brick Works

Aux boiler MCC Building Works

Bunker C Ring Erection Works

CPU Regin Building Ground Floor Works

Mill Mechanical Works

Neutrilization pit works

DG Building

Day oil Tank Civil Works

CW Pipe Erection works

Emergency oil pit works

Bunker Beam Erectoin Works

Power House Structure

ID Duct Works between ID Fan - A and Chimney

ID Fan - B with DIffuser

FOPH MCC Building Works

Duct works between ESP and ID Fan

DG Building Works

Boiler and Power House Structure

Air Pre-heaters

Insulation Works

FOPH Building Civil Works

ESP Structure

Duct Works

Air Pre-heater Works

MRS Compressor Building Works

Power House 8.5 Mtrs Floor Brick Works

Emergency Oil Pit Works

Duct Works in Boiler

Bunker Works

Pedestal Bearing Works

CPU Regin Building Works

Front panel Erection Works in Boiler

Oil Pit Works

Mill Mechanical Works

Air Pre-heater

Condenser - B Wall Works

Service Building Civil Works

Pressure Parts Works

Insulation Works

Duct Erection Works in Boiler

ESP Control Room Civil Works

Mills Mechanical Works

ID Fan - B Works

ID Duct Works between ID Fan - A and Chimney

Air Pre- Heater Works

Neutrilization Pit Works

Front Panel Erection Works in Boiler

CST, HSD Tank Fabrication Works

Generator Transformer Works

Duct Erection Works In Boiler (RHS)

Burner Works

Boiler and Power House Structure

Air Duct Works

Bunker Shell Erection Works

FOPH Building Civil Works

Power House Roof Works

Day Oil Tank Boundary Wall Works

Emergency Oil Pit Works

Duct Erection Works in Boiler (LHS)

DG Building Ground Floor Cable Trench Works

CW Pipe Erection Works

CPU Regin Building

CST Tank Civil Works

CPU Regin Building Ground Floor Brick Works

FOPH MCC Building Works

Insulation Works

Service Building Second Floor Brick Works

Power House 17 Mtr Roof Works

Silencer Works

Bunker Works

DG Building Brick Works

CPU Regin Building Ground Floor Cable Trench Works

Auxilary Boiler Civil Works

Oil Pit Works

Pressure Parts Works

Service Building Third Floor Works

Service Building 17 mtrs Floor Casting

Neutralization Pit PCC work

ESP Control room Roof casting

Sevice Building Reinforcement works at 17 Mts

Emergency Oil Pit Works

CPU Regin Building Works

DG Building Works

ESP Control Room Civil Works

Station Transformer Works

Service Building Civil Works

MRS Compressor Building Works

Mill Mechanical Works

Condenser - B side wall Turbine Side front end erection.

Bus Duct Foundation Works

TG Works

Silencer Works

Boiler Roof Works

Duct Works in Boiler

Power House Roof Works

CPU Regin Building Works

Air Pre-Heaters

Boiler Works

Generator Transformer Works

Air Pre-Heaters

Power House Structure

Power House Roof Works

Front Panel Erection Works in Boiler (RHS)

ESP Structure

Condenser Pre-Fabriction Works

Bunker Works

ID Duct Works between ID Fan - A and Chimney

MRS Compressor building Works

Power House 8.5 mtr Floor Brick Works

Unit Transformer Works

Station Transformer Civil Works

Front Panel Erection Works in Boiler ( LHS)

Duct Erection Works in Boiler

DG Building Works

Day Oil Tank Civil Works

CPU Regin Building Works

Aux Boiler MCC Building Works

Boiler and Power house Structure

Bunker Shell Erection Works

Aux Boiler Works

Oil Pit Works

Mills Mechanical Works

GT Foundation Wall Beam Works

CW Pipe Erection Works

Station Transformer

MRS Compressor Building Column Works

DG Building

CPU Regin Building Works

Power House and Boiler Structure

Boiler Works

Unit Transformer Works

Boiler Roof Works

Power House Roof Works

Power House Second Floor Brick Works

Oil Pit Works

Aux Boiler Works

Insulation Works

Bearing Pedestal Erection in TG Hall

ESP Structure

Power house Ground floor BC Bay Concrete works

Duct Erection Works in Boiler

Station Transformer

Service Building Works

Oil Pit Works

EOT Crane

Duct Works between ESP and ID Fan

DG Building

Condenser Wall B

FOPH Building Civil Works

ESP Control Room Brick Works

Service Building Ground floor Works

MRS Compressor Building Column Works

Mills Mechanical works

ID Duct works between ID Fan - A and Chimney

CW Pipe Erection Works

Day Oil Tank

CPU Regin Building Brick Works

Bunker Works

Aux Boiler MCC Building Works

Oil Pit Works

ID Duct Works between Chimney to ID Fan - A

ID Fan - B Defuser

GT Transformer Foundation Wall Beam Concrete works

Duct Works in Boiler

Air Pre-Heaters

Duct Works in Air pre-Heaters

CPU Regin Building Ground Floor Cable Trange Works

FOPH Building Works

Pressure parts

FOPH MCC Building Works

CW Pipe Erection Works

CPU Regin Building Brick Works

Duct Works between ESP to ID Fan

DG Building Works

Condenser wall B

FOPH MCC Building

Bunker Works

DG Building Works

CPU Regin Building Works

Bearing Pedestal Erection in TG Hall

Station Transformer Works

Front Panel Erection Works in Boiler

GT Transformer Foundation Wall Works

Mills Mechanical Works

MRS Compressor Building Pilth Beam Works

Oil pit Works

Air pre-Heaters

Aux Boiler MCC Building Roof Works

Air Pre-heaters works

ESP Structure

Bunker Shell Erection Works

CW Pipe Erection Works

Boiler Roof Work

Silencer Works in Boiler

ID Fan - B Defuser

CPU Regin Building Civil Works

Power House First Floor Brick Works

Power House Roof

Mill Mechanical Works

DG Building Works

Duct Erection Works in Boiler

Bunker Works

Aux Boiler Works

Boiler Roof

ESP Control Room Civil Works

Duct Works

Generator Transformer Wall Works

MRS Compressor Building Beam Works

Power House BC Bay Ground Floor Works

Station Transformer Column Works

Power House Roof Works

Front panel Erection works in Boiler

Duct Erection Works in Boiler

Pressure parts

FOPH MCC Building Works

Duct Works

Mill Mechanical Works

Insulation Works

CW Pipe Erection Works

Bunker Works

Auxiliary Boiler MCC Building Works

ID Duct works between ID Fan A to Chimney

17 Meters power house slab casting

left side lower panel erection works

Service Building Civil Works

ID Duct Works Between ESP and ID Fan

Auxiliary Boiler Works

Insulation Works

Bunker Shell Erection Works

Boiler and Power House Structure

CPU Regin Building Ground Floor Brick Works

FOPH MCC Building Works

GT Transformer Wall Works

FOPH Building Works

ESP Control Room Works

Duct Works

DG Building Works

CW Pipe erection Works

CPU Regin Building Civil Works

Auxiliary Boiler MCC building Works

Service Building Ground Floor Brick Works

Station Transformer Works

Mill and Bunker Structure RHS Erection

CW Pipe Erection Works

Station Transformer

CPU Regin Building Civil Works

DG Building Works

Unit Transformer

Service Building Civil Works

Service Building third floor Roof Works

MRS Compressor Building Foundation Beam Works

CW Pipe Erection Works

CPU Regin Building

Mill Mechanical Works

`DG Building

Condenser Pre-fabrication works

Bunker Works

Mill Mechanical Works

DG Building

FOPH Building Civil Works

ESP Control Room Works

Power House Switchgear Floor Works

Unit Transformer

FOPH MCC Building Works

Station Transformer Wall Works

Day oil Tank Works

CPU Regin Building

Auxiliary Boiler MCC Building Works

CW Pipe Erection Works

Power House Structure

Duct Works in Boiler

CW Pipe Erection Works

GT FOundation Wall Concrete Works

ESP Control Room Third floor Colomn Works

Bunker Shell Erection Works

Unit Transformer

TG Works

EOT Crane

ESP Control Room Works

CW Pipe Works

MRS Compressor Building Civil Works

Station Transformer

CPU Regin Building Ground Floor Works

DG Building

CST Tank Civil Works

Aux Boiler MCC Building Works

Mills Mechanical Works

Bunker Shell Erection Works

Insulation Works

Pressure parts

CPU Regin Building Ground Floor Brick Works

ESP Control Room Third Floor Roof Works

Power House Structure

FOPH MCC Building Foundation Works

Front Panel Erection Works in Boiler

FOPH Building

Duct Works Between ESP and ID Fan

ESP Control Room First Floor Brick Works

Duct Erection Works

Boiler and Power House Structure

CPU Regin Building

ESP Control Room

GT Foundation Wall Works

Bunker Shell Erection Works

Power House Roof Works

Duct Erection Works in Boiler

CW Pipe Works

MRS Compressor Building

CPU Regin Building Works

Bunker Works

Station Transformer

TG Works

Service Building Civil Works

Station Transformer Civil Works

Oil Pit Civil Works

MRS Compressor Building Beam Works

Mill Mechanical works

FOPH MCC Building Foundation Works

Duct Works between Esp and ID Fan

DG Building

CPU Building Ground floor Brick Works

Burners

Boiler and power house Structure

Front Panel Erection Works in boiler

ESP Structure

CPU Regin Building

CPU Building Ground Floor Cable trange Works

Condenser Pre fabrication Works

Bunker Works

Air Pre Heaters

Duct works in Boiler

Unit Transformer

FOPH MCC Building Foundation Works

MRS Compressor Building Civil Works

CW Pipe Civil Works

CPU Regin Building Works

CW Pipe erection works

DG Building Roof Works

Oil Pit Works

GT Foundation Works

FOPH Building CIvil Works

Bunker Shell Erection Works

Auxiliary Boiler MCC Building Works

EOT Crane

Day oil Tank Civil Works

Power House Roof Concrete Works

MRS Compressor Building Works

Air Pre-Heater

Pressure Parts

Oil Pit Works

Bunker Works

ID Fan - B Defuser

ID Fan - A Defuser

Front Panel assembly in Boiler

ESP Control Room Civil Works

EOT Crane

Duct Works in Boiler

DG Building Works

CW Pipe Civil Works

Burner Works

Shell Erection Works

FOPH Building Foundation Works

Mill Mechanical Works

Auxilary Boiler MCC Building Civil Works

TG Works

FOPH MCC Building Foundation Works

Auxiliary Boiler Works

GT Foundation Wall Works

CPU Regin Building Civil Works

Bunker Works

DG Building Roof Works

Oil Pit Works

Power House Ground Floor Works

EOT Crane

Duct Erection Works In Boiler

Boiler Roofs Works

ESP Structure

Station Transformer

CPU Regin Building Civil Works

Unit Transformer

Service Building Civil Works

Generator Transformers Wall Works

Burner Works

CST Tank Civil Works

Duct Erection Works in Boiler

CW Pipe Concrete Works

Mill Mechanical Works

Power House Roof Works

Front Panel Erection Works in Boiler

Boiler Roof Works

Power House 3.5 mtr Floor Brick Works

Wind box Erection In Boiler

Silencer

Unit Transformer

Air Pre-Heaters

Duct Works in Boiler

Station Transformer Civil Works

Bunker Beam Erection Works

Boiler Roof Work

CST Tank Civil Works

FOPH Storage Building Civil Works

CW Pipe Fabrication Works

Bunker Works

Bus Duct Foundation Civil Works

Boiler Roof Works

Aux Boiler MCC Building Works

CPU Regin Building Civil Works

ID Fan-A Defuser

Front Panel Erection Works in Boiler

Aux Boiler Works

Bunker Shell Erection Works

Duct Erection Works in Boiler

DG Building Works

Mill Mechanical Works

ID Fan - B Defuser

GT Transformer Wall Works

Oil Pit Works

ESP Front Side

Duct Works in Boiler

ESP Control Room Civil Works

ESP Structure

FOPH MCC Compressor Building Foundation Works

Front Panel Erection Works

Bunker Shell Erection Works

Unit Transformer Foundation Works

Service Building Third Floor Concrete Works

CW Pipe Erection Works

Station Transformer Civil Works

CPU Regin Building

Bunker Works

Duct Works In Boiler

FOPH MCC Building Foundation Works

Boiler and Power House Structure

Air Pre-Heaters

Power House Structure

DG Building Civil Works

Mills Mechanical Works

ESP Control Room Civil Works

Day Oil Tank Civil Works

FOPH Storage Building Foundation Works

CPU Regin Building CIvil Works

Hotwell Placed in Position B

Hotwell Placed in Position A

CW Pipe Fabrication Works

Bunker Works

Duct Erection Works in Boiler

Service Building Civil Works

Station Transformer

Boiler Roof Works

Generator Transformers Civil Works

EOT Crane

CW Pipe Erection Works

DG Building Civil Works

GT Foundation Works

Power House 3 Mtr Floor Brick Works

Oil Pit Civil Works

ESP Control Room Civil Works

CPU Regin Building Civil Works

Power House 8.5 Mtrs Floor Concrete Works

ID Fan A-B Grade Slab Concrete Works

Bunker Beam Erection Works

Air-Preheaters

Silencer Works

Bunker Shell Erection Works

Service Building Third Floor Works

ID Fan -B Defuser

ID Fan -A Defuser

Hot Well Position in B

Hot Well Placed in A

Day Oil Tank Civil Works

ESP Structure

Duct Works in Boiler

Boiler Roof Works

Station Transformer

CW Pipe Erection Works

CPU Regin Building Civil Works

Air Washer Building Foundation Works

DG Building Works

Duct Works between ESP and ID Fan

GT Foundation Works

Duct Erection Works

Insulation Works

Mills Mechanical Works

Oil Pit Works

Pressure Parts Pre-assembly Works

Service Buiding Ground Floor Brick Works

ESP Control Room Civil Works

Condenser pre-Fabrication Works

Bus Duct Foundation Works

Boiler and Power House Structure

CST Tank Civil Works

TG Works

Station Transformer

DG Building Civil Works

Power House and Boiler Structure

Oil Pit Works

Bunker Works

Pressure Parts

Duct Works in Boiler

CPU Regin Building

Boiler and Power House Structure

Burner

Bunker Works

CW Pipe Erection Works

Power House Roof Works

Mill Mechanical Works

Duct Works between ESP and ID Fan

TG Works

EOT Crane

ESP Structure

Day Oil Tank Civil Works

CPU Regin Building Civil Works

Boiler Roof Works

Air Pre-Heaters Structure

Station Transformer Works

Pressure Parts

Pile Rack Foundation Works

Power House Brick Works

MRS Compressor Building Foundation Works

ID Duct Works between ID Fan and Chimney

ID Fan-B Defuser

ESP Control Room Building Works

Fuel Oil Pump House Storage Building Civil Works

Air Washer Building Foundation Works

DG Building Civil Works

CST Tank Civil Works

Oil Pit Works

Bus Duct Foundation Civil Works

Air Pre-Heater

Auxilary Boiler Civil Works

Mill Mechanical Works

Boiler Structure

DG Building

ESP Works

CW Pipe Erection Works

Hot Well Placed

Pressure Parts

Power House and Boiler Structure

Pile Rack Foundation Works

Duct Works between ESP and ID Fan

CPU Regin Building

Condenser oil pit Works

Bunker Erection Work

Hot Well Placed in Position

Control Room Brick Works

Hot Well Placement in Condenser- B

Bunker Beam Erection Works

Air Pre-Heaters

Boiler Roof Works

Silencer

Pressure parts Pre-assembly Works

CW Pipe Erection Works

Bunker Shell Erection Works

Boiler Works

Duct Erection Works in Boiler

Condenser oil pit Works

Duct Works

ESP Control Room Works

MRS Compressor Building Foundation Concrete Works

Station transformer works

Service Building Woks

Mill Mechanical Works

Condenser Pre -Fabrication Works

CPU Regin Building Civil Works

CST Tank civil Works

DG Building Works

Duct Works in Boiler

Service Building Ground floor Civil Works

Pressure Parts Pre- Assembly Works

PRDS Floor Works (35.5 Meters)

Power House Brick Works

Pile Rack Foundation Concrete Works

Auxilary Boiler Civil Works

Power House 35.5 mtrs Floor Casting Works

Power House 35.5 mtrs Floor Casting Works

Front Erection Panel Works

Shell Erection in Progress

Front Panel Erection in Progress

ID Fan -B Defuser

Insulation Works

Duct Erection Works

Pressure parts Works

CPU Regin Building Civil Works

ID Duct Between ID Fan -A and Chimney

MRS Compressor Building Foundation Works

Duct Erection Works in Boiler

Condenser Pre-Fabrication Works

Service Building Second Floor Foundation Works

Pressure parts Pre assembly Works

ESP Control Room Civil Works

Bunker Erection Works

Air Washer Building Foundation Works

Burner Work

Condenser Oil Pit Works

Mill Mechanical; Work

Power House and Boiler Structure

Service Building Ground Floor Works

FOPH Building Foundation Works

ESP Control Room Second Floor Foundation Works

Duct Foundation Civil Works

DG Building Civil Works

Day Oil Tank Civil Works

CW Pipe Erection Works

CPU Regin Building Ground Floor Cable Trange Work

Duct Works between ESP and ID Fan

Bunker Beam Erection Works

Bunker Support Structure

MRS Compressor Building Foundation Works

Duct Erection Works in Boiler

GT Transformer Foundation Works

Bus Duct Foundation Civil Works

CW Pipe Erection Works

DG Building Works

Power House Structure

Pile Rack Foundation Works

CPU Regin Building Works

Condenser Pit

Service Building Second Floor FOundation Works

Service Building Ground Floor Bricks Works

CST Tank Civil Works

Auxilary Boiler Works

Mill Mechanical Works

Power House Brick Works

Service Building Civil Works

Air Pre -Heaters

Mill Mechanical works

Service Building Ground Floor Works

Bunker Beam Erection Works

Duct Work In Boiler

Pressure Parts Pre Assembly Works

ESP Control Room Building CIvil Works

Duct Erection Works (2)

GT Transformers Foundation Works

Power House Brick Works

CW Pipe Erection Works

DG Building Civil Works

Duct Erection Works

CST Tank Civil Works

Condenser Pre-Fabrication Works

CPU Regin building Civil Works

Duct Foundation civil Works

Road Drain Works

Power House Ground Floor Brick Works

Boiler Structure

EOT Crane

Power House Brick Works

Air Washer Building Foundation Works

Mill Mechanical Works

Station Transformer Works

Power House Structure

Pile Rack Foundation Works

Condenser Pre Fabrication Works (2)

Bunker Erection Works

Road Drain Works

Pressure Parts

Boiler and Power House Structure

Bus Duct Foundation Works

Day Oil Tank Works

CPU Regin Building Works

Condenser Pit Works

CW Pipe Erection Works

Service Building Second Floor Works (2)

TG Works

Power House Roof Works

Duct Erection Works in Boiler (2)

CPU Building Ground Floor Cable Trange Works

Condenser Pre Fabrication Works

Duct Works Between ESP and ID Fan

Duct Erection Works in Boiler

DG Building Works

Auxiliary Boiler Works

Air Pre-Heater

ESP Control Room Second Floor Casting Works

ESP Control Room Second Floor Works

CW Pipe Erection Works

Service Building Ground Floor Works

Boiler Roof Works

Bus Duct Foundation Works

Duct Erection Works in Boiler

Boiler Roof Works

CW Pipe Erection Works

ESP Structure

DG Building

Service Building Ground floor Brick Works

GT Transformer Foundation Works

Duct Erection Works

Preesure Parts Works

Mill Mechanical Works

Air Pre-Heaters

Boiler Works

Duct Works in Boiler

Bunker Works

Condenser Pit Works

Bunker Shell Erection Works

Boiler Roof Works

DG Building Works

Condenser Pre Fabrication Works

Pressure Parts Works

GT Transformers Foundation Works

Pile Rack Foundation Works

ID Fan - B Defuser

ESP Roof Works

CST Tank Civil Works

TG Works

Power House Brick WorksTG Works

Mill Mechanical Works

Bunker erection Works

ESP Structure

Power House Structure

Station Transformer

CW Pipe Erection Works

DG Building Civil Works

ESP Control Room Civil Works

Duct Foundation Works

Pipe Rack Foundation Works

Duct Erection Works in Boiler

ID Fan- B Defuser

ID Fan Defuser

CW Pipe Erection Works

Boiler Roof Works

Auxiliary Boiler Works

Bunker Erection Works

Station Transformer

Power House Brick Works( 3 Mtrs)

DG Building Beam Concrete Works

CPU Regin Building Ground Floor Cable Trange Works

Condenser Pre Fabrication Works

Bus Duct Foundation Works

Mill Mechanical Works

Power House Roof Works

TG Works

Service Building Second Floor Slab Works

Day Oil Tank Civil Works

Condenser Pit

Fuel Oil pump House MCC Building Foundation Works

ESP COntrol Room Second Floor Works

CPU Building Slab Works

Control Room Brick Works

Bunker Works

GT Transformers Foundation Works

ESP Control Room Civil Works

Duct Foundation Work

Service Building Ground Floor Brick Works

Service Building Second Floor Concrete Works

Service Building Second Floor Concrete Work

CPU Regin Building Concrete Slab Works

Air Washer Building Foundation Works

Power House Structure

CPU Regin Building Concrete Works

CPU Building Concrete Works

Boiler and Power House Structure

Condenser Pit

Service Building Second Floor Works