Boiler Chemical cleaning activity in progress
|
Boiler Light up before planned chemical cleaning
|
RHS PA Duct insulation
|
ECO handling structure
|
RHS lift structure work
|
PA duct Hot &Cold gate work
|
LHS Lift Erection works
|
compaction works
|
Sofa ducts LHS cladding work completed
|
Road works
|
Paving works
|
Fencing works
|
Economicer RHS cladding work under completion
|
Eco to aph duct pass A rear cladding completed
|
ECO to Aph duct pass A vertical duct completed
|
Boiler chemical cleaning arrangement
|
Boiler and ESP view
|
ESP Control room
|
Aux Boiler
|
Boiler RHS
|
Mill & Coal Piping
|
Boiler LHS
|
Pent house front side lagging work
|
Hot sec Air duct LHS cladding work under progress
|
BC Bay Air washer fans
|
CCR
|
Mill J Oil Flushing
|
Pipe rack
|
Aux Boiler
|
Boiler LHS
|
Turbine Hall
|
Bunker Painting works
|
PRDS Piping
|
Duct Pre-assembly works in progress
|
Mill Lube oil flushing
|
Aux Boiler Chimney Insulation
|
Power House Cladding works
|
Service Building 1st Floor False ceiling works
|
MRS Trench work
|
Spiral wall lhs 57-50m first 2 layers lagging comp
|
RHS hot air sec side cladding over. Top side under
|
Spiral wall 44 - 26 mtr front side lagging work un
|
PA fan pass A lagging completed
|
PA fan pass B lagging under progress
|
FD fan pass B lagging completed
|
ID fan pass B cladding work under progress
|
Inlet duct structure painting work
|
Heat flux Sensor tube work
|
1st pass to extd wall expansion piece attachment w
|
Coal pipe corner-1 connection
|
FD & SCAPH duct completed
|
LHS tempering duct completed
|
LHS Mill duct completed
|
1st pass RHS Enclosure
|
2nd Pass rear side Roof enclosure
|
Transformer yard and TG View
|
Boiler and ESP view
|
LHS Bunker Floor Clading works
|
Coal Pipe works
|
ESP Control room Ventilation Duct
|
Boiler LHS Duct
|
Aux Boiler
|
Main Battery room
|
Boiler LHS duct erection
|
Service Fans in AC system room
|
Ser AC system works in 4th Floor
|
UAT A , B
|
Transformer yard
|
Pipe rack between Boiler and ESP
|
PA Fan B & FD Fan B
|
TG Hall
|
TDBFP -A
|
Duct Pre-fabrication works
|
Boiler LHS
|
TG Hall
|
Boiler RHS
|
Aux Boiler
|
LHS Mill Ducts
|
Common Control room
|
ESP Control room
|
FOPH Building
|
FOPH MCC
|
Enclosure top deck sheeting
|
Vertical roof enclosure Frame Rear
|
Rear Arch support structure completed at 64 mts
|
64 Mtrs Floor work Completed
|
Grating and Handrail work RHS (Boiler 52 Mts)
|
LHS Duct support structure work
|
ID Fan B Boxed up
|
PA Fan B Boxed up
|
LHS Mills
|
RHS Mills
|
LHS Duct
|
PA fan to APH Duct pass B cladding work under progress
|
PA Fan to APH Duct pass A retainer cutting work under progress
|
Service Building
|
PA Fans & FD Fans
|
ESP Inlet
|
ESP Hoppers
|
Boiler RHS
|
Boiler RHS
|
415V Service building MCC #0DC Bus section B char
|
Auxiliay Boiler Safety valve Floating
|
FD Fan B
|
UT A and B
|
Bus Duct
|
MRS Building
|
Duct and Coal Pipe Pre-fabrication
|
GT R, GT Y , GT B
|
Boiler Front View
|
CPU Building
|
PH Roof Extractors
|
UAT A and B
|
Station Transformer
|
Auxiliary Boiler
|
Primary Water Flushing work in Progress
|
Turbine Hall
|
Pre-assembly
|
Power House B row
|
Mills area
|
MDBFP
|
HP Turbine area
|
PA Duct area
|
CST Tank with Forwarding pumps
|
Bunker LHS area
|
Boiler & PH Inter connecting area
|
Auxiliary Boiler
|
ID Fan A
|
ID Fan B
|
PA Fan B
|
FD Fan B
|
FD Fan A
|
PA Fan A
|
Boiler LHS Ducting
|
Boiler RHS
|
RHS Mills
|
Inlet funnel pass E1 scaffolding work
|
ESP inlet duct pass B top side cladding work
|
Boiler 84 mtr retainer fixing work after 2nd layer
|
AB bay final screed concrete works
|
Transformer yard fencing post fixing under progres
|
Seal oil drain oil collector and it`s associated
|
Service Building
|
AC Plant
|
Insulation of Turbine Integral Piping in progress
|
Main Boiler LDO and HFO Forwarding pumps
|
Aux Boiler HSD Forwarding Pumps
|
CPU Resin regeneration Vessels
|
CPU system Acid & Alkali Equipment
|
Auxiliary Boiler HSD Forwarding station
|
Oil FIlling in HSD Tank in progress
|
UT- B Oil Filling in progress
|
IPBD Bus Duct
|
RHS Pipe rack
|
Auxiliary Boiler Feed Water storage tank erected
|
Auxiliary Boiler Feed Water storage tank erected
|
Inlet duct module 17 erection under progress
|
Inlet Duct supporting Structure last frame P7R & R7R erection under progress
|
BOF to ESP PASS-A To PASSE Duct Erection Completed
|
Fan Casing erection in progress in Aux Boiler FD Fan
|
BOF TO ESP,PASS-A TO PASSE DUCT ERECTION COMPLETED
|
Termination of hopper heater cables at ESP(C-Pass)
|
Pass-E Inlet duct erection under progress
|
Hopper heater cable termination at ESP (B-Pass)
|
Aux boiler Upper drum erection completed
|
Control room false ceiling works
|
MDBFP booster pump erection in progress at 17M
|
Termination of cables from EC panels to LT SWGR
|
415V Aux.Boiler PMCCElectrical Numericalprotection
|
Cable testing at ECP panels in ESP control room
|
CPU vessels erected in position
|
MOT alignment and tank locking plate foundation
|
Lube Oil Piping works
|
MOT tank and Oil cooler erection
|
11 KV HT UNIT SWBD#1BD:VCB testing in progress..
|
Self Cleaning strainer erection
|
Piping erection in CD Bay
|
Truss welding in Progress
|
ESP Control room AC ducting works in Progress
|
Boiler oultet to ESP Duct Erection in progress
|
Lube Oil Cooler for MOT in progress
|
Flue gas Inlet Duct (D pass) in progress
|
C row Piping works
|
Boiler Corner-3 Upper windbox Erection
|
Bus Duct Erection in ESP Control Swgr
|
Inlet duct Module-9 (Raiser duct) erection under progress
|
LP Turbine-1 final box-up completed
|
Boiler Hydro Test sucessfully completed
|
IPDB Bus Duct Erection
|
Boiler to Esp (Duct Gate Erection)
|
FD Fan A Silencer Erection
|
Corner -1 Loose tube Welding
|
HT Panel works
|
HP & IP Turbine - Boxed up
|
LP Turbine works
|
Boiler LHS works
|
Aux Boiler & Aux Boiler MCC
|
FOPH & FOPH MCC
|
ESP to Chimney Duct works
|
ESP
|
Boiler to ESP Duct Erection
|
Pipe rack Works
|
CST Tank Erection works
|
Boiler LHS Bunker works
|
CPU regeneration Building
|
Generator Transformers works
|
Station Transformer Works
|
MRS Building brick works
|
DG Building
|
220 KV battery system works
|
LP-1 Turbine Trail Box Up
|
Main Steam Line Fit up below Turbine area
|
Boiler Spiral hopper
|
BoF to ESP Duct Module-03 LHS erection under progr
|
Duct Erection b/s Boiler and ESP
|
Boiler Rear spiral hopper panel erection
|
Unit Auxillary Transformer placed in Position
|
Pipe rack Erection on Boiler LHS
|
Boiler Front Hopper Panel Erection
|
Power House and Boiler Structure
|
Boiler works RHS
|
Power House Stucture works
|
Station Transformer works
|
Boiler Duct works LHS
|
Mills Coal Pipe works
|
Boiler works LHS
|
Generator Transformer
|
CST Tank Erection works
|
Boiler LHS Pipe Rack Erection
|
765 KV Gantry Tower Erection
|
BOF to ESP Module 3 Making ready for Erection
|
Front and Rear Spiral hopper Pre assembly works
|
BOF to ESP Duct Erection works
|
Erection of Rear Spiral panel assembly completed
|
Rear 2nd Spiral panel Assembly vertical done
|
Power House Cladding works
|
Station Transformer
|
GT Gantry Erection in Transformer yard
|
Station Transformer along with Bus Duct Erected
|
FOPH Pump house Equipment Erection under progress
|
DG Set Erection works
|
Gantry for GTs erection under progress
|
Station Transformer along with Bus Duct & Gantry
|
Station Transformer Bus Duct
|
LP Turbine works
|
LHS Mill works along with Coal Piping
|
LHS Bunker works
|
HT Switchgear
|
Generator Transformer Gantry works
|
Generator Transformer Erection works
|
Flue Gas Inlet to ESP - Duct works
|
DG Building Painting works
|
CW Piping work
|
CST Tank Erection works
|
Cable Tray works in ESP area
|
Bunker RHS works
|
Boiler Pressure Parts Erection
|
AC Ducting works in CCR - 17 Mts
|
TDBFP- A Main Oil Pump placement in progress at 0 Mtr
|
Conductor Stringing of 220 KV station Transformer tower to tower completed
|
TDBFP A Deck casting completed on 28.10.2019
|
Civil works for balance duct pedestals in progress
|
11KV Station Bus Duct from HT SWGR to Station Tran
|
Station Transformer with 11KV Bus Duct
|
Switchyard Side 220V Gantry Structure
|
Control Room Air Conditioning Works
|
2 Nos Gantry Towers at switch yard side completed
|
FD Fan - A Motor Erection Completed
|
Boiler works RHS
|
Boiler Works LHS
|
Condenser Works
|
Generator Stator Mechanical works
|
CST Tank works
|
Power House Structure
|
corner - 1 sofa panel Erection
|
Rear spiral 2nd Lift pre - assembly
|
FD Fan - B Diffuser assy erection in progress
|
FD Fan - A Erection works
|
Power House Structure
|
Boiler Works RHS
|
CST Tank Works
|
DG Building works
|
Tube Insertion works in Condenser - A
|
Boiler Works LHS
|
Power House and Service Building Structure
|
Stator works
|
Stator works
|
Stator Mechanical works
|
Stator Mechanical works
|
Power House Structure
|
Pressure parts works
|
Bunker Erection works RHS
|
ESP Control Room Works
|
Boiler Roof works
|
CW Pipe works
|
Generator Stator works
|
Station Transformer Erection works
|
Power House Floor Slab works
|
MRS Compressor Building Brick works
|
Mills Mechanical works RHS
|
ID Duct works betweenID Fan - A and Chimney
|
ID Duct works between ID Fan - B and Chimney
|
HT Switchgear panel positioned in placed.
|
Generator Transformer yard Brick works
|
Generator Stator works
|
Bunker Works LHS
|
CST Tank works
|
CPU Regin Building works
|
Condenser - B works
|
DMCW SG Work in Progress
|
Station Transformer works
|
Erection of LHS ESV in HPT
|
BFD Piping at 8.5 Mtr E.L
|
Power House Cladding fixing work
|
Station Transformer Radiator Erection
|
Economizer coils erection
|
Tube insertion works in condenser - B
|
Service Building Roof Concrete works
|
Pressure parts works
|
DMCW Motor placed in position
|
Front Tube Panel Erection works
|
Air Pre - heater duct works
|
IP turbine works
|
Boiler Works RHS
|
Power House BC Bay Roof works
|
LP Piping works
|
CEP mechanical works
|
Bunker Erection works RHS
|
Mills Mechanical works
|
Pipe Rack Cable tray Erection works
|
Pressure parts Erection works
|
Generator Stator works
|
Service Building Roof Concrete works
|
Transformer yard Brick works
|
CST Tank works
|
ESP Control Room Civil works
|
CPU Regenaration Building works
|
Bunker Erection works RHS
|
Condenser Tube insertion - B
|
Pressure Parts works
|
Mill Mechanical works
|
Duct Erection works in Boiler
|
Air Pre-heater
|
Bunker Erection works in RHS
|
Silencer
|
Generator Transformer Yard works
|
Duct Erection works in Boiler
|
IP Turbine mechanical works
|
FOPH Building Brick works
|
Mills Mechanical works
|
Pressure parts Erection works
|
Service Building Roof Works
|
Generator Stator Mechanical works
|
Bunker Erection works
|
CST Tank Fabrication Works
|
LT - 1 out casing front wall Erection
|
HT Switchgear Panel Erection works
|
Condenser A & B Erection works
|
Bunker Supporting Structure Works
|
ESP Insulation works
|
Station Transformer Yard Brick works
|
Mill Mechanical works
|
Generator Transformer Yard Brick works
|
Duct Erection works in Boiler
|
Day Oil Tank Fabrication works
|
Bunker Erection works
|
LPT -1 outer casing front wall erection
|
Mill C bunker Erection
|
Vaccum Pump A & B Placed in position
|
Duct Erection works in boiler
|
Bunker Erection works
|
Station Transformer Brick works
|
Mills Mechanical works
|
DG Building Brick works
|
Boiler Roof works
|
Air Duct Erection works
|
Pressure parts works
|
CST Tank Fabrication works
|
MRS Compressor Building Brick works
|
Duct Erection works in Boiler
|
ID Duct works between ID Fan - A and Chimney
|
ID Duct works between ID Fan - B and Chimney
|
Hopper Erection works
|
Neutrilization pit works
|
Power House Structure works
|
Pipe Rack Fabrication works
|
GT Transformer yard Brick works
|
Boiler Roof Works
|
Day Oil Tank Fabrication works
|
Bunker works
|
Mill Mechanical works
|
Pipe Rack Fabrication works
|
Pedestal Bearing works in TG Hall
|
Mills Mechanical Works
|
Insulation Works
|
FOPH MCC Building Works
|
CPU Regin Building Works
|
Generator Stator Positioned in TG Hall
|
FOPH Building Brick works
|
DG Building Brick works
|
Condenser Oil Pit Roof works
|
Condenser - B Erection works
|
Condenser - A Erection works
|
Bunker Erection works
|
Boiler Erection works
|
Stator Placed In TG Hall
|
Stator Placed in Position
|
Stator Lifting in TG Area
|
Flue Gas Duct (48386) Erection works
|
Flue Gas Duct (48386) Erection works
|
LTRH Coil Erection Under Progress
|
Tie bar fitup of front spiral panel fitup under pr
|
MS Line Erection works
|
Hopper Erection works
|
Front Spiral Panel joint grinding and fitup are under progress
|
FOPH Area Condensate Tank Erection
|
CRH fitup in TG Floor
|
DMCW Piping Erection
|
CEP - A Erected
|
Front spiral wall with intermediate header first lift u/p.
|
LT Switchgear Panel positioned in ESP
|
FOPH Building Brick works
|
CPU Regin Building Brick works
|
Day oil tank works
|
CST Tank Fabrication works
|
ESP Control Room Civil Works
|
CW Pipe Erection Works
|
DG Building Brick works
|
Transformer yard Brick works
|
Pipe Rack Erection works
|
Insulation Works
|
Condenser - B front left right lower dome wall ere
|
CRH line ELBOW fit up underprogress
|
TGDMCW line PHE connection under progress
|
LTRH Coils Erection under progress
|
Hopper checking progress
|
Bunker Ring Beam Erection works
|
Condenser - A Erection works
|
Condenser - B Erection works
|
CPU Regin Building works
|
Pipe Rack Erection works
|
Pressure parts Erection works
|
MRS Compressor Building Works
|
Mills Mechanical works
|
EOT Crane
|
Duct Erection works in Boiler
|
CST Tank Fabrication works
|
Bunker works
|
Neutrilization pit works
|
GT Transformer yard Brick works
|
FOPH Building brick works
|
ESP Control Room Civil works
|
DG Building Brick works
|
CPU regin Building Brick works
|
Condenser Oil Pit works
|
Condenser - A Erection works
|
Condenser - B Erection works
|
Bunker Ring Beam Erection works
|
CW Pipe Fabrication works
|
CST Tank fabrication works
|
Bunker works
|
Condenser - A Erection works
|
Condenser - B Erection works
|
Station Transformer works
|
Pipe Rack Erection works
|
MRS Compressor Building works
|
Mill Mechanical works
|
Front Tube panel Erection works
|
FOPH MCC Building works
|
Duct Erection works in Boiler
|
DG Building Brick works
|
Debris Pit works
|
Bunker Ring Beam Erection works
|
Flue Duct works near ESP
|
Condenser - A Erection works
|
Condenser - B Erection works
|
Insulation works in ESP
|
DG Building Brick works
|
Neutrilization pit works
|
FOPH MCC Building Brick works
|
MRS Compressor Building works
|
Pedestal Bearing works in TG Hall
|
Pipe Erection works in Power House
|
TG Works
|
ID Duct works between ID Fan - A and Chimney
|
ID Duct works between ID Fan - B and Chimney
|
FOPH Building Brick works
|
CST Tank fabrication works
|
CPU Regin Building works
|
Bunker works
|
Bunker Ring Beam Erection works
|
Aux Boiler MCC Building Brick works
|
Duct erection works in Boiler
|
Condenser - A Erection works
|
Condenser - B Erection works
|
CPU Regin Building Civil works
|
Front tube panel erection works in Boiler
|
CW Pipe Fabrication works
|
Pipe Rack Erection works
|
Power House 0 mtr platform works
|
Bunker Ring beam Erection works
|
MRS Compressor Building works
|
DG Building works
|
Mills Mechanical works
|
Mill Deck works
|
Power House Structure
|
PHE Placement on Foundation
|
Insulation works
|
Day Oil Tank works
|
Air Inlet Duct works
|
CST Tank fabrication works
|
Condenser - A TSP Erection works
|
Condenser - B TSP Erection works
|
CPU Regin Building works
|
CW Pipe Encasing works
|
DG Building Brick works
|
Duct Erection works in Boiler
|
Emergency Oil pit works
|
FOPH Building Brick works
|
ESP Control Room Civil works
|
MRS Compressor Building works
|
ID Duct works between ID Fan - A and Chimney
|
ID Duct works between ID Fan - B and Chimney
|
Air Duct works in Boiler
|
Pipe rack Fabrication works
|
CST Tank Fabrication works
|
Condenser - A TSP Erection works
|
Condenser - B TSP Erection works
|
Power House 17 mtr (CD bay )Brick works
|
Pedestal Bearing works in TG Hall
|
Duct Erection works in Boiler
|
Pressure parts Fabrication works
|
Neutrilization pit works
|
TG Hall Works
|
11 KV HT Panel positioning completed
|
Boiler Roof works
|
Bunker Ring Beam Erection works
|
Power House BC Bay (Axis 3 to 6 ) Roof works
|
MRS Compressor Building Civil works
|
Mills Mechanical works
|
Generator Transformer yard works
|
Front Tube panel works
|
DG Building works
|
CPU Regin Building works
|
Air ID Duct works
|
Air Duct works
|
Neutrilization Pit works
|
Mills Mechanical works
|
Bunker Ring Beam Erection works
|
CPU Regin building Civil works
|
DG Building Brick works
|
Bunker works
|
Duct works between ESP and ID Fan
|
CW Pipe Fabrication works
|
MRS Compressor Building works
|
FOPH MCC Building Brick works
|
ID Duct works between ID Fan - B and chimney
|
ID Duct works between ID Fan - B and chimney
|
Front tube panel erection works
|
FOPH Building Brick works
|
Duct Erection works in Boiler
|
Bunker works
|
Insulation works
|
ESP Control Room Civil works
|
FOPH Building works
|
Mill mechanical works
|
front panel erection works
|
Bunker Ring Beam Erection works
|
EOT Crane
|
Air Pre-heaters works
|
Condenser A TSP Erection works
|
Condenser B Erection works
|
Station Transformer Civil works
|
TG Works
|
CST Tank Fabrication works
|
Front Tube Panel Erection Works in Boiler
|
CPU Regin Building Civil works
|
Insulation works between A Pass & B Pass
|
Power House 8.5 Mtr Roof
|
Neutrilization Pit works
|
MRS Compressor Building Roof
|
ID Duct works Between ID Fan - A and Chimney
|
ID Duct works Between ID Fan - B and Chimney
|
ESP Control Room Civil Works
|
Duct Erection works in Boiler
|
DG Building Brick works
|
Boiler Roof Works
|
Aux Boiler Civil works
|
Air washer Building Pile works
|
Mill Deck Works
|
Condenser - A TSP Erection works
|
Diesel Generator Stack works
|
DMCW Pump works
|
MRS Compressor Building Roof works
|
Bunker Ring Beam Erection works in RHS
|
Condenser - A Erection works
|
Condenser - B TSP Erection works
|
Front Tube Panel Erection works in Boiler
|
Duct works between ESP and ID Fan
|
Duct Erection works in Boiler
|
FOPH MCC Building Brick works
|
FOPH Building Brick works
|
Generator Transformer Yard works
|
Insulation works
|
ID Duct works between ID Fan - A and Chimney
|
ID Duct works between ID Fan - B and Chimney
|
Power House Brick works
|
Neutrilization Pit works
|
Mills Mechanical works
|
Power House Ground Floor Grade slab casting works
|
Station Transformer Brick Works
|
Transformer Yard Oil Pit Works
|
TG Works
|
Bearing Pedestal mechanical works
|
DG Building Brick works
|
Day Oil Tank works
|
CPU Regin Building works
|
CST Tank works
|
Boiler Roof works
|
Burner works
|
Bunker Works
|
Aux Boiler MCC Building Brick works
|
Air Pre-heater works
|
Bunker Ring Beam Erection works
|
GT Transformer Yard works
|
Boiler and Power House Structure
|
Bunker works
|
Air Pre-heaters
|
Front tube panel erection works
|
Day Oil tank works
|
CW Pipe Erection Works
|
Bearing Pedestal Works
|
Condenser B works
|
CPU Regin Building works
|
Insulation works
|
Mills Mechanical works
|
MRS Compressor Building Roof Works
|
TG Hall Works
|
CST Tank works
|
FOPH MCC Building Brick works
|
FOPH Building works
|
Duct Erection works in Boiler
|
DG Building works
|
Air Duct works
|
Condenser - B TSP Erection works
|
Boiler Roof works
|
ESP Front works
|
Mill Mechanical works
|
MRS Compressor Building works
|
DMCW Pump works
|
CST Tank Works
|
CPU Regin Building works
|
Bunker Ring Beam Erection works
|
ID Duct works between ID Fan - A and Chimney
|
ID Duct works between ID Fan - B and Chimney
|
Front tube panel Erection works in Boiler
|
FOPH MCC Building Brick works
|
CW Pipe Erection works
|
Station Transformer Brick works
|
Transformer yard Oil pit works
|
Insulation works
|
Duct works between ESP and ID Fan - A
|
GT Transfomer Yard works
|
FOPH Building Civil works
|
ESP Control Room Brick works
|
Duct Erection works in Boiler
|
DG Building works
|
Day Oil tank works
|
Bunker works
|
Air Duct works
|
Bunker Ring Beam Erection works
|
Station Transformer Brick works
|
MRS Compressor Building Works
|
ID Duct works between ID Fan - A and Chimney
|
ID Duct works between ID Fan - B and Chimney
|
TG Works
|
Mill mechanical works
|
Duct Erection works in Boiler
|
DG Building works
|
CST Tank works
|
CPU Regin Building works
|
Condenser - B Erection Works
|
Aux Boiler MCC Building Brick works
|
Air Pre-heaters
|
Front Panel Erection works in Boiler
|
FOPH Building works
|
ESP Control Room civil works
|
Bearing Pedestal Mechanical works
|
Condenser - B Erection works
|
ESP Control Room fourth floor Roof Works
|
Front tube panel erection works in Boiler
|
CST Tank works
|
Mill Mechanical works
|
Transformer yard oil pit works
|
Power House 8.5 Mtr floor Roof works
|
MRS Compressor building works
|
Insulation works
|
DG Building works
|
CW Pipe Erection works
|
CPU Regin Building Works
|
Burner works
|
Aux Boiler MCC Building Brick works
|
Mill Mechanical works
|
Duct Erection works in Boiler
|
Condenser wall Erection works
|
Bunker Ring Beam Erection works
|
Air Pre-Heaters
|
Front Panel Erection works
|
Aux Boiler MCC Building works
|
GT Transformer Yard works
|
CST Tank works
|
Burner works
|
ESP Structure
|
ESP Control Room Civil works
|
FOPH MCC Building Brick works
|
MRS Compressor Building Column works
|
Aux Boiler MCC Building Brick works
|
Front tube Panel Erection Works in Boiler
|
CPU Regeneration Building works
|
DMCW Pumps works
|
Mill Mechanical works
|
Air - Preheater works
|
ID Duct works between ID Fan - A and Chimney
|
ID Duct works between ID Fan - B and Chimney
|
Duct Erection works in Boiler
|
Day Oil Tank civil works
|
Emergency oil pit works
|
ESP Control Room Civil works
|
CW Pipe Erection works
|
Bunker Works
|
Air Duct works
|
Duct works between ESP and ID Fan
|
GT Transformer yard wall beam works
|
ESP Front Works
|
Bearing Pedestal Grouting works
|
GT Transformer yard
|
Bunker Ring Beam Erection works
|
MRS Compressor Building works
|
Neutrilization Pit works
|
DG Building
|
CST Tank works
|
Aux Boiler MCC Building works
|
Power House Roof casting works
|
Boiler roof works
|
GT Transformer Assembling works
|
Power House Roof works
|
DMCW Pump
|
Duct erection works in boiler
|
CPU Regin Building
|
Mill Mechanical works
|
CST Tank works
|
Power House ground floor Brick works
|
Oil pit wall concrete works
|
MRS Compressor Building
|
Condenser - A Erection works
|
Boiler Structure
|
ESP Structure
|
Insulation Works
|
ESP Control Room Civil works
|
DG Building
|
FOPH Building Works
|
ID Duct works between ID Fan - A and Chimney
|
MRS Compressor Building works
|
Neutrilization pit works
|
Oil Pit works
|
GT Transformer works
|
FOPH MCC Building works
|
CPU Regin Building Works
|
Aux Boiler MCC Building Brick works
|
Power House Structure
|
DMCW Pumps placed on foundation
|
Service Building First floor Brick works
|
DMCW Pump placed in position
|
ESP Control Room Civil works
|
Aux Boiler MCC building Brick Works
|
ESP Duct works
|
Bunker Ring Beam erection works
|
EOT Crane
|
FOPH Building Civil works
|
Insulation works
|
Service Building Fourth Floor Column raising Works
|
Power House Structure
|
FOPH MCC Building Brick works
|
CW Pipe Erection Works
|
Boiler and Power House Structure
|
DG Building Brick works
|
Duct Erection works in Boiler
|
Bunker Works
|
Radiant Roof tube with outlet header erection under progress
|
Tube Panel Erection works
|
Bunker Ring Beam Erection Works
|
GT Transformer Yard works
|
CW Pipe Works
|
Condenser pit works
|
Air Duct Works
|
Air Pre-Heaters
|
Bunker Shell erection Works
|
Piping works
|
MRS Compressor Building Roof
|
Duct Works in Boiler
|
Front Panel Erection works
|
Silencer works
|
Neutrilization Pit works
|
Aux Boiler MCC Building Brick Works
|
Aux Boiler Works
|
CPU Regin Building Works
|
Burner Works
|
Power House Roof works
|
MRS Compressor Building Roof
|
TG Bearing Pedestal erection works
|
CST Tank erection works
|
Air Duct Works in Boiler
|
Air pre-heater works
|
Duct Erection Works in Boiler
|
Duct works between ESP and ID Fan - A
|
ESP Structure Works
|
FOPH Building Works
|
ID Duct works between ID Fan - B and Chimney
|
ID Duct works between ID Fan - A and Chimney
|
Front panel erection works
|
Insulation works
|
CEP Pit Works
|
Bunker Ring Beam Erection Works
|
CST Tank Works
|
CW Pipe Erection Works
|
Bunker Works
|
DG Building Brick Works
|
ESP Control Room Civil Works
|
CPU Regin Building Works
|
Transformer Yard Oil Pit Works
|
Station Transformer Civil Works
|
MRS Compressor Building Roof Casted
|
Mill Mechanical Works
|
Mill Foundation Works
|
DMCW Mechanical Works
|
FOPH Building Roof Casting Works
|
FOPH Building Roof Works
|
Insulation Works
|
Neutrilization Pit Works
|
Mill Mechanical Works
|
Pressure Parts Works
|
ESP Control Room Works
|
FOPH Building Works
|
Bunker Ring Beam Erection Works
|
Hopper Painting Works
|
Day Oil Tank Works
|
Duct Erection works in Boiler
|
MRS Compressor Building Works
|
Transformer yard oil pit works
|
Fabrication Works
|
EOT Crane
|
CW Pipe Casting Works
|
Bunker Erection Works
|
Aux Boiler MCC Building Works
|
Air Pre-Heaters Works
|
BP Front Screen tube Panel Erection in Progress
|
BP Front lower Panel Preassembly Works
|
Neutrilization Pit Works
|
Feed Water Storage Tank Erection Works
|
Pressure parts Erection in Boiler
|
Deaerator Heater Assembly Erection in progress
|
Power House Structure
|
Power House Structure
|
Air Pre-Heaters
|
Power House 3.5 mtr floor Works
|
Flash Tank Works
|
Bunker Ring Beam Erection Works
|
Insulation Works
|
Mill Mechanical Works
|
Generator Transformer works
|
Duct Erection Works in Boiler
|
Bunker Shell Erection Works
|
BC Bay Crane - Rail Fixing works
|
Pipe Rack Structure Works
|
CPU Neutralization Pit Civil works
|
CPU Regin Building Brick Works
|
ESP Control Room
|
ESP Structure
|
Boiler and Power house Structure
|
ESP Control Room Second Floor Brick Works
|
DG Building Brick Works
|
Aux boiler MCC Building Works
|
Bunker C Ring Erection Works
|
CPU Regin Building Ground Floor Works
|
Mill Mechanical Works
|
Neutrilization pit works
|
DG Building
|
Day oil Tank Civil Works
|
CW Pipe Erection works
|
Emergency oil pit works
|
Bunker Beam Erectoin Works
|
Power House Structure
|
ID Duct Works between ID Fan - A and Chimney
|
ID Fan - B with DIffuser
|
FOPH MCC Building Works
|
Duct works between ESP and ID Fan
|
DG Building Works
|
Boiler and Power House Structure
|
Air Pre-heaters
|
Insulation Works
|
FOPH Building Civil Works
|
ESP Structure
|
Duct Works
|
Air Pre-heater Works
|
MRS Compressor Building Works
|
Power House 8.5 Mtrs Floor Brick Works
|
Emergency Oil Pit Works
|
Duct Works in Boiler
|
Bunker Works
|
Pedestal Bearing Works
|
CPU Regin Building Works
|
Front panel Erection Works in Boiler
|
Oil Pit Works
|
Mill Mechanical Works
|
Air Pre-heater
|
Condenser - B Wall Works
|
Service Building Civil Works
|
Pressure Parts Works
|
Insulation Works
|
Duct Erection Works in Boiler
|
ESP Control Room Civil Works
|
Mills Mechanical Works
|
ID Fan - B Works
|
ID Duct Works between ID Fan - A and Chimney
|
Air Pre- Heater Works
|
Neutrilization Pit Works
|
Front Panel Erection Works in Boiler
|
CST, HSD Tank Fabrication Works
|
Generator Transformer Works
|
Duct Erection Works In Boiler (RHS)
|
Burner Works
|
Boiler and Power House Structure
|
Air Duct Works
|
Bunker Shell Erection Works
|
FOPH Building Civil Works
|
Power House Roof Works
|
Day Oil Tank Boundary Wall Works
|
Emergency Oil Pit Works
|
Duct Erection Works in Boiler (LHS)
|
DG Building Ground Floor Cable Trench Works
|
CW Pipe Erection Works
|
CPU Regin Building
|
CST Tank Civil Works
|
CPU Regin Building Ground Floor Brick Works
|
FOPH MCC Building Works
|
Insulation Works
|
Service Building Second Floor Brick Works
|
Power House 17 Mtr Roof Works
|
Silencer Works
|
Bunker Works
|
DG Building Brick Works
|
CPU Regin Building Ground Floor Cable Trench Works
|
Auxilary Boiler Civil Works
|
Oil Pit Works
|
Pressure Parts Works
|
Service Building Third Floor Works
|
Service Building 17 mtrs Floor Casting
|
Neutralization Pit PCC work
|
ESP Control room Roof casting
|
Sevice Building Reinforcement works at 17 Mts
|
Emergency Oil Pit Works
|
CPU Regin Building Works
|
DG Building Works
|
ESP Control Room Civil Works
|
Station Transformer Works
|
Service Building Civil Works
|
MRS Compressor Building Works
|
Mill Mechanical Works
|
Condenser - B side wall Turbine Side front end erection.
|
Bus Duct Foundation Works
|
TG Works
|
Silencer Works
|
Boiler Roof Works
|
Duct Works in Boiler
|
Power House Roof Works
|
CPU Regin Building Works
|
Air Pre-Heaters
|
Boiler Works
|
Generator Transformer Works
|
Air Pre-Heaters
|
Power House Structure
|
Power House Roof Works
|
Front Panel Erection Works in Boiler (RHS)
|
ESP Structure
|
Condenser Pre-Fabriction Works
|
Bunker Works
|
ID Duct Works between ID Fan - A and Chimney
|
MRS Compressor building Works
|
Power House 8.5 mtr Floor Brick Works
|
Unit Transformer Works
|
Station Transformer Civil Works
|
Front Panel Erection Works in Boiler ( LHS)
|
Duct Erection Works in Boiler
|
DG Building Works
|
Day Oil Tank Civil Works
|
CPU Regin Building Works
|
Aux Boiler MCC Building Works
|
Boiler and Power house Structure
|
Bunker Shell Erection Works
|
Aux Boiler Works
|
Oil Pit Works
|
Mills Mechanical Works
|
GT Foundation Wall Beam Works
|
CW Pipe Erection Works
|
Station Transformer
|
MRS Compressor Building Column Works
|
DG Building
|
CPU Regin Building Works
|
Power House and Boiler Structure
|
Boiler Works
|
Unit Transformer Works
|
Boiler Roof Works
|
Power House Roof Works
|
Power House Second Floor Brick Works
|
Oil Pit Works
|
Aux Boiler Works
|
Insulation Works
|
Bearing Pedestal Erection in TG Hall
|
ESP Structure
|
Power house Ground floor BC Bay Concrete works
|
Duct Erection Works in Boiler
|
Station Transformer
|
Service Building Works
|
Oil Pit Works
|
EOT Crane
|
Duct Works between ESP and ID Fan
|
DG Building
|
Condenser Wall B
|
FOPH Building Civil Works
|
ESP Control Room Brick Works
|
Service Building Ground floor Works
|
MRS Compressor Building Column Works
|
Mills Mechanical works
|
ID Duct works between ID Fan - A and Chimney
|
CW Pipe Erection Works
|
Day Oil Tank
|
CPU Regin Building Brick Works
|
Bunker Works
|
Aux Boiler MCC Building Works
|
Oil Pit Works
|
ID Duct Works between Chimney to ID Fan - A
|
ID Fan - B Defuser
|
GT Transformer Foundation Wall Beam Concrete works
|
Duct Works in Boiler
|
Air Pre-Heaters
|
Duct Works in Air pre-Heaters
|
CPU Regin Building Ground Floor Cable Trange Works
|
FOPH Building Works
|
Pressure parts
|
FOPH MCC Building Works
|
CW Pipe Erection Works
|
CPU Regin Building Brick Works
|
Duct Works between ESP to ID Fan
|
DG Building Works
|
Condenser wall B
|
FOPH MCC Building
|
Bunker Works
|
DG Building Works
|
CPU Regin Building Works
|
Bearing Pedestal Erection in TG Hall
|
Station Transformer Works
|
Front Panel Erection Works in Boiler
|
GT Transformer Foundation Wall Works
|
Mills Mechanical Works
|
MRS Compressor Building Pilth Beam Works
|
Oil pit Works
|
Air pre-Heaters
|
Aux Boiler MCC Building Roof Works
|
Air Pre-heaters works
|
ESP Structure
|
Bunker Shell Erection Works
|
CW Pipe Erection Works
|
Boiler Roof Work
|
Silencer Works in Boiler
|
ID Fan - B Defuser
|
CPU Regin Building Civil Works
|
Power House First Floor Brick Works
|
Power House Roof
|
Mill Mechanical Works
|
DG Building Works
|
Duct Erection Works in Boiler
|
Bunker Works
|
Aux Boiler Works
|
Boiler Roof
|
ESP Control Room Civil Works
|
Duct Works
|
Generator Transformer Wall Works
|
MRS Compressor Building Beam Works
|
Power House BC Bay Ground Floor Works
|
Station Transformer Column Works
|
Power House Roof Works
|
Front panel Erection works in Boiler
|
Duct Erection Works in Boiler
|
Pressure parts
|
FOPH MCC Building Works
|
Duct Works
|
Mill Mechanical Works
|
Insulation Works
|
CW Pipe Erection Works
|
Bunker Works
|
Auxiliary Boiler MCC Building Works
|
ID Duct works between ID Fan A to Chimney
|
17 Meters power house slab casting
|
left side lower panel erection works
|
Service Building Civil Works
|
ID Duct Works Between ESP and ID Fan
|
Auxiliary Boiler Works
|
Insulation Works
|
Bunker Shell Erection Works
|
Boiler and Power House Structure
|
CPU Regin Building Ground Floor Brick Works
|
FOPH MCC Building Works
|
GT Transformer Wall Works
|
FOPH Building Works
|
ESP Control Room Works
|
Duct Works
|
DG Building Works
|
CW Pipe erection Works
|
CPU Regin Building Civil Works
|
Auxiliary Boiler MCC building Works
|
Service Building Ground Floor Brick Works
|
Station Transformer Works
|
Mill and Bunker Structure RHS Erection
|
CW Pipe Erection Works
|
Station Transformer
|
CPU Regin Building Civil Works
|
DG Building Works
|
Unit Transformer
|
Service Building Civil Works
|
Service Building third floor Roof Works
|
MRS Compressor Building Foundation Beam Works
|
CW Pipe Erection Works
|
CPU Regin Building
|
Mill Mechanical Works
|
`DG Building
|
Condenser Pre-fabrication works
|
Bunker Works
|
Mill Mechanical Works
|
DG Building
|
FOPH Building Civil Works
|
ESP Control Room Works
|
Power House Switchgear Floor Works
|
Unit Transformer
|
FOPH MCC Building Works
|
Station Transformer Wall Works
|
Day oil Tank Works
|
CPU Regin Building
|
Auxiliary Boiler MCC Building Works
|
CW Pipe Erection Works
|
Power House Structure
|
Duct Works in Boiler
|
CW Pipe Erection Works
|
GT FOundation Wall Concrete Works
|
ESP Control Room Third floor Colomn Works
|
Bunker Shell Erection Works
|
Unit Transformer
|
TG Works
|
EOT Crane
|
ESP Control Room Works
|
CW Pipe Works
|
MRS Compressor Building Civil Works
|
Station Transformer
|
CPU Regin Building Ground Floor Works
|
DG Building
|
CST Tank Civil Works
|
Aux Boiler MCC Building Works
|
Mills Mechanical Works
|
Bunker Shell Erection Works
|
Insulation Works
|
Pressure parts
|
CPU Regin Building Ground Floor Brick Works
|
ESP Control Room Third Floor Roof Works
|
Power House Structure
|
FOPH MCC Building Foundation Works
|
Front Panel Erection Works in Boiler
|
FOPH Building
|
Duct Works Between ESP and ID Fan
|
ESP Control Room First Floor Brick Works
|
Duct Erection Works
|
Boiler and Power House Structure
|
CPU Regin Building
|
ESP Control Room
|
GT Foundation Wall Works
|
Bunker Shell Erection Works
|
Power House Roof Works
|
Duct Erection Works in Boiler
|
CW Pipe Works
|
MRS Compressor Building
|
CPU Regin Building Works
|
Bunker Works
|
Station Transformer
|
TG Works
|
Service Building Civil Works
|
Station Transformer Civil Works
|
Oil Pit Civil Works
|
MRS Compressor Building Beam Works
|
Mill Mechanical works
|
FOPH MCC Building Foundation Works
|
Duct Works between Esp and ID Fan
|
DG Building
|
CPU Building Ground floor Brick Works
|
Burners
|
Boiler and power house Structure
|
Front Panel Erection Works in boiler
|
ESP Structure
|
CPU Regin Building
|
CPU Building Ground Floor Cable trange Works
|
Condenser Pre fabrication Works
|
Bunker Works
|
Air Pre Heaters
|
Duct works in Boiler
|
Unit Transformer
|
FOPH MCC Building Foundation Works
|
MRS Compressor Building Civil Works
|
CW Pipe Civil Works
|
CPU Regin Building Works
|
CW Pipe erection works
|
DG Building Roof Works
|
Oil Pit Works
|
GT Foundation Works
|
FOPH Building CIvil Works
|
Bunker Shell Erection Works
|
Auxiliary Boiler MCC Building Works
|
EOT Crane
|
Day oil Tank Civil Works
|
Power House Roof Concrete Works
|
MRS Compressor Building Works
|
Air Pre-Heater
|
Pressure Parts
|
Oil Pit Works
|
Bunker Works
|
ID Fan - B Defuser
|
ID Fan - A Defuser
|
Front Panel assembly in Boiler
|
ESP Control Room Civil Works
|
EOT Crane
|
Duct Works in Boiler
|
DG Building Works
|
CW Pipe Civil Works
|
Burner Works
|
Shell Erection Works
|
FOPH Building Foundation Works
|
Mill Mechanical Works
|
Auxilary Boiler MCC Building Civil Works
|
TG Works
|
FOPH MCC Building Foundation Works
|
Auxiliary Boiler Works
|
GT Foundation Wall Works
|
CPU Regin Building Civil Works
|
Bunker Works
|
DG Building Roof Works
|
Oil Pit Works
|
Power House Ground Floor Works
|
EOT Crane
|
Duct Erection Works In Boiler
|
Boiler Roofs Works
|
ESP Structure
|
Station Transformer
|
CPU Regin Building Civil Works
|
Unit Transformer
|
Service Building Civil Works
|
Generator Transformers Wall Works
|
Burner Works
|
CST Tank Civil Works
|
Duct Erection Works in Boiler
|
CW Pipe Concrete Works
|
Mill Mechanical Works
|
Power House Roof Works
|
Front Panel Erection Works in Boiler
|
Boiler Roof Works
|
Power House 3.5 mtr Floor Brick Works
|
Wind box Erection In Boiler
|
Silencer
|
Unit Transformer
|
Air Pre-Heaters
|
Duct Works in Boiler
|
Station Transformer Civil Works
|
Bunker Beam Erection Works
|
Boiler Roof Work
|
CST Tank Civil Works
|
FOPH Storage Building Civil Works
|
CW Pipe Fabrication Works
|
Bunker Works
|
Bus Duct Foundation Civil Works
|
Boiler Roof Works
|
Aux Boiler MCC Building Works
|
CPU Regin Building Civil Works
|
ID Fan-A Defuser
|
Front Panel Erection Works in Boiler
|
Aux Boiler Works
|
Bunker Shell Erection Works
|
Duct Erection Works in Boiler
|
DG Building Works
|
Mill Mechanical Works
|
ID Fan - B Defuser
|
GT Transformer Wall Works
|
Oil Pit Works
|
ESP Front Side
|
Duct Works in Boiler
|
ESP Control Room Civil Works
|
ESP Structure
|
FOPH MCC Compressor Building Foundation Works
|
Front Panel Erection Works
|
Bunker Shell Erection Works
|
Unit Transformer Foundation Works
|
Service Building Third Floor Concrete Works
|
CW Pipe Erection Works
|
Station Transformer Civil Works
|
CPU Regin Building
|
Bunker Works
|
Duct Works In Boiler
|
FOPH MCC Building Foundation Works
|
Boiler and Power House Structure
|
Air Pre-Heaters
|
Power House Structure
|
DG Building Civil Works
|
Mills Mechanical Works
|
ESP Control Room Civil Works
|
Day Oil Tank Civil Works
|
FOPH Storage Building Foundation Works
|
CPU Regin Building CIvil Works
|
Hotwell Placed in Position B
|
Hotwell Placed in Position A
|
CW Pipe Fabrication Works
|
Bunker Works
|
Duct Erection Works in Boiler
|
Service Building Civil Works
|
Station Transformer
|
Boiler Roof Works
|
Generator Transformers Civil Works
|
EOT Crane
|
CW Pipe Erection Works
|
DG Building Civil Works
|
GT Foundation Works
|
Power House 3 Mtr Floor Brick Works
|
Oil Pit Civil Works
|
ESP Control Room Civil Works
|
CPU Regin Building Civil Works
|
Power House 8.5 Mtrs Floor Concrete Works
|
ID Fan A-B Grade Slab Concrete Works
|
Bunker Beam Erection Works
|
Air-Preheaters
|
Silencer Works
|
Bunker Shell Erection Works
|
Service Building Third Floor Works
|
ID Fan -B Defuser
|
ID Fan -A Defuser
|
Hot Well Position in B
|
Hot Well Placed in A
|
Day Oil Tank Civil Works
|
ESP Structure
|
Duct Works in Boiler
|
Boiler Roof Works
|
Station Transformer
|
CW Pipe Erection Works
|
CPU Regin Building Civil Works
|
Air Washer Building Foundation Works
|
DG Building Works
|
Duct Works between ESP and ID Fan
|
GT Foundation Works
|
Duct Erection Works
|
Insulation Works
|
Mills Mechanical Works
|
Oil Pit Works
|
Pressure Parts Pre-assembly Works
|
Service Buiding Ground Floor Brick Works
|
ESP Control Room Civil Works
|
Condenser pre-Fabrication Works
|
Bus Duct Foundation Works
|
Boiler and Power House Structure
|
CST Tank Civil Works
|
TG Works
|
Station Transformer
|
DG Building Civil Works
|
Power House and Boiler Structure
|
Oil Pit Works
|
Bunker Works
|
Pressure Parts
|
Duct Works in Boiler
|
CPU Regin Building
|
Boiler and Power House Structure
|
Burner
|
Bunker Works
|
CW Pipe Erection Works
|
Power House Roof Works
|
Mill Mechanical Works
|
Duct Works between ESP and ID Fan
|
TG Works
|
EOT Crane
|
ESP Structure
|
Day Oil Tank Civil Works
|
CPU Regin Building Civil Works
|
Boiler Roof Works
|
Air Pre-Heaters Structure
|
Station Transformer Works
|
Pressure Parts
|
Pile Rack Foundation Works
|
Power House Brick Works
|
MRS Compressor Building Foundation Works
|
ID Duct Works between ID Fan and Chimney
|
ID Fan-B Defuser
|
ESP Control Room Building Works
|
Fuel Oil Pump House Storage Building Civil Works
|
Air Washer Building Foundation Works
|
DG Building Civil Works
|
CST Tank Civil Works
|
Oil Pit Works
|
Bus Duct Foundation Civil Works
|
Air Pre-Heater
|
Auxilary Boiler Civil Works
|
Mill Mechanical Works
|
Boiler Structure
|
DG Building
|
ESP Works
|
CW Pipe Erection Works
|
Hot Well Placed
|
Pressure Parts
|
Power House and Boiler Structure
|
Pile Rack Foundation Works
|
Duct Works between ESP and ID Fan
|
CPU Regin Building
|
Condenser oil pit Works
|
Bunker Erection Work
|
Hot Well Placed in Position
|
Control Room Brick Works
|
Hot Well Placement in Condenser- B
|
Bunker Beam Erection Works
|
Air Pre-Heaters
|
Boiler Roof Works
|
Silencer
|
Pressure parts Pre-assembly Works
|
CW Pipe Erection Works
|
Bunker Shell Erection Works
|
Boiler Works
|
Duct Erection Works in Boiler
|
Condenser oil pit Works
|
Duct Works
|
ESP Control Room Works
|
MRS Compressor Building Foundation Concrete Works
|
Station transformer works
|
Service Building Woks
|
Mill Mechanical Works
|
Condenser Pre -Fabrication Works
|
CPU Regin Building Civil Works
|
CST Tank civil Works
|
DG Building Works
|
Duct Works in Boiler
|
Service Building Ground floor Civil Works
|
Pressure Parts Pre- Assembly Works
|
PRDS Floor Works (35.5 Meters)
|
Power House Brick Works
|
Pile Rack Foundation Concrete Works
|
Auxilary Boiler Civil Works
|
Power House 35.5 mtrs Floor Casting Works
|
Power House 35.5 mtrs Floor Casting Works
|
Front Erection Panel Works
|
Shell Erection in Progress
|
Front Panel Erection in Progress
|
ID Fan -B Defuser
|
Insulation Works
|
Duct Erection Works
|
Pressure parts Works
|
CPU Regin Building Civil Works
|
ID Duct Between ID Fan -A and Chimney
|
MRS Compressor Building Foundation Works
|
Duct Erection Works in Boiler
|
Condenser Pre-Fabrication Works
|
Service Building Second Floor Foundation Works
|
Pressure parts Pre assembly Works
|
ESP Control Room Civil Works
|
Bunker Erection Works
|
Air Washer Building Foundation Works
|
Burner Work
|
Condenser Oil Pit Works
|
Mill Mechanical; Work
|
Power House and Boiler Structure
|
Service Building Ground Floor Works
|
FOPH Building Foundation Works
|
ESP Control Room Second Floor Foundation Works
|
Duct Foundation Civil Works
|
DG Building Civil Works
|
Day Oil Tank Civil Works
|
CW Pipe Erection Works
|
CPU Regin Building Ground Floor Cable Trange Work
|
Duct Works between ESP and ID Fan
|
Bunker Beam Erection Works
|
Bunker Support Structure
|
MRS Compressor Building Foundation Works
|
Duct Erection Works in Boiler
|
GT Transformer Foundation Works
|
Bus Duct Foundation Civil Works
|
CW Pipe Erection Works
|
DG Building Works
|
Power House Structure
|
Pile Rack Foundation Works
|
CPU Regin Building Works
|
Condenser Pit
|
Service Building Second Floor FOundation Works
|
Service Building Ground Floor Bricks Works
|
CST Tank Civil Works
|
Auxilary Boiler Works
|
Mill Mechanical Works
|
Power House Brick Works
|
Service Building Civil Works
|
Air Pre -Heaters
|
Mill Mechanical works
|
Service Building Ground Floor Works
|
Bunker Beam Erection Works
|
Duct Work In Boiler
|
Pressure Parts Pre Assembly Works
|
ESP Control Room Building CIvil Works
|
Duct Erection Works (2)
|
GT Transformers Foundation Works
|
Power House Brick Works
|
CW Pipe Erection Works
|
DG Building Civil Works
|
Duct Erection Works
|
CST Tank Civil Works
|
Condenser Pre-Fabrication Works
|
CPU Regin building Civil Works
|
Duct Foundation civil Works
|
Road Drain Works
|
Power House Ground Floor Brick Works
|
Boiler Structure
|
EOT Crane
|
Power House Brick Works
|
Air Washer Building Foundation Works
|
Mill Mechanical Works
|
Station Transformer Works
|
Power House Structure
|
Pile Rack Foundation Works
|
Condenser Pre Fabrication Works (2)
|
Bunker Erection Works
|
Road Drain Works
|
Pressure Parts
|
Boiler and Power House Structure
|
Bus Duct Foundation Works
|
Day Oil Tank Works
|
CPU Regin Building Works
|
Condenser Pit Works
|
CW Pipe Erection Works
|
Service Building Second Floor Works (2)
|
TG Works
|
Power House Roof Works
|
Duct Erection Works in Boiler (2)
|
CPU Building Ground Floor Cable Trange Works
|
Condenser Pre Fabrication Works
|
Duct Works Between ESP and ID Fan
|
Duct Erection Works in Boiler
|
DG Building Works
|
Auxiliary Boiler Works
|
Air Pre-Heater
|
ESP Control Room Second Floor Casting Works
|
ESP Control Room Second Floor Works
|
CW Pipe Erection Works
|
Service Building Ground Floor Works
|
Boiler Roof Works
|
Bus Duct Foundation Works
|
Duct Erection Works in Boiler
|
Boiler Roof Works
|
CW Pipe Erection Works
|
ESP Structure
|
DG Building
|
Service Building Ground floor Brick Works
|
GT Transformer Foundation Works
|
Duct Erection Works
|
Preesure Parts Works
|
Mill Mechanical Works
|
Air Pre-Heaters
|
Boiler Works
|
Duct Works in Boiler
|
Bunker Works
|
Condenser Pit Works
|
Bunker Shell Erection Works
|
Boiler Roof Works
|
DG Building Works
|
Condenser Pre Fabrication Works
|
Pressure Parts Works
|
GT Transformers Foundation Works
|
Pile Rack Foundation Works
|
ID Fan - B Defuser
|
ESP Roof Works
|
CST Tank Civil Works
|
TG Works
|
Power House Brick WorksTG Works
|
Mill Mechanical Works
|
Bunker erection Works
|
ESP Structure
|
Power House Structure
|
Station Transformer
|
CW Pipe Erection Works
|
DG Building Civil Works
|
ESP Control Room Civil Works
|
Duct Foundation Works
|
Pipe Rack Foundation Works
|
Duct Erection Works in Boiler
|
ID Fan- B Defuser
|
ID Fan Defuser
|
CW Pipe Erection Works
|
Boiler Roof Works
|
Auxiliary Boiler Works
|
Bunker Erection Works
|
Station Transformer
|
Power House Brick Works( 3 Mtrs)
|
DG Building Beam Concrete Works
|
CPU Regin Building Ground Floor Cable Trange Works
|
Condenser Pre Fabrication Works
|
Bus Duct Foundation Works
|
Mill Mechanical Works
|
Power House Roof Works
|
TG Works
|
Service Building Second Floor Slab Works
|
Day Oil Tank Civil Works
|
Condenser Pit
|
Fuel Oil pump House MCC Building Foundation Works
|
ESP COntrol Room Second Floor Works
|
CPU Building Slab Works
|
Control Room Brick Works
|
Bunker Works
|
GT Transformers Foundation Works
|
ESP Control Room Civil Works
|
Duct Foundation Work
|
Service Building Ground Floor Brick Works
|
Service Building Second Floor Concrete Works
|
Service Building Second Floor Concrete Work
|
CPU Regin Building Concrete Slab Works
|
Air Washer Building Foundation Works
|
Power House Structure
|
CPU Regin Building Concrete Works
|
CPU Building Concrete Works
|
Boiler and Power House Structure
|
Condenser Pit
|
Service Building Second Floor Works
|
CPU Building Cable Trange Works
|
Mills Mechanical Works
|
DG Building
|
Pressure Parts
|
Control Room Brick Works
|
CW Pipe Erection Works
|
Road Drain Works
|
ESP Control Room Bricks Works
|
Bunker Works
|
Mill Body Works
|
CPU Regin Building Works
|
Control RoomBrick Works
|
Fuel Oil Pump House MCC Building Column works
|
Duct Between ID Fan and Chimney
|
Service Building Second Floor Works
|
Road Drain Works
|
Auxiliary Boiler Works
|
Condenser Pre Fabrication Works
|
Station transformer
|
DG Building Works
|
Mills Mechanical Works
|
Boiler Roof Works
|
Duct Erection Works
|
Condenser Pit
|
Service Building Ground Floor Works
|
Bunker Works
|
ESP Roof Works
|
Air pre-Heaters
|
Pressure Parts
|
CPU Regin Building Civil Works
|
ESP Structure
|
Duct Foundation Works
|
Air Pre-Heater
|
Duct Works Between ESP and ID Fan
|
TG Structure
|
CW Pipe erection Works
|
Boiler and power House Structure
|
PRDS Floor Works
|
Mill Body Works
|
ESP Second Floor Civil Works
|
Fuel oil Pumphouse MCC Building
|
Service Building Second Floor Works
|
CW Pipe Erection Works
|
Mills Mechanical Works
|
Boiler and Power House Structure
|
CPU Regin Building Civil Works
|
Duct Foundation Works
|
Bunker Works
|
Hopper Works for Mill-H
|
Service Building Ground Floor Works
|
Condenser Pre Fabrication Works
|
Duct Works Between ESP and ID Fan
|
Pressure Parts
|
Hopper Works of Mill H
|
Mill Hopper H Works
|
Mill Hopper H Erection Works
|
Mill Hopper H Erection Works
|
unit transformer Works
|
Boiler Roof Structure Works
|
Pressure Parts
|
Air Pre-Heaters
|
Power House Structure
|
Bunker Shell Erection Works
|
Boiler Structure
|
Station Transformer
|
Boiler Roof Works
|
Condenser Pit
|
Bunker Works
|
Mills Mechanical Works
|
Pressure Parts
|
Service Building Ground Floor Civil Works
|
Duct Works in Boiler
|
DG Building Civil Works
|
Bunker Beam Works
|
Air Pre-Heater
|
Boiler Roof Work
|
CST Tank Civil Works
|
CPU Regin Building Civil Works
|
PRDS Floor Works
|
Mills mechanicals Works
|
Pressure Parts Pre-Assembly Works
|
Power House Roof Works
|
Condenser Pre Fabrication Works
|
Duct Erection Works in Boiler
|
Duct works Between ESP and ID Fan
|
ESP Control Room Civil Works
|
Duct Erection Works
|
GT Transformers Foundation Works
|
Service Building Second Floor Foundation Works
|
TG Works
|
Mills Mechanical Works
|
Bunker Shell
|
Burner Works in Boiler
|
Duct Foundation Civil Works
|
Power House Roof
|
Mill Mechanical Work
|
CW Pipe Erection Works
|
Auxiliary Boiler Works
|
Power House Structure
|
Bunker Works
|
ESP Control Room Civil Works
|
Mill Mechanical Works
|
PRDS Floor Works
|
ESP Duct Foundation Works
|
Condenser Pre Fabrication Works
|
GT Transformers Foundation Works
|
Bunker Shell Erection Works
|
Condenser Pre Fabrication Works
|
Bunker Beam Works
|
Bunker Shell
|
EOT Crane
|
CST Tank Civil Works
|
Air Washer Building Foundation Works
|
Air Pre Heaters Structure Works
|
Duct Erection Works
|
PRDS Floor Works
|
Mill Mechanical Works
|
Service Building Second Floor Foundation Works
|
TG Structure
|
Air Pre -Heater
|
Duct Works Between ESP and ID Fan
|
Bunker Works
|
CW Pipe Erection Works
|
ESP COntrol Room Building Works
|
Pressure Parts
|
Power House Roof Works
|
GT Foundation Works
|
unit Transformer
|
Power House Roof
|
Power House and Boiler Structure
|
CPU Building Civil Works
|
Bunker Erection Works
|
Auxiliary Boiler Works
|
DG Building Civil Works
|
Duct Erection Works in Boiler
|
Duct Foundation Works
|
Station Transformer
|
Service Building Ground Floor Works
|
ESP Structure
|
Crane Load Test
|
Bunker Shell S1 Lifting D-E Grid
|
HVR Transformer Erection
|
Mill Works
|
Boiler Roof Works
|
Duct Foundation Civil Works
|
Duct Works Between ESP and ID Fan
|
PRDS Floor Works
|
CW Pipe Erection Works
|
Pressure Parts
|
ESP Ground Floor Civil Works
|
Duct Foundaion Works
|
Air Pre Heaters
|
PRDS Floor Work
|
Air Washer Building Foundation Works
|
Bunker Works
|
Auxiliary Boiler Works
|
CPU Building Civil Works
|
Duct Work Between ESP and ID Fan
|
Duct Foundation Works
|
ESP Control Room Civil Works
|
GT Foundation Works
|
Unit Transformer Works
|
Mills Mechanical Works
|
Pass A Outlet Duct
|
Power House Structure
|
Mill Mechanical Works
|
ID Duct Between ID Fan and Chimney
|
TG Works
|
Station Transformer Works
|
Service Building Second Floor Foundation Works
|
DG Building Civil Works
|
Duct Erection Works
|
Duct Works in Boiler
|
CST Tank Civil Works
|
Condenser Pre Fabrication Works
|
Burner Works
|
Air Pre Heater
|
Boiler and Power House Structure
|
Duct Foundation Works
|
DG Building Civil Works
|
Duct Foundation Civil Works
|
Generator Transformer Foundation Works
|
GT Foundation Works
|
Mill Mechanical Works
|
Unit Transformer
|
Auxiliary Boiler Works
|
CW Pipe Fabrication Works
|
CST Tank Civil Works
|
Condenser Pre-fabrication Works
|
Bunker Works
|
Mills Mechanical Works
|
Power House Structure
|
Station Transformer Foundation Works
|
TG Works
|
Air Washer Building Foundation Works
|
EOT Crane
|
Unit Transformer Works
|
TG Works
|
Pressure Parts
|
Mill Works
|
Duct Foundation Works
|
Duct Foundation Civil Works
|
DG Building
|
Burner Works
|
Boiler and power House Structure
|
Air Pre- Heaters
|
Duct Works in Boiler
|
ESP Control Room Ground Floor Civil Works
|
Power House Structure
|
Duct Between ESP and ID Fan
|
Mill Mecahnical Works
|
Aux Boiler Works
|
CW Pipe Fabrication Works
|
CST Tank Civil Works
|
Condenser Pre-Fabrication Works
|
Bunker Works
|
Air Pre-Heaters Works
|
Boiler and Power House Structure
|
Air Washer Building Foundation Works
|
CST Tank Civil Works
|
Bus Duct Foundation Civil Works
|
Mill Mechanical Works
|
EOT Crane
|
CPU Building Civil Works
|
Condenser Pre Fabrication Works
|
DG Building Civil Works
|
Auxiliary Boiler Civil Works
|
ESP Control Building Works
|
Service Building Second Floor Foundation Works
|
Station Transformer Works
|
TG Works
|
Unit Transformer Works
|
ESP Structure
|
Power House Works(24 meters)
|
Power House and Boiler Structurre
|
CW Pipe Fabrication Works
|
Bunker Works
|
Air Pre-Heaters
|
Mill Mechhanical Works
|
Bus Duct Foundation Works
|
Mills Mechaical Works
|
GT Foundation Works
|
Duct Work Between ESP and ID Fan
|
DG Building Civil Works
|
Bus Duct Civil Works
|
CPU Building Civil Works
|
Burner Works
|
Condenser Pre Fabrication Works
|
ESP Ground Floor Works
|
Bus Duct Erection in Boiler
|
Power house and Boiler Structure
|
Bunker Works
|
ESP Control Room Building Civil Works
|
Service Building Ground Floor Works
|
ESP Structure Works
|
Mill Mechanical Works
|
Station transformer Civil Works
|
ESP Control Building
|
Mill Mechanical Works
|
TG Structure
|
Air Pre Heaters
|
CST Tank Civil Works
|
DG Building Civil Works
|
CPU Building Civil Works
|
Condenser pre Fabrication Works
|
Aux Boiler Works
|
Air Pre-Heaters
|
Bunker Works
|
Duct Work between ESP and ID Fan
|
ESP Control Room Civil Works ( Back Side)
|
Service Building Second Floor Foundation Works
|
GT Foundation Works
|
Mill Mechanical Works
|
Station Transformer Civil Works
|
TG Works
|
Condenser Pre Fabrication Works
|
Unit Transformer Civil Works
|
Pressure Part Works
|
Bus Duct Erection In Boiler
|
DG Building
|
CST Tank Civil Works
|
CPU Building Civil Works
|
Bus Duct Foundation Civil Works
|
Boiler Structure Works
|
Aux Boiler Works
|
Boiler Structure
|
Power House First Floor Works
|
Bunker Works
|
Station Transformer Works
|
EOT Crane
|
Service Building Second Floor Works
|
Turbine Generator Works
|
Power House Structure Works
|
Mill Mechanical Works
|
GT Works
|
GT Foundation Works
|
ESP Control Room Second Floor Civil Works
|
Bus Duct Foundation Works
|
Service Building Ground Floor Works
|
DG Building Civil Works
|
CST Tank Civil Works
|
CPU Building Civil Works
|
Bus Duct Civil Works
|
TG Works
|
Unit Transformer Works
|
Boiler and Power House Structure Works
|
Aux Boiler Works
|
TG Works
|
Station Transformer Civil Works
|
Service Buildimg Second Floor Foundation Works
|
Pressure Parts Works
|
Power House ground Floor Works
|
Mill Mechanical Works
|
GT Foundation Works
|
Esp Ground Floor Works
|
ESP Duct Structure
|
ESP Control Room Civil Works
|
DG Building Works
|
CST Tank Civil Works
|
CPU Building Civil Works
|
Bunker Works
|
Aux Boiler Civil Works
|
Pressure parts Works
|
CST Tank Civil Works
|
Duct Erection in boiler
|
Boiler & Power House Structure
|
CW Piping Works
|
Service Building Second Floor (50% Completed)
|
TG Deck Works
|
Mill Mechanical Works
|
GT Foundation Works
|
DG Building Works
|
Bus Duct Foundation Works
|
Bunker Works
|
Auxilary Boiler Works
|
Service Building Second Floor Works
|
Mill Mechanical Works
|
Service Building Ground Floor Works
|
EOT Crane
|
GT Foundation Works
|
Bunker Works
|
CPU Building Works
|
Station Transformer
|
Transformer Oil Pit Civil Works
|
Power House Works
|
Station Transformer Foundation Works
|
Service Building
|
Service Building Platform Works
|
MRS Compressor Building
|
ESP Control Room
|
Mills Works
|
Generator Foundation Works
|
DG Building
|
Condensser Pre-assembly
|
Bus Duct Foundation Works
|
Auxilary Boiler Works
|
Air Washer Foundation Works
|
Transformer Oil Fit Civil works
|
Station Transformer Foundation
|
Station Transformer
|
MRS Compressor Building
|
Mill Mechanical Works
|
ESP Control Room
|
EOT Crane
|
DG Building
|
CPU Building
|
Bus Duct Foundation
|
Service Building 2nd Floor works
|
Service Building Ground Floor
|
Service Building Works
|
ESP to ID Fan Duct
|
ESP Control Room Works
|
ESP Erection
|
Mill Erection
|
Fuel Oil Pump House Works
|
Auxilary Boiler Works
|
CPU Building Works
|
DG Building Works
|
Boiler Erection
|
TG Works
|
Power House Erection
|
Power House & Boiler Erection
|
Over All View
|
Power House Erection
|
Mill Erection
|
Service Building Works
|
ESP to ID Fan Duct
|
ESP Control Room Works
|
ESP Erection
|
Fuel Oil Pump House Works
|
Auxilary Boiler Works
|
Boiler Ring Beam Erection
|
Boiler Erection
|
CPU Building Works
|
DG Building Works
|
UAT Foundation
|
Transformer Yard Works
|
TG Works
|
Power House Erection
|
Site overview
|
Mill Erection
|
ESP to ID Fan Duct
|
ESP Control Room Works
|
ESP Erection
|
Service Building Works
|
Transformer Yard Works
|
Fuel Oil PumpHouse Works
|
Auxilary Boiler Works
|
CPU Building Works
|
DG Building Works
|
Boiler Ring Beam Erection
|
Boiler Erection Works
|
TG Works
|
Power House Erection
|
P.H & Boiler Erection
|
Service Building Works
|
P.H & TG Works
|
ESP to ID Fan Duct
|
P.H & Boiler Erection
|
UAT Foundation Works
|
Service Building Works
|
Tranformer Yard Works
|
Boiler Ring Beam Erection
|
ESP to ID Fan Duct
|
ESP Control Room Works
|
ESP Erection Works
|
Fuel Oil PumpHouse Works
|
Auxilary Boiler Works
|
CPU Building Works
|
CW-Pit
|
DG Building Works
|
TG Works
|
Power House Erection
|
Boiler Erection Works
|
Over All View
|
Bunker Hopper Erection
|
Mill Erection Works
|
Service Building Works
|
Transformer Yard Works
|
ESP TO ID Fan Duct
|
ESP Control Room Works
|
ESP Erection Works
|
Boiler Ring Beam Erection Works
|
CPU Building Works
|
DG Building Works
|
TG Works
|
Power House Erextion
|
Boiler Erection Works
|
Over All Project View
|
Service Building Works
|
ESP to ID Fan Duct
|
ESP Control Room Works
|
ESP Erection
|
Auxilary Boiler Works
|
CPU Building Works
|
Boiler Ring Beem Erection
|
Boiler Erection Works
|
DG Building Works
|
CW-Pit
|
Transformer Yard Works
|
TG Works
|
Power House & Boiler Erection
|
Service Building Works
|
ESP Control Room Works
|
Auxilary Boiler Works
|
CST Tank Foundation
|
CPU Building Works
|
DG Second Foundation Casting
|
TG Works
|
Boiler & Power House Erection
|
APH-B
|
APH-B Erection
|
Transformer Yard
|
Power House Erection
|
TG Works
|
DG Building Works
|
DG Set Foundation Works
|
CW-Pit
|
Boiler Erection
|
UT Foundation Works
|
FOPH Works
|
CW-Pit Works
|
DG Set Foundation Works
|
Boiler Ring Beem Erection
|
P.H & Boler Erection
|
Power House Works
|
Service Building Works
|
TG Works
|
Power House Erection Works
|
Tansformer Yard
|
Mill Motor Erection
|
PA Fan -B
|
PA Fan -A Works
|
ESP Control Roo Works
|
ESP Erection Works
|
DG Building Works
|
CW-Pit
|
CPU Building Works
|
Bioler Wind Box Erection
|
Boiler Erection
|
APH-B Erection
|
Power House Erection
|
Boiler Erection Works
|
Transformer Yard Works
|
ESP TO ID Fan Works
|
Service Building Works
|
Service Building Works First Floor
|
Transformer Yard Works
|
Mill Works
|
Fuel Oil Pump House Foundation Works
|
ESP Erection Works Front View
|
CPU Building Works
|
Bunker Ring Beem Erection
|
Boiler Erection Works
|
Mill Motor Erection Works
|
Bunker Fabrication Works
|
Boiler Wind Box Erection
|
APH-B Erection Works
|
AirWasher Pile Cap
|
ID Duct between ESP To ID Fan
|
Mill Side Liner Body Erection
|
Mill J PGB Erection
|
APH-B Main Pedestal Erection
|
P.H.Side View
|
Service Building Works
|
ESP Erection Works
|
Power House Erection Works
|
Fuel Oil PumpHouse Works
|
DG Building Works
|
DG Building Works
|
CW Pit
|
CPU Building Works
|
Bunker Ring Beem Works
|
Boiler Erection Works
|
Auxilary Boiler Civil Works
|
Service Building Works
|
ESP Erection Works
|
Boiler Erection Works
|
Service Building First Floor Works
|
Auxilary Boiler Works
|
DG Building Works
|
CW Pit Works
|
TG Works Under Progress
|
Boiler Erection Works
|
ESP Erection Works Under Progress
|
P.H Erection Works
|
CPU Building Works
|
Fuel Oil Pump House Works
|
Auxilary Boiler Works
|
CPU Building Works
|
TG Building Works
|
ESP Control Room Works
|
Transformer Building Works
|
Boiler Erection Works
|
Power House Erection Works
|
Site overview
|
Power House Floor Slab At 8.5Meter C-F Bay
|
Ring Beam Lifting
|
Boiler Area Duct Erection under progress
|
Service Building civil works under progress
|
Power House-BC bay Floor Beam Erection
|
ESP Control room
|
HT Switchgear civil works
|
Mill Spring Fixing
|
ESP and ID Duct
|
Service Building works
|
Power House Erection works
|
HT Switchgear Floor Works
|
Transformer Yard Paving works
|
UT Foundation works
|
UAT Civil works
|
EOT Crane Erection works
|
DG Building Civil works
|
CPU regeneration Building
|
Boiler Roof Erection works under progress
|
Boiler & Power House Erection works
|
ESP rear side
|
ESP Front side- Pass A roof works under progress
|
ID Fan B Civil works complete
|
ID Fan-A Staging works
|
EOT Crane Erection
|
CST Tank Foundation
|
Boiler Erection
|
PA Fan Spring fixing
|
ID Fan Spring Fixing
|
Service Building Floor Casting
|
TG Deck after 2nd Stage Concreting
|
Service Building 1st Floor works
|
Control room Floor Casting
|
CW Pit Civil works
|
Auxiliary Boiler Chimney
|
APH Strucutre Erection works
|
ESP Erection work
|
Boiler & Power House
|
Auxiliary Boiler Civil works
|
Power House Erection
|
Power House Erection works
|
Station Transformer Foundation
|
CPU Building works
|
DG Building Column works
|
Service Building Shuttering at 4.25 mts Floor
|
Duct Erection
|
TG Deck Casting completed
|
TG Deck Casting under progress
|
TG Deck casting
|
TG Deck Concrete Arrangement
|
CST Tank Civil works
|
Auxiliary Boiler Chimney Foundation
|
Boiler Erection works
|
ESP Erection works
|
ID Duct Erection
|
ESP Control room
|
Mill Reinforcement Fixing under progress
|
Aux Boiler Foundation works
|
CST Tank Foundation works
|
CPU Regen Building civil works
|
Power House Structure
|
Station Transformer Foundation
|
Transformer Yard
|
Service Building works
|
TG Deck Reinforcement Fixing
|
ID fan Deck casting
|
ID Fan Deck Casting
|
Power House works
|
Service Building works
|
Transfromer yard civil works
|
CST Tank Civil works
|
Auxiliary Boiler Civil works under progress
|
Boiler & Power House Structure works
|
Station Transformer Civil works
|
TG Deck Reinforcement Fixing under progress
|
ID Duct Erection in Progress
|
Boiler and Power House Structure
|
TG Deck Reinforcement
|
Generator Stator unloaded at site.
|
7th and last Cieling Girder erection
|
Mill J deck concreting commenced.
|
Service Building Works
|
Duct Erection Works
|
ESP Control Room Works
|
ESP Erection Works
|
Mill Civil Works
|
Auxilary Boiler Works Under Progress
|
Fuel Oil P.H Works Under Progress
|
CPU Building Works
|
DG Building Works Under Progress
|
TG Deck Reinforcement Works
|
Transformer Building Works
|
Boiler Erection Works
|
Site Overview
|
DG Building Works
|
TG Deck Reinforcement Works
|
Boiler Erection Works Under Progress
|
Transformer Building Works Under Progress
|
Power House & Boiler Erection Works
|
Duct Fabrication Works
|
ESP Control Room Works
|
ESP Erection Works
|
Mill Civil Works
|
Boiler Erection Works
|
Auxiliary Boiler Works Under Progress
|
Fuel Oil Pump House Works
|
CPU Building Works Under Progress
|
DG Building Works
|
TG Deck Reinforcement Works Under Progress
|
Transformer Building Works
|
Power House & Boiler Erection Works
|
ESP Erection Works
|
Power House Erection Works
|
TG Deck Reinforcement Works
|
Auxilary Boiler Works Under Progress
|
Fuel Oil Pump House Works Under Progress
|
DG Building Works Under Progress
|
Boiler Erection Works
|
Site Overview
|
Service Building Works
|
Duct Erection Works
|
ESP Erecton Works Under Progress
|
Mill Civil Works
|
Boiler Erection Works
|
TG Deck Reinforcement Works Under Progress
|
Power House & Boiler Erection Works
|
Service Building Works Under Progress
|
Duct Erection Works
|
ESP Control Room Works
|
ESP Erection Works
|
Mill Civil Works
|
Boiler Erection Works Under Progress
|
Power House Erection Works
|
TG Deck Reinforcement Works Under Progress
|
Transformer Building Works
|
Site overview
|
Service Building Works
|
ESP Control Room Works
|
ESP Erection Works Under Progress
|
Mill Civil Works
|
Bioler Erection
|
Power House Erection Works
|
Transformer Building Works
|
TG Building Works Under Progress
|
Power House & Boiler Erection Works
|
ESP to ID Fan Duct Erection Under Progress
|
Duct Fabrication Works Under Progress
|
Ceiling Girders 6 and 7 Pre-assembly under progress
|
Mill Deck Reinforcement Work under progress
|
Plant Road Improvement for Stator Transportation
|
Service Building Works
|
Duct Erection Works Under Progress
|
ESP Control Room Works
|
ESP Erection Works (R.H.S)
|
TG Deck Reinforcement Works
|
Mill Civil Works
|
Transformer Building Works
|
Boiler Erection Works
|
TG Building Works Under Progress
|
Site overview
|
Service Buiding Works
|
ESP Erection Works
|
ESP Control Room Works Under Progress
|
Mill Civil Works
|
TG Deck Reinforcement Works
|
Boiler Erection Works
|
TG building Works
|
Service Building Works Under Progress
|
Duct Erection Works
|
ESP Control Room Works
|
ESP Erection Works (L.H.S)
|
Mill Civil Works
|
TG Deck Reinforcement Works
|
TG Building Works
|
Transformer Building Works
|
Power House & Boiler Erection Works
|
Power house Floor Casting
|
Service Building Works Under Progress
|
ESP Erection Works Under Progress
|
TG Deck Reinforcement Works
|
Transformer Building Works
|
Boiler Erection Works Under Progress
|
TG Building Works
|
Power House & Boiler Erection Works
|
Mill Civil Works Under Progress
|
Service Building Works Under Progress
|
ESP Erection Works
|
ESP Control Room Works Under Progress
|
Power House Works
|
Boiler Erection Works Under Progress
|
Transformer Building Works
|
TG Deck Reinforcement Works
|
TG Building Works
|
Site overview
|
Service Building Works Under Progress
|
ESP Control Room Works
|
ESP Erection Works
|
Boiler Erection Works Under Progress
|
TG Building Works Under Progress
|
Power House BC Bay Column Foundation Works
|
Site overview
|
Service Building Work under progress
|
ESP Control Room Works
|
ESP Erection Works Under Progress
|
Boiler Erection Works
|
TG Building Works
|
Power House & Boiler Erection Works
|
Power House BC Bay Column Foundation Works
|
Site over View
|
Service Building Works
|
ESP Control Room Works Under Progress
|
ESP Erection Works
|
Boiler Erection Works Under Progress
|
Power House BC Bay Column Foundation Works
|
TG Building Works
|
Power House &Boiler Erection Works Under Progress
|
Service Building Woks
|
ESP control Room Works
|
ESP Erection Works Left Side View
|
Boiler Erection Works Under Progress
|
TG Building Works
|
Power House BC Bay Column Foundation Works
|
Site overview
|
Service Building work under progress
|
ESP Control Room Works
|
ESP erection under progress
|
Power House Erection & Column Works Under Progress
|
Boiler erection under progress
|
TG Building erection under progress
|
Boiler Erection Works
|
Service Building Works
|
ESP Control Room Works
|
ESP Erection Works Left Side View
|
Boiler Erection Works
|
Power House BC Bay Column Foundation Works
|
TG Building Works
|
Site over View
|
ESP Control Room Works
|
ESP Erection Works Under Progress
|
Boiler Erection Works
|
Power House Column Erection Works
|
TG Building Works
|
Power House & Boiler Erection under progress
|
Service Building Works
|
ESP Control Room Works
|
ESP Left Side View Erection Works
|
Power House BC Bay Column foundation Works
|
Boiler Erection Works
|
TG Building Works
|
Power House & Boiler Erection Works
|
Service Building erection under progress
|
ESP Control Room Works
|
ESP Erection under progress
|
Boiler Erection under progress
|
P.H BC Bay column foundation
|
TG Building erection under progress
|
Site overview
|
Power House & Boiler Erection Works
|
Service Building work under progress
|
ESP Control Room Works
|
ESP Erection Works Left Side View
|
Boiler Erection Work Under Progress
|
TG Building Civil Works
|
Over All Project View
|
Power House Erection Works
|
Service Building area
|
ESP erection under progress
|
ESP Control Room erection under progress
|
Boiler Erection under progress
|
TG Building erection under progress
|
Site Overview
|
Service Building work under progress
|
Boiler Erection Work
|
ESP Control Room work under progress
|
Power House erection work
|
TG building & power house erection work
|
TG Civil works
|
ESP Control room works
|
Boiler erection works
|
Power House works
|
TG Column Casting above 8.5 Mts under progress
|
Power House Axis 13 & 14 Erection works
|
Power House auxiliary Column Erection
|
CW Pit Reinforcement Fixing
|
Second ceiling girder erected
|
Boiler & Power House erection work
|
Duct Erection commenced on 01-06-2018
|
ESP area
|
TG deck (tie beam civil works)
|
Ceiling Girder -01 Erected
|
Boiler & Power House- Top View
|
CW Pit work under progress
|
ESP Control room civil work
|
TG work Under progress
|
Ceiling girder erection in progress
|
Girder Pre-Assembly
|
TG Civil works
|
Boiler and PH Area
|
TG column casting
|
ESP Control room civil works
|
Boiler
|
PH A row civil works
|
Boiler
|
TG area civil works
|
ID Fan B Civil work
|
ID Fan A Civil work
|
ESP Control Room Civil Works
|
Boiler Area
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|