U#4 Boiler Lift sheeting works
|
LDO Tank 1&2 Painting completion
|
Unit#4 GR fan foundation
|
Unit#4 GR fan shuttering works
|
Unit#4 MRS Silo erection works
|
Unit#3 Boiler lift machine erection
|
TG#4 Elevator
|
Boiler#4 Elevator
|
Boiler#3 Elevator
|
Plant view
|
Plant view
|
Chemical Lab
|
Watch towers
|
SCR works Unit#1
|
SCR preassembly fabrication
|
Track hopper
|
Mill reject system Unit#1
|
Mill reject system
|
Administrative building, Canteen & Fire station
|
Plant view
|
Plant View
|
Unit#4 Civil Work
|
Civil Work
|
Civil Works
|
Civil Works
|
Civil Works
|
Civil Work
|
Civil works near chimney
|
Civil Works
|
Unit#4 CDbay civil work
|
AHP MCC#1 IPS Flooring
|
Civil works in CD bay U#4
|
Civil work in PQ row
|
PH#4 Civil Works
|
Unit#4 Duct Insulation
|
Coal Conveyor
|
MILL - 4F erection under progress
|
Unit#4 PQ row civil work
|
Unit#4 Transformer Yard Civil work
|
Unit#4 Fans
|
Wagon Tippler area
|
Track hopper
|
U#4 ESP-B Pass Insulation Works
|
ESP#4 Pass-B
|
Mill-F Unit#4
|
ESP#4 B pass
|
Feeders Unit#4
|
Civil Works in Unit#4
|
Unit#4 Mill Piping
|
Feeders Unit#4
|
Unit#4 Boiler
|
Seal Air Fan
|
ESP Inlet duct
|
Feeders Unit#4
|
Civil Works
|
ESP#B Pass
|
Gravimetric Feeders Unit#4
|
APRDS
|
Unit#4 Mill Feeders
|
Unit#4 Mill ducts
|
Unit#4 Coal Mill Pipes
|
ESP-4 B Pass
|
Unit#4 Mill Feeders
|
Seal Air Fan Installation
|
Civil Works
|
Intake Water Pump House
|
Plant Overview
|
Earth Preparation Work
|
Unit#4 FD-B Fan
|
Track hopper
|
Wagon Tippler Area
|
ESP area Civil works
|
Unit#4 Zero meter
|
Ash Silos
|
Coal conveyor pipes from Mill to Boiler
|
Feeder A to Mill
|
Coal Conveyors for coal Bunkers
|
Unit-4 ESP
|
Unit#4 PH Backside
|
Internal Road Works
|
Unit#4 Mills
|
Unit#4 B Side Boiler Outlet Duct
|
Unit#4 Fan area
|
CWPH#3&4
|
Coal Conveyor 7 B
|
Unit#4 Gravimetric feeders
|
Unit#4 Coal Bukers
|
Unit#4 Coal Bunkers
|
ESP#4 B Pass
|
Wagon Tippler
|
Track Hopper
|
Wagon Tippler
|
Unit-1 Power House with Service Building
|
Unit-4 ducts
|
Coal Storage Yard
|
ESP top Pass#A U#4
|
Unit#2&3 road
|
Unit#4
|
Unit#1
|
FO Tank 2
|
VPH 2
|
ESP B work u/p
|
Unit 2 Mills
|
Chlorination Plant
|
CW Treatment Plant
|
PA Fan 2A start up under progress
|
PH Roof
|
Rain Water accumulation between unit1 & 2
|
Plant Overview
|
Switch Yard
|
Switch Yard
|
Plant Overview
|
Rain water accumulation
|
Rain water accumulation in PH 0 m
|
PH arae after heavy rain
|
Boiler #4 area after heavy rain
|
Boiler #4 area after heavy rain
|
ESP#4
|
Unit#4 TG
|
Unit#2 Eco Hopper area
|
ESp#2 area
|
Unit#2 Mill area
|
Unit#3 GTarea
|
Unit#1 GT
|
Unit#1 GT
|
Ash Water Pond
|
Track Hopper
|
BCN 3AB under earth
|
ESP 2
|
CHP MCC#2
|
Track Hopper
|
BCN 3AB
|
BCN 3AB
|
Crusher House
|
Crusher House
|
Bunker#4
|
Unit#1 PH
|
NDCT 1&2
|
Chlorination Plant 1
|
CW Traetment Plant 1&2
|
CWPH 1&2
|
Clarified Water Tank
|
DM Plant
|
AHP MCC 1
|
ETP
|
Clarified water Pump House
|
Vacum Pump House 2
|
PT Plant 2
|
PT Plant 1
|
BCN 3A/B Tunnel
|
Wagon Tippler
|
Wagon tippler
|
BCN#3-A/B Structure
|
Crusher house
|
Bunker#4
|
ESP#4
|
Transformer yard rail road
|
Unloading bay Construction Activities
|
Fire Wall GT Unit#3
|
LP heaters #3
|
LP heater unit#3
|
Boiler#2
|
Boiler#2
|
TG#4 area
|
TG#4 generator
|
TG#4 site
|
TG#4 area
|
CCR 3&4 2nd
|
CCR 3&4
|
TG#3 3rd
|
TG#3 2nd
|
TG#3
|
TG#2 area
|
TG#1 area 2
|
TG#1 area
|
Utility building construction 2
|
Boiler#1 area 2
|
Boiler#1 area
|
Utility Building Civil Work
|
CW Pump House 1&2
|
ESP#2 Pass B
|
DSPH
|
Unit#3&4 Control Room
|
CWPH 3&4
|
Unit#4 TG area
|
Unit#4 TG area
|
LP bye pass section
|
Unit#4 Fan foundations
|
ESP Unit#3
|
Mills Unit#3
|
Unit#3 GT area
|
U#2&3 PH building intersection
|
U#3 PH zero meter
|
ESP#2 Pass-B
|
Bunker Structure
|
ESP#2 Pass-A
|
Bunker#2
|
Bunker#2
|
ESP#2
|
ESP#3
|
Mill U#2
|
Mill U#2
|
ESP U#2
|
AHP trench work U#2
|
Utility Building Work U#1
|
Mill area Unit#1
|
Insulation work ESP#1
|
ESP#1
|
ID Fan area Unit#1
|
Seal Air Fan Foundations#1
|
HFO Tank#1
|
AHP pipes to Ash Dyke
|
ESP MCC 3&4
|
Tipper Floor
|
TG#4
|
ESP#4
|
Battery room Unit#2
|
Unit#1
|
Inside NDCT
|
Unit#1 Mills
|
Bunkers with Gravimetric Feeders
|
PT Plant Water Storage tank
|
Clarifier B
|
Bunker#1
|
Top of ESP#1
|
Boiler#1 area
|
AHP Pipe Trench excavation
|
BAH#1
|
BAH#1
|
DMCW Pump Unit#2
|
Chlorination building Unit#3&4
|
NDCT#4
|
Plant Overview#2
|
Plant Overview 1
|
Inside NDCT#4
|
Track Hopper
|
Chlorination Building U#3&4
|
Forebay U#3&4
|
Unit#4
|
Bunker Str U#4
|
CCR U#3&4
|
Bunker Unit#2
|
Unit#3
|
Bunker#4
|
CW piping Unit#3&4
|
Crusher House
|
BCN 10A
|
ESP CR 1,2
|
BCN 3A/B Structural Work
|
Forebay area 1,2
|
CW Treatment Plant
|
Chlorination Plant
|
Chlorination Plant
|
NDCT3,4
|
NDCT#1
|
NDCT#2
|
Chlorination Plant Unit 1&2
|
Chlorination Building
|
CW house & PH
|
Chlorination Plant 1&2
|
Utility Building
|
Utility Building
|
Mill A area Unit#1
|
AHP MCC#1
|
ESP#1
|
ESP#1
|
Tipper Floor
|
ESP 2
|
Boiler#4
|
Boiler#4
|
Plant Overview
|
ESP 3&4
|
Condenser Work
|
CW Pump House
|
Condenser Base Plate
|
Condenser Base Plate
|
Condenser Base Plate
|
Unit#4
|
ESP Unit#4
|
Unit#4 Boiler
|
Unit#4 Boiler
|
Bunker Structure Unit#3
|
Bunker Structure
|
ESP Unit#3
|
ESP Unit#3
|
Piping work Unit#2
|
PH Floor Unit#4 15 mtr
|
TG base Unit#4
|
GT Unit#4
|
GT Unit#2
|
TG Hall Unit#4
|
Generator
|
Turbine
|
Turbine
|
Generator
|
BFP
|
APH Unit#3
|
BFP Unit3
|
Earthwork at Unit 2
|
Raft for Mill 3
|
Control Room 3&4
|
Column Base
|
Bunker Structure #4
|
Unit#4
|
Inside ESP 4
|
Fans Unit#3
|
Unit#4
|
Unit#3
|
Bunker
|
Bunker
|
Bunker
|
Switch Yard2
|
Switch Yard1
|
Overview4
|
Overview3
|
Overview2
|
Plant Overview 1
|
Roof of PH 1&2
|
Roof of PH 3&4
|
Inside Boiler#3
|
Fans Unit#2
|
Unit#3
|
Bunkers Unit#3
|
Fans Unit#3
|
Unit#2
|
Bunkers Unit#2
|
Space Between 2&3
|
Space Between 1&2
|
AHP MCC1
|
AHP MCC1
|
DM Plant
|
BCN 5A/B
|
ESP#3
|
ESP#3
|
ESP#2
|
Top of ESP#1
|
Top of ESP#1
|
Unit#2 Mills
|
Mill Installation Work
|
Condensate Transfer Pump House
|
Inside ESP
|
AHP Pipe racks
|
Fire Wall GT
|
ID Fan
|
ESP Control Rool 1&2
|
Fly Ash Silo
|
NDCT 3&4
|
Bottom Hopper
|
Wagon Tippler
|
MCC#1
|
DM Plant
|
Crusher House
|
6A/B
|
Clarifier Tank
|
CHP MCC2
|
Fire Water Pump House
|
Civil Work for ST#2
|
Transmission Yard
|
Boiler Drum tubes
|
Unit#4 Boiler Drum
|
Boiler Unit#4
|
NDCT#3&4
|
BCN 10 ERH
|
CHP TP#2
|
CHP MCC#1
|
Civil Work for Foundations
|
Unit#4 ESP Under Progress
|
GT#2 Civil Work
|
Ash Slurry Pumps
|
BCN#2
|
Stacker Reclaimer area
|
Tipper Floor
|
Unit#1 Bottom
|
Interconnection
|
AHP MCC#1
|
Unit#1 Mills
|
Wagon Tippler
|
Ash Dyke
|
AHP MCC1
|
CW Treatment Plant
|
Unit#1&2 Ash Slurry Pump house
|
Unit#1 Mills
|
Work in Progress
|
Store Room
|
SwitchYard
|
TP#5 Interconnection
|
Unit#3 FD Fan
|
Administration Building
|
ESP Unit#2
|
Unit#2 Boiler
|
Bunker Structure
|
Interconnection between Mill & Bunker Structure
|
Cooling Tower Unit#1&2
|
CW Pump house Unit#1&2
|
NDCT
|
ESP
|
CHP Coal Conveyor
|
Ash Water Pump House
|
Stacker & Reclaimer
|
Boiler Unit#4
|
U#1 Bunkers
|
TP-4
|
Ash Slurry Pump House
|
CHP MCC
|
Ash water pump house
|
De watering at site
|
U#2 FD Fan B
|
U#2 FD & PA Fan-A
|
U#2 ESP PASS A
|
U#2 ID FAN
|
ESP
|
Mobile Crusher foundations
|
Unit#1 Synchronization
|
Unit#1 Synchronization
|
Unit#1 Synchronisation
|
Unit#1 Sync in Progress
|
Unit#1 Sync in Progress
|
Conveyor Galleries
|
ESP & Bunker House
|
HFO Storage tanks
|
Boiler Unit#1
|
Unit#2&3 inter connection
|
Unit#2 BFP
|
Unit#1 GT
|
Contol Room
|
NDCT
|
Unit#4 Boiler Tubes
|
Fire Water Pumps
|
ESP Outlet Unit#1
|
DM Plant Interstage Filter Tanks
|
TP#3
|
Crusher House
|
C-D Bay
|
Bunker Structure
|
Overview
|
Unit#1
|
Unit#2 Bunker
|
Overview
|
PT Plant
|
Reactor Clarifier A
|
Mill Structure Unit#1
|
Mill Unit#1
|
Coal Conveyor
|
Boiler Unit#2
|
ESP Unit # 4
|
Boiler Unit # 4
|
Raw Water Reservoir
|
Raw Water Reservoir
|
Unit # 1 Power House
|
Unit # 1 Bunker & TP # 5
|
Unit # 4 Boiler
|
UNit 1 & 2 Transformer Yard
|
Unit 3 & 4 CCR
|
BTPS Overview
|
Unit # 4 Boiler
|
Unit # 2 Boiler
|
Unit # 3 Boiler
|
AHP MCC # 1
|
Unit # 3 ESP
|
Unit # 2 ESP
|
Unit # 1 ESP
|
Unit # 2 Bunker
|
UNit 1 & 2 CW Pump house
|
Unit # 3 TG
|
Unit # 2 TG
|
DM Plant inside
|
Unit # 3 Dearator erection
|
DM Plant- Neutralising Pit
|
AHP - ASh water Pump House
|
Gallery Erection of BCN 6AB
|
Unit # 1 Boiler & Bunker
|
TP # 5
|
BTPS Overview
|
Unit#2: LP rotor placement completed on 21.05.19
|
UAT 1B placement done
|
NDCT#1 Inside View
|
U#1&2 CW Pump House
|
U#2 LPT inner outer bottom half casing Erected
|
U#2 LP Turbine inner outer bottom half casing
|
CW PUMP HOUSE U#3&4
|
CW THRUST BLOCK UNIT-4 CONCRETING
|
NDCT#4
|
PLANT VIEW (FROM NDCT#3)
|
CHP Crusher House
|
ACW Pump House
|
Unit-2 Bunker
|
U#1 DCS Panel Room
|
Unit-3 Bunker
|
CHP ERH Hopper
|
CHIMNEY#1 Flue Can erection
|
RAW WATER RESERVOIR
|
ESP Unit-01,Pass-B H.V. Transformer Rectifier erec
|
Clarifier-1, bridge erection u/p
|
Fire protection work started in HFO Tank 1
|
Unit 2 ..LP turbine right side girder placement
|
CCR U#3&4
|
ESP #4 & Control Room
|
Plant View
|
BCN 6AB Gallery No.6 Erection under progress.
|
CW Pump house 1&2 Screen erection completed
|
Deareator Floor U#2
|
Chemical House
|
Wagon Tippler
|
Vaccum pump hosue (AHP)
|
U#1 Pipe Rack2
|
Rotor insertion is successfully completed in U#2
|
Ash disposal pipe line foundation work (excavation
|
ESP U#3 Pass A Hopper Plateform
|
ESP#4 Pass-B Str Erection
|
U#2 LP Turbine place on position on 01.04.19
|
U#1 DG Building & Bus Duct Supports
|
Compressor House
|
FOHS Pump House
|
Boiler U#4
|
ESP #4
|
Control Room U#1&2
|
CST TANKS
|
TP # 5
|
FOPH Pump House & MCC
|
Compressor House
|
U#2 ACW Pumps erection
|
U#1 Generator Seal Oil system skid
|
Road Work between Compressor house and FOPH
|
Unit-1 Pipe Rack
|
CCR U#1&2
|
U#2 Deaerator & FST
|
U#1 & 2 CW Treatment Plant
|
U#1 & 2 CW Chlorination Plant
|
NDCT#2
|
CW PUMP HOUSE U#1&2
|
DM PLANT EQUIPMENT ERECTION
|
BFP U#2
|
Unit-2 ID Fan Foundation
|
Unit-2 BFP Erection
|
Unit-3 & 4 CCR
|
Unit-1 Mill Erection activity
|
Wagon Tippler Area
|
CHP MCC-1
|
Unit-1 ID Fan Ducting
|
ESP Control Room Unit-1&2
|
Unit-1 Bunker
|
Chimney # 2 Bottom View
|
Unit-1 UAT Foundations
|
Unit-4 Boiler
|
Unit-2 HP Heaters Erection
|
CHP MCC
|
Unit-1 Dosing Skids Foundations
|
Unit-1 Station Transformer
|
U#2 LP Heater Erection
|
U#2 TG Condenser Erection
|
Unit-1&2 ESP Control Room
|
CCR U#1&2
|
Compressor House
|
FOPH Pumps Erection
|
Switch Yard
|
Permanent Sheds
|
Unit-1 Station Transformer
|
Power House Structure
|
Unit-4 ESP
|
Unit-4 Boiler
|
CHP MCC-3
|
CST
|
FOPH Pump House & MCC
|
Compressor House
|
ESP # 3 Electrode Lifting
|
Boiler Unit-4
|
ESP # 4
|
Unit-4 ID Fan Foundation
|
Unit-2 Bunker
|
Unit-1 Bunker
|
Unit-2 Condenser erection
|
Cooling Tower # 1 & 2
|
Unit-3&4 CW Piping work
|
Boiler Unit-4
|
Chimney 1 & 2
|
Unit-4 ID Fan Foundation
|
Boielr , Bunker $ ESP Unit-1
|
Wagon Tippler area
|
Site overview
|
Raw water reservoir
|
TP # 5 to TP#3
|
Unit-1 TG Floor
|
TG Floor Unit- 2, 3& 4
|
CW Pump House Unit-1 & 2
|
Pipe Rack U#1
|
Clarified water tank area
|
Crusher House
|
Plant overview
|
Raw water reservoir
|
Unit-1 Transformer Yard
|
Unit-1 Mill Erection
|
LDO Tanks
|
FOPH MCC & Pump House
|
Unit-1 TG Floor
|
Unit-1 ID Fan Impeller Lifting
|
Unit-1 Generator Rotor Lifting
|
Unit-1 Condenser Tube Insertion
|
Unit-3 Bunker
|
Unit-4 Power House Structure
|
Unit-4 Boiler
|
Unit-3 Boiler
|
Unit-2 Boiler
|
Unit-2 Bunker
|
Unit-1 Generator Rotor Testing
|
Power House Structure Unit-3&4
|
CCR Unit- 3&4
|
Unit-4 ESP
|
CHP MCC#3
|
LDO Tanks
|
Unit-1 TG area
|
Unit-1 C&I DCS Panels Erection at Boiler
|
Unit-1 CW Pump House
|
Power House Roof casting
|
Site View
|
Unit-1 Pipe Rack along TG & Boiler
|
Unit-1 DCS, UPS & ACDB Panels erection
|
Unit-1 CW Pump House
|
Unit-1 MCC Charging and commissioning activities
|
Compressor House
|
Unit-1 Deaerator
|
Unit-1 TG Oil Piping
|
Crusher House
|
Common Control Room Unit-1& 2
|
Power House Structure Unit-3&4
|
Unit-1 Bottom Ash Hopper
|
Unit-1 Bunker
|
U#1 CW Pump House
|
U#1 Mill Erection
|
CS TANKs
|
DM Water Tanks
|
CS TANKS
|
CCR Unit- 3 & 4
|
Unit-3&4 PH Structure Work
|
Boiler Unit-4
|
Unit-2 Boiler Eco Hopper Erection
|
Unit-1 ID Fan Foundation
|
FOPH MCC Roof Slab Casting
|
UNIT-1 BFP Array
|
U#1 Generator Stator Placement
|
U#1 Generator Stator Lifting
|
Unit-1 ID Fan Duct Work
|
ESP#1 Pass-B Hopper Erection
|
Unit-1 C&I DCS Panels Erection Started
|
Unit-1 BFP-C LO Cooler Piping work started
|
U#3 CW Line PCC Thrust Coloumn
|
U#1 Generator Stator Shifting
|
Wagon Tippler PCC Start
|
PH BUILDING UNIT-3&4
|
Site View
|
AHP MCC-1 Excavation Started
|
Portable EOT Crane Commissioning Done
|
Compressor House Cable Tray Work
|
Pipe Rack Support work
|
CW Pump House Unit-1 & 2
|
TP 3 & 4 Area
|
CCR U# 1 & 2
|
ESP # 4
|
U#1 ID Fan Duct Work
|
TP# 5 MCC Area
|
U#1 CW Pump House
|
Pipe Rack Support work
|
NDCT # 1 Jump Form Removal
|
U#1 CW Pump House
|
Duct Erection
|
Unit-1 NDCT (Top View)
|
Site overview
|
Ubit-1 SPBD Footing
|
ESP#4 Pass-B Casing Panel Erection
|
Site Overview
|
TP # 3 Area
|
CHP MCC-2
|
PT Plant- Chemical house cum MCC
|
Coal Conveyor Gallery from TP-3 to TP-4
|
Unit # 2: Boiler Drainable Hydro test Completed
|
TP# 5 Area
|
Unit-1 Bunker
|
TG Area Fire Fighting Piping work
|
Unit-1 Coal Mills Foundation
|
Unit-4 Boiler
|
Unit-4 TG Deck
|
Admin Building
|
CCR U# 3 & 4
|
NDCT # 2 & CW Pump House
|
PH BUILDING UNIT-3 & 4
|
Unit-1 LPH PIPING
|
U#1 Boiler MCC Charging
|
U#1 HP & IP Turbine Module lifting to TG Floor
|
Pipe Rack & Condensate transfer pump foundation
|
DM Plant Building
|
Track hopper area
|
Unit-1 Pipe Rack & Condensate transfer pump excavation
|
UNIT-2 Condenser CW Line
|
ERH CHP Area
|
Chemical House
|
Unit-3 Power House Building
|
Unit-1 Condenser
|
TP# 5 Area
|
Unit-1 Bunker
|
CW Line Work
|
Plant overview (From NDCT Final Shell)
|
Raw water reservoir
|
Unit-3 ESP
|
NDCT # 1 (Shell Final Lift Completed)
|
CCR U# 3 & 4
|
Boiler Unit-4
|
ESP # 4
|
U#1 Bottom Ash Hopper
|
U#1 TG Floor
|
Boiler Unit-4 Silencer Erection
|
Erection of Portable DM Water System
|
ERH CHP Area
|
U#1 ST & DG Building
|
U#1 SB MCC Erection
|
NDCT # 3
|
U# 1 & 2 Four Way CW Pump House
|
U#4 ID Fan Foundation
|
Admin Building
|
Unit-1 & 2 ESP Control Room Building
|
Unit-4 ESP
|
Unit-3 Cooling tower
|
Unit-3&4 CW Pump House
|
TP# 4 Area
|
Compressor House
|
CHP Crusher House
|
HV Bushing erection U#1
|
Clarified water tank area
|
Raw water reservoir
|
U#3 Condenser Wall
|
U# 3 & 4 CCR
|
U# 1 & 2 CCR
|
Unit-1 Mill foundation
|
Compressor House
|
Unit-2 Cooling Tower
|
Unit-1 Cooling Tower
|
Unit-1 TG Floor
|
Adminstrative Building
|
Site Overview
|
PT Plant area
|
Clarified Water Tank
|
PT Plant
|
Track Hopper
|
Raw Water Reservoir
|
Power House Building UPS & Battery room
|
Unit-1 BFP & Cable trench area
|
ESP Control Room area
|
AHP Vacuum Cum Compressor house
|
Unit-1 HPH5 Shifting for Erection
|
Unit-1 Pipe Rack started
|
Unit-1 LDO tank shell 1st Lift
|
Unit-1 ID Fan Foundation
|
Unit-1 FD & PA Fans
|
Unit-1 Bunker area
|
Unit-2 Bunker area
|
Unit-1 Deaerator Erection
|
Unit-1 Cooling tower
|
Unit-1 Power House Building
|
Unit-1 & 2 ESP Control room
|
DM Plant Building
|
TP# 5 Area
|
Compressor House
|
Silo Utility Building
|
DG Building & ST Area
|
Foam Pump House
|
Ash Slurry Pump House
|
Unit-4 Boiler
|
Bhadradri TPS Overview
|
Unit-1 Mill foundation
|
Unit- 1 Bunker
|
Unit 1 & 2 ESP control room area
|
Unit- 1 ID to Chimney duct column erection
|
Unit-4 Boiler
|
FAE Tower area (AHP)
|
Fly Ash Silo excavation
|
Silo Utility Building (AHP)
|
LDO Tank 1 area
|
Unit-1 ID Fan area
|
Unit-1 CW Pipe Thrust block near condenser area
|
Unit-1 & 2 DG Building
|
Site Overview
|
Compressor House
|
Unit-2 CCR Column erection activity
|
CHP Area
|
Site overview
|
Raw water Pump House area
|
CHP Area: Stacker & Reclaimer
|
Unit-1 Condenser CW Lines
|
Unit-1 FD & PA Fans
|
Unit-1 Condenser
|
Bhadradari Overview
|
Unit-1 TG Floor
|
DM Tank
|
CW thrust Block Unit-1 & 2
|
CW Treatment Plant Excavation started (Unit 1 & 2)
|
NDCT # 2
|
Fuel Oil Pump House
|
Compressor House
|
Vacuum Pump House (AHP)
|
Unit-1 CCR 8.5 Meter Battery Room brick work started
|
Unit-1 Condenser erection activities
|
Compressor House
|
Ash Slurry Pump House
|
DM Plant Building
|
DM Water Tanks
|
Cooling Tower-1, Boiler 1 to 4, Chimney 3 &4
|
Boiler 1 to 4 & Chimney 3 & 4
|
Site overview
|
Unit-1 Boiler
|
Unit-2 Boiler
|
Unit-3 Boiler
|
Unit-4 Boiler
|
Unit-1 Condenser CW Lines
|
Fly Ash silo building
|
Admin Building
|
DM Water Tanks
|
DM Plant
|
EOT Crane Load testing
|
ST Unit -1 & 2
|
Unit-3 Boiler
|
Power House Building
|
Boiler Unit-1,2,3,4
|
Unit-4 Boiler Drum Lifting Completed
|
Unit-4 Boiler Drum Lifting
|
Unit-1 Cooling Tower
|
Ash Slurry Pump House
|
Unit-1 & 2 CCR Building
|
Unit 1 & 2 CCR 8.5Meter floor E-F bay
|
Unit 1 & 2 CCR 8.5Meter floor C-E bay
|
Chimney 2 & Boiler 2
|
DM Water Tanks
|
TP# 4 Area
|
Site overview
|
Unit-1 Drainable Hydro Test completed
|
Unit-1 Condenser bottom plate with hotwell
|
Site overview
|
Unit-3&4 Chimney
|
Unit-2 Cooling Tower
|
Unit-2 Boiler
|
Unit-1 Cooling Tower
|
Power House Building
|
Unit-1 Boiler & Bunker
|
Unit-1 TG Building
|
Unit-1 ESP
|
Unit-4 Boiler
|
Site Overview
|
Unit-3 TG Deck
|
Site overview
|
Condensate Storage Tank
|
Unit-1 Boiler
|
Unit-1 Chimney
|
NDCT # 1
|
Vacuum Pump house (AHP)
|
NDCT # 4
|
Unit-4 ESP
|
Unit-1 TG Building
|
Unit-3 TG Deck
|
Unit-2 TG Deck
|
Unit-3 Cooling Tower
|
CHP TP #4 Area
|
Unit-4 Boiler
|
Unit-3 Boiler
|
Unit-3 ESP
|
CS TANK
|
DM Water Tanks
|
Unit-1 & 2 CCR
|
Unit-4 Boiler
|
Site Overview
|
Compressor House
|
DM Water Tanks
|
Admin Building
|
Unit-1 TG Building
|
Unit-1 site Overview (ESP,TG,Boiler,Bunker area)
|
Unit-1 Chimney
|
TP-4 Area
|
Unit-1 Boiler
|
Unit-1 Cooling Tower
|
Clarifier (PT Plant) area
|
DM Plant area
|
Site overview
|
Unit-1 Boiler
|
Unit-1 Power House
|
Unit-4 Boiler
|
Unit-1 Power House Roof Sheeting
|
Unit-1 & 2 CCR
|
Unit-2 Boiler
|
Boiler # 1
|
Ash Slurry Pump House Phase I
|
Boiler # 4
|
U#1 TG Deck
|
U#2 TG Deck
|
U#3 TG Deck
|
U#4 TG Deck
|
Unit-1 & 2 CCR Building 15 Meter Floor
|
Unit-3 & 4 CW & ACW Pump House
|
Unit-1 Deaerator Floor
|
Unit-1 TG Floor
|
Unit-4 Cooling tower
|
Unit-3 Cooling tower
|
Unit-2 Cooling tower
|
Unit-1 Cooling tower
|
Unit-4 Boiler
|
Unit-2 Boiler
|
Unit-1 Boiler
|
Unit-3 Boiler
|
Unit-1 Chimney & ESP area
|
Unit-1 LP Heaters
|
Unit-1 Bunker area
|
Unit-1&2 CCR Building
|
Unit-1 TG Building Roof Sheeting progress
|
Unit-1 & 2 CCR 9 Meter Floor
|
Unit-3 ESP area
|
Vacuum Pump House (AHP)
|
Unit-1: 3rd BFP Foundation
|
Unit-1 Cooling Tower
|
Unit-1 Power House Roof Sheeting
|
Unit-1 Boiler
|
DM Tank
|
Unit-4 TG Building and Boiler Area
|
Switch Yard Control Room Building
|
Unit-1 ESP & Boiler
|
Unit-3 Boiler
|
Unit-2 Boiler
|
Unit-4 ESP
|
Unit-1&2 Chimney
|
Unit-4 Boiler
|
Cooling Tower Unit-1 & 2
|
Unit-1& 2 Boiler & ESP
|
Chimney Unit#1&2
|
TG Building EOT Cranes
|
Unit#1 FD & PA FAN
|
CST Tank area
|
Unit-4 ESP
|
Unit-3 Boiler
|
Unit-1 Chimney
|
Unit-4 TG Building
|
ESP Unit-2 & 3 & Boiler Unit-2 & 3
|
Unit-1 BFP area
|
Unit-1 Cooling Tower
|
Unit-2 Cooling Tower
|
Site overview
|
Unit-2 Chimney
|
Site overview
|
Unit-2 & 3 ESP System
|
CCR Building area
|
Unit-2 Boiler
|
Unit-1 ESP area
|
Unit-1 & 2-Cooling Tower
|
Unit-1:Boiler and Bunker
|
Unit-1 Overview TG Deck, Boiler & ESP Systems
|
Unit-3 ESP
|
Unit-1&2 CW Pump House
|
Unit-1 TG Floor
|
Unit-1 Boiler
|
Site overview
|
Permanent shed
|
Unit-2 Cooling Tower
|
Unit-1 Cooling Tower
|
Unit-3 Cooling Tower
|
Unit-1 ESP
|
Unit-1 Boiler
|
Unit-2 TG Deck
|
Condensate Storage Tank
|
Site overview
|
PT Plant
|
Clarified Water Tank
|
DM Plant
|
Unit-4 TG Deck & Boiler
|
Unit-3 Boiler
|
Unit-3 ESP
|
Unit-2 ESP
|
Unit-2 TG Deck
|
Unit-4 Boiler
|
Unit-4 TG Deck
|
Power House area
|
Fuel Oil Tank Area
|
Unit 1 Dearator Floor area
|
Unit-1 & 2 Cooling Tower
|
Condensate Storage Tank area
|
Unit-1 Cooling Tower
|
CW Pump House & Forebay Unit 1 & 2
|
Unit-2 Cooling Tower
|
Site Overview
|
Unit-1 CW Pipe Thrust block near condenser
|
Unit -2 ESP
|
Unit-3 Boiler
|
Unit-3 ESP area
|
Unit-4 ID Fan & duct area
|
Unit-4 TG Deck area
|
Unit-4 Boiler
|
Site overview
|
Transfer Point #3 area
|
Ash Slurry Pump House Phase I
|
Unit-2 Boiler
|
Unit-1 Bunker area
|
Unit-3 FD & PA Fan area
|
Unit-2 Cooling tower
|
Unit-2 Boiler
|
Raw Water Reservoir area
|
Unit-3&4 Station Transformer & DG Building area
|
Unit-4 TG Deck
|
Unit-1 Cooling Tower
|
Unit-1 Chimney
|
Site Overview
|
Unit-3 Cooling Tower
|
Condensate storage tank area
|
Unit-1&2 CW Pump house & Forebay
|
Unit-1 TG Floor area
|
Unit-2 Cooling Tower
|
Unit-1 Cooling Tower
|
Unit-4 TG Deck
|
Unit-4 ESP area
|
Unit-3 ESP area
|
Vacuum Pump House(AHP)
|
Unit-3 Boiler
|
Unit-4 Boiler area
|
Unit-1 Boiler
|
Unit-2 ESP
|
Unit-1 FD & PA Fan area
|
Unit-1 Bunker
|
Unit-1 ID Fan & duct area
|
Unit-1 Chimney
|
Unit-1 ESP
|
Condensate Storage Tank area
|
Wagon tippler area
|
Emergency reclaimer hopper & tunnel area
|
Unit-1 LP heaters area (9m floor)
|
Tunnel 10
|
Unit # 1 ID Fan & duct
|
LDO Tank 1
|
HFO Tank #1
|
Unit-1&2 Vacuum Pump House area
|
Unit-2 TG Deck De-Staging in Progress
|
DG Building area
|
BFP Foundation area
|
Condensate Storage Tank area
|
Track Hopper area
|
Emergency Reclaimer Hopper area
|
DM Plant area
|
Clarified Water Tank area
|
Unit-2 Chimney
|
Unit-1 Power House, Boiler, Bunker & ESP area
|
Ash Slurry Pump House area
|
Compressor House area
|
Unit-3 GT
|
Unit-3 ESP
|
Unit-1 Cooling Tower
|
DM Tank area
|
Unit-1 Chimney
|
Unit-1 Power House area
|
Unit-4 Boiler
|
Unit-2 ESP
|
Admin Building area
|
Transfer Point # 4
|
Transfer Point # 3
|
Bhadradari TPS Overview
|
Unit-3 Boiler
|
Permanent Shed
|
Unit-3 Boiler
|
Vacuum Pump House(AHP)
|
HFO Tank
|
Unit-1 ID Fan & duct area
|
Common Control Room Unit 1 & 2
|
Unit-2 Chimney
|
Unit-2 Boiler
|
Unit-1 Chimney
|
Emergency Reclaimer Hopper
|
Condensate Storage Tank area
|
Unit-1 TG Deck
|
Unit-4 TG Deck
|
Unit-2 TG Deck
|
Unit-2 ESP
|
Unit-1 ESP
|
Unit-1 Bunker area
|
Unit-1 Boiler area
|
Stacker Reclaimer # 2
|
Unit -3 FD & PA Fan area
|
Stacker Reclaimer # 1
|
NDCT # 3
|
Plant view
|
Boiler # 1
|
Bunker # 1
|
Wagon Tippler
|
Unit -2 CW Piping Return Line
|
Power House #1
|
Unit-1 Chimney
|
Unit-1 ID Fan & duct area
|
Condensate storage tank area
|
Unit-1 CW Pipe Thrust block near condenser
|
Unit-1 ESP Electrode loading
|
Unit-1 Boiler Feed Pump area
|
Bhadradari TPS Overview
|
Unit-3 ESP
|
Unit-3 Boiler
|
Track Hopper area
|
Raw Water Reservoir area
|
Bhadradari TPS Overview
|
Unit-1 Bunker
|
HFO Tank area
|
Unit-2 GT
|
Unit-1 TG Deck & EOT Crane
|
Unit-2 TG Deck
|
Unit-3 TG Deck
|
Unit-4 TG Deck
|
Switchyard cable trench
|
Switchyard Tower & Equipment Structure
|
Switchyard Road
|
Switchyard control room
|
Unit-1 ESP to ID Duct
|
Unit-2 Boiler
|
Unit-2 Chimney
|
Unit-1 Chimney
|
Bhadradari TPS Overview
|
DM Tank
|
Unit-4 TG Deck
|
Unit-1 TG Deck
|
Admin Building
|
Unit-3 & 4 CW Pump House & Forebay
|
Unit-1 Condensate Storage Tank & ESP
|
Unit-4 Cooling Tower
|
Unit-3 Cooling Tower
|
Compressor House
|
Unit 1 & 2 Main Control Room
|
Vacuum Pump House(AHP)
|
Unit-1 & 2-CW Pump House & Forebay
|
Site Overview
|
ESP # 4
|
ESP # 3
|
ESP # 2
|
ESP # 1
|
Boiler # 4
|
Boiler # 3
|
Boiler # 2
|
Boiler # 1
|
Raw Water Pump House
|
Raw Water Reservoir
|
Chimney # 2
|
Chimney # 1
|
Bhadradri TPS View
|
Cooling Tower#2
|
Cooling Tower#1
|
Power House #2
|
Power House #1
|
Unit # 1 ESP, BOILER & PH
|
Wagon Tippler
|
Track Hopper
|
Emergency Reclaim Hopper
|
Raw Water Reservoir
|
BTPS View # 1
|
Stacker Reclaimer # 2
|
Stacker Reclaimer # 1
|
Chimney # 1
|
Clarified Water Tank & PH
|
Chimney Unit #3 &4
|
NDCT # 3
|
NDCT # 4
|
Power House Unit # 2
|
Bunker Unit # 4
|
ESP Unit # 2
|
ESP Unit # 3
|
Unit # 1 view ESP, Boiler & Power House
|
Bunker Unit # 1
|
TG Deck Unit # 3
|
Boiler # 4
|
Boiler # 3
|
Boiler # 2
|
Boiler # 1
|
POWER HOUSE UNIT-1
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|