Home   

YELAHANKA CCPP (1X370 MW)


TRANSFORMER YARD

STG

SERVICE BUILDING

RWPH AND MCC

ROMB

IDCT

IDCT

HRSG

GTG

GBC

FIRE STATION

ETP

DG BUILDING

CWTP

CWPH

CWPH

CW OZONE

BFP BUILDING

AC PLANT & MCC





















Raw Water Pump House MCC

RW Ozone Building

Raw Water Pump House

ETP Chamber

DG Building

Transformer Yard

AC Plant

RODM Building

CWPH Building

GBC Building

Cooling Tower

Compressor Building

Fire station building

Cooling Tower

Gas Turbine area

GBC Building

Gas Storage Shed

RODM Building

STG Building

BFP Building

Effluent Treatment Plant

RODM Building

Cooling Tower

Cooling Water Treatment Plant

Gas Conditioning Skid

Diesel engine hydrant pump 4 hrs. trial run starte

Fire station building lintel beam reinforcement i/

Steam turbine bearing housing cleaning i/p

CW Ozone MCC building plastering work i/p

BFP Building outer wall plastering i/p

CW Ozone MCC panel all 18 panels erected

CW Ozone MCC building plastering work i/p

BFP Building brickwork i/p

STG final swing check completed

Acid resistant paint final coating in CW Ozone battery room

CW Ozone PMCC panels shifting & erection i/p

IDCT Cell 4 bitumen painting i/p

CWPH internal plastering i/p

BFP Building brickwork i/p

CWPH MCC Building plastering i/p

BFP Building brickwork i/p

CW Ozone MCC Building plastering i/p

CW Ozone building internal plastering i/p

STG LP-Generator coupling bolts fixing i/p

Fire station building tie beam RCC i/p

CWPH building internal plastering i/p

CWPH Building destaging work i/p

BFP Building staging work i/p

CW Ozone MCC building parapet wall plastering i/p

Fire station building column concreting i/p

RWR Chamber-2 balance wall shuttering works i/p

Drain wall shuttering i/p near CWPH MCC room

HP LP coupling hole dia measurement & hole fixing

CW Ozone building brickwork i/p

Fire station building lintel beam reinforcement

DE hydrant pump alignment & coupling completed

Destaging work i/p north of CWPH building

IDCT west plinth protection work i/p

Fire station building tie beam reinforcement i/p

CW Ozone building drain wall deshuttering i/p

RW Ozone building parapet wall RCC i/p

DMCW hoist load testing i/p

STG LP Generator coupling reaming honing i/p

BFP Building shuttering i/p for plaster work

CW Ozone MCC Building grade slab RCC completed

Fire station building tie beam shuttering i/p

CWPH Brickwork i/p

CW Ozone pumps grouting work i/p

BFP Building brickwork i/p

Fire station building lintel shuttering work i/p

IDCT Cell 4 bitumen painting i/p

BFP A pump seal body replacement work i/p

Plastering work i/p in CWPH

CW Ozone building pumps grouting u/p

Fire station building column shuttering work i/p

HP to LP ,14/14 coupling reaming honing completed

Transformer yard rail road plate fixing i/p

DV Shed brickwork i/p near BFP Building

Plastering work i/p in CWPH

Fire station building lintel shuttering work i/p

DV Shed brickwork i/p near BFP Building

BFP Building brickwork i/p

Plastering work i/p in CWPH

CW Ozone building brickwork i/p

Fire station building column shuttering work i/p

DG Hydrant pump reassembly i/p

RWPH brickwork i/p

CW Ozone MCC building wall & roof putty completed

BFP Building brickwork i/p

Plastering work i/p in CWPH

Fire station building column shuttering work i/p

Site view from top

Dosing & chiller pumps alignment in Ozone building

Dosing & chiller pumps alignment in Ozone building

CW Ozone building balance drainwall shuttering i/p

DV Shed brickwork i/p near BFP Building

BFP Building brickwork i/p

Plastering work i/p in CWPH

Fire station building column shuttering work i/p

RWR Chamber-2 balance wall shuttering works i/p

BFP Building brickwork i/p

DV Shed brickwork i/p near BFP Building

CWPH MCC building painting i/p

Fire station building column shuttering work i/p

LP Turbine to generator coupling & CRO i/p

RWR Chamber-2 balance wall reinforcement works i/p

BFP Building sunshade work i/p

Plastering work i/p in CWPH

Fire station building column shuttering work i/p

RWR Chamber-2 balance wall reinforcement works i/p

DV Shed raft shuttering work i/p

CW Ozone building brickwork i/p

CWPH plastering work i/p

Fire station building plinth beam reinforcement i/

BFP Building brickwork i/p

CW Ozone building brickwork i/p

CWPH destaging work i/p

Fire station building plinth beam concreting i/p

HP IP to LP coupled runout checking i/p

STG HP IP to LP temporary coupling & CRO checking

RWPH brickwork i/p

STG Building A row sunshade shuttering work i/p

BFP Building brickwork i/p

Plastering work i/p in CWPH

Fire station building column reinforcement work

RWR Chamber-2 screed finishing works i/p

STG gable end sunshade shuttering work i/p

BFP Building brickwork i/p

Plastering work i/p in CWPH

Fire station building plinth beam deshuttering i/p

DG Hydrant pump reassembly i/p

BFP Building brickwork i/p

CW Ozone building brickwork i/p

Plastering work i/p in CWPH

Fire station building plinth beam shuttering i/p

All 960 filters erected in Inlet Air Filter

STG alignment correction works i/p

CW Ozone building brickwork i/p

CW Ozone MCC Building plastering i/p

BFP Building brickwork i/p

Plastering work i/p in CWPH

Fire station building plinth beam shuttering i/p

RWR Chamber-2 screed concreting

RWPH staging work i/p

BFP Building brickwork i/p

CWPH Brickwork i/p

Fire station building plinth beam reinforcement i/

Gas piping terminal joints fit up cleared at GAIL area

Fire station building column shuttering work i/p

CW Ozone building brickwork i/p

CWPH plastering work i/p

GBC gable end plastering work i/p

BFP Building east side brickwork i/p

BFP Building east side brickwork i/p

CW Ozone MCC building plastering work i/p

CW Ozone building brickwork i/p

Plastering work i/p in CWPH

Fire station building plinth beam reinforcement i/p

DG Hydrant pump reassembly i/p

DG Hydrant pump reassembly i/p

CWTP AR Tiling works i/p

Fire station building plinth beam reinforcement i/p

CWPH Brickwork i/p

Fire station building plinth beam reinforcemen i/p

ETP Chamber 2 balance wall final lift shuttering i/p

CW Ozone building brickwork i/p

CWTP AR Tiling works i/p

Plastering work i/p in CWPH

Fire station building column reinforcement wor i/p

Fire station building plinth beam reinforcement i/

CW Ozone building tanks erection i/p

RWR Chamber-2 screed concreting i/p

BFP Building brickwork i/p

Service building column shuttering work i/p

Drain wall shuttering i/p near compressor building

CWPH west side brickwork i/p

Fire station building plinth beam reinforcement i/p

DG Hydrant pump base plate leveling & blue matching i/p

CWTP AR Tiling works i/p

Plastering work i/p in CWPH

Fire station building plinth beam shuttering i/p

IDCT Cell 1 fan cylinder final lift RCC i/p

DG Hydrant pump reassembly i/p

Road works i/p north of RODM Building

BFP Building brickwork i/p

Drain wall shuttering i/p near compressor building

Plastering work i/p in CWPH

Fire station building column shuttering work i/p

Fire station building column shuttering work i/p

ETP west side Road RCC i/p

CWTP AR Tiling works i/p

BFP Building brickwork i/p

CWPH Brickwork i/p

Fire station building column shuttering work i/p

BFP Building brickwork i/p

CWPH Brickwork i/p

CWTP AR Tiling works i/p

RW Ozone building slab concreting completed

Transformer yard rail road 2nd stage RCC completed

IDCT Cell 1 fan cylinder final lift shuttering i/p

Drill tower backfilling i/p

Fire station building plinth beam shuttering i/p

Transformer yard rail road angle fixing works i/p

ETP Chamber 2 balance wall 2nd lift RCC i/p

BFP Building brickwork i/p

CWPH Brickwork i/p

Fire station building plinth beam deshuttering i/p

RWPH brickwork i/p

Road works i/p west of ETP

BFP Building brickwork i/p

CWTP foundation plastering work i/p

Fire station building plinth beam RCC i/p

Road works i/p west of ETP

BFP Building brickwork staging i/p

CWTP foundation plastering work i/p

CWPH Brickwork i/p

Drill tower backfilling i/p

BFP Building brickwork i/p

CWPH Brickwork i/p

IDCT Cell 1 fan cylinder final lift shuttering i/p

Fire station building plinth beam shuttering i/p

Drill tower backfilling i/p

Drill tower backfilling i/p

BFP Building brickwork i/p

CWPH Brickwork i/p

Fire station building plinth beam reinforcement i/

Switchyard south side road cleaning & shuttering i/p

ETP Chamber 2 balance wall 2nd lift shuttering i/p

AAQMS backfilling completed

Drill tower backfilling i/p

BFP Building

STG Building

CWPH building

CWPH building

BFP building west side brickwork i/p

CWPH south side brickwork i/p

AAQMS pedestals bitumen painting i/p

Fire station building plinth beam shuttering i/p

BFP Building brickwork i/p

ETP Chamber 2 wall 2nd lift shuttering i/p

CWPH south side staging work i/p

Transformer yard rail road shuttering works i/p

BFP Building brickwork i/p

CWPH north side destaging work i/p

BFP Building brickwork i/p

IDCT Cell 1 fan cylinder final lift shuttering i/p

Fire station building backfilling & leveling i/p

AAQMS pedestals ready for casting

CW Ozone building brickwork i/p

BFP Building brickwork i/p

Switchyard south side road shuttering work i/p

Transformer yard rail road reinforcement works i/p

BFP Building brickwork i/p

Rail road reinforcement i/p for 2nd stage concrete

Drill tower columns cleared for concreting

AAQMS footing PCC completed

AAQMS footing PCC completed

Drill tower column deshuttering i/p

Switchyard south side road reinforcement work i/p

Switchyard south side reinforcement work i/p

GBC MCC Building POP i/p

Ozone MCC room brickwork i/p

BFP Building brickwork i/p

Drill tower column shuttering & bitumen painting i/p

Drill tower column shuttering & bitumen painting i

BFP Building south side brickwork i/p

IDCT cell 1 fan cylinder shell 2nd lift deshuttering i/p

CWPH west side parapet concrete i/p

Transformer yard rail road reinforcement works i/p

CW Ozone MCC Building south side brickwork i/p

GT Inlet Air Filter element erection i/p

CW Ozone MCC Building south side brickwork i/p

Transformer yard rail road reinforcement works i/p

Switchyard south side road shuttering i/p

BFP Building brickwork i/p

CWPH west side brickwork i/p

Drill tower last footing reinforcement work i/p

CW Ozone building brickwork i/p

Drill tower

Service building 1st floor column reinforcement i/p

CWPH east side parapet wall concreting i/p

BFP Building brickwork i/p

RWPH brickwork i/p

Drill tower staircase foundation reinforcement i/p

BFP Building brickwork i/p

BFP building Sun shade bottom shuttering i/p

BFP south side brickwork i/p

CWPH west side brickwork i/p

CW Ozone building brickwork i/p

Drill tower spiral staircase foundation preparatory work i/p

RWPH brickwork i/p

BFP Building brickwork i/p

Drill tower plinth beam deshuttering i/p

RWPH brickwork i/p

BFP Road edge angle fixing i/p

Final painting for GT GT IPBD i/p

Drill tower staircase foundation work i/p

BFP south side brickwork i/p

CWPH west side brickwork i/p

IDCT south road panel reinforcement i/p

IDCT Cell 1 second lift shuttering i/p

Drill tower column shuttering work i/p

CWPH west side brickwork i/p

ETP Chamber 2 balance wall reinforcement i/p

ETP Chamber 2 balance wall reinforcement i/p

BFP Building brickwork i/p

CWPH west side brickwork i/p

IDCT east slope portion road slab RCC started

Drill tower plinth beam shuttering i/p

Drill tower plinth beam shuttering i/p

CW Ozone building brickwork i/p

CW Ozone building brickwork i/p

STG A row glass fixing work i/p

Tr. yard rail road angle fixing i/p

BFP west side brickwork i/p

IDCT east side road reinforcement i/p

BFP Building westside brickwork i/p

IDCT Cell 1 fan cylinder cell 2nd lift reinforcement i/p

Plant road slope portion slab shuttering work i/p

Drill tower plinth beam shuttering i/p

BFP Building brickwork i/p

CWPH Brickwork i/p

Fire station building backfilling work i/p

Drill tower plinth beam reinforcement i/p

BFP Building brickwork i/p

Drain shuttering i/p near compressor bldg

CW Ozone building brickwork i/p

CW Ozone MCC Building brickwork i/p

Fire station building backfilling work i/p

CW Ozone MCC room brickwork i/p

CWPH north side parapet wall concreting i/p

Drill tower plinth beam reinforcement i/p

Road slab south of BFP cleared for RCC

Drill tower plinth beam reinforcement i/p

CW Ozone building brickwork i/p

CW Ozone building brickwork i/p

IDCT east drain wall shuttering i/p

BFP Building Westside brickwork i/p

CW Ozone MCC Building brickwork i/p

Drill tower plinth beam shuttering i/p

Drill tower plinth beam shuttering i/p

CWPH west side scaffolding i/p

Drill tower plinth beam bottom shuttering i/p

CW Ozone building brickwork i/p

Transformer yard rail road grouting i/p

CW Ozone building brickwork i/p

CWPH east side brickwork i/p

Transformer yard rail fixing works i/p

Drill tower plinth beam shuttering i/p

Drill tower plinth beam shuttering i/p

BFP west side brickwork i/p

CWPH east side brickwork i/p

IDCT east drain wall deshuttering i/p

CW Ozone building brickwork i/p

CW Ozone building brickwork i/p

IDCT east drain wall cleared for concrete

CWPH east side brickwork i/p

ETP Chamber 2 screed concreting completed

RW Ozone building slab shuttering i/p

CW Ozone MCC Building brickwork i/p

Main road shuttering i/p in front of BFP

IDCT west side road curing i/p

DV Shed slab concreted near GTG

Road slab shuttering & cleaning i/p south of BFP

CWPH east side brickwork i/p

OHT Column 2nd lift staging work preparation i/p

Ozone MCC building brick shifting i/p

SOHT Columns 2nd lift RCC started

RWR Chamber-2 screed finishing i/p

BFP Building brickwork i/p

IDCT east side drain wall deshuttering i/p

CW Ozone building brickwork i/p

Steam blowing temporary piping works i/p

IDCT east slope portion drain wall RCC i/p

IDCT Cell 1 fan cylinder shell 1st lift touch up

SOHT Columns 2nd lift reinforcement i/p

CWPH Brickwork i/p

IDCT east drain wall deshuttering i/p

RW Ozone building staging work i/p

CWPH east side brickwork i/p

IDCT Cell 1 fan cylinder cell 1st lift RCC started

Drain wall west of ETP shuttering i/p

CWPH east side brickwork i/p

OHT Column shuttering work i/p

DV Shed grade slab reinforcement i/p near GTG

SOHT Column shuttering i/p

CWPH east side brickwork i/p

DV Shed excavation near CST tank started

CW Recirculation pipe pedestal reinforcement i/p

RW Ozone building roof slab staging work i/p

IDCT Cell 1 fan cylinder cell 1st lift shuttering i/p

CWPH lintel beam shuttering i/p

CWPH east side brickwork i/p

Drill tower column shuttering work i/p

Fire station building column shuttering work i/p

CW Ozone building brickwork i/p

Drain wall west of ETP shuttering i/p

CW Recirculation pipe footing cleared for concreting

CW Ozone building drain reinforcement i/p

IDCT Cell 1 first lift shuttering i/p

GCS Drain tank brickwork i/p

CW Ozone building toilet area brickwork i/p

IDCT east drain wall shuttering i/p

CW Ozone building toilet area brickwork i/p

Fire station building column shuttering work i/p

ETP Chamber 2 wall 2nd lift reinforcement binder work i/p

Drill tower column shuttering work i/p

IDCT west side road works i/p

ETP Chamber 2 wall 2nd lift reinforcement binder work i/p

Drill tower

CW Ozone building balance grade slab works i/p

Inlet air duct bellow covering works i/p

CWPH parapet wall reinforcement work i/p

Steam blowing temporary piping works i/p

BFP Building brickwork i/p

CW Ozone building brickwork i/p

Drill tower footing RCC i/p

Main road drain wall shuttering work i/p

CWPH Brickwork i/p

CW Ozone building Grade slab reinforcement i/p

CW Ozone building brickwork i/p

BFP Building brickwork i/p

CWPH Brickwork i/p

CW Ozone Building cable slit angle fixing i/p

Main road drain wall binder reinforcement i/p

ETP Chamber 2 balance slab RCC completed

CWPH Brickwork i/p

IDCT west side road shuttering i/p

Steam blowing temporary piping works i/p

CW Ozone Building brickwork i/p

Fire station building column shuttering work i/p

CWPH Brickwork i/p

BFP Building brickwork i/p

CW Ozone Building brickwork i/p

OHT tank column reinforcement works i/p

Excavation i/p for CW Recirculation pipe support

CW Ozone building brickwork i/p

CW Ozone building cable slit angle fixing i/p

RW Ozone building lintel beam shuttering i/p

OHT Column ring fixing work i/p

ETP Chamber 2 balance slab reinforcement work i/p

CWPH north side brickwork i/p

ETP Chamber 2 balance slab reinforcement work i/p

BFP Building brickwork i/p

Ozone MCC building parapet wall deshuttering i/p

Ozone MCC building south side firewall brickwork i/p

RW Ozone building lintel beam shuttering i/p

BFP Building brickwork i/p

IDCT Cell 1 leveling grading work i/p

CWPH Brickwork i/p

Drill tower raft shuttering i/p

CW Ozone building plinth beam cleaning i/p

Drill tower footing column reinforcement i/p

BFP Building eastside brickwork i/p

Ozonisation ATM tank pedestals curing i/p

CWPH Brickwork i/p

Drill tower footing shuttering work i/p

CW Ozone building foundation pocket fixing i/p

Ozone building ATM tank raft & pedestal bitumen painting i/p

CW Ozone building brickwork i/p

Drill tower footing reinforcement work i/p

Ozone MCC building brickwork i/p

Ozone building grade slab reinforcement i/p

Drill tower footing reinforcement work i/p

CWPH Brickwork i/p

Ozone MCC building parapet wall shuttering i/p

RW Ozone building board making for lintel beam i/p

IDCT Cell 1 shell shuttering inner support fixing i/p

CWPH Brickwork i/p

Ozone building grade slab reinforcement i/p

Ozone building ATM tank pedestal reinforcement i/p

Drill tower foundation dewatering works i/p

IDCT Cell 1 shell shuttering i/p

CWPH Brickwork i/p

Ozone building grade slab reinforcement i/p

Ozone building ATM tank raft reinforcement i/p

Ozone MCC parapet wall shuttering work i/p

CWPH Brickwork i/p

STG 0 mt brickwork i/p

Ozone building foundation reinforcement work i/p

Transformer yard rail fixing works i/p

RW Ozone building grade slab soling work i/p

CWPH Brickwork i/p

IDCT Cell 1 first lift shuttering i/p

Ozone building foundation side shuttering i/p

STG alignment checking i/p

CWPH Brickwork i/p

Drill tower 6 no. foundation PCC completed

IDCT south side road curing i/p

CW Ozone building grade slab RCC completed

ETP Chamber 2 balance M10 filling completed

Drain wall shuttering i/p near BFP building

Drill tower 3 no. foundation PCC completed

BFP south road drain shuttering i/p

CWPH Brickwork i/p

STG Building A row brickwork i/p

STG Building A row brickwork i/p

CWPH brick curing work i/p

AC Plant tie beam reinforcement work i/p

STG A row brickwork i/p

IDCT Cell 1 shell ring beam shuttering i/p

RW Ozone building cable trench touch up work i/p

STG 0 mt brickwork i/p

Ozone MCC room slab shuttering work i/p

Road panel slab shuttering i/p near GBC building

CWPH Brickwork i/p

CW Forebay water filling started

Ozone MCC room slab shuttering & reinforcement i/p

STG Building 0 mt brickwork i/p

CWPH Brickwork i/p

Slope road reinforcement work i/p near GBC building

Ozone MCC room slab shuttering & reinforcement i/p

Brickwork i/p at STG 0 mt

Excavation i/p for earth mat works near Ozone building

CWPH Brickwork i/p

Preparatory work for PCC i/p at Drill tower

Cleaning i/p for road reinforcement work near GBC

Earth mat work i/p near Ozone MCC building

Ozone MCC room slab shuttering & reinforcement i/p

CWPH Brickwork i/p

Transformer yard rail road plate fixing works i/p

CW Ozone MCC slab reinforcement & shuttering i/p

CWPH Brickwork i/p

LP Turbine outer casing parting plane matching i/p

STG Gable end brickworks i/p

CWPH east side brickwork i/p

Ozone MCC room slab reinforcement & shuttering i/p

STG Gable end brickworks i/p

IDCT cell no. 1 shell reinforcement binding work i/p

CWPH Brickwork i/p

Ozone MCC building staging work i/p

CWPH east side brickwork i/p

STG south side gable end brickwork i/p

Ozone MCC room slab shuttering & reinforcement i/p

PCC completed at east of IDCT main road slope portion

IDCT east main road slope portion PCC i/p

RW Ozone building cable trench wall shuttering i/p

BFP Drain raft shuttering work i/p

CWPH Brickwork i/p

Ozone MCC building roof beam reinforcement work i/

Drill tower earth excavation work i/p

Pull pit wall deshuttering i/p near Ozone building

IDCT east side main road drain reinforcement i/p

Drill tower earth excavation work i/p

CWPH Brickwork i/p

Ozone MCC room slab shuttering work i/p

HRSG north road shuttering i/p for PCC

CWPH Brickwork i/p

Drain wall reinforcement i/p near BFP building

Inlet duct bellow leakage test with water i/p

Ozone MCC building staging work i/p

Drill tower earth excavation work i/p

Cable pull pit wall near compressor bldg cleared for RCC

CWPH Brickwork i/p

Drain wall reinforcement work i/p near BFP Building

Vacuum pump piping works i/p

Ozone building grade slab reinforcement i/p

Transformer yard rail road slab reinforcement i/p

Gas analyser building inside plastering i/p

Drain wall near GBC shuttering work i/p

IDCT south side road slab reinforcement work i/p

STG bearing cleaning works i/p

CWPH Brickwork i/p

BFP Drain raft reinforcement work i/p

CWPH Staging work i/p

Ozone MCC room beam shuttering work i/p

Transformer yard rail road reinforcement work i/p

Vacuum pump piping i/p

Gas analyser building north side brickwork i/p

CWPH east side staging work i/p

BFP Drain raft reinforcement work i/p

Ozone MCC room beam shuttering work i/p

Excavation i/p for balance 2 footings in service building

CPHRC Pump A alignment i/p

Transformer yard rail fixing works i/p

LP Turbine outer casing seating matching i/p

Ozone MCC room beam bottom shuttering work i/p

Ozone building grade slab reinforcement i/p

Gas analyser building outside plastering i/p

CWPH Brickwork i/p

Road shuttering & reinforcement i/p near IDCT

Ozone building grade slab reinforcement work i/p

CWPH Staging work i/p

Turbine pedestal cleaning i/p

Flow nozzle fixing in CW Forebay filling line

GBC Coupling guard fixing work started

Gas analyser building outside plastering i/p

CWPH Brickwork i/p

Ozone MCC room grade slab reinforcement i/p

Road rail shuttering i/p for grouting

Ozone MCC room slab staging i/p

Road reinforcement work i/p near Cooling tower

CW Ozone MCC room slab staging work i/p

CWPH Brickwork i/p

125 V battery maintenance work i/p

Ozone building cleaning i/p for grade slab reinforcement

IDCT south side road RCC (35 CuM) completed

BFP Building brickwork i/p

CWPH Brickwork i/p

IDCT south side road RCC i/p

Condensate spray control valve erection i/p

CWPH Staging work i/p

BFP Building brickwork i/p

CW Ozone building Grade slab reinforcement i/p

Cable pull pit wall shuttering work i/p near CW Ozone building

CWPH Staging work i/p

CWPH Brickwork i/p

Soling work i/p for Ozone MCC room

Road slab panel reinforcement i/p north of compressor building

Road slab bund making i/p west of compressor building

Drain wall shuttering i/p west of IDCT

Final cleaning i/p for painting of GTG IP bus duct

Control fluid oil tank system cleaning completed

Soil compaction work i/p for Ozone MCC room

Fire station building all footings completed

DB 6 side deshuttering work i/p

CWPH Brickwork i/p

Service water flushing at ETP dosing tank inlet

AC MCC final cleaning i/p for permanent charging

ETP Chamber-2 raft cleaning & bitumen painting i/p

BFP Building Zero mt floor brickwork i/p

CWPH Brickwork i/p

STG HP IP centering & horndrop i/p

RW Ozone bldg toilet roof parapet wall reinforcement i/p

BFP Building brickwork i/p

DB 6 shuttering work i/p

CWPH Brickwork i/p

Road RCC (31 CuM) completed at IDCT south east corner

STG HP IP centering works i/p

Forebay final cleaning work i/p

BFP Building 10 mt floor bracing & beams painting i/p

DB 6 reinforcement & shuttering i/p

Brickwork i/p in CWPH

AC Plant cooling tower basin painting completed

DB 6 Pipe placement i/p near CW Ozone building

Cooling tower basin floor cleaning work i/p

OHT raft curing work i/p

CWPH north side scaffolding i/p

Brickwork i/p in CWPH

IDCT east side road bund making i/p

BFP Building floor beam painting i/p

DB 6 reinforcement i/p nearCW Ozonisation building

Final painting of Service Transformer 1 completed

STG grouting work u/p

RW Ozone building toilet roof slab casted

Road panel curing work i/p near DG Building

Brickwork started in CWPH

RWR Chamber-2 screed concreting i/p

ETP Chamber 2 balance wall 1st lift binder reinfor

IDCT east side road shuttering work i/p

Ozone MCC room plinth beam preparatory work i/p

Service overhead tank raft reinforcement work i/p

Fire station building backfilling work i/p

ETP Chamber-2 balance wall 1st lift lap reinforcement i/p

Watering done for soil consolidation in Ozone MCC room

GCS area coalescent filter housing inside cleaning

RWR Chamber-2 cleaning i/p for screed

Drain wall east of IDCT RCC i/p

RWR Chamber-2 basin slab panel (300 sqm) concreting completed

OHT raft reinforcement work i/p

Ozone MCC room backfilling work i/p

Preparatory work for road pavement with paver i/p

Fire station building bitumen paint i/p

Drain raft casted near BFP Building

OHT raft reinforcement work i/p

Tie beam shuttering work i/p at Ozone MCC building

Road panel curing work i/p near DG Building

ETP Chamber-2 balance wall 1st lift shuttering i/p

BFP Building 10 mt wall plastering work i/p

Road panel slab west of compressor bldg. curing i/

ETP Chamber 2 balance wall 1st lift shuttering i/p

CW Ozone MCC room cable trench wall shuttering i/p

Overhead tank raft reinforcement work i/p

BFP Building 10 mt wall plastering i/p

GBC A&B suction control valve erection completed

Looping works in turbine control oil lines

ETP North side drain cross over slab RCC i/p

Road panel shuttering works i/p near ETP

Road panel slab west of compressor bldg. bund maki

Fire station building footings bitumen paint i/p

STG Alignment work u/p

Drain wall shuttering i/p east of IDCT

CW Ozone MCC Building

Fire station building footings bitumen paint i/p

Overhead tank raft bottom mat reinforcement i/p

DB 6 at CW Ozonisation building PCC completed

Branch tray work i/p for RODM UF Blower

Drain wall casted west of ETP slope portion

Drain wall deshuttering i/p west of compressor house

Fire station building column 1st lift shuttering i/p

CW Ozone MCC room cable trench wall shuttering i/p

Road panel shuttering works i/p near DG building

Cleaning u/p for CWPH Ser. transf. 2 for final painting

Drain wall shuttering i/p south of GBC building

BFP Building 10 mt plastering work i/p

Fire station building

PCC preparatory works i/p for DB6 at CW Ozone bldg

RCC Chamber 2 PCC i/p near entrance

CW Ozone MCC room cable trench wall shuttering i/p

Ozone MCC room cable trench wall cleared for concrete

Ozone MCC room tie beam side deshuttering i/p

Final painting i/p at 11 mt floor beams of IAF

RWR Chamber-2 screed curing i/p near RWPH

ETP wall dowel reinforcement for 2nd lift wall fixing i/p

GBC CCW Pump A & B in circulation for flushing

ETP Chamber 2 balance wall 1st lift shuttering i/p

Fire station building

CW Ozone MCC room cable trench wall shuttering i/p

CWPH Ser. Tr.-1 cleaning i/p for final painting

Drain wall shuttering i/p east of IDCT

Power cable termination for ETP main pump i/p

RWR Chamber-2 screed concreting i/p

Drain wall shuttering i/p west of BFP building

ETP Chamber-2 wall 1st lift reinforcement complete

CW Ozone MCC room column reinforcement work i/p

GBC CCW Pump A & B in circulation for flushing

Power cable termination for flash mixer in ETP completed

ETP Chamber-2 wall binder fixing i/p

CW Ozone MCC cable trench wall shuttering i/p

LP Turbine rotor end stage cleaning i/p

RWPH Ser. Transformer 2 cleaning i/p for final painting

STG Building A row cladding sheet erection i/p

CW Ozone MCC balance trench raft concreting started

ETP Chamber 2 balance wall 1st lift reinforcement i/p

Drain wall shuttering i/p west of BFP building

ETP Chamber 2 balance raft cleared for concreting

Drain wall shuttering i/p west of BFP building

CPHRC pump normalisation works i/p

CW Ozone MCC building tie beam shuttering i/p

Fire station building column shuttering work i/p

CWPH building rain water down take pipe fixing i/p

Drain wall casted south east of GBC building

CPHRC normalisation works i/p

Overhead tank raft cleaning completed

Drain shuttering i/p west of CW Ozone MCC building

RWPH Service transformer cleaning i/p for final painting

RW Ozone building toilet roof side shuttering i/p

RW Ozone cable trench raft casting completed

RWR Chamber-2 screed concreting i/p

BFP Building south side plastering work i/p

ETP Chamber 2 shear key chipping i/p

CW Ozone MCC Building cable trench reinforcement i/p

Drain wall shuttering i/p at south east corner of Piperack

Drain wall shuttering on east side of slope road i/p

BFP Building outside wall plastering i/p

CW Ozonisation Building roof screed concreting completed

STG A row cladding i/p

CW Ozone MCC Building trench shuttering i/p

RWR Chamber-2 screed concreting (220 sq mt) completed

CW Ozonisation building rain water downtake pipe fixing i/p

Fire station building

BFP Building wall outside plastering i/p

Drain shuttering i/p west of CW Ozone MCC building

Ozone MCC building tie beam shuttering i/p

Drain wall shuttering i/p east of RODM building

RWR Chamber-2 screed concreting i/p

RW Ozone building toilet roof shuttering i/p

ETP Chamber 2 balance wall raft shear key chip i/p

Ozone MCC building cable trench reinforcement i/p

Fire station building column reinforcemen work i/p

RW Ozone building cable trench reinforcement work i/p

Drain wall south of GBC cleared for concreting

Fire station building column shuttering work i/p

BFP Building parapet wall outside plastering i/p

CW Ozone building roof treatment preparatory works i/p

Ozone MCC building cable trench reinforcement i/p

Cladding sheet fixing i/p along STG A row

RW Ozone building cable trench soling i/p

Booster Pump A suction fit up i/p

Tie beam shuttering work i/p at Ozone MCC building

Fire station building column shuttering work i/p

Ozone MCC building fire barrier wall plastering i/p

Fire station building footings RCC i/p

Ozone MCC building fire barrier wall plastering i/p

Tie beam reinforcement i/p at Ozone MCC Building

RW Ozone building plinth filling levelling i/p

ETP Chamber 2 balance wall raft reinforcement i/p

CEP B discharge flange concentricity & parallelity checking

BFP A booster pump discharge flow element cleaning completed

BFP Building parapet wall outside plastering i/p

Drain excavation west of CWPH MCC building i/p

Service building staircase 3rd flight shuttering work i/p

Scaffolding i/p for painting of GCB floor beam structures

Tie beam reinforcement i/p at Ozone MCC Building

BFP 14m roof screeding completed

CEP Min Recirculation valve erection

CW OZONE MCC Brick work in progress

ETP 2 raft reinforcement in progress

Fire station building column 1st lift in progress

Service building casting

RWR 2 screeding 6935/12625 Sqm completed

Overhead tank slush removal completed

fire station bldg 25/34 total footing completed

ETP 2 NW corner raft reinforcement in progress

Drain cum retaining wall north of CWPH in progress

BFP building 10M brick work and plastering

BFP Building roof screed curing i/p

RWPH MCC building roof treatment work i/p

RWR Chamber-2 screed curing i/p

ETP Chamber 2 balance wall raft reinforcement i/p

Service building slab concreting completed

Fire station building footings work i/p

Concreting i/p for service building slab

CWPH north drain wall shuttering i/p

BFP Building 10 mt MCC wall brickwork i/p

RWPH MCC roof treatment work i/p

ETP Chamber 2 balance wall raft reinforcement i/p

Zoomlion crane boom down for dismantling

RWR Chamber-2 screeding i/p

CW Ozonisation building parapet wall shuttering i/p

Service building slab cleared for concrete

BFP Building 10 mt brickwall plastering i/p

ETP Chamber 2 balance wall raft shear key excavation i/p

STG PMCC Service transformer final painting completed

IDCT east road drain raft reinforcement work i/p

BFP Building 10 mt brickwork i/p

BFP Roof screeding work i/p

RWR Chamber-2 screed curing i/p

ETP Ch-2 balance wall raft shear key excavation & dewatering i/p

Painting of STG UAT completed

Grading on north side of IDCT i/p

BFP Bldg 14 mt preparatory works for roof screeding i/p

Switchyard road panel reinforcement work i/p

CW Ozone MCC Building brickwork i/p

Ozone building westside parapet wall cleared for concrete

RWR Chamber-2 basin screeding (280 sqm) completed

BFP Building 10 mt brickwork i/p

Service building slab shuttering & reinforcement i/p

CW Ozone MCC Building trench PCC completed

CO2 bank area wire fencing work completed

OHT Tank raft brickwork completed

Ventilation duct structure bottom cladding sheet work i/p

RWR Chamber-2 basin screeding works i/p

STG A row window support channel erection i/p

Staging work i/p in BFP Building

Drain reinforcement work i/p near compressor house

ETP Chamber 2 raft PCC work i/p

ETP Chamber 2 area slush removal completed

Service building slab beam reinforcement work i/p

Staging material shifting i/p for BFP Building

Slush cleaning i/p for Overhead tank

CW Ozone MCC Building brickwork i/p

Brick masonry work in BFP building

Cooling tower west area grading work i/p

Fencing post fabrication works i/p

DV Shed for 8 mt. cable gallery welding work i/p

GBC east side drain raft reinforcement & shuttering i/p

Service building beam side shuttering works i/p

Drain wall shuttering works i/p west of BFP building

ETP Chamber 2 balance raft excavation i/p

STG Building A row cladding sheet fixing i/p

Service building slab reinforcement works i/p

Overhead tank brick works i/p

Service building side shuttering board making i/p

RWR Chamber-2 screed curing i/p

ETP west road cleaning for reinforcement i/p

BFP Building scaffolding work for brickwork i/p

CW Ozone MCC Building brickwork i/p

BFP MCC 10 Mtr brickwork i/p

ETP Chamber 2 balance raft excavation i/p

Service building slab reinforcement work i/p

ETP inlet channel wall shuttering work i/p

BFP Building staging i/p

RODM east side drain preparatory work for PCC i/p

CWPH Toilet portion shuttering i/p

RWR screeding work i/p

Fire station bldg foundation work i/p

Brick work in HRSG MCC room in BFP bldg i/p

Drain wall works near CWPH i/p

STG A row cladding works i/p

Service bldg first floor slab works i/p

CW Ozone MCC cable trench preparatory work i/p

CW Ozone MCC brick work i/p

Service bldg - First level slab works i/p

Exacavation of balance raft of ETP i/p

Road works on west side of BFP bldg i/p

Drain works near GBC MCC bldg i/p

Ozone MCC brick work in progress

Fire station bldg foundation works i/p

Preparatory works for overhead tank foundation i/p

Brick work in BFP 10m i/p

Fire station bldg foundation bldg i/p

BFP bldg west side brick work i/p

BFP west side road works i/p

Service overhead tank foundation preparatory works

CW Ozone MCC fire barrier wall brick work i/p

RWPH MCC roof screed completed

Fire station bldg foundation works in progress

RWR chamber 2 screeding works in progress

BFP bldg internal plastering works in progress

Forebay hand rail finishing works in progress

RWR - M10 filling concret at approach portion

Service bldg first floor slab works

Road works near DG building

BFP bldg SWAS room brick work in progress

Road works in main plant area

Main plant road view

Service building first floor slab work in progress

ETP inlet chamber works in progress

RWR chamber 2 screeding works in progress

Control room particle board fixing in progress

CWTP plastering work completed

RWR chamber -2 screeding works in progress

BFP bldg west side brick work in progress

Ozone building slab de shuttering in progress

Approach road to STG unloading bay in pro

RWR wall lift casted upto grade slab level

GBC MCC fire door fixing in progress

Ozone MCC fire barrier wall brick work in progress

Fire station building foundation work in progress

Transformer yard to RWR road works

Service building first floor slab works

Road works on west side of BFP

Drain wall works on east side of RODM

CWPH toilet roof slab casted

Raw water reservoir - Wall and screeding works

Fire station building - Foundation work in progres

CW Ozone MCC Building brickwork i/p

Fire station building PCC completed for 8 footing

RWR Chamber-2 wall shuttering work i/p

Service Building shuttering & reinforcement works i/p

Transformer yard to RWR slope road PCC i/p

CWTP Plastering works i/p

STG Building A row cladding sheet fixing i/p

ETP North side drain cross over slab reinforcement i/p

Drain raft shuttering work i/p west of ETP

Service building slab shuttering & reinforcement i/p

Road panel reinforcement work i/p west of BFP

Road curing works i/p near DG Building

Box culvert concreted in front of AC Building

BFP suction pipe edge preparation i/p

Road panel shuttering works i/p near DG building

Road pavement slab west of BFP reinforcement i/p

RWR Ch-2 wall raft balance portion RCC completed

Road PCC shuttering i/p west of ETP

RWR Chamber-2 wall raft balance portion RCC i/p

ETP buried piping wrapping coating i/p at RW reservoir

Drain wall reinforcement i/p west of ETP

STG Building A row cladding sheet fixing i/p

Service building slab shuttering works i/p

IDCT west side levelling & grading works i/p

CW Intake channel wall top finishing work i/p

Final painting for STG GT Radiators i/p

Ozone Building slab deshuttering work i/p

Box culvert slab side shuttering i/p in front of AC Building

Road panel shuttering preparatory work i/p near DG building

Road pavement slab shuttering i/p west of BFP building

ETP buried piping wrapping coating i/p at RW reservoir

Reinforcement work started in CWPH Toilet slab

CWTP Plastering works i/p

Drain wall reinforcement i/p west of ETP

Alignment of BFP-B Pump with hydraulic coupling i/p

STG Building A row cladding sheet fixing i/p

ETP west road soling spreading i/p

Drain wall shuttering i/p west of ETP

Transformer yard road preparatory works i/p near DG building

Switchyard south east corner 2 panels ready for concrete

CW Intake channel cleaning i/p

Road pavement slab RCC i/p west of HRSG

Service building slab shuttering works i/p

CWPH toilet roof slab staging work i/p

Cooling tower east side area grading i/p

Box culvert shuttering works i/p in front of AC Building

DG Building south side 1 road panel casted

Main plant road works i/p

RWR Ch-2 wall raft balance portion reinforcement i/p

STG Building A row (Grid 2-3) inner cladding sheet fixing i/p

BFP west Road panel shuttering work i/p

BFP Building handrail grinding & finishing work i/p

Drain wall deshuttering i/p near AC Building

Road pavement slab west of BFP RCC i/p

RWR Ch-2 wall raft balance portion reinforcement i/p

Road PCC curing west of ETP i/p

Pipe culvert reinforcement i/p near BFP building entrance

MOV erected for AC Plant cooling tower

Drain wall deshuttering work i/p near DG Building

Road PCC along west side of ETP i/p

Grading on CWPH MCC east side i/p

CST area Earth mat excavation work i/p

LP BFP Normalisation works i/p

Pipe culvert PCC completed near BFP building entrance

Deaerator normalisation work i/p

ETP Tube settler fills cleaning i/p

CWTP external plastering works i/p

AC Plant drain wall shuttering i/p

Drain wall deshuttering works i/p near DG building

Switchyard south road curing i/p

ETP Tank platform erection i/p

Drain raft reinforcement work i/p west of ETP

AC Plant inner drain wall shuttering works i/p

Drain wall shuttering i/p east of RODM building

LP BFP piping & pump inspection i/p

CWTP Plastering works i/p

Road slab reinforcement work i/p west of HRSG

STG Building A row outer cladding sheet fixing i/p

ETP west road soling spreading i/p

CWTP Column plastering work i/p

Road slab shuttering i/p west of BFP Building

Switchyard south side road panel shuttering work i/p

Drain wall curing i/p near DG Building

STG Building A row outer cladding sheet fixing

BFP building west side brickwork i/p

Road panels reinforcement & shuttering i/p west of Chimney

Bund making i/p for road casted in front of RODM

Drain wall deshuttering works i/p near DG building

ETP Pipe erection i/p at STP area

Road west of BFP building PCC completed

Steam blowing temporary piping works from HPMS to CRH i/p

Drain wall shuttering works i/p south of DG building

DV Shed raft reinforcement works i/p near staircase 4

Switchyard south side road panels (3 no.) casted

RODM entrance road panel shuttering works i/p

Preparatory works for road PCC i/p on west side of Chimney

Bund making & curing of road panels i/p

Drain raft west of BFP casted

DG Building corner road PCC completed

STG Building A row outer cladding sheet fixing i/p

Grading works along A row of STG Building i/p

Drain wall reinforcement works at switchyard south

Switchyard south road reinforcement works i/p

Road PCC completed north of RODM

Road pavement slab completed west of compressor building

ST GT Transformer gravel levelling work i/p

Road reinforcement works i/p near compressor build

BFP building west side brickwork i/p

Switchyard road panel reinforcement work i/p

Switchyard south side drain wall deshuttering i/p

Excavation along slope main road i/p

ETP discharge piping hydro test preparation u/p

Service building slab shuttering works i/p

CO2 area paving casting completed

Road panel (2 no.) casted

Compressor building entrance ramp concrete completed

CW Treatment Plant plastering works i/p

Road soling works i/p south of DG building

GBC Foundation EP painting i/p

3 road panels ready for casting north of CWPH

STG Building A row outer cladding sheet fixing i/p

GT Slip ring to turning gear alignment u/p

STG GT HV Bushings cleaning for Tan Delta test

Compressor south drain wall reinforcement work i/p

Soling works i//p for DV Shed at staircase 4

Ozone Building destaging works i/p

Earthmat excavation started between STG & BFP Building

ST GT Transformer south side fencing wire work i/p

STG Building A row outer cladding sheet fixing i/p

BFP South side (3 panels) concreting completed

Drain concrete completed south of switch yard

CO2 bank west side grade slab ready for concrete

Drain wall shuttering works i/p west of ETP

RWR Chamber-2 basin slab cleaning works i/p

Staging works i/p in CWTP

Brickwork i/p in Gas Analyzer Building

CWTP Beam & Column plastering works i/p

Soling works i/p in front of DG Building

BFP Building east side wall plastering works i/p

CW Ozone building deshuttering works i/p

STG Gable end cladding outer sheet works completed

RW Fire water control room false ceiling completed

CO2 area grade slab reinforcement i/p

Compressor building ramp shuttering works i/p

Road drain reinforcement works i/p at BFP west

CWTP Beam & Column plastering works i/p

RODM Building ventilator frame fixing completed

HRSG Paving drain shuttering work i/p

Drain raft south of DG Building cleared for concrete

CO2 area west side balance paving PCC completed

ETP Chamber 2 floor slab RCC (31 CuM) completed

STG Gable end cladding sheet erection i/p

BFP Building brickwork i/p in east side

Drain PCC completed west side of BFP building

2 panels ready for approach road to BOP area

Drain reinforcement fixing i/p south of compressor building

Drain reinforcement fixing i/p south of DG Building

Compressor building south side road drain reinforcement i/p

Drain excavation & dressing work i/p west side of BFP Building

GTG Slipping coupling runout checking i/p

Rail fixing works i/p at rail road between ST GT & GT GT

ETP Chamber 2 basin slab reinforcement i/p

Road PCC west of compressor house completed

RWR Chamber 2 wall 2nd lift deshuttering i/p

Road soling works i/p in front of Compressor building

RODM east side drain wall reinforcement work i/p

HRSG Paving reinforcement works i/p

Switchyard south side levelling work i/p for road

Road pavement slab RCC (13 CuM) completed near RODM CWPH MCC Junction

BFP Building brickwork i/p

Side shuttering works i/p for paving in transformer yard

ETP Disposal pump discharge piping erection i/p

STG Gable end cladding sheet erection i/p

Switchyard drain wall deshuttering works i/p

Balance shuttering for box culvert top slab near AC Plant

Road PCC completed between BFP & Compressor building

Transformer yard rail road sand filling works i/p

ETP Chamber 2 floor slab cleaning i/p

Compressor building north side road compaction i/p

Transformer yard area soling works i/p

Road excavation south side of CW Ozonisation building

RWR Chamber 2 wall 2nd lift shuttering i/p near entrance

Soling works between compressor building & BFP

Compressor west drain deshuttering works i/p

Switchyard east side drain raft PCC (20 rmt) completed

IDCT south side drain raft RCC (35 rmt) completed

Approach to Power House building drain work i/p

HRSG Paving reinforcement works i/p

CWPH north side drain deshuttering works i/p

RWR Chamber-2 basin slab panel RCC (35 CuM) completed

STG Gable end cladding sheet erection i/p

RWR Chamber-2 wall 2nd lift shuttering i/p near entrance

BFP Building brickwork i/p

Drain wall west of ETP shuttering i/p

Switchyard drain reinforcement works i/p

RODM DCS Room false ceiling completed

RWR Chamber-2 basin slab reinforcement works i/p

Drain wall reinforcement i/p near Compressor house

GTG east side road concreting completed

Drain wall west of ETP RCC (1CuM) completed

Drain raft north of ETP RCC (2 CuM) completed

Reinforcement i/p for drain wall on south side of AC Building

DM Water transfer pump mechanical seal replacement i/p

Rail road side shuttering work i/p near burnt oil pit

Reinforcement for drain wall on north side of CWPH i/p

Drain wall deshuttering works i/p near DG building

STG Gable end cladding sheet erection i/p

Platform work i/p inside BFP Building

Road panel casted on north approach to CW MCC

Road panel casted on north side of RODM

Drain wall concrete completed at south of AC building

Drain wall reinforcement works i/p south of DG building

RWR Chamber-2 basin slab panel (30 CuM) RCC Completed

Rail road reinforcement i/p near burnt oil pit

HRSG Paving slab RCC (65 CuM) completed

Transformer yard 2 panels casting completed

Soling works i/p near ST GT Transformer

Cement plastering for chilled water line i/p near AC Plant

BFP entrance grade slab works i/p

CWPH north drain wall reinforcement work i/p

Bund making for road panel casted between RODM & CWPH

GBC A FG Suction line normalisation work i/p

Switchyard south side drain wall shuttering i/p

GTG east road panel concreting completed

RODM approach road one panel cleared for concreting

Flushing drain out piping erection at transformer yard

STG Gable end cladding sheet erection i/p

Transformer yard road curing works i/p

Drain PCC south of DG building completed

Drain raft RCC completed south of AC building

Road panel reinforcement at RODM & CWPH junction i/p

BFP entrance grade slab reinforcement fixing i/p

RWR Chamber 2 wall final lift shuttering i/p

RWR Chamber-2 basin slab reinforcement works i/p

Rail road side deshuttering work i/p

Transformer road curing works i/p

Drain PCC along south side of IDCT i/p

RWR Chamber-2 wall shuttering supporting works i/p

HRSG grade slab reinforcement i/p

BFP Building brickwork i/p

CW Ozonisation building parapet wall concreting i/p

Transformer Yard

BFP Building brickwork i/p

RW Ozone Building column shuttering i/p

Transformer yard 3 panels casting completed

Scaffolding works for vent insulation i/p at HRSG

RWR Chamber-2 basin slab 30 Cum PCC completed

HRSG Paving reinforcement works i/p

RWR Chamber-2 basin slab reinforcement works i/p

STG Gable end cladding sheet fixing i/p

CWPH north east corner PCC completed

Plate fixing i/p for transformer yard rail road

Painting i/p for AC system condenser water line & makeup tank

RWR Chamber 2 wall 3rd lift shuttering preparation i/p

Drain wall shuttering i/p at west of ETP

Scaffolding works for vent line insulation i/p at HRSG

Soling works i/p at south east of STGT

RWR Chamber-2 basin slab panel concreting completed

Switchyard south drain raft (20 Mt) concreting completed

RWR Chamber-2 basin slab panel reinforcement i/p

STG Gable end cladding insulation works i/p

Compressor building corner road drain PCC complete

GT GT Rail road 2nd stage concreting completed

GTG east road panel concreting completed

HRSG grade slab reinforcement works i/p

RWR Chamber-2 basin slab reinforcement works i/p

Switchyard south side drain wall shuttering i/p

RODM north side 7 Mt wide road panel shuttering i/p

RWR Chamber-2 basin slab reinforcement works i/p

GT approach road side deshuttering work i/p

Deshuttering of drain wall i/p west of ETP

GT GT Rail road 2nd stage concrete reinforcement i/p

Switchyard south side drain wall deshuttering i/p

Switchyard south side drain wall concreting completed

CW Annex building north road panel concreting completed

ETP Chamber 2 floor slab RCC (40 CuM) i/p

GT East approach road side shuttering works i/p

Ozone building parapet wall deshuttering i/p

GT GT Rail road 2nd stage concrete shuttering works i/p

LP Vent line insulation i/p

AC System condenser water pipe painting i/p

ETP Chamber 2 wall final lift RCC i/p

Road drain wall south of DG building deshuttering i/p

STG Gable end cladding sheet erection i/p

CW Annex building north road panel shuttering i/p

RWR Chamber-2 basin slab bund making & cleaning i/p

BFP A motor to HC coupling i/p

IP downcomer & drains insulation work i/p

RWR Chamber-2 basin slab RCC i/p

ETP-2 wall shuttering final alignment work i/p

GT GT Rail road 1/4 no. grouting completed

Reinforcement placing preparatory work at drain near AC Building

ST UAT transformer fencing work completed

RWR Chamber-2 basin slab panels cleared for concreting

Bitumen painting of CT basin slab of Cell 6

Road dressing work i/p between transformer yard to ETP

ETP Chamber 2 basin slab reinforcement i/p

Transformer yard pipe culvert shuttering works i/p

RO 2 Membrane loading i/p in RODM

ETP Pipes wrapping coating i/p

GBC B Motor to gear box coupling completed

CWPH MCC Building inside wall plastering i/p

STG cross around pipe insulation work i/p

Drain excavation i/p near AC Plant

Cooling Tower basin cleaning i/p

STG Gable end z purlin fixing i/p

BFP Building bricks shifting work i/p

GT GT Rail road shuttering works i/p

CW outlet gate monorail welding i/p

Service transformer fencing wire mesh fixing i/p

Cleaning works in intake channel

Transformer yard pipe culvert reinforcement fixing i/p

RO 2 Flushing i/p in RODM

STG Building B row cladding erection i/p

Monorail alignment i/p in CW outlet area

ETP Chamber 2 basin slab reinforcement i/p

GBC B Motor to gear box alignment i/p

Switchyard road south side drain reinforcement i/p

ETP Chamber 2 basin slab reinforcement i/p

DV Shed piping work u/p

ST GT Rail road 2nd stage concreting completed

Switchyard road south side drain reinforcement i/p

DG Plant east side corner drain shuttering i/p

GBC B Motor to gear box alignment i/p

Wrapping coating i/p for ETP disposal pump discharge piping

STG B row cladding erection i/p

ETP 2nd chamber balance 3rd lift wall shuttering i/p

Backfilling of drain sides along IDCT west side road

ST GT Rail road angle fixing i/p

Grade slab RCC (7 Cum) below HRSG completed

ST GT Transformer fencing works i/p

DV Valve charging u/p

Road panel deshuttering & curing at RODM north side

CW Ozonisation building parapet wall shuttering i/p

ETP Chamber 2 balance 3rd lift wall shuttering i/p

Preparatory work for ETP Chamber-2 grade slab i/p

HRSG grade slab cleaning i/p

Insulation work i/p near flash tank area

Detergent flushing temporary piping works i/p

RWR to transformer yard road drain wall cleared for concreting

ST GT PCC paving concrete completed

RODM north side road slab RCC completed

RODM north side road slab RCC i/p

Bitumen painting i/p in IDCT

CEP Pit cleaning works i/p

CW Ozonisation building slab parapet wall reinforcement i/p

Transformer yard pipe culvert raft shuttering works i/p

ST GT Rail grouting works i/p

RWR Chamber-2 basin slab cleaning works i/p

STG B row cladding erection i/p

Leftover drains & vents insulation i/p in HRSG

Bitumen painting i/p on west side of IDCT

Steel window frame fixing completed in CWPH MCC

CW Ozonisation building slab concrete (96 Cum) completed

N2 generation system charged

STG B row cladding erection i/p

CW Ozonisation building slab concreting i/p

Insulation work i/p near flash tank

CWPH east side backfilling i/p

Fencing wire mesh placing around CWPH transformers

STG B row cladding erection

STG B row cladding works i/p

Steel window frame fixing in CWPH MCC i/p

CWPH Screen erection completed

Transformer yard road pipe culvert PCC preparatory works i/p

Rail road grouting shuttering works i/p

Detergent Flushing drain out piping works i/p

Fuel gas pipeline cleaning i/p

HRSG Drain line insulation works i/p

Transformer yard PCC preparatory works i/p

CEP Strainer flange hinge relocation works i/p

Detergent flushing draining pipe erection i/p

Fuel gas pipeline pigging arrangement i/p

Feed water system flushing readiness checking i/p

Cooling Tower bitumen painting i/p

Firefighting system compressor A & B healthiness checking

Detergent flushing temporary piping works i/p

HRSG Drain line insulation works i/p

Rail fixing i/p for approach road of GT GT in transformer yard

Tie rod cutting of ETP south side wall i/p

Backfilling on north side of CWPH i/p

Reinforcement work for road panel on north side of CWPH

Final alignment works of fan in Cooling Tower

IDCT West side scaffolding erection for bitumen painting i/p

ETP Piping preassembly i/p

FFU Plenum erection i/p at 32 Mt GTG Building

CWTP Main cable tray work i/p

STG Gable end inner cladding works completed

Reinforcement work i/p for approach road to CWPH

Air Inlet Filter Platform grating erection i/p

Backfilling on north side of CWPH i/p

Paver blocks unloading near GBC building road

Bitumen painting i/p on west side of IDCT

Gas Turbine on Barring Gear

Flash tank insulation work i/p

RODM Neutralisation Pit Chamber 1 cleaning i/p

Brickworks i/p in Raw Water Pump House

STG Gable end cladding sheet fixing i/p

Bitumen painting i/p on west side of IDCT

Backfilling on north side of CWPH i/p

STG Gable end cladding sheet erection i/p

RODM UF Blower B Trial run u/p

Gap setting of speed sensors completed

GT GT Rail road rail fixing works i/p

STG Drain piping insulation i/p

IDCT Cell 11 west side painting i/p

GTG North side preparatory works for precast slab placement i/p

GCS area fencing post erection i/p

Brickwork i/p along south side in RW Pump House

Fuel gas pipe 1st stretch cleaning completed

Bitumen painting in progress on north side of IDCT cell 11

UF Membrane loading completed in RODM

Air compressor motor A & B (Fire Hydrant System) trial run u/p

AC Fire hydrant motor trial run u/p

UF Membrane installation i/p in RODM

STG Gable end cladding sheet erection i/p

Rail fixing works i/p for ST GT Rail road

STG Drain piping insulation i/p

CW Ozonisation building reinforcement works i/p

GT Aft pedestal side key inspection with GE & customer i/p

STG Gable end cladding sheet erection i/p

Road soling spreading i/p north of RODM

Rail fixing works i/p for ST GT Rail road

Levelling work i/p for paving in transformer yard

IDCT Cell 11 bitumen painting i/p

HRSG Warm up line work u/p

IDCT Cell 10 bitumen painting i/p

Main approach road PCC (12 CuM) completed

CW Ozonisation building slab shuttering works i/p

Rail placing i/p at ST GT Rail road

Road panel shuttering works i/p at RODM north side

STG A row column painting i/p

GT Rail fixing works in progress

Preparatory works for road soling at RODM north

IDCT Cell 8 Fill beam bitumen painting i/p

Road pavement RCC (2 panels) completed south of GBC MCC

Preparatory works for PCC i/p for main approach road

STG A row cladding sheet erection in progress

Road excavation at north of RODM i/p

RODM North side road reinforcement i/p

GT Generator Exciter end outer oil labyrinth fixing i/p

Cooling Tower bitumen painting i/p

Excavation for TR. yard rail road pipe culvert i/p

Ozone Building staging works i/p

Staircase-4 handrail fixing work i/p

STG A row cladding sheet erection i/p

Staircase-4 handrail fixing work i/p

Reinforcement work i/p at approach road to GBC

RODM MCC Room wall POP application i/p

Drain wall shuttering works i/p near DG building

Earth levelling on north side of RODM i/p

ETP 2nd chamber south 3rd lift wall concreting i/p

STG A row cladding sheet erection i/p

RWPH Staircase portion grade slab PCC i/p

RODM MCC Room wall POP application i/p

ST GT East grade slab preparatory works i/p

STG A row cladding i/p

ST GT South side levelling work i/p

ST GT Rail road curing & side deshuttering work /p

Bund making i/p for rail road curing

CWPH approach road PCC i/p

ST GT Rail road concrete i/p

DV Shed plastering work i/p

Painting work at GCS area

Soling spreading in RWPH unloading bay i/p

CW Ozonisation building slab reinforcement i/p

GBC Slope road deshuttering work i/p

STG A row cladding i/p

IDCT Cell 6 bitumen painting i/p

Preparatory works for soling below grade slab in RWPH Maintenance bay

ETP 2nd chamber south side final lift shuttering alignment i/p

Preparatory works for PCC for approach road to CWPH i/p

PRV fixing in GT jacking oil line

GBC A suction line air blasting in progress

ST GT rail road preparatory works for concreting

CW ozonisation building slab reinforcement works

GT-GT rail cum road first stage concreting casted

ETP north side wall final lift casted

HPBFP B voith coupling trial run completed

Transformer yard fencing post erection

Raw water reservoir basin slab panel concreting

GTG Gable end chhajja plastering i/p

GTG A row cladding i/p

RODM North side drain wall shuttering i/p

GBC MCC Building chhajja plastering i/p

Rail road plate fixing work i/p

STG building A row pipe rack painting work i/p

STG Gable end structural painting works i/p

CW Ozonisation building slab beam reinforcement i/p

GTG A row cladding i/p

RWR-2 - Basin slab reinf work

CW make up pump B trial run

Generator ATT in progress

EP fixing for rail road in transformer yard

Steam blowing piping erection in progress

GTG A row cladding i/p

Steam blowing piping erection outside GT building

GTG Rail road bolt fixing works i/p

Steam blowing piping erection at GT north

RWR Chamber-2 basin slab reinforcement works i/p

Cooling Tower bitumen painting i/p

Painting work inside BFP building i/p

GTG east side road deshuttering & cleaning work i/p

RWR Chamber-2 basin slab reinforcement works i/p

Rail road plate fixing work i/p

Cooling Tower painting i/p

IDCT south side road ramp PCC completed

Steam blowing piping fabrication work i/p

Drain raft shuttering work i/p near AC Building

IDCT south side road ramp PCC i/p

GTG east side road shuttering & cleaning work i/p

Pipe rack pipe cleaning i/p

RODM north side road soling work i/p

CW Ozonisation building slab shuttering works i/p

RWR Chamber-2 basin slab panel (130 sqm) concreting completed

GTG Building insulated cladding sheet fixing i/p

RWR Chamber-2 basin slab concreting i/p

GTG east road concreting works i/p

DV Shed slab concreting i/p

ETP Oil storage tank placed on foundation

HRSG Fill pump space heater installation i/p

Box culvert BC-3 top slab concrete completed

Rail road concreting completed

Pipe rack hand rail erection i/p

Pipe culvert deshuttering work i/p near compressor building

RODM North side road balance soling work i/p

Rail road concreting i/p

GTG Gable end cladding sheet fixing i/p

ETP 2nd chamber south side 2nd lift wall concreting i/p

Painting work at CW Pipe i/p

Plinth beam reinforcement work at BFP entrance i/p

Earthmat interconnection between GBC & BFP grid /p

ETP screed concrete completed

GTG road shuttering works i/p

Ozone Building staging & shuttering works i/p

Reinforcement work i/p for box culvert at transformer yard area

GTG Gable end cladding sheet fixing i/p

Transformer yard rail road EP fixing works i/p

STG 8th grid plastering work i/p

Ozone Building staging works i/p

Box culvert slab cleaning i/p near DG Building

STG A row cladding runner painting i/p

Earthmat laying works i/p near chimney

Road panel shuttering works i/p near GBC building

Drain shuttering works i/p near GBC MCC

GTG 12th grid outer plastering works i/p

CWTP Plastering works i/p

GTG Gable end plastering works i/p

RODM North side drain wall shuttering i/p

Preparatory works for Drain raft PCC near AC Building

GTG Gable end plastering i/p

ETP Chamber 2 reinforcement works i/p

RWR Chamber-2 wall shuttering i/p

Road reinforcement placing & concreting i/p near GBC

BFP Building handrail erection i/p

Gas room inside plastering works i/p

GTG Gable end plastering works i/p

RODM Building cage ladder works i/p

Gas room inside plastering works i/p

GTG Gable end balance brickworks i/p

Ozone Building staging works i/p

DG Building east side drain raft reinforcement i/p

DM Tank platform works i/p

GTG Gable end cladding sheet fixing i/p

Drain wall shuttering i/p west of GBC MCC Building

GTG Building grid 10-11 plastering works completed

Transformer yard rail road plate fixing works i/p

Handrail erection i/p between HRSG & BFP interconnection

DM Tank platform erection i/p

Ozone Building staging works i/p

GTG C row inner plastering works i/p

GTG Gable end cladding sheet fixing i/p

GTG Gable end cladding sheet fixing i/p

Ozone Building staging works i/p

CE Pump-A alignment i/p

STG DV shed piping fittings & gasket fixing i/p

GTG C row inner plastering works i/p

Transformer yard rail road plate fixing works i/p

Handrail erection i/p at STG to BFP interconnection platform

STG A row cladding runner painting i/p

Preparatory works for drain shuttering near GBC MCC

CW Ozonisation building slab shuttering works i/p

RWR Chamber-2 basin slab reinforcement works i/p

HRSG Staircase handrail work i/p

Road soling & leveling works i/p north of CWPH MCC

Painting of ACW discharge piping i/p

GTG East side road reinforcement works i/p

Plant water piping erection to Compressor building

STG A row cladding runner painting i/p

Pipe painting works in GT Building

SW/PW Piping to compressor building

Drain wall reinforcement i/p near GBC MCC

RWR Chamber-2 basin slab panel concreted

GTG Building C row plastering i/p

DMCW piping painting works i/p

Approach road slush removal i/p near chimney

RWR Chamber-2 basin slab panel cleared for concreting

GTG C row inner plastering works i/p

Insulation lagging works i/p at HRSG Pipe rack

STG A row cladding runner painting i/p

Pipe culvert encasing shuttering i/p at RODM north

Box culvert slab concreting i/p near Compressor building

GTG C row inner plastering works i/p

RW Pump House platform welding i/p

GTG Gable end cladding sheet fixing i/p

Box culvert shuttering completed near compressor building

Pipe culvert side shuttering completion below pipe rack

Slush removal for drain raft near RODM i/p

Pipe culvert encasing shuttering i/p at RODM north

Rail road plate fixing works i/p

ETP north side road drain wall shuttering i/p

DV Shed piping work u/p

Box culvert slab shuttering i/p near Compressor building

ETP north side road drain wall shuttering i/p

STG A row cladding runner painting i/p

Rail road plate fixing preparatory works i/p

GTG Gable end cladding sheet fixing i/p

Box culvert wall concrete done near compressor building

ETP north side grade slab reinforcement i/p

Drain raft RCC i/p west of GBC MCC

GTG Gable end cladding sheet fixing i/p

Rail road plate fixing preparatory works i/p

Box culvert wall deshuttering i/p near compressor

Preparatory works for grade slab reinforcement at ETP

Transformer yard rail road reinforcement works i/p

RODM north side drain raft casting

Ozone building beam bottom shuttering works i/p

STG A row cladding runner painting i/p

Pipe culvert reinforcement work i/p south of GBC MCC

Beam bottom shuttering making for Ozone building

GTG Gable end cladding sheet fixing i/p

STGT Rail road reinforcement works i/p

Drain wall shuttering works i/p near DG building

Earthmat work to RWPH grid i/p

RWPH Pump floor brickworks i/p

Road drain raft reinforcement i/p west of IDCT

STG A row cladding runner painting i/p

RODM north side drain raft shuttering i/p

GTG B row cladding completed for available front

GTG East side road reinforcement works i/p

Transformer yard road reinforcement works i/p

Road near compressor building PCC completion

Drain wall concreting i/p near DG Building

RWPH Pump floor brickworks i/p