Home   

ENNORE SEZ (2X660 MW)


NDCT # 1

Fire water tank shuttering works

Filter water tank Raft works

Unit-2 MBB RHS Tripper floor erection u/p

TT-06 Reinforcement work in progress

Silo storage tank 01 +6.00 level slab beam

Seawater Intake system- Pipe supporting pedestal

RODM control building 4.5m slab shuttering works

Pipe rack-05 gallery erection

NDCT & CWPH feedpool

N pit concreting in progress

JTB-04 foundation work

ID duct U-1 Grade slab reinforcement binding works

FOPH bldg- Plastering & parapet wall shuttering

Foam pump house roof slab concrete work u/p

Fly Ash Silo-1 (+6 Mtr level)

Feed pool works

Feed Pool works

CW piping

CW pipeline encasing reinforcement & shuttering

Cable Rack foundation

Cable Rack foundation

Cable Rack

Buffer hopper unit-1 concreting

AHS HT&LT MCC building column shuttering work u/p

AWPH- Curing

Compressor House

Unit-2 Power House (17 m)

Unit-2 Mills

Unit-1 CEP pit

Service building works

Sea Water Pump Annex building

Sea Water Intake System- Pipe supporting pedestal

NDCT-2 basin works

NDCT-1

HT LT MCC building

Guard pond Concreting

Fuel Oil Pump House

Foam Pump House

ERH Bore piling work in progress

CW pipeline encasing

Boiler area

Ash Water Pump House

Admin building underdeck insulation work

2xx60 MW Ennore SEZ- Overall view

Cooling water pump house

Cooling water pump house

Cooling water pump house

Cooling water pump house

Unit-01 CEP pit

View of boiler and power hoUse

View of boiler and power hoUse

Compressor shifting in progress

Compressor receiver tank erection completed

FMB building reinforcement works

GRP encasing works

ID duct pavement works

Transformer yard reinforcement works

Clarifier reinforcement works

Clarifier reinforcement works

Seawater pump house work

Seawater pump house work

UFRO building roof purlin works

CW Piping encasing

RODM- filter shed reinforcement works

SCR-02 casting in progress

SCR-02 casting in progress

SCR-02 casting in progress

Pipe conveyor and seawater pipe works

Pipe conveyor and seawater pipe works

Pipe conveyor and seawater pipe works

Pipe conveyor and seawater pipe works

Pipe conveyor and seawater pipe works

CW pipeline 4 line encasing

Unit-01 CEP pit raft work

Unit-02

PA fan-2A second lift wall completed

SCR-02 Ready for concreting

SCR-02 Ready for concreting

MILL-2C reinforcement works

Unit-02 17M reinforcement works

PA fan unit-02 wall works

Unit-01 condenser pit reinforcement works

CCR -13M floor casting

CCR -13M floor casting

CCR -13M floor casting

CCR -13M floor casting

A14 column erection completed

Unit-01 EOT Girders and trolley erection completed

Unit-01 EOT Crane girder placed.

CW pipe erection

CW pipe erection

CW pipe erection

Power cycle piping unit-02

Power cycle piping unit-02

Buffer hopper tower unit-02

ESP-01 D-pass cladding works

NDCT-01 Jumpform status

NDCT-01 Jumpform status

NDCT-01 Jumpform status

NDCT-01 Jumpform status

NDCT-02 Basin slab

NDCT-02 Basin slab

CPU regen building roof casted

CWPH raft casting completed

CWPH raft casting completed

CWPH raft casting completed

FOPH Brick works

Clarifier-A raft works

Clarifier-A raft works

PH floor shuttering and reinforcement works

PH floor shuttering and reinforcement works

PA-02 Raft reinforcement works

PA-02 Raft reinforcement works

Seawater P3 type pedestals

Seawater P3 type pedestals

FOPH Cable trench works

Unit-02 A ROW ventilation duct erection status

Filter water tank raft concreting

Filter water tank raft concreting

Bunker Unit-02 RHS erection

Bunker Unit-02 RHS erection

Seawater curved portion raft reinforcement works

SWIPH annex Building

Firewater tank raft casting

Firewater tank raft casting

Firewater tank raft casting

Seawater intake annex building

Seawater intake annex building

Seawater intake annex building

NDCT-02 CW basin

NDCT-02 CW basin

NDCT-02 CW basin

NDCT-02 CW basin

NDCT-02 CW basin

Mill -2 C reinforcement placement works

NDCT-01

NDCT-01

BCZ-1A1B pedestals

BCZ-1A1B pedestals

NDCT-01 jump form erection

NDCT-02

NDCT-02

NDCT-02

NDCT-02

NDCT-02

NDCT-02 Basin slab reinforcement work

NDCT-02 Basin slab reinforcement work

Fluecan fabrication works

Road reinforcements works

Murram blanketing works

Power house -3.5 M brick works

Power house floors

FOPH

RODM- Filter shed vessel

Esp control room -01 tie beam work

SCR unit-02 works

SCR unit-02 works

Dyke wall area paving works

Dyke wall area paving works

Dyke wall area paving works

Mill -2 B Casting

CW piping encasing works

Power house aux column erection

Piperack -05 reinforcement work

Fire water tank raft casting

Fire water tank raft casting

Fire water tank raft casting

Fire water tank raft casting

Fire water tank raft casting

Fire water tank raft casting

Fire water tank raft casting

Fire water tank raft casting

Paving works near ID duct

Paving works near ID duct

Seawater annex building grade slab

CWPH -8.9M ready for casting

CWPH -8.9M ready for casting

Power house erection status

Power house erection status

Power house erection status

Power house erection status

Power house erection status

Power house erection status

Power house erection status

Power house erection status

Power house erection status

Power house erection status

Power house erection status

Power house erection status

Power house erection status

Power house erection status

Power house erection status

Power house erection status

Power house erection status

Power house erection status

Power house erection status

Power house erection status

Workshop building gantry erection completed

Mill -2B bottom reinforcement works

PH floor reinforcement works

ESP CONTROL room-01 beam works

FOPH brickworks in progress

Light store building truss erection

UFRO pump house monorail erection

Road concreting in progress

Road concreting in progress

Fuel oil unloading platform concreting in progress

Fuel oil unloading platform concreting in progress

SWIPH annex Building

SWIPH annex Building

SWIPH annex Building

Filtered water tank raft casting completed

Filtered water tank raft casting completed

Filtered water tank raft casting completed

Filtered water tank raft casting completed

Misc switchgear room roof casting completed

Misc switchgear room roof casting completed

Misc switchgear room roof casting completed

FOPH building equipment foundation

FOPH building equipment foundation

FOPH building equipment foundation

Unloading platform soling

Unloading platform soling

SCR casting in progress

SCR casting in progress

SCR casting in progress

SCR casting in progress

Boiler and ESP

FOPH and Fuel Oil Tanks

Transfer Points Structure

Power House Structure

Transformer Yard

SCR PC-1 reinforcement works

SCR PC-1 reinforcement works

SCR PC-1 reinforcement works

SCR PC-1 reinforcement works

BCZ-1A1B PEDESTALS

BCZ-1A1B PEDESTALS

BCZ-1A1B PEDESTALS

TG-01 UPV TEST in Progress

Seawater pump house lintel beam works

Transformer rail yard

SCR PC-01 UNIT-01 reinforcement works

SCR PC-01 UNIT-01 reinforcement works

Dewatering in CW piping area

Dewatering in CW piping area

DG building

Power house unit-02

Inundation due to heavy rainfall

Inundation due to heavy rainfall

CW pipeline dewatering works

Seawater pump house column works

ERZ plinth beam works

SCR PC-01 raft reinforcement woeks

Inundation due to heavy rainfall

Inundation due to heavy rainfall

Inundation due to heavy rainfall

Inundation due to heavy rainfall

Inundation due to heavy rainfall

Inundation due to heavy rainfall

SCR reinforcement works

Seawater log gate reinforcement works

Road RCC works

FOPH gradeslab works

CWPH -8.9M raft reinforcement woeks

UFRO building roof erection

cpu regen building

Misc switchgear room roof works

Filtered water tank reinforcement works

Filtered water tank reinforcement works

Filtered water tank reinforcement works

RODM buildings

RODM buildings

RODM buildings

RODM buildings

RODM buildings

RODM buildings

RODM buildings

RODM buildings

RODM buildings

RODM buildings

CW pipe -double pipe stretch

Unit-02 power house floors

DG building

Plant overall view

Plant overall view

Plant overall view

Plant overall view

Plant overall view

Plant overall view

Plant overall view

Plant overall view

VPH-01 cable trench works

VPH-01 cable trench works

BCN-3A3B erection status

BCN-3A3B erection status

BCN-3A3B erection status

FOPH grade slab

Power house -02 A15 and A16 erection

Unit-02 piping erection

Seawater pump house annex Building

Seawater pump house log gate

SCR reinforcement status

Grid -22-23 ready for casting

Grid -22-23 ready for casting

CST Pump house plastering work

UAT final lift

BCZ-1A1B foundation works

BCZ-1A1B foundation works

NDCT area

NDCT area

NDCT area

NDCT area

NDCT area

NDCT area

CCR floor beam erection status

Power house Unit-02

Power house Unit-02

CWPH -8.9 M reinforcement fixing works in progress

CWPH -8.9 M reinforcement fixing works in progress

POWER house 17 M Grid 21-22 AB bay

NDCT-02 pedestal reinforcement works

NDCT-02 pedestal reinforcement works

Start-up transformer soling works

NDCT -02

View of NDCT-01

View of NDCT-01

View of NDCT-01

View of NDCT-01

Periphery road RCC works

17 M floor reinforcement works

BCZ TR-19/20 casting completed

BCZ TR-19/20 casting completed

CWPH- -8.9M dewatering pit casting in progress

Clarifier water pump house reinforcement works

PR-05 foundations

SCR PC-1 reinforcement works

NDCT-02 Tower Crane erection

BCZ-1A1B TR-19 casting completed

BCZ-1A1B TR-19 casting completed

Chemical lab foundation casting completed

Chemical lab foundation casting completed

CW Pump house 8.9 M level raft

SCR PC-1 reinforcement works

SCR PC-1 reinforcement works

BCZ-1A1B TR-19 reinforcement works

GRP Single line thrust block

Mill-2A casting completed

Peripheral road DLC WORKS

GRP single line encasing works

Misc Switchgear room lintel Beam

Misc Switchgear room lintel Beam

Misc Switchgear room lintel Beam

GRP thrust block encasing works

CW Piping excavation works in progress

UFRO building erection

Filter shed erection status

Coal retaining wall shuttering works

15M Road Rcc works

CW piping encasing works

SWIPH log gate

BCZ-1A1B TR-19/20 pcc works

NDCT-01 ring beam

NDCT-02 segment 23&24 reinforcement works

NDCT-02 segment 23&24 reinforcement works

NDCT-02 segment 23&24 reinforcement works

NDCT-02 segment 23&24 reinforcement works

ECHS stool fixing works

CPU regen Building roof slab completed

CPU regen Building roof slab completed

CPU regen Building roof slab completed

CPU regen Building roof slab completed

NDCT-02 segment -22/24 reinforcement works

NDCT -02 raft -21 ready for concrete

NDCT -02 raft -21 ready for concrete

Compressor Building

DG building brick work

NDCT-02 raft -19/24 reinforcement works

NDCT-02 raft -19/24 reinforcement works

NDCT-02 raft -19/24 reinforcement works

NDCT-02 raft -19/24 reinforcement works

NDCT-02 segment 19 /24

NDCT-02 segment 19 /24

NDCT-02 segment 19 /24

ID fan -2B CASTING STARTED

PH-02 8.5M shuttering works in progress

TG-01 second stage concreting

TG-01 second stage concreting

TG-01 second stage concreting

TG-01 second stage concreting

NDCT-02 18th ring raft works in progress

NDCT-02 18th ring raft works in progress

NDCT-02 18th ring raft works in progress

NDCT-02 Tower crane erection

BCN-2A2B initial pile load test

Aux boiler reinforcement works

ID fan -2B SHUTTERING WORKS

NDCT-02 segment -17 ready for Concreting

NDCT-02 segment -17 ready for Concreting

NDCT-02 segment -17 ready for Concreting

Boiler -01 7/7 bunker shell erection completed

Unit-02 BC AND CD BAY

Unit-02 BC AND CD BAY

CCR floor beam erection

CCR floor beam erection

CCR floor beam erection

Ndct-01 ring beam final segment casting

Ndct-01 ring beam final segment casting

CCR erection status

Condenser-02 bottom plate work

NDCT-02 segment -17 reinforcement works

NDCT-02 segment -17 reinforcement works

NDCT-02 segment -17 reinforcement works

NDCT-01 ring beam reinforcement works

NDCT-01 ring beam reinforcement works

NDCT-02 raft reinforcement works

NDCT-02 raft reinforcement works

ID fan-2B

SCR foundation excavation in progress

Mail-2A reinforcement works started

NDCT-01 3rd lift reinforcment works

NDCT-01 ring beam final segment reinforcement work

FOPH unloading platform wall

BCZ-1A1B piling works in progress

FD-1A wall 2nd lift ready for concreting

ERZ-01 Pilecap reinforcment works

Unit-02 condenser erection

Aux boiler gradeslab completed

Aux boiler gradeslab completed

FOPH oil pit shuttering work

Seawater annex Building plinth beam

Road Rcc works

BCZ-1A1B TR8 pilecap

Chimney roof casting started

NDCT-01 ring beam 4/5 segments completed

Overhead tank foundation works

PR-5A trestle erection

ECHS deck slab works P128-129

GRP triple pipe encasing works

Annex Building civil

Annex Building civil

Aux Boiler pavement work

FOPH oil pit

Unit-02 EOT erection

Seawater channel wall 1st lift concrete

ESP unit -02 D PASS GRADE SLAB

Road RCC works commenced

Road RCC works commenced

CWPH feed pool excavation status

CWPH feed pool excavation status

CWPH feed pool excavation status

CWPH feed pool excavation status

TG-01 deck casting completed

TG-01 deck casting completed

TG Deck-01 casting in progress

TG Deck-01 casting in progress

TG Deck-01 casting in progress

TG Deck-01 casting in progress

TG Deck-01 casting in progress

TG Deck-01 casting in progress

TG deck-01 work progress

TG deck-01 work progress

CW piping Work progress

CW piping Work progress

CW piping Work progress

CW piping Work progress

CW piping Work progress

CW piping Work progress

TG deck-01 final checking works in progress

TG deck-01 final checking works in progress

TG deck-01 final checking works in progress

Drain reinforcement work

Seawater Annex Building works

BCZ-1A1B Foundation works

BCZ-1A1B Foundation works

FOPH oil pit reinforcement works

TG DECK-01

TG DECK-01

TG DECK-01

TG DECK-01

TG DECK-01

TG DECK-01

TG DECK-01

TG DECK-01

TG DECK-01

TG DECK-01

PR-5A ready for casting

NDCT-02 13/48 casting in progress

RODM control building grade slab work

RODM- chemical building soling works

RODM UFRO pump house soling works

CW Dual pipe encasing

CW Dual pipe encasing

CW Dual pipe encasing

CWPH feepool excavation

CWPH feepool excavation

Unit-01 7/7 hopper erection completed

NDCT-01 96/96 racker column completed

NDCT-01 96/96 racker column completed

NDCT-01 96/96 racker column completed

NDCT-01 96/96 racker column completed

NDCT-01 96/96 racker column completed

CW piping encasing status

CWPH excavation and sheet piling works

CWPH excavation and sheet piling works

CWPH excavation and sheet piling works

TG deck-01

TG deck-01

TG deck-01

TG deck-01

TG deck-01

Fire water tank casting planned in May

Fire water tank casting planned in May

Fire water tank casting planned in May

Fire water tank casting planned in May

TG Deck-01

TG Deck-01

TG Deck-01

TG Deck-01

TG Deck-01

TG Deck-01

TG Deck-01

TG Deck-01

TG Deck-01

TG Deck-01

TG Deck-01

TG Deck-01

NDCT-02 Segment -16/24 casted

TG Deck-01 inserts fixing works

TG Deck-01 inserts fixing works

TG Deck-01 inserts fixing works

TG Deck-01 inserts fixing works

TG Deck-01 inserts fixing works

TG Deck-01 inserts fixing works

TG Deck-01 inserts fixing works

TG deck -01

TG deck -01

TG deck -01

TG deck -01

TG deck -01

TG deck -01

TG deck -01

TG deck -01

TG deck -01

TG deck -01

TG deck -01

TG deck -01

TG deck -01

TG deck -01

RODM- SWRO building foundation works

Peripheral road drain works

Fuel oil unloading platform

Road works DLC started

Road works DLC started

PR-06 foundation excavation

Generator transformer unit-03

NDCT-01 80/96 raker columns complete

NDCT-01 80/96 raker columns complete

NDCT-01 80/96 raker columns complete

NDCT-01 80/96 raker columns complete

NDCT-01 80/96 raker columns complete

TG deck -01 265/292 MT completed

TG deck -01 265/292 MT completed

TG deck -01 265/292 MT completed

TG deck -01 265/292 MT completed

TG deck -01 265/292 MT completed

TG deck -01 265/292 MT completed

Pipe conveyor stool erection works

UNit-01 LHS bunker erection

Seawater intake channel

Fuel oil unloading platform foundation

SWIPH floor slab

SWIPH floor slab

TG Deck-01

TG Deck-01

TG Deck-01

TG Deck-01

TG Deck-01

TG Deck-01

TG Deck-01

Fire water tank raft reinforcment works

PR-01 erection status

GRP double pipe encasing works

GRP double pipe encasing works

NDCT-01 76/96 raker column completed

NDCT-01 76/96 raker column completed

NDCT-01 76/96 raker column completed

NDCT-01 76/96 raker column completed

NDCT-01 76/96 raker column completed

NDCT-01 76/96 raker column completed

NDCT-01 76/96 raker column completed

NDCT-01 76/96 raker column completed

NDCT-01 basin slab

NDCT-01 basin slab

Pipe rack-07 erection

TG deck Unit-01

TG deck Unit-01

TG deck Unit-01

TG deck Unit-01

TG deck Unit-01

TG deck Unit-01

TG deck Unit-01

TG deck Unit-01

Fire station building painting status

CW piping progress

CW piping progress

NDCT-02 15/24 raft completed

NDCT-02 15/24 raft completed

NDCT-02 15/24 raft completed

TG Deck-01

TG Deck-01

TG Deck-01

TG Deck-01

Drain works

Seawater Channel Slush cleaning works

Seawater Pump House

Seawater Pump House

Seawater Pump House

TG deck-01 reinforcement works

TG deck-01 reinforcement works

TG deck-01 reinforcement works

TG deck-01 reinforcement works

TG deck-01 reinforcement works

TG deck-01 reinforcement works

TG deck-01 reinforcement works

TG deck-01 reinforcement works

TG deck-01 reinforcement works

PMH-1A Raft F3 2nd nos RCC completed

SWIS Pipe pedestal earthwork u/p

FMB Piling work in progress

FO Unloading Platform Raft work in progress

PR -7 Pedestal 2 nos RCC completed

Pump house PMH-1A Raft RCC completed

Murrum blanketing work in progress

Pipe rack1&2(L&T) Pilecap PCC work in progress

FA SLURRY PH Pilecap Reinforcement work u/p

SW intake system P2 Pedestal u/p earth work u

ECHS PC-1A1B P-93 Portal Column Bolt Lift work u/p

SWIS Pipe supporting Pedestal prepared for PCC

Sea water intake system PH floor slab work u/p

Sea water intake system PH floor slab work u/p

Road 2691.700 westing GSB spreading progress

Air washer Unit 2 Piling work in progress

Pipe rack PR 6 Piling work in progress

Bunker Unit 1 Mill G Wall 2nd lift RCC completed

Road Drains 139 wall cleared for concreting

ESP Control Room Unit 2 Grade slab concreting

Pipe rack PR 4 Piling work in progress

FMB area piling work in progress

Condenser wall TG Unit 2 cleared for concreting

FO Unloading Platform Raft reinforcement work

TG Deck Unit 1 Reinforcement fixing work u/p

Ring beam NDCT-01

NDCT-02 raft reinforcement works-

NDCT-02 raft reinforcement works-

NDCT-02 raft reinforcement works-

Road GSB levelling works

Boundary wall panel erection

Boundary wall panel erection

FOPH unloading bay reinforcement works

Seawater intake pump house floor slab works

Drain raft reinforcement works

Dozer shed raft reinforcement works

FASPH pilecap shuttering works

ECHS precast beam reinforcement works

NDCT-01

NDCT-01

NDCT-01

NDCT-01

NDCT-01

Seawater Pump House Annex Building

Compressor House cable trench

Tg-01 deck reinforcement works

Tg-01 deck reinforcement works

Tg-01 deck reinforcement works

CW Piping erection status

CW Piping erection status

PIpe rack for Ash pipes

NDCT-01 ring beam

NDCT-01 ring beam

NDCT-01 ring beam

NDCT-01 ring beam

NDCT-01 ring beam

NDCT-01 ring beam

NDCT-01 ring beam

BCN-3A/3B backfilling works

Unit-01 Hopper erection 4/7 completed

Coal stock yard retaining wall reinforcement works

Unit-01 LHS hopper erection

RODM-UFRO building erection started

TG deck -01 reinforcement status

GRP Double pipeline works

GRP Double pipeline works

Aggregate works in chimney road

Aggregate works in chimney road

Aggregate works in chimney road

TG deck reinforcement placement works in progress

TG deck reinforcement placement works in progress

CW piping fitup in progress

ESP control Room -02 4M slab reinfor works

NDCT-02 raft -12/24 Ready for casting

NDCT-02 raft -12/24 Ready for casting

Murram Blanketing works in progress

Murram Blanketing works in progress

Seawater Channel Water proofing membrane works

Seawater Channel Water proofing membrane works

Pile vertical load test for ERZ-01

Seawater Channel shuttering works

TG deck-01 reinforcement works

GRP double pipe erection

GRP double pipe erection

GRP double pipe erection

GRP double pipe erection

Compressor House cable trench raft reinforcement w

SWIPH curved portion channel shuttering works

CWPH excavation ramp formation works

CWPH excavation ramp formation works

NDCT-02 CW Basin excavation works by Simplex

NDCT-02 CW Basin excavation works by Simplex

NDCT-02 Raft 12/24 reinforcement works

NDCT-02 Raft 12/24 reinforcement works

NDCT-02 Raft 12/24 reinforcement works

NDCT-02 Raft 12/24 reinforcement works

NDCT-02 Raft 12/24 reinforcement works

NDCT-01 Raker column staging works

NDCT-02 Raft-11/24 casting in progress

NDCT-02 Raft-11/24 casting in progress

NDCT-02 Raft-11/24 casting in progress

NDCT-02 Raft-11/24 casting in progress

Power House unit-02 structure ern status

Seawater Intake Channel

Seawater Annex Building footing works

NDCT-01 RAKER COLUMN-64/96 Completed

NDCT-01 RAKER COLUMN-64/96 Completed

NDCT-01 RAKER COLUMN-64/96 Completed

NDCT-01 RAKER COLUMN-64/96 Completed

Piperack -07 foundations

Piperack -07 foundations

Misc Switchgear room foundations

Misc Switchgear room foundations

Clarified water tank roof works

Clarified water tank roof works

Clarified water tank roof works

Clarified water tank roof works

CW Piping fitup and civil raft for pipe erection

CW Piping fitup and civil raft for pipe erection

CW Piping fitup and civil raft for pipe erection

CW Piping fitup and civil raft for pipe erection

CW Piping fitup and civil raft for pipe erection

TG-01 deck reinforcement works

TG-01 deck reinforcement works

TG-01 deck reinforcement works

TG-01 deck reinforcement works

TG-01 deck reinforcement works

Unit-01 FD PA fan excavation works

ECHS Pier 75/75A works

ECHS precast beam works

Cast In situ slab reinforcment works

Flyash Silo beam reinforcement works

Seawater pedestals P3 type excavation works

NDCT-01 raker column casting

NDCT-01 raker column casting

NDCT-02 tower crane foundation breaking works

TG-01 deck reinforcement works

TG-01 deck reinforcement works

TG-01 deck reinforcement works

Area levelling for Murram blanketing in progress

Piperack-07 4nos footing 100Cum completed

NDCT-02 Raft-11/24 reinforcement works

TG-01 Deck reinforcement placement works

TG-01 Deck reinforcement placement works

TG-01 Deck reinforcement placement works

TG-01 Deck reinforcement placement works

ECHS PR-81 concreting in progress

Power House Unit-01 17M reinforcement works

Power House Unit-01 17M reinforcement works

NDCT-01 Ring beam curing in progress

Drain side raft

CW pipe encasing works

SCR PC-02 casting completed

SCR PC-02 casting completed

SCR PC-02 casting completed

Unit-01 SCR PC-02 reinforcement placement works

Unit-01 SCR PC-02 reinforcement placement works

Unit-01 SCR PC-02 reinforcement placement works

NDCT-02 raft No. 10/24 ready for casting

NDCT-02 raft No. 10/24 ready for casting

NDCT-02 raft No. 10/24 ready for casting

NDCT-01 ring beam 1st segment casted

NDCT-01 ring beam 1st segment casted

NDCT-01 ring beam 1st segment casted

Unit-01 SCR PC-03 reinforcement placement in progr

Unit-01 SCR PC-03 reinforcement placement in progr

Unit-01 SCR PC-03 reinforcement placement in progr

Unit-01 SCR PC-03 reinforcement placement in progr

NDCT-01 ring beam 1st quadrant casting in progress

NDCT-01 ring beam 1st quadrant casting in progress

Piperack-01 excavation in progress

Mill-2D deck casting completed

Mill-2D deck casting completed

Piperack-07 footing reinforcment works

Transformer yard Ground improvement works

NDCT-02 raft-10/24 segment reinforcement works

NDCT-02 raft-10/24 segment reinforcement works

NDCT-01 Ring beam works-1st quadrant

NDCT-01 Ring beam works-1st quadrant

NDCT-01 Ring beam works-1st quadrant

ESP Control Room-01 Grade slab works

Power House-02 CCR and Boiler-02

Power House -01 and Boiler-01

Piperack-07 footing works

Piperack-07 footing works

CW piping works- 2 Nos ready for encasing

CW piping works- 2 Nos ready for encasing

CW piping works- 2 Nos ready for encasing

CW piping works- 2 Nos ready for encasing

CW piping works- 2 Nos ready for encasing

CW piping works- 2 Nos ready for encasing

CW piping works- 2 Nos ready for encasing

Compressor house transformer reinforcement works

Bottom Ash Hopper Unit-01 plinth beam and pedestal

TG Deck Staging 95% completed

TG Deck Staging 95% completed

TG Deck Staging 95% completed

Mill-2D deck ready for casting

Mill-2D deck ready for casting

CCR Column erection status

Unit-01 Boiler RHS

Pipe rack-01 FOundations

Unit-01 SCR PC-03 Pilechipping works

Unit-01 SCR PC-03 Pilechipping works

Dyke wall ready for concreting

NDCT-01 Raker Column-56/96 casted

NDCT-02 Raft-10/24 reinforcement placement works

NDC_01 Raker column-56/96 completed

NDCT-02 raft reinforcement works-

NDCT-02 raft reinforcement works-

NDCT-02 raft reinforcement works-

ESP control Room-01 insert checking works

SCR Foundation Pilechipping works

Reinforcement works for CW pipe Encasing

Reinforcement works for CW pipe Encasing

ICHS (keller) BC-3A/3B TT-4 to TT-5 location found

Fly ash silo-3 EL+6.00M level slab shuttering work

ESP CR 2 +3.95 m floor slab reinforcement fixing a

Compressor Transformer reinforcement works in prog

CW pipe erection - 6 Nos completed -4 Nos welded

CW pipe erection - 6 Nos completed -4 Nos welded

TG-01 deck staging and shuttering work 85% comp

TG-01 deck staging and shuttering work 85% comp

PR-56 piercap bottom shuttering in progress

Precast beam reinforcement works in progress

ECHS- P81 reinforcement placement works

Admin Building plastering works

Stop log gate third lift shuttering in progress

Mill-2D Shuttering and Pocket fixing works

Shuttering works in FOPH dyke wall

Seawater - waterproofing works

Seawater - waterproofing works

C-row pipe rack erection in progress

ID duct foundation Unit-01 reinforcement placement

Piperack-01 Bolt fixing works

Compressor House SAT PCC works

Permanent store monorail erection

TG-01

TG-01

TG-01

Power house erection status

Power house erection status

Power house erection status

Fluecan fabrication

Fluecan fabrication

FOPH dyke wall works

FOPH dyke wall works

Seawater channel final lift

RODM remineralisation pump house

GRP dual line RCC works

Workshop Building lintel beam

Fuel oil tank erection works

Light store building grade slab

Light store building grade slab

Esp control Room-01 reinforcement fixing works

ID duct foundation unit-02

Seawater pump house annex Building

GRP slush cleaning work

DG building cable trench

ESP control Room -02

C-row piperack erection works

ECHS Piercap

Fly Ash Silo column works

Drain reinforcement works in progress

CST Pump House Equipment foundation

Sewater Intake Annex Building

Curing works for permanent store grade slab

Pipe Rack-8A driven Pile works

ESP control Room-02 slab shuttering works

GRP single pipe raft works

FOPH roof reinforcement works

Piperack erection

Boiler-01

CST Pump house foundations

CST Pump house foundations

permanent store

TG deck-01

TG deck-01

CW Piping laying

CW Piping laying

CW Piping laying

Mill-2D

Piercap

Piercap

PC-1A 1B Cast insitu slab

ECHP cast in-situ slab

CST Pump House equipment foundations

Permanent store Building gradeslab

TG deck-01

TG deck-01

Pipe-rack-05 erection

Bottom Ash Hopper Unit-01

Bottom Ash Hopper Unit-01

Permanent store Building gradeslab

Permanent store Building gradeslab

Permanent store grade slab works

Permanent store grade slab works

Canteen Building

Fire station building

Admin Building

FD- Fan 1B

Bottom ash Hopper pedestal concreting

Rain at Seawater Intake Pump house

Rain at Seawater Intake Pump house

Rain at Seawater Intake Pump house

Seawater Pipe Pedestals

Seawater Pipe Pedestals

Seawater Pipe Pedestals

Seawater Pipe Pedestals

Seawater Pipe Pedestals

Seawater intake channel

Seawater intake channel

Seawater intake channel

Seawater intake channel

Seawater intake channel

Seawater intake channel

Seawater intake channel

TG Deck -1 Scaffolding works

NDCT-01 CW basin casting works

NDCT-01 CW basin casting works

NDCT-01 CW basin casting works

TG-01 slush cleaning works

FD fan -1B reinforcement works

CST pump house equipment foundation works

ECHP PC-1A/1B works

ECHP PC-1A/1B works

Stacker reclaimer retaining wall reinforcement work

Canteen Building curing work

CEP pit raft -02

CEP Pit raft Unit-02 concreting in progress

Cable Rack GI Piling work in progress

GRP Single line excavation in progress

Canteen Building 2nd Floor Slab work progress

CWIPH Channel final lift work in progress

SWIPH Pipe pedestal works

ESP Control Room 2 : +3.95m slab Reinforcementwork

CW Piping dewatering work in progress

Murrum blanketing area preparation in progress

ESP Control Room 2 : +3.95m slab work

Canteen Building 2nd Floor Slab work progress

Channel wall 3rd and final lift with tie beam

PR-112-113 span beam reinforcement work pgr.

ECHP PC-1A1B PR-62 Piercap Reinforcement work

ECHP PC-1A1B PR-62 Piercap Reinforcement work

CST Pump house PCC for Hotwell pump

CST Pump house pcc works

ESP Control Room-02

TG-01

TG-01

TG-01

TG-01

CST Pump house pcc works

GT1B unloading on to rail road

GT 1C being dragged to loading position

GT 1B dragging to foundation in progress

GT 1B dragging to foundation in progress

GT 1B dragging to foundation in progress

GT 1A placed on plinth

Spare GT Tank placed on Plinth

NDCT-01

NDCT-01

NDCT-01

Seawater Channel final lift shuttering works

Seawater Channel final lift shuttering works

NDCT-02 dewatering in progress

NDCT-02 dewatering in progress

NDCT-02 dewatering in progress

Admin Building works Parapet wall in progress

GRP Double pipeline dewatering in progress

Seawater Intake Channel waterproofing in progress

NDCT-1 ,Basin slab, Pannel no.- 37 concreting

ECHS Pier cap 63 shuttering work in progress

ECHS precast beam works

NDCT-01 Basin slab concreting

Seawater Intake Pump House Wall 4th lift work

Seawater piping pedestals preparation work for PCC

Seawater piping pedestals preparation work for PCC

CW Pipeline Dewatering in progress

Dewatering works in Seawater pump house

Dewatering works in Seawater pump house

Dewatering works in Seawater pump house

Dewatering works in Sea water pump house

ESP control room-02 edge angle works

ECHS precast beam works

ECHS precast beam works

ECHS precast beam works

Unit-01 PA fan and FD fan spring fixing in progres

Unit-01 PA fan and FD fan spring fixing in progres

Unit-01 PA fan and FD fan spring fixing in progres

Unit-01 PA fan and FD fan spring fixing in progres

Dewatering works in Seawater pump house

Dewatering works in Seawater pump house

Dewatering works in Seawater pump house

ECHS precast beam works

ECHS precast beam works

ECHS precast beam works

ECHS precast beam works

ECHS precast beam works

TG-01 staging works in progress

TG-01 staging works in progress

TG-01 staging works in progress

Canteen Building roof shutteriing works

Admin building parapet wall works

Seawater pump house dewatering

Unit-01 Bunker ring beam erection

Seawater Intake Pump House dewatering works

Seawater Intake Pump House dewatering works

Seawater Intake Pump House dewatering works

Seawater Intake Pump House dewatering works

Seawater Intake Pump House dewatering works

Canteen Building roof shuttering works

Canteen Building roof shuttering works

JTB-03 piling in progress

Sea water intake pump House PCC part completed

ID Duct Unit-02 Part-2

Pier reinforcement works

TT-06 erection in progress

TT-07 erection in progress

Generator Transformer Unit-01

Ground Improvement works in MRS Silo

Good earth filling works in Transformer yard

Preservation of Hardwar materials by M/s Pronk

Preservation of Hardwar materials by M/s Pronk

SCR pilechipping works

SCR pilechipping works

GRP Piping civil works

Good earth filling in transformer yard

Spare GT Bitumen painting

Plant view from RODM side

TT-09 pedestal shuttering works

Ash water tank

Ash water tank

sc

sc

TT-12 pilecap

E

E

ID Duct Unit-01 Part-II

ID Duct Unit-01 Part-II

ID Duct Unit-01 Part-II

GRP piping works

FLY ASH MCC 100920

FLY ASH SILO 100920

FLY ASH SILO 100920

Crusher house 100920

Crusher house 100920

P-67 shuttering works in progress

Pier-59 excvation works in progress

Precast beam reinforcement works

SWIPH excavation works

SWIPH channel excavation works

ECHS p-63 reinforcement works

BCN4A4B excavation in progress

Ash Water tank reinforcement works

P-67 cleared for concreting

ID Duct Part-II concreting in progress

ECHP pilecap works

ECHP pilecap works

ECHP pilecap works

ECHP pilecap works

ECHP pilecap works

ECHP pilecap works

ECHP pilecap works

Admin Building

Admin Building

Admin Building

Admin Building

Admin Building

Admin Building

ID duct part-I Unit-01

ECHP piling status

TT-03 erection status

CWPH Excavation status

CWPH Excavation status

CWPH Excavation status

ID Duct Unit-01 Part-II

ID Duct Unit-01 Part-II

ID Duct Unit-01 Part-II

ID Duct Unit-01 Part-II

ID Duct Unit-01 Part-II

ID duct Unit-02 part-2

ID duct Unit-02 part-2

ID duct Unit-02 part-2

TT-12 PILECAP COMPLETED

TT-12 PILECAP COMPLETED

Fly ash Silo

Fly ash Silo

Fly ash Silo

Fly ash Silo

Fly ash Silo

SCR pilechipping works

SCR pilechipping works

BCN 3A3B works

BCN 3A3B works

BCN 3A3B works

BCN 3A3B works

Unit-01 Transformer yard

Unit-01 Transformer yard

Unit-01 Transformer yard

Unit-01 Transformer yard

Backfilling works in DG House

Backfilling works in DG House

Backfilling works in DG House

RODM Control building footing

RODM Control building footing

GRP pipeline excavation and levelling works

GRP pipeline excavation and levelling works

TT-07 erection in progress

Murram works

Murram works

Murram works

CWPH tower crane erection progress

TT-12 pilecap reinforcement works

Driving of liners for piling

SCR excavation works

Fly ash Silo pilecap works

Fly ash Silo pilecap works

Admin Building column works

BCN 3A3B PEDESTAL

GRP piping civil works

GRP piping civil works

Marine liner fabrication works

Admin Building column works

Sea water Pump House excavation works

Sea water Pump House excavation works

Sea water Pump House excavation works

TG-02 Destaging works

TG-02 Destaging works

TG-02 Destaging works

SWIPH EARTH WORK EXCAVATION IN PROGRESS

ECHS P-87 PILE CAP CONCRETE COMPLETED 24-08-2020

ECHS P-90 PILE CHIPPING WORK IN PROGRESS

ECHS P-91 PILE CHIPPING WORK IN PROGRESS

ECHS P-69 PILECAP CONCRETE COMPLETED ON 31-08-2020

ECHS P-68 PILE CHIPPING WORK IN PROGRESS

ECHS P-67 PILE CAP REINFORCEMENT WORK IN PROGRESS

ECHS PIER-65 EARTH WORK EXCAVATION STARTED

SWIPH EARTH WORK EXCAVATION STARTED 31-08-2020

ECHS P-64 PILE CAP CONCRETE COMPLETED ON 14-08-2020

ECHS P-69 PILE CAP PILE CHIPPING AND CLEANING IN PROGRESS.

ECHS P-67 PILE CAP REINFORCEMENT WORK IN PROGRESS

ECHS P-63 PILE CAP CONCRETE COMPLETED ON 22-08-2020

GRP pipeline sand filling works in progress

Curing of BCN-3A3B

jtb

P-87 Pilecap reinforcement works in progress

BATCHING PLANT WORK IN PROGRESS BY SREE SARAVANA

ECHS P-61 PILE CAP REINFORCEMENT WORK IN PROGRESS

ECHS MS LINER ROLLING IN PROGRESS FOR MARINE PILE

SWIPH DEWATTERING IN PROGRESS AT NCTPS STAGE-2

CRUSHER HOUSE 130820

FLYASH SILOS 130820

FLY ASH SILO AREA 130820

TT-03 Erection started

admin Building plinth beam works

P-64 pilecap shuttering works

BCN-3A/3B trestle works

ID Duct Unit-02

VPH-01 slab curing works

P-87 shuttering works in progress

P-64 pilecap

Control Room Building reinforcement works

Batching Plant erection for Sree Saravana

Batching Plant erection for Sree Saravana

Batching Plant erection for Sree Saravana

BCN-3A3B Pilechipping works

Crusher House Pedestal shuttering works

TT-12 pilechipping works

Admin Building plinth beam shuttering works

TT-03 ERECTION IN PROGRESS

Admin Building plinth beam works

ESP COntrol Room-02 backfilling works

P-64 reinforcement works

Sea water Intake Pump house dewatering status

GRP Piping rubble works

GRP Piping rubble works

GRP Piping rubble works

GRP Piping rubble works

Murram Blanketing works in scrap yard

Murram Blanketing works in scrap yard

TT-12 pilechipping works

TT-12 pilechipping works

TT-12 pilechipping works

TT-12 pilechipping works

TT-12 pilechipping works

RODM Complex foundation works

RODM Complex foundation works

RODM Complex foundation works

RODM Complex foundation works

RODM Complex foundation works

RODM Complex foundation works

RODM Complex foundation works

RODM Complex foundation works

RODM Complex foundation works

TG-02 Destaging works

TG-02 Destaging works

TG-02 Destaging works

TG-02 Destaging works

TG-02 Destaging works

TG-02 Destaging works

TG-02 Destaging works

TG-02 Destaging works

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

Unit-01 Generator Transformer foundations

DG building footing works

DG building footing works

DG building footing works

Spare GT foundations 1st lift completed

Spare GT foundations 1st lift completed

Compressor House all pedestals completed

Compressor House all pedestals completed

Compressor House all pedestals completed

BCN-3A3B Pilechipping works

BCN-3A3B Pilechipping works

TT-09 bitumen painting works

Vacuum Pump House-01 roof reinforcement works

Vacuum Pump House-01 roof reinforcement works

Vacuum Pump House-01 roof reinforcement works

Vacuum Pump House-01 roof reinforcement works

RODM Control Building reinforcement works

GT-1A deshuttering works

VPH roof slab reinforcement works

P62 pilecap concrete completed

RODM-control building works

Spare GT Deshuttering works in progress

Vacuum Pump House Slab fixing works in progress

CWPH Slush Cleaning works

GT-1A first lift wall ready for concreting

P62 pilecap ready for concreting

GT-1A first lift wall concreting in progress

Fly Ash Silo PC3 RCC completed

Compressor House Bolt fixing works

BCN-3a/3B FOUNDATION

Rail foundation from GT-1A to GT-1C

TT-12

Seawater pump house Dewatering status

ECHS marine pile liner fabrication

ECHS marine pile liner fabrication

ECHS marine pile liner fabrication

TG-02 Destaging status

Spare GT first lift concrete in progress

ECHS P-61 PILE CAP EXCAVATION WORK IN PROGRESS

ECHS P-62 SHUTTERING WORK IN PROGRESS

ECHS P-64 PILE CHIPPING WORK IN PROGRESS

SWIPH POOJA PERFORMED 29-07-2020

ECHS P-62 PILE CAP REINFORCEMENT WORK IN PROGRESS

CWPH excavation works

Compressor House pedestal Shuttering works

CWPH Tower crane foundations

ECHS permanent liner works

ID Duct Unit-01 part-01

RODM Control Building reinforcement works

Murram blanketing works started

VPH-01 roof beam reinforcement checking

Survey works for JTB-03 in NCTPS stage-II

RODM Control Building reinforcement works

Admin Building levelling works

ESP Control Room-02 Column works

VPH-01 roof works

CWPH excavation status

ECHS P-62 PILE CAP CLEANING WORK COMPLETED

ECHS P63 PILE CAP CONCRETE COMPLETED ON 20-07-2020

ECHS P-62 PILE CAP CLEANING WORK IN PROGRESS

ECHS P-63 PILE CAP SHUTTERING WORK COMPLETED

ECHS P-63 PILE CAP REINFORCEMENT WORK IN PROGRESS.

ECHS BORE PILING WORK IN PROGRESS.

ECHS P-87 PILE CAP REINFORCEMENT WORK IN PROGRESS.

P-63 reinforcement works

VPH-01 roof slab works

CW Pump House excavation in progress

TG-02 Deshuttering status

Fly ash silo PC3B cleared for concreting

DG Building Bitumen painting works

Filter shed Form works in progres

Tranf yard firewall footing casting in progress

DM Building PCC works

CW Pump House excavation in progress

DG Building concreting in progress

VPH roof shuttering works in progress

UFRO footing curing in progress

TG-01 Slush cleaning works

Fly as Silo Pile chipping works

Fly ash Silo rebar fixing works

DM Building excavation works

Fly ash Silo curing works

Batching plant area levelling by Sree Saravana

Fly ash Silo reinforcement works

GT firewall concreting

Flyash Silo lateral load test

Unit-01 CW pit A row casting-223CUM

Unit-01 CW pit A row casting-223CUM

Unit-01 CW pit A row casting-223CUM

DG building footing works

GT firewall concreting

CW pit A row ready for concreting

CW pit A row ready for concreting

GT foundatons

FAS PC3A PILE CAP CONCRETE COMPLETED ON 03-06-2020

ECHS PIER-70 PILE CAP CONCRETE COMPLETED ON 06-06-2020.

Transformer yard firewall footing works

TG-02 Deshuttering in progress

Flyash Silo pile chipping in progress

VPH-01 plinth beam concreting

P-70 ready for concreting

CW pit-A row bolt fixing in progress

UFRO footing curing in progress

DG Building reinforcement and shuttering works

ESP-02 CONTROL ROOM FOOTING WORKS

DM Pump House plastering works

UFRO foundation curing in progress

TG-02 deck deshuttering status

GT firewall reinforcement works

unit-01 CW pit A row

unit-01 CW pit A row

CHP area structural area fabrication in progres

CHP area structural area fabrication in progres

Road works in progress

VPH-01Roof Slab staging and shuttering works

VPH-01Roof Slab staging and shuttering works

ECHS piling works in PC-1A1B

GT firewall reinforcement works

Aux Boiler Fan-B pocket fixing works in progress

RODM Concreting in progress

Flyash siloconcreting in progress-120Cum

Flyash silo pilecap

UFRO shed curing progress

TG-02 deck deshuttering status

TRANSFORMER YARD FIREWALL

unit-01 CW pit A row

Fire station building plastering status

Flyash silo pilebreaking status

TG-02 deck deshuttering status

TG-02 deck deshuttering status

TG-02 deck deshuttering status

Firewall in GT

PC-1A1B piling

DG HOUSE FOOTING WORKS

TRANSFORMER YARD FIREWALL

VPH-01

VPH-01

ESP-02 CONTROL ROOM FOOTING WORKS

CW PIT A ROW UNIT-01 REINFORCEMENT STATUS

RODM-UFRO building

RODM-UFRO building

DG HOUSE FOOTING WORKS

DG HOUSE FOOTING WORKS

Fire station building

Fire station building

Fire station building

PC-1A1B LOAD TEST

RODM-UFRO building footing works

RODM-UFRO building footing works

DG building foundation works

DG building foundation works

Unit -01 CW pit A row reinforcement works

ESP control Room -02 cleaning works

ECHP PC-1A1B piling works started

Mill-2F deck casting in progress

Mill-2F deck casting in progress

Mill-2F deck casting in progress

RODM reinforcement binding works

RODM reinforcement binding works

Mill-2F deck checking in progress

Mill-2F deck checking in progress

Unit-01 A row raft cleaning works

Auxiliary boiler FD foundation cleared for concret

TG-02 works commenced by Simplex

ESP control Room -02 levelling and dressing works

Fly ash silo reinforcement works

A-row pilechipping works

TT-10 4th tier erection completed

TT-11 third tier alignment completed

NDCT CW basin concreting

TT-02 erection started

ID duct part-I

Admin Building plinth beam works

Pier-54 reinforcement works

CW Channel excavation works

Fly ash silo ready for PCC

DG Building

P70 reinforcement status

UFRO Building footing works

UFRO Building footing works

Raker column- 24/96 completed

GT-1B raft reinforcement works

P-63 lateral load test

ECHS PIER 90 LOAD TEST COMPLETED.

NDCT-01 CW basin casting

Precast beam reinforcement works

DG set building excavation in progress

Unit-01 ID duct part-1

Unit-02 ID duct part-2

A row brick works

GT-1C raft casted

MILL-1C hopper erection

MILL-1C hopper erection

MILL-1C hopper erection

MILL-1C hopper erection

ECHS PIER-90 ROUTINE VERTICAL LOAD TEST IN PROGRES

ECHS SET-12 INITIAL PULLOUT LOAD TEST WIP

ECHS PIER 70 EARTH WORK EXCAVATION IN PROGRESS.

ECHS PIER-90 ROUTINE VERTICAL LOAD TEST WIP

ECHS SET-12 INITIAL VERTICAL LOAD TEST COMPLETED

NDCT-01 CW BASIN

CW pit A row

VPH bottom support works

Raker Column -45/46

TT-09

P-71 concrete completed

Compressor house erection started

P62 Pcc works

ECHS P-63 ROUTINE VERTICAL LOAD TEST WORK IN PROGR

ECHS SET-12 INITIAL VERTICAL LOAD TEST STARTED

ESP control Room -02 column lift works

DG set building excavation in progress

P71 reinforcement status

NDCT raker column scaffolding and shuttering works

TT-09 reinforcement works

TT-06 bracings erection

TT-10 6 th tier erection

Crusher House footing works

TT-01 erection

TT-03 ready for concreting

Crusher house footing - 21/28

Spare GT concreting in progress

CWPH EXCAVATION COMMENDED

TT-09 reinforcement works

Power House-02 BC row columns

ID Duct Part-II

ID Duct Part-II

ID Duct Part-II

ID duct part-II foundations

TT-11/TT-10/TT-08

ESP Control Room-02

ESP Control Room-02

Control Room structure

TG-01 Slush cleaning works

TT10 erection

Spare GT ready for casting

SAT foundations

Compressor House pedestals

Compressor House pedestals

ESP-2 to chimney outlet duct support erecting

ESP-2 to chimney outlet duct support erecting

ESP-2 to chimney outlet duct support erecting

ESP-2 to chimney outlet duct support erecting

Set-13 vertical load test

ESP control Room -02

VPH-01 roof beam

Raker column concreting

TT-09 Bottom reinforcement works

Unit-01 excavation works in A ROW

Compressor house pedestals bitumen painting

ID duct foundations

NDCT-01raker column

RODM filter shed excavation works

TT-03

SCR excavation for PC-3

TT-09

TG-02 Curing works

Compressor house column painting

Compressor house pedestals

Compressor house SAT foundation s

CWPH dewatering

P72 pilecap reinforcement works

ID duct part-II foundations

TG-02 deck casting

Spare-GT reinforcement works

TT-01 erection status

Boiler-02 Furnace front hopper erection

Pull Out test Set-15

NDCT Raker column

NDCT Raker column

CWPH dewatering

ID Duct part-II reinforcement fixing works

VPH-01 Tiebeam shuttering works

ID Duct part-II

NDCT Raker column shuttering works

NDCT-01 basin slab reinforcment works

CWPH dewatering

Fire station building roof casting under progress

Crusher house shuttering works

Crusher house shuttering works

ID duct part-2

Crusher house PC-7 reinforcement works

Crusher house PC-5 concreting

Precast beam casting

P-73 Pilecap completed

ESP control Room -02

TT-03 beam reinforcement works

Fire station building roof slab reinforcement work

Plate load test in compressor house

P73 concreting

TT-04/05/06

TT-06 erection works

CST Tank

View of power house and Boiler

spare GT Reinforcement placement

TT-08/10/11

GT-1A pilechipping works

spare GT Reinforcement placement

Compressor House pedestals

BCN 5A5B Piling

P73 Shuttering works

Pier 93 piling in progress

P73 Reinforcement works

TP-11 Pull out test

Crusher House Pilecap Concreting

Unit-01 ID Outlet duct erection

Compressor House pedestals

RODM UFRO building PCC works

RODM UFRO building PCC works

ECHS PIER 76 ROUTINE VERTICAL LOAD TEST PROGRESS

P86 vertical load test

TG Deck-02 top insert and plate fixing works

RODM PCC arrangements

P73 reinforcement fixing

Pile Integrity test in Spare GT

BCN-1A 1B

VPH-01

ESP Control Room-02

NDCT CW basin concreting

NDCT CW basin concreting

Fire station building

GT-1A/1B/1C pilebreaking and PCC works

GT-1A/1B/1C pilebreaking and PCC works

GT-1A/1B/1C pilebreaking and PCC works

ESP Control Room-02

Excavation and PCC works in RODM

Compressor House

Spare GT

TG-02 deck

TG-02 deck

TG-02 deck

TG-02 deck

TG-02 deck

TG-02 deck

TG-02 deck

TG-02 deck

ECHS SET-11 INITIAL VERTICAL LOAD TEST COMPLETED 13-02-2020

ECHS SET-15 INITIAL VERTICAL LOAD TEST COMPLETED

Admin Building all footings completed

Fire station building

Compressor House pedestal

AWPH raft

ESP Control Room-02

Generator transformer PCC works

TT-09 pilechipping

Compressor house

TG deck-02

TG deck-02

TG deck-02

TG deck-02

TG deck-02

P73 Pilechipping

VPH-01

Transformer yard PCC works

GT-1A/1B/1C excavation and PCC works

GT-1A/1B/1C excavation and PCC works

ID duct part-I AB pass foundations

TT-08 erection status

TT-09 pilechipping

Ash water Pump House

P73 Pilechipping

NDCT-01

NDCT-01

NDCT-01

NDCT-01

TT-10 erection status

BCN-1A 1B

AWPH

ID duct part-II foundations