Home   

NORTH KARANPURA (3X660 MW)


LTRH last coil Ern U3

ID outlet duct RHS U3

Rear Arch panel Ern U3 blr

Pass E heater insulator ESP U2

Chemical cleaning of PP tubes at U3.

U3 ACC Main duct Ern

Main duct ACC U3 erection

Grade slab at CPU & CST area U3

Dereator & CST tank U3 erection

ACC main duct unit 3 foundation

ACC unit 3 main duct foundation

GT fire wall unit 3

GT unit 3 foundation

GT unit 3 fire wall

GT unit 3 foundation

LVS at U2 Control room

Unit 3 LVS frame at control room

LP HP heaters at 17 mtrs U3

Outer casing of LP Turbine U3

Outer Casing of LP turbine U3

LP HP heaters piping U3 17 mtrs

LP Turbine U3

LP & Generator U3

IVCV of IP Turbine U3

HP IP Turbine U3

Floor 17 mtrs U3

TG flood U3 HP turbine

GT -2 commg u/p

GT unit 2 ready for Synch

CPU 2 under commg

ACC 2 vacuum pumps

LVS installed at U2 CR

U2 & 3 CCR

Unit 3 CCR

U3 ACC trust erection

CPU 2 piping & valves erection

CPU 2 vessel erection

CPU 2 drain pit cleaning

CPU 2 drain pit

CPU & CST tank U2

ACC 2 drain pumps

ACC 2 condenser line

CPU Unit 2 panel room

CEP pumps U2

U2 ACC STREET 10

U2 ACC STREET 10 progress

Unit-3 ACC erection

Harbin Trestle near vacuum pump ACC 2

Trestle below ACC 2

Harvin Trestle ACC 2 near CEP

A row trestle U2 erection

A row trestle U2 erection

ACC U2 duct section 11-12-13

Painting at U1 ACC columns

CPU vassel U2

Vacuum pumps ACC U2

Vacuum pump ACC U2

ACW underground piping U2

ACW piping U2

Vertical Cable tray ACC U2

Cable tray job ACC U2

ACC U2 cable tray job

Cable tray progress ACC U2

GT ST fire wall U2

ACW piping excavation U2

ACW piping excavation ACC U2

ACW piping under ACC U2

U3 Bunker RHS

U2 Chimney during Steam blowing

Truss erection ACC U3

Truss erection U3 u/p

LTRH COIL ERECTION U3

U2 CPU foundation u/p at ACC area

U2 GT rail erection u/p

U3 IP Turbine ready for box up

U3 ACC first fan bell erection

TG barring U2 puja

ACC U2 progress

GT civil foundation u/p U3

GT U3 civil area under ACC U3

ST-3 under ACC U3

AT U2 civil foundation

UAT U2 foundation

GT U2 civil work u/p

GT area under ACC U2

CEP Pump Erection U2

CEP PUMP U2

Truss erection of ACC U3

Truss erection of U2 ACC

U3 ESP E pass inlet funnel duct erection

False ceiling erection CCR unit-2

False ceiling CCR U2

Temporary steam boiling pipes @17 Mrs U2

Truss erection in ACC U3

Front View NKP Site

Backup standby GT between ACC U1&2.

U2 ACC riser-5 erection u/p

FD fan 2A C&I fittings U2

Boiler U2 & U3 Drone view

Steam blowing pipes arrangement at U2

Oil Filtrations at transformer U2 unloading bay

U3 Generator blue matching u/p

U2 Final duct erection I/d to chimneys

CCR U2&3 false ceilings erection

CCR U2&3 false ceilings erection

U2&3 control room false ceilings erection

ACC U2 Section 6 erection

UD truss erection ACC U2

UAT civil pedestals unit2

ST pedestals readiness U2


Chemical cleaning U2

Chemical cleaning pumps

U2 steam blowing blocking flange pipe

U2 steam blocking device installation

Steam blocking device installed at U2 HP Turbine

MN row Duct structure erection

ESP U2 inter T Duct with blanking erection

ESP U2 inlet T duct erection

U3 APH Center section erection

ACC U2 Section 6 erection

ACC U2 Section 6 shifting for erection

NKP gate no 1 view from admn building

NKP Yard behind Admn building

CC pump dummy un installation U2

ID FAN INSULATION U2

MN row U2

ACC U2 Gimble 2nd part erection

Between ESP U2 & U3

2nd gallery erection between TP4 & TP5

Gallery erection between TP 5 & TP 6

Drone view Admin Building NTPC

APH Center section erection u/p Boiler-3

Boiler-3 second pass roof alignment

ACC unit 2 riser -3 ern

TP-6 unit#2

BAH Boiler unit#2

Control room unit 3 fall ceilings

Control room panels unit 2

ACC MCC UNIT 3

ACC MCC ROOM UNIT 2

ACC MCC UNIT 2

Transformer ready for erection.

Spare GT under ACC unit2

TP-5 works under progress

Boiler-3 backpass

TG U#3 HP turbine ESV & CV erection

TG U#3 TDBFP A erection

Night view Switch yard

Night view

Drone view NKP

APH Boiler U-2

ID FAN Ducting unit-2

ESP Unit-2

ESP Unit-2

Boiler Unit-3

FD FANs Unit-2

600MT crane position between BLR 2&3

ESP Unit-3 & TP-7

TP-6

TP-5

PA FAN unit#2

ACC duct raiser erection completion

ACC unit 2 erection

ESP duct erection unit 2

ESP unit1 Pass E insulation

CD bay Unit #2 pipe erection

ACC duct raiser erection completion

ACC unit 1 top view

ACC raiser 8 erection

ACC Duct elbow sec14 erection

ACC raiser 9 erection

TG "A" row cladding sheet work progress

Control room 2&3

Boiler unit 3

CD bay Unit #3

ACC street 1 tube bundle erection completion

ACC-unit 2 progress

Insulation in Boiler #1

Insulation in Boiler #1

Insulation in Fan Duct

ACC Permanent lift foundation

ST of unit #3

MRS pyrite hopper erection

ACC unit#1 duct section

ACC unit#1 staircase structure

ACC unit #2 deareator foundation

ACC unit 3 duct foundation

ACC piping erection

ACC raiser assembly

Boiler bottom ring header inside

potable pipe line work

ACC fan bell assembly

MRS fabrication location

MRS fabrication location

Fabrication yard

Fabrication yard

TP-5 and ESP Unit#2

ACC Duct section erection 9,10,11,12,13

Duct section erection 9,10,11,12,13

ACC `A" structure inside

ACC temp plateform for erection

ACC plateforms

ACC fan casing

ACC side cladding

ACC fan bridge

Fan bridge & motor

Mills box up Boiler #1

Drain work progress

Permanent staircase erection ACC

Fan bell erection ACC

Cable gantry erection between ACC column by TBG

Cable gantry erection between ACC column by TBG

FO tanks

TP-1

O&M store

FGD area & workshop building

Constrcution cover shed

Erection of Duct elbow street 7

Erection of Duct raiser street 7

TDBFP unit 2

unit 2 TG area

unit 1 CEP area

Coal piping progress Unit 1

Coal piping progress Unit 1

Last Gallery of conveyor 2AB erection CHP

ACC drain pump piping in progress

boiler unit 2&3

ACC wall cladding in progress

ACC#3

ACC #3 Civil column progress

ACC #2 erection progress

Pipe Rack Part-1 Erection

Charge Pump Erected for AHP

HCSD Pump Erection for AHP system

ACC duct erection 6 with manifold

ACC duct elbow street 6

ACC permanent staircase progress

BOF to ESP duct erection Boiler #1

DM Plant

DM plant control room

ACC street 1 progress

ACC Street 10 readiness

View from crusher house

TP-9 & 10

View from crusher house

View from crusher house

ACC Panel room

ACC Panel room

ACC Panel room

ACC main steam duct 7,8& 9 erection.

Open yard outside plant boundary

Painting of ACC steam manifold

ACC main steam duct ground assembly

view from crusher house

view from crusher house

Crusher house

Crusher house

Cover shed between shed 4 and 3

Cover shed between shed 2 and 3

PT Plant aerator charged

CST tanks

Pipe Rack Part-7 Fab under progress

Dewatering Bin

CH - Painting Under progress

ACC permanent lift foundation excavation

ACC permanent lift foundation excavation

ACC duct erection 7,8,&9

ACC vaccum pump

ACC vaccum pump

ACC transformer and panel room

ACC cable tray works

GT area

GT area

Lifting of ACC Duct no 7,8 and 9

Lifting of ACC Duct no 7,8 and 9

service building office room

service building office room

service building

service building

service building

service building

Pavement work in ACC area

Pavement work in ACC area

DM Plant

ESP unit 1

ESP unit 1

ESP unit 1

ESP unit 1

MN row erection In boiler #1

hopper erection Boiler #2

ACC side view street 10 unit #1

Compressor house inside

Compressor house inside view

Compressor house

FGD Absorber Unit-1A

FGD Absorber Unit-1A

FGD Absorber Unit-1A

FGD Absorber Unit-1A

FGD Chimney

FGD Chimney

FGD Chimney

FGD Chimney

BCN 2A/B

Dewatering Bin and HCSD Silo

BCN 1A/B

Stacker cum Reclaimer 1

ACC erection of street 10

ACC-2

ACC erection of street 1

ACC unit 2 erection

IVCV erection TG-2

SH joints Boiler 1

street 1 ACC erection A frame

SH joints Boiler 1

ACC erection of street 1

ACC erection of street 1

ACC erection of street 1

GBC assemble TG unit 2

LP casing erection TG unit 2

DM Plant

Service Building

IDCT

ACC mechanical Erection

U#1 Mill LHS

unit 1 Duct

Service Building

Power House

O&M Stores

ID FAN U2 LHS

ID FAN U1

FOPH BUILDING

FOAM PUMP HOUSE

FIRE WATER TANKS

ESP U3

ESP U2

ESP U1

ESP CR UNIT2

ESP CR U1

CPU REGEN BLDG

CLARIFIED WATER TANK AND PH

CCR UNIT 3

AUX BOILER

ACW Pump House

ACC

Bunker Unit 2 LHS

Bunker Unit 1 RHS

Bunker Unit 1 LHS

IDCT

Fire Water Tank and Pump House

Compressor House

PT Plant , Chemical House

DM Plant

ACC Unit 2

ACC Mechanical Erection

Boiler Unit 3

Boiler Unit 2

Boiler Unit 1

TG Unit 1

TG Unit 2

ESP Unit 3

ESP Unit 1 and 2

Boiler Unit 1

Boiler Unit 3

unit 1 mill

CW Clarifier

Mills

CPU Regen Building

PH Unit 3

Unit-3 ESP

Unit-3 Boiler

ACC Erection

TG #2

TG #1

NKSTPP Site

Boiler Unit 3


ESP Unit 2

ESP Unit1

FD, PA Fan U#1

Mill Unit 1

Mill and Bunker Unit 1

Service Building

DM Plant

IDCT

ACC Mech Erection

IDCT

Power House Roof

PH Structure A Row

Service Building

DM Tanks

Aux. Boiler

Clarifier

ESP Unit 3

Boiler Unit 3

ESP Unit 2

Boiler Unit 2

ESP Unit 1

CCR PH Unit 1

Unit 1 Boiler

Compressor House

PH Unit 1

ACW treatment Plant

IDCT

ACC unit 1

PT Plant

ACC Structure Pre Assembly

Unit 2 TG

Unit 2 ESP

Auxiliary Boiler

ACC

Unit 1 ESP

Unit 1 Boiler

FOPH building

Unit 2 ESP Control Room

LDO tanks

unit 2 ID Fan

Unit 1 ID Fan

unit 1 FD , PA Fan

Unit 1 Mill area

unit 2 Boiler

Unit 3 Boiler

Unit 2 Mill area

Unit 3 ESP

Power House area

DM Plant, N Pit, DM Tanks, CPU regen Bldg

IDCT

IDCT

Unit-1 Mills

UNIT 2 PA FAN

Boiler Unit 2

ESP Unit 1

ESP Unit 2

ESP Unit 3

Boiler Unit 3

Mill Unit 2

Power House Unit 3

Flue Can Unit 1

ID Fan Unit 1

ESP Unit 1 and 2

FOHS package

Plant Overview

IDCT

DM Tanks

DM Plant area

ACC, Boiler, Chimney

DM Storage Tanks

Boiler Unit 3

Boiler Unit 2

DM Plant

ACC area

Unit 1 Boiler

Compressor House

Power House Structure

Unit-3 ESP area

Unit-1 ESP area

Unit-1 Boiler

Unit 2 Boiler

Unit-3 Boiler

Unit 3 Chimney

Unit 3 Boiler

Power House Building

Unit-2 Boiler and Power House

DM Storage Tanks

Unit-3 Boiler area

Unit-3 Power House

Unit-1 Mills area

ACC area

Unit-3 Boiler

PT Plant

Unit-1 Boiler and Power House

DM water Tanks

Unit-1 Boiler

Unit-3 Boiler area

Unit-1,2&3 Chimney

Unit-3 ESP area

Unit-1,2&3 Power House

Unit-1 ESP area

Air Cooled Condenser (ACC)

Unit-1 Power House and Boiler area

DM tanks, DM plant area

Induced Draft Cooling Tower (IDCT) area

North Karanpura 1 ACC Column

Unit-3 Boiler

Compressor House

Boiler Unit 3

ACC

IDCT

Unit 1 Power House