LTRH last coil Ern U3
|
ID outlet duct RHS U3
|
Rear Arch panel Ern U3 blr
|
Pass E heater insulator ESP U2
|
Chemical cleaning of PP tubes at U3.
|
U3 ACC Main duct Ern
|
Main duct ACC U3 erection
|
Grade slab at CPU & CST area U3
|
Dereator & CST tank U3 erection
|
ACC main duct unit 3 foundation
|
ACC unit 3 main duct foundation
|
GT fire wall unit 3
|
GT unit 3 foundation
|
GT unit 3 fire wall
|
GT unit 3 foundation
|
LVS at U2 Control room
|
Unit 3 LVS frame at control room
|
LP HP heaters at 17 mtrs U3
|
Outer casing of LP Turbine U3
|
Outer Casing of LP turbine U3
|
LP HP heaters piping U3 17 mtrs
|
LP Turbine U3
|
LP & Generator U3
|
IVCV of IP Turbine U3
|
HP IP Turbine U3
|
Floor 17 mtrs U3
|
TG flood U3 HP turbine
|
GT -2 commg u/p
|
GT unit 2 ready for Synch
|
CPU 2 under commg
|
ACC 2 vacuum pumps
|
LVS installed at U2 CR
|
U2 & 3 CCR
|
Unit 3 CCR
|
U3 ACC trust erection
|
CPU 2 piping & valves erection
|
CPU 2 vessel erection
|
CPU 2 drain pit cleaning
|
CPU 2 drain pit
|
CPU & CST tank U2
|
ACC 2 drain pumps
|
ACC 2 condenser line
|
CPU Unit 2 panel room
|
CEP pumps U2
|
U2 ACC STREET 10
|
U2 ACC STREET 10 progress
|
Unit-3 ACC erection
|
Harbin Trestle near vacuum pump ACC 2
|
Trestle below ACC 2
|
Harvin Trestle ACC 2 near CEP
|
A row trestle U2 erection
|
A row trestle U2 erection
|
ACC U2 duct section 11-12-13
|
Painting at U1 ACC columns
|
CPU vassel U2
|
Vacuum pumps ACC U2
|
Vacuum pump ACC U2
|
ACW underground piping U2
|
ACW piping U2
|
Vertical Cable tray ACC U2
|
Cable tray job ACC U2
|
ACC U2 cable tray job
|
Cable tray progress ACC U2
|
GT ST fire wall U2
|
ACW piping excavation U2
|
ACW piping excavation ACC U2
|
ACW piping under ACC U2
|
U3 Bunker RHS
|
U2 Chimney during Steam blowing
|
Truss erection ACC U3
|
Truss erection U3 u/p
|
LTRH COIL ERECTION U3
|
U2 CPU foundation u/p at ACC area
|
U2 GT rail erection u/p
|
U3 IP Turbine ready for box up
|
U3 ACC first fan bell erection
|
TG barring U2 puja
|
ACC U2 progress
|
GT civil foundation u/p U3
|
GT U3 civil area under ACC U3
|
ST-3 under ACC U3
|
AT U2 civil foundation
|
UAT U2 foundation
|
GT U2 civil work u/p
|
GT area under ACC U2
|
CEP Pump Erection U2
|
CEP PUMP U2
|
Truss erection of ACC U3
|
Truss erection of U2 ACC
|
U3 ESP E pass inlet funnel duct erection
|
False ceiling erection CCR unit-2
|
False ceiling CCR U2
|
Temporary steam boiling pipes @17 Mrs U2
|
Truss erection in ACC U3
|
Front View NKP Site
|
Backup standby GT between ACC U1&2.
|
U2 ACC riser-5 erection u/p
|
FD fan 2A C&I fittings U2
|
Boiler U2 & U3 Drone view
|
Steam blowing pipes arrangement at U2
|
Oil Filtrations at transformer U2 unloading bay
|
U3 Generator blue matching u/p
|
U2 Final duct erection I/d to chimneys
|
CCR U2&3 false ceilings erection
|
CCR U2&3 false ceilings erection
|
U2&3 control room false ceilings erection
|
ACC U2 Section 6 erection
|
UD truss erection ACC U2
|
UAT civil pedestals unit2
|
ST pedestals readiness U2
|
|
Chemical cleaning U2
|
Chemical cleaning pumps
|
U2 steam blowing blocking flange pipe
|
U2 steam blocking device installation
|
Steam blocking device installed at U2 HP Turbine
|
MN row Duct structure erection
|
ESP U2 inter T Duct with blanking erection
|
ESP U2 inlet T duct erection
|
U3 APH Center section erection
|
ACC U2 Section 6 erection
|
ACC U2 Section 6 shifting for erection
|
NKP gate no 1 view from admn building
|
NKP Yard behind Admn building
|
CC pump dummy un installation U2
|
ID FAN INSULATION U2
|
MN row U2
|
ACC U2 Gimble 2nd part erection
|
Between ESP U2 & U3
|
2nd gallery erection between TP4 & TP5
|
Gallery erection between TP 5 & TP 6
|
Drone view Admin Building NTPC
|
APH Center section erection u/p Boiler-3
|
Boiler-3 second pass roof alignment
|
ACC unit 2 riser -3 ern
|
TP-6 unit#2
|
BAH Boiler unit#2
|
Control room unit 3 fall ceilings
|
Control room panels unit 2
|
ACC MCC UNIT 3
|
ACC MCC ROOM UNIT 2
|
ACC MCC UNIT 2
|
Transformer ready for erection.
|
Spare GT under ACC unit2
|
TP-5 works under progress
|
Boiler-3 backpass
|
TG U#3 HP turbine ESV & CV erection
|
TG U#3 TDBFP A erection
|
Night view Switch yard
|
Night view
|
Drone view NKP
|
APH Boiler U-2
|
ID FAN Ducting unit-2
|
ESP Unit-2
|
ESP Unit-2
|
Boiler Unit-3
|
FD FANs Unit-2
|
600MT crane position between BLR 2&3
|
ESP Unit-3 & TP-7
|
TP-6
|
TP-5
|
PA FAN unit#2
|
ACC duct raiser erection completion
|
ACC unit 2 erection
|
ESP duct erection unit 2
|
ESP unit1 Pass E insulation
|
CD bay Unit #2 pipe erection
|
ACC duct raiser erection completion
|
ACC unit 1 top view
|
ACC raiser 8 erection
|
ACC Duct elbow sec14 erection
|
ACC raiser 9 erection
|
TG "A" row cladding sheet work progress
|
Control room 2&3
|
Boiler unit 3
|
CD bay Unit #3
|
ACC street 1 tube bundle erection completion
|
ACC-unit 2 progress
|
Insulation in Boiler #1
|
Insulation in Boiler #1
|
Insulation in Fan Duct
|
ACC Permanent lift foundation
|
ST of unit #3
|
MRS pyrite hopper erection
|
ACC unit#1 duct section
|
ACC unit#1 staircase structure
|
ACC unit #2 deareator foundation
|
ACC unit 3 duct foundation
|
ACC piping erection
|
ACC raiser assembly
|
Boiler bottom ring header inside
|
potable pipe line work
|
ACC fan bell assembly
|
MRS fabrication location
|
MRS fabrication location
|
Fabrication yard
|
Fabrication yard
|
TP-5 and ESP Unit#2
|
ACC Duct section erection 9,10,11,12,13
|
Duct section erection 9,10,11,12,13
|
ACC `A" structure inside
|
ACC temp plateform for erection
|
ACC plateforms
|
ACC fan casing
|
ACC side cladding
|
ACC fan bridge
|
Fan bridge & motor
|
Mills box up Boiler #1
|
Drain work progress
|
Permanent staircase erection ACC
|
Fan bell erection ACC
|
Cable gantry erection between ACC column by TBG
|
Cable gantry erection between ACC column by TBG
|
FO tanks
|
TP-1
|
O&M store
|
FGD area & workshop building
|
Constrcution cover shed
|
Erection of Duct elbow street 7
|
Erection of Duct raiser street 7
|
TDBFP unit 2
|
unit 2 TG area
|
unit 1 CEP area
|
Coal piping progress Unit 1
|
Coal piping progress Unit 1
|
Last Gallery of conveyor 2AB erection CHP
|
ACC drain pump piping in progress
|
boiler unit 2&3
|
ACC wall cladding in progress
|
ACC#3
|
ACC #3 Civil column progress
|
ACC #2 erection progress
|
Pipe Rack Part-1 Erection
|
Charge Pump Erected for AHP
|
HCSD Pump Erection for AHP system
|
ACC duct erection 6 with manifold
|
ACC duct elbow street 6
|
ACC permanent staircase progress
|
BOF to ESP duct erection Boiler #1
|
DM Plant
|
DM plant control room
|
ACC street 1 progress
|
ACC Street 10 readiness
|
View from crusher house
|
TP-9 & 10
|
View from crusher house
|
View from crusher house
|
ACC Panel room
|
ACC Panel room
|
ACC Panel room
|
ACC main steam duct 7,8& 9 erection.
|
Open yard outside plant boundary
|
Painting of ACC steam manifold
|
ACC main steam duct ground assembly
|
view from crusher house
|
view from crusher house
|
Crusher house
|
Crusher house
|
Cover shed between shed 4 and 3
|
Cover shed between shed 2 and 3
|
PT Plant aerator charged
|
CST tanks
|
Pipe Rack Part-7 Fab under progress
|
Dewatering Bin
|
CH - Painting Under progress
|
ACC permanent lift foundation excavation
|
ACC permanent lift foundation excavation
|
ACC duct erection 7,8,&9
|
ACC vaccum pump
|
ACC vaccum pump
|
ACC transformer and panel room
|
ACC cable tray works
|
GT area
|
GT area
|
Lifting of ACC Duct no 7,8 and 9
|
Lifting of ACC Duct no 7,8 and 9
|
service building office room
|
service building office room
|
service building
|
service building
|
service building
|
service building
|
Pavement work in ACC area
|
Pavement work in ACC area
|
DM Plant
|
ESP unit 1
|
ESP unit 1
|
ESP unit 1
|
ESP unit 1
|
MN row erection In boiler #1
|
hopper erection Boiler #2
|
ACC side view street 10 unit #1
|
Compressor house inside
|
Compressor house inside view
|
Compressor house
|
FGD Absorber Unit-1A
|
FGD Absorber Unit-1A
|
FGD Absorber Unit-1A
|
FGD Absorber Unit-1A
|
FGD Chimney
|
FGD Chimney
|
FGD Chimney
|
FGD Chimney
|
BCN 2A/B
|
Dewatering Bin and HCSD Silo
|
BCN 1A/B
|
Stacker cum Reclaimer 1
|
ACC erection of street 10
|
ACC-2
|
ACC erection of street 1
|
ACC unit 2 erection
|
IVCV erection TG-2
|
SH joints Boiler 1
|
street 1 ACC erection A frame
|
SH joints Boiler 1
|
ACC erection of street 1
|
ACC erection of street 1
|
ACC erection of street 1
|
GBC assemble TG unit 2
|
LP casing erection TG unit 2
|
DM Plant
|
Service Building
|
IDCT
|
ACC mechanical Erection
|
U#1 Mill LHS
|
unit 1 Duct
|
Service Building
|
Power House
|
O&M Stores
|
ID FAN U2 LHS
|
ID FAN U1
|
FOPH BUILDING
|
FOAM PUMP HOUSE
|
FIRE WATER TANKS
|
ESP U3
|
ESP U2
|
ESP U1
|
ESP CR UNIT2
|
ESP CR U1
|
CPU REGEN BLDG
|
CLARIFIED WATER TANK AND PH
|
CCR UNIT 3
|
AUX BOILER
|
ACW Pump House
|
ACC
|
Bunker Unit 2 LHS
|
Bunker Unit 1 RHS
|
Bunker Unit 1 LHS
|
IDCT
|
Fire Water Tank and Pump House
|
Compressor House
|
PT Plant , Chemical House
|
DM Plant
|
ACC Unit 2
|
ACC Mechanical Erection
|
Boiler Unit 3
|
Boiler Unit 2
|
Boiler Unit 1
|
TG Unit 1
|
TG Unit 2
|
ESP Unit 3
|
ESP Unit 1 and 2
|
Boiler Unit 1
|
Boiler Unit 3
|
unit 1 mill
|
CW Clarifier
|
Mills
|
CPU Regen Building
|
PH Unit 3
|
Unit-3 ESP
|
Unit-3 Boiler
|
ACC Erection
|
TG #2
|
TG #1
|
NKSTPP Site
|
Boiler Unit 3
|
|
ESP Unit 2
|
ESP Unit1
|
FD, PA Fan U#1
|
Mill Unit 1
|
Mill and Bunker Unit 1
|
Service Building
|
DM Plant
|
IDCT
|
ACC Mech Erection
|
IDCT
|
Power House Roof
|
PH Structure A Row
|
Service Building
|
DM Tanks
|
Aux. Boiler
|
Clarifier
|
ESP Unit 3
|
Boiler Unit 3
|
ESP Unit 2
|
Boiler Unit 2
|
ESP Unit 1
|
CCR PH Unit 1
|
Unit 1 Boiler
|
Compressor House
|
PH Unit 1
|
ACW treatment Plant
|
IDCT
|
ACC unit 1
|
PT Plant
|
ACC Structure Pre Assembly
|
Unit 2 TG
|
Unit 2 ESP
|
Auxiliary Boiler
|
ACC
|
Unit 1 ESP
|
Unit 1 Boiler
|
FOPH building
|
Unit 2 ESP Control Room
|
LDO tanks
|
unit 2 ID Fan
|
Unit 1 ID Fan
|
unit 1 FD , PA Fan
|
Unit 1 Mill area
|
unit 2 Boiler
|
Unit 3 Boiler
|
Unit 2 Mill area
|
Unit 3 ESP
|
Power House area
|
DM Plant, N Pit, DM Tanks, CPU regen Bldg
|
IDCT
|
IDCT
|
Unit-1 Mills
|
UNIT 2 PA FAN
|
Boiler Unit 2
|
ESP Unit 1
|
ESP Unit 2
|
ESP Unit 3
|
Boiler Unit 3
|
Mill Unit 2
|
Power House Unit 3
|
Flue Can Unit 1
|
ID Fan Unit 1
|
ESP Unit 1 and 2
|
FOHS package
|
Plant Overview
|
IDCT
|
DM Tanks
|
DM Plant area
|
ACC, Boiler, Chimney
|
DM Storage Tanks
|
Boiler Unit 3
|
Boiler Unit 2
|
DM Plant
|
ACC area
|
Unit 1 Boiler
|
Compressor House
|
Power House Structure
|
Unit-3 ESP area
|
Unit-1 ESP area
|
Unit-1 Boiler
|
Unit 2 Boiler
|
Unit-3 Boiler
|
Unit 3 Chimney
|
Unit 3 Boiler
|
Power House Building
|
Unit-2 Boiler and Power House
|
DM Storage Tanks
|
Unit-3 Boiler area
|
Unit-3 Power House
|
Unit-1 Mills area
|
ACC area
|
Unit-3 Boiler
|
PT Plant
|
Unit-1 Boiler and Power House
|
DM water Tanks
|
Unit-1 Boiler
|
Unit-3 Boiler area
|
Unit-1,2&3 Chimney
|
Unit-3 ESP area
|
Unit-1,2&3 Power House
|
Unit-1 ESP area
|
Air Cooled Condenser (ACC)
|
Unit-1 Power House and Boiler area
|
DM tanks, DM plant area
|
Induced Draft Cooling Tower (IDCT) area
|
North Karanpura 1 ACC Column
|
Unit-3 Boiler
|
Compressor House
|
Boiler Unit 3
|
ACC
|
IDCT
|
Unit 1 Power House
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|