DARLIPALLI SG & ESP PKG (2X800 MW)


Mill reject system compressors Ern I/P

U2 FD fan 2B lube oil flushing I/P

U2 LHS Mills Duct erection I/P

U2 Seal air fan erection work started

U2 BOF to ESP Duct in completion stage

U1 RHS lift sheeting and guide channel I/P

U1 RHS lift sheeting and guide channel I/P

U-1 LHS view, Painting I/P in coal pipes

U-2 BOF to ESP Duct Erection

U-2 PA 2B fdn status- NTPC

U-2 FD fan 2 B

Compressor ACW supply line upto strainer flushing

U-1 Safety valves floating completed on 11.11.19

Approach to Unloading bay TG2- NTPC

Approach to “A” Row, TG-2 - NTPC

U2 CD bay approach - NTPC

U2 ESP control room status -NTPC

U2 PA -B fdn status - NTPC

U2 FD B area water logged and not backfilled/NTPC

U1 Silo fdn area full with water -NTPC

U-2 ID fan A Boxed up for readiness of fan trial

U1 LHS bunker roof sheet completed, side sheet I/P

U-1 Full load achieved on 02.10.19

U-1 LHS mills duct insulation (Mill J only balance

U-1 PAPH LHS hot duct insulation

U1 LHS Coal feeders

U1 RHS bunker side sheeting work

U1 RHS bunker side sheeting work

U-1 Boiler painting with airless sprayer M/c

U2 PA B FDN STATUS BY NTPC

U2 FD B FDN STATUS BY NTPC

U1 LHS Mill duct insulation

U1 RHS Bunker side roof sheeting

U-2 BOF to ESP (ABC pass) welding i/p

U-2 CD bay approach -NTPC

U-1 LHS PA hot Bus duct insulation in completion

U-2 FD A to SAPH A insulation

U-2 PA 2B fdns status by NTPC

U-1 LHS mills Duct insulation I/P

U-1 RHS Bunker shell painting

U-1 RHS bunker roof

U-2 FD B silencer preassy I/p

U-2 Boiler NDHT done on 24.08.19

U-2 CD bay approach -NTPC

U-2 CD bay approach -NTPC

U-1 LHS mill duct insulation

U-1 LHS mills

U-2 ESP outlet insulation

Unit -2 BOF to ESP duct status

Unit -2 ESP to ID duct insulation completed

Unit -2 ESP control room building - NTPC scope

Approach road to Untit-2

Unit -1 LHS bunker view

Approach from "A" row side

Unit -2 CD bay approach

Unit-2 RHS FD and PA fdns status

Unit-2 RHS FD and PA fdns status

RHS Hot PA Bus insulation

Unit-1 BOF to ESP insulation started

Unit-1 LHS Bunker bottom hopper preassembly in progress

Unit-1 BOF to ESP pass D,E,F ATT completed

Unit-2 FD and PA fan A silencer erected

Unit-1 LHS Bunker bottom hopper reassembly in progress

Unit-1 RHS-Last PA duct erection In Progress

Unit-1 Mill-A Lube oil flushing started

U-2 FD fan A silencer ern

Unit-1 LHS mill duct connection

Unit -1 PA fan B

Unit-2 FD fan A lube oil flushing started

Unit-1 FD TO APH Insulation

Unit-1 MILL -B lube oil flushing in progress

Unit-2 FD A Lube oil piping In progress

Unit-2 Pass AB BOF to ESP Structure Erection

Unit-1 LHS Mill Bus duct

Unit-1 PA 1B Discharge Duct Scaffolding in progress

Unit-2 RHS Bunker Hopper Bottom erection

Unit-2 RHS LIFT sheeting started, Pit& M/c room

UNIT-1 PA FAN B MOTOR 8 hr TRIAL UNDER PROGRESS

Unit-1 LHS bunker last mill tipper floor balance erection

U1 front&Rear bottom enclouser insulation complete

Unit-1 front&Rear bottom enclouser insulation complete

Unit-1 Seal Air header & Seal air fan

U1 FD 1A discharge duct Insulation pin fixing I/P

Unit-1 Mills A,B,C Lube oil piping work in progress

Unit-2 Pass A Hopper Insulation In Progress

Unit-2, Pass-D balance hopper erection In Progress

Unit-2 FD fan A silencer pre assembly in progress

ESP-2, F pass roof purlin str work I/P

Unit-1 SAPH-A BOX-UP work In Progress

Unit-1 RHS Tempering duct to mill duct In Progress

Unit-1 Seal air to mill connection In Progress

Unit-1 Seal air header completion In Progress

Unit-1 PA FAN B motor termination and testing In Progress

Unit-1 RHS mills lube oil piping In Progress

Unit-1 RHS Hot PA Ducts to MIlls area

Unit-1 LHS last bunker shell erected

Unit-1 LHS Bunker, feeder floor front handed over

Unit-1 ESP Outlet bottom insulation &sheeting work in progress

Unit-2 ESP Outlet D,E,F scaffolding In Progress for ATT

Unit-1 Seal Air fans

Unit-1 FD FAN 1A

Unit-1 LHS lift work started by M/s Techno

Unit-1 ESP to ID Insulation

Unit-2 ESP Outlet insulation started

Unit-2 ID FAN A Lube oil flushing I/P

Unit-2 ESP D PASS balance hopper preassy and ern

Unit-2, TP 10 Outside landing platform erection work in progress

U2 BOF AB pass BOF to ESP Duct structure frames erection

Unit-2 ESP to ID Duct ABC Pass ATT completed

Unit-2 BLR HT with IBR done on 04.12.18

Unit-1 LHS cable trestle foundation work by NTPC

Unit-1 LHS cable trestle foundation work by NTPC

ESP -2 control room status by NTPC

Unit-1 PA fan A Impeller housing blue matching In Progress

Unit-2 BOF to ESP AB Pass Duct support frame erection

Unit-2 BAH foundation excavation started by NTPC

Unit-2 BAH foundation excavation started by NTPC

Unit-2 PA Header LHS erection

Unit-2 ESP Pass-A side wall and hopper insulation in progress

Unit-2 ESP Pass-D balance hopper erection in progress

Unit-1 FD A LOP erection and fan alignment work In progress

Unit-1 PA fan B LOP is ready for flushing

Unit-1 PA Fan A

Unit-2 ESP outlet scaffolding and Pin fixing in progress

Unit-1 LHS last bunker shell per-assembly In progress

Unit-1 LHS Bunker view

Unit-2 Bottom Ash hopper Foundation work started by NTPC

Unit-2 PAPH B Axial seal in progress

Unit-2 SAPH A Support bearing LOP

Unit-2 ID fan 2A LOP work started

Unit-1 rear side bottom enclouser insulation

Unit-1 LHS lift sheeting

Unit-1 Boiler chemical cleaning completed

Unit-1 chemical cleaning, citric acid addition start

Unit-1 alkali boil out with hot and cold rinsing completed

Unit-2 critical pipe support structure column erection

Unit-1 BLU for chemical cleaning on 20.11.18

Unit-1 Boiler insulation

Unit-1 Boiler insulation

Unit-1 Boiler insulation

Unit-1 Boiler insulation

Unit-1 Boiler insulation

Unit-1 ESP

Unit-1 ESP

Unit-1 ESP

Unit-1 ESP

Unit-1 ESP

Unit-1 ESP Last inlet funnel Pass #A insulation in progress

Unit-1 SAPH B Insulation in progress

U1 LHS last Bunker ring beam erected

Unit-2 Bunker bottom part hopper pre assy in progress

U1 chemical cleaning, cold rinsing is planned today

Unit-1 LHS last Bunker roof structure column erection

U2 SAPH A Bottom Duct ereted

Unit-2 D row MS Line support cantilever frame erection

Unit-1 BRP Trial run for 4 hrs in progress

U1 MS Line insulation

U1 CRH Line insulation

U1 CRH Line insulation

Unit-2 TPs side platform str pre assembly In Progress

Unit-2 LHS Cable Trestle foundation civil work by NTPC

Unit-2 SAPH B Pin Rack Alignment in progress

Unit-2 PAPH -A bottom Duct pre assembly

Unit-1 auxiliary steam system insulation started

Unit-1 auxiliary steam system insulation started

Unit-2 FD A and PA fan A grouting

Unit-1 Drain oil tank and Pump Foundation

Unit-2 D row pipe support cantilever Preassembly in progress

Chemical cleaning N-Pit civil work completed

Unit-2 BOF to ESP Foundation Str frames preassembly in progress

Unit-1 BRP Commissioning In Progress- vendor available at site

Unit-2 RHS Coal Pipes erection

Unit-2 RHS Coal Pipes erection

Unit-1 PA header interconnection Duct In progress

Unit-1 RHS Mills Seal Air Piping work in progress

Unit-1 LHS last Bunker Ring beam support erected

Unit-2 PAPH bottom ducts Pre assembly in progress

Unit-2 PAPH bottom ducts erection in progress

Unit-1 BOF to ESP bottom part Scaffolding pipes

Unit-1 Boiler bottom enclosure insulation

Unit-2 Bunker bottom hopper pre assembly

Unit-1 FD fan 1A

Chemical cleaning drain pipe to Pit work in progress

Unit-1 chemical cleaning system,motor trial is planned

Unit-1 HPSU commissioning work, vendor available

Unit-1 LHS lift sheeting work

Unit-1 Boiler Gun trial carried out on 28.10.18

Unit-1 FD fan 1A

Unit-1 Chemical cleaning preparatory work.

Unit-1 Furnace insulation completion

Unit-1 Furnace bottom enclouser insulation

U2 LHS mills seal air piping work in progress

Unit-1 RHS Duct to Mills

Unit-1 LHS Mills and coal piping

Unit-2 Bunker bottom hopper pre assembly

Unit-1 LHS lift sheeting work

Unit-1 SAPH to Hot interconnection duct insulation

Unit-1 BOF to ESP duct welding in progress

Unit-1 BOF to ESP duct welding in progress

Unit-1 ESP Top view

Unit-1 Eco Hopper scaffolding completed

Unit-1 FD fan 1A

Unit-1 FD discharge interconnection duct completed

Unit-1 last bunker ring beam post Preassembly in progress

Unit-1 CRH along with RH HT in progress

Unit-1 Furnace insulation completion

Unit-2 RHS Bunker roof stair work

Chemical cleaning N-pit work status

FOPH Pump Alignment and cleaning work

Unit-1 chemical cleaning preparatory work

Unit-2 PAPH Hot Air inlet preassy in progress

Unit-1 LHS Bunker

Unit-1 FD discharge interconnection duct completion

Unit-1 Last Bunker ring beam and hopper preassy

Unit-1 Last Bunker ring beam and hopper preassy

Unit-1 ESP inlet funnel insulation

Unit-1 ESP inlet funnel insulation

Unit-1 PA Fan -A Foundation not handed over by NTPC

FD Fan 1A

PA 1B Lube oil piping started

Unit-2 LHS Bunker

Unit-1 RHS Bunker

Unit-2 Piping cantilever frame preassy in CD bay

Unit-2 RHS Mills

Unit-2 Bunker RHS View

Unit-1 RHS MILLS LOP FDN WORK STARTED BY NTPC

Unit-2 PIPING SUPPORT STR FDN BY NTPC

Unit-1 LHS LIFT SHEETING WORK

Unit-1 BOF TO ESP scaffolding work

ESP 1 Inlet funnel insulation

ESP 1 Inlet funnel insulation

Unit 1 FD FAN A WORK STARTED

UNIT 1 LHS BUNKER

Unit 2 RHS BUNKER VIEW

Unit 1 PA fan B LOP Skid and piping work

Unit 1 chemical cleaning preparatory work

Unit 2 RHS Mills seal air piping work

Unit 2 RHS Mills seal air piping work

Unit-2 ESP

Unit -1 outlet funnel insulation completed

Unit 1 seal air piping work

Unit 1 Furnace insulation in finishing stage

Unit-1 SAPH B Air motor decoupled trial done

Unit #2 RHS Mills

Unit #2 FD A work in progress

Unit #2 ESP Outlet duct ATT in progress

ESP #1 Outlet Funnel Insualation

ESP #1 Outlet Funnel Insualation

ESP #1 Outlet Funnel Insualation

ESP #1 Outlet Funnel Insualation

Unit -1 wind box Duct insulation and sheeting

Unit-1 LHS bunker erection

Unit-1 ID fan B- trial done

Unit-1 BOF to ESP LHS Duct erection completed

Unit-1 LHS Lift Sheeting work

Unit-1 LHS Bunker

Unit-1 LHS BOF to ESP

Unit-2 RHS Bunker shell erection

Unit-1 LHS Lift Sheeting Work started

Unit-1 LHS Mills area

Unit 1 LHS BOF to ESP

Unit-2 RHS Bunker view

Hot secondary air interconnection Duct insulation

UNIT 1 MILLS H & J erection

UNIT 1 LHS BUNKER

Unit 1 ID Fan B Motor Bump Trial Taken

Unit 1 LHS BOF TO ESP

Unit 2 ESP to ID Duct area

Fuel oil pump house

Fuel oil pump house

Last gallery from Unit 2 RHS Bunker to TP11 erected

Unit-1 LHS BOF to ESP

Unit-2 RHS Bunker to TP-11 gallery pre- assembly

Compressors commissioning in progress

Unit-2 RHS Bunker

Unit 1 LHS Bunker and Mills

Unit-2 gallery erection in between TP11 and TR3

Unit 1 LHS BUNKER and MILL-H

Unit 1 BOF TO ESP LHS Duct area

Unit-1 BOF to ESP LHS Duct structure in progress

Unit-1 BOF to ESP LHS Duct structure in progress

Unit #2 gallery erection in between TP10 and TR3

Unit #2 gallery erection in between TP10 and TR3

Unit #1 BOF to ESP

TP-9 floor completion work

Unit #1 Mill H

Unit#1 Seal air fan

Unit-2 ESP

Unit-1 Seal air fans erection started

Unit-1 LHS lift painting work

Unit-1 LHS lift pit work by civil agency

Mill-1H erection work started

Unit-1 RHS Mills

Unit-2 LHS mills

Unit -2 ESP outlet Duct

Unit -2 ESP outlet Duct

Unit-1 LHS BOF to ESP Duct structure

Furnace lower LHS insulation

Unit-2 RHS Bunker

Unit-1 BOF to ESP

Unit-1 LHS bunker

SG - DMCW system

Unit-1 PA header Duct preassembly & erection

Unit-1 LHS BOF to ESP

Unit-2 TP 11 structure

Unit-2 RHS Bunker

Unit-1 BOF to ESP

Unit-1 PA header Pre-assembly

Unit-1 LHS Stream BOF to ESP duct

Unit-1 PA 1A Silencer erection

Unit#1 BOF to ESP

Unit#2 ID outlet Ducting

Unit #1 LHS Bunker

Unit#1 LHS FD and PA fans Silencer erection

Unit #1 ID outlet insulation

Unit #2 TR-3 Erection

Unit#2 TP-11 Structure

Unit#2 RHS Bunker

unit #1 LHS bunker str erection

Unit#2 ESP to Chimney

Unit-2 ESP to ID Duct area

Unit-1 ESP to ID Duct- ATT completed

Unit-1 BOF to ESP

Unit-2 TP gallery pre-assembly under progress

Unit-2 RHS Mills

Unit-2 RHS bunker Hopper assembly in progress

Unit-1 RHS stream BOF to ESP

Unit-1 Left stream ESP inlet

Unit-1 ESP outlet ducting - ATT in progress

Unit-1 ESP outlet ducting - ATT in progress

Unit-2 BOF to ESP Pass-AB duct foundation

Unit-1 LHS stream fan foundation

Unit-1 ID to Chimney insulation

Unit-1 BOF to ESP Ducting area

Unit-1 BOF to ESP Ducting area

Unit-2 RHS bunker and TP-11 area

Unit-2 Boiler Erection under progress

FD fan- 1B area

Unit-1 SG DMCW system

Unit-1 LHS Bunker area

ESP-2 and BOF to ESP Pass AB area

Unit-2 RHS mills and Coal Piping work

Unit-1 ID fan to Chimney insulation work

Unit-1 ESP to ID duct- ATT in progress

Unit-1 LHS bunker erection

LHS Fan foundation

Unit-1 LHS Stream Boiler outlet flange(BOF) to ESP duct

Unit-1 ESP insulation and sheeting work

Unit#2 APH and Connecting Ducts

Unit#1 BOF to ESP, Pass A&B

Unit #2 RHS View

Hopper & insulation work of ESP1

Insulation & Sheeting work of ESP-1

Unit-2 ESP outlet Duct

Unit-2 ID fan to Chimney Duct

Boiler# 2 - RHS Bunker

Boiler #2 LHS view

Unit #1 RHS Mills

Unit #1 RHS Bunker

FD Fan 1B

ESP#1 outlet to chimney duct