Home   

NABINAGAR SG PKG (3X660 MW)


Unit 3 Bunker side views

Unit 3 LTRH tube . Inside furnace checking U/P

Unit 3 Boiler clearance checking U/P

Unit 3 ID B insulation U/P

Unit 3 views

Boiler overall Night views

Unit 3 Bunker side views

Unit 3 ID B

Boiler overall views

Overall view of Boiler

Unit 3 PA duct side views

Unit 3 BOF Duct Right side insulation U/P

Unit 3 ESP right side views

Unit 3 ESP outlet duct and ESP side views

PAPH B Hopper duct insulation

PAPH B DUCT side views

Unit 3 Chimney connection duct

Unit 3 ID outlet to chimney duct

ID B OUTLET STRCTURE UNIT 3

ESP OUTLET DUCT PASS F SIDE VIEWS UNIT 3

ID B WITH ESP OUTLET DUCT UNIT 3

unit 3 FD B discharge duct and PA cold comman duct

unit 3 esp inlet views

unit 3 bunker side views


RHS View

ESP 3 view

TP&TR 3

BOTTOM ASH HOPPER (CUSTOMER)

BOTTOM ASH HOPPER (CUSTOMER)

ID DUCT

ID FAN3B

ID FAN3A

ESP_3

Bunker -3 RHS

Bunker -3 LHS

Overview2

Overview

Unit#3 view of RHS BUNKER unit#3

Unit#2 RHS BUNKER- 01/05 no. shell erected

Unit#2 Duct erection in ESP inlet (03 passes) comp

Unit#1 MRS silo erected

Overall View of plant

View of plant from Unit#1 LHS

View of plant from Unit#3 RHS

MRS Air Compressor installed.

Unit-3 ESP top view

Unit#3 view of penthouse boiler unit#3

Unit#3 CD bay piping structure & piping erection under progress

Unit#3 RHS bunker shell (04/05) nos. erected

Unit-2 Hot secondary air duct insulation under progress

Unit-2 FD fan A discharge duct insulation under progress

Unit-1 Insulation work under progress in duct inside chimney.

Unit-1 ESP pass F insulation sheeting under progress

Unit-2 Duct erection under progress in ESP inlet

Unit-1 LHS Bunker - Side sheeting & painting under progress

Unit-1 LHS Bunker painting & sheeting work under progress

Unit-3 Insulation sheeting under progress in ESP F pass wall

Unit-2 ESP inlet duct erection under progress

Unit-1 Cladding sheet erection under progress in TP#7

Unit-2 Duct erection under progress in ESP inlet

Unit-1 LHS Bunker - Side sheeting & paining under progress

Unit-3 Duct erection under progress in ESP outlet

Unit-2 ESP- Insulation & sheeting under progress in pass D&E

Unit#1- ID fan B discharge duct insulation completed

UNIT#1 Insulation work under progress in inside chimney

UNIT#2 Coal pipe erection under progress

UNIT#2 - In view FD Fan A discharge duct.

Unit-3 Duct erection under progress in ESP outlet

Unit-2 - All Bunker shell erected.

Unit-2 LHS Bunker- All bunker shell erected.

Unit-1 LHS Bunker - Side sheeting under progress

Unit-3- RHS Bunker- 02/05 bunker shell erection under progress

Unit-3-FD Fan A

Unit#3- RHS bunker-03/05 nos. hopper erected

Unit-3 02/04 nos Eco hopper erection under progress

Unit-3 Eco hopper erection under progress

Unit-1 View of ID fan B & discharge duct

Unit-3 Duct erection inside chimney under progress

Unit#2 - LHS Bunker 03/04 nos. Bunker shell erected

Unit-1 erected tracings in ESP outlet

Unit-3- Duct under progress in ESP outlet

Unit#3- RHS Bunker- 01/05 bunker shell erected.

aerial view

aerial view

aerial view

aerial view

UNIT#2 Duct support structure & ESP inlet duct u/p

Unit#ID fan discharge duct Insulation u/p

Unit#2 Bunker LHS 01/04 shell erected.

Unit#1 Bunker LHS- roof sheeting u/p

Unit#2 FD Fan suction hood erected.

Unit#2 View of Boiler RHS

Unit-1 Bunker RHS -painting & sheeting under progress

Unit-2- FD Fan duct support column erection under progress

Unit#3 Boiler- View from RHS

LDO pumps #1,2 & 3 at Fuel Oil Pump House

FTDT pump unit-1( LHS) ready as well as commission

Unit-2 ESP inlet duct erection under progress

Unit-2 LHS Bunker-03/04 nos. bunker hopper erected.

Unit-1 MRS RHS - Transporting vessel placement under progress

Unit-1 Insulation under progress in ID fan A to chimney

Unit#2- PA fan A silencer erection u/p

Unit#2 Bunker LHS 02/04 nos. hopper erected

Unit#2 48-482 ( ESP pass A) duct erection u/p

UNIT#3 Eco link erection u/p

Unit#3 pipe support structure between CD bay

Unit-I ESP inlet top( insulation complete)

Unit-II Boiler

Unit-II APH

Unit-II ESP

Unit-II critical piping

Unit-1 Bunker side sheeting & painting work under progress

Unit-1- Hoist erected in FD fan area

Unit-2 Area between Boiler to ESP

Unit-2 ID fan to chimney area

Unit-2 -Boiler area

Unit-1 Boiler structure painting work under progress.

Unit-1 Bunker side sheeting & painting work under progress

Unit-1 Bunker side sheeting & painting work under progress

Unit#1 Both hoist erected between ESP & chimney

Unit-1 ID Fan A discharge duct insulation under progress

ESP#1 Insulation under progress in F pass outlet funnel

ESP#1 Painting of column & beam under progress

Unit-3 Basket loading under progress in APH

Unit-1 Bunker RHS painting under progress

Unit-1 Insulation under progress in PA & FD fan

Unit-1 Insulation under progres in bottom of BOF to ESP duct

MRS air compressor erected in compressor house

Unit-3: RHS Bunker 01/05 ring beam erected

Unit-2 ESP ATT of pass F under progress.

Unit-2 Bunker LHS 01/04 Hopper erected.

Unit-1 ESP pass F outlet funnel insulation under progress

Unit-1 ID Fan Hoist erected.

TP-12 Column erection under progress

Unit-3 1st pass hopper bottom ring header erected

Unit-3 1st pass hopper bottom ring header erected

Unit-1 RHS mill waste pipe erection under progress

Unit-1 Mill air duct insulation under progress

Unit-1 PA Discharge duct insulation under Progress

Unit-1 FD Fan Discharge duct insulation under progress

Unit-1 ID FAN Hoist erection under proress

View of TP#8, TR#3 & TP#9

Unit-1 RHS Bunker painting work under progress

Unit-1 PA Discharge duct insulation under progress

Unit-1 LHS Bunker

Unit-2 pre assembly of Bunker hopper under progress

Unit-2 LHS Bunker erection

Unit3-1st pass pressure parts hopper erection under progress

Unit-3 Structure above APH under progress

Unit-2 LHS Bunker- all ring beam erected.

Unit-3- RHS Bunker top sheeting under progress

Unit-1 Bunker RHS painting under progress

Unit-2 1st pass bottom enclosure under progress

Unit-3:1st pass bottom ring header reassembly under progress

Unit-3:View of LHS Bunker

TP-12 Column erection under Progress

TP-11 Column & Beam erection under progress

Unit-3 ESP - Inlet funnel up to Pass D completed.

Unit-3 Eco Hopper duct erected

Unit-3 Eco hopper duct Pre-assembly under Progress

Unit-3 Eco hopper duct Pre-assembly under Progress

Unit-3 Eco hopper duct Pre-assembly under Progress

Unit-3 Bottom ring header pre-assembly under Progress

Unit-3 Bottom ring header pre-assembly under Progress

TP#12 Column erection u/p

unit#3 CRH piping pre assemblu u/p at 50M ELVN.

Unit#3- BRP casing fit up u/p

PA Fan#A Insulation work u/p

Unit#1 BOF to ESP duct insulation u/p in bottom

Unit#1 BOF to ESP duct insulation u/p in bottom

view of Unit-1 Boiler & Unit-2 Boiler

Unit-1 Bunker roof sheeting under progress

Unit-1 Bunker RHS painting under progress

Unit-1 Bunker RHS painting under progress

Unit-1 Bunker RHS painting under progress

Unit-2- Duct supporting structure in ESP inlet

Unit-1 Insulation work under progress in ESP outlet duct

Unit#3- View of duct supporting structure ESP out

Unit-3 ESP Hopper erection under progress

TP-12 Column erection under progress

Unit-3 -Boiler & APH

ESP Cabling in Cable Gallery

ESP Cabling in Cable Gallery

Installed EOT crane

Unit-3 Boiler view

TP-12 Column erection under progress

Unit-2Bottom insulation under progress in duct ESP to ID fan

Unit-1 ESP Cabling work under progress in pass D, E, F

Unit-2 LHS Bunker Feeder Floor Beam Erected.

Unit-2 RHS Mills

Unit-2 RHS Duct (48-232) Erection under progress

Unit-2- Suction Transition piece erection under progress

RHS Bunker Unit-1 Painting work under progress

Unit-2 ESP Pass F making ready for ATT.

Unit-2 ESP Pass F making ready for ATT.

ESP-2- ESP to ID A Insulation under progress

Unit-1 RHS bunker top sheeting under progress

Topmost column erection under progress.

Unit-1- PA & FD Fan A suction insulation under progress

Unit-1 Insulation under progress in duct above APH

Unit-1- Insulation under progress in BOF to ESP inlet duct

LHS Bunker Unit#2 - Hopper pre assembly under progress

TR-3 Topmost column erection under progress.

Unit-1 Air receiver tank (RHS - MRS) erected

Unit-1: Coal pipe erection under progress in LHS

Unit-1 Insulation work under progress in ESP pass D & E

Unit-1 Insulation work in ESP outlet duct

Unit-1- Insulation under progress in ESP outlet duct

Unit#3 - View of 1st pass

Unit#3 - View of 1st pass

Unit-3 Duct supporting structure erection under progress

APH-3 Basket loading Under Progress in SAPH#B

Unit#3-Flue gas duct erection Under progress outside ESP

ESP-2 Cable tray erection Under Progress

ESP#1 - Insulation work Under Progress in pass E

Unit-2- Insulation & sheeting work completed up to 35M.

Unit-2- Insulation work in separator & storage tank.

Unit-2- Critical piping & support erection under progress

Unit-2- Critical piping & support erection under progress

Unit-3: 1st pass view

Unit-3:1st pass view

Unit-3 Eco hopper duct pre-assembly under progress

Unit-1 - Insulation work under progress in Boiler

Unit-1 insulation work under progress in duct above APH

TP-10 Column & beam erection under progress

Unit-2- Duct support column foundation near Pass C & D.

TP-11 Column & Beam erection under progress

Unit-1 -03/04 nos. ring beam erected in LHS bunker

Unit-2- 03/04 nos. ring beam erected in LHS bunker

Unit-2 ESP-Hopper approach platform, hand rail

Unit-2 ESP- Erection under progress in F-pass pent house

Unit-2 ESP- Erection under progress in F-pass pent house

Unit-3 Flue gas duct erection under progress in outside ESP

Unit-2 Insulation work under progress in flue gas duct ESP

Unit-1 LHS Mill G & H lube oil flushing under progress

TP-11 Column & Beam erection under progress

Unit-1 Insulation work under progress in flue gas duct BOF to ESP

Unit-1 Insulation work under progress in pass D

Unit-2 4/5 nos.ring beam erected in RHS Bunker

ESP-2 Inlet funnel erection completed

TP-10 Column erection in progress

Unit-1 Flue gas duct insulation between Boiler & ESP

Unit-1 Gallery between TP-7 & LHS Bunker erection

Unit-2 Flue gas duct between ID fan-B & Chimney

Unit-1 Gallery erection between TP7 & LHS bunker

UNIT#2 Duct support column- erection started.

Unit-2 RHS Bunker- Shell pre assembly

Unit-3 - 1st pass Boiler.

Unit-2- 01/05 nos. RHS bunker cone erected

Unit-1- LHS bunker

Unit-1 LHS Mill LOS erected.

Unit-1- ID fan-B ready for trial run

Unit-2 ID fan B discharge gate erected

Unit-3- 01/04 ring beam erected in LHS Bunker

Unit-2 Boiler Wall blower erection

Unit-1 Feeder(LHS) erected

TP 9- staircase erection

Unit-2-FD Fan A Discharge duct erected

Unit-3 Boiler 1st pass

Boiler-3 Ring header erected in 2nd pass.

Boiler Unit#2- DMCW motor & pump erected

ESP UNIT#2 - Insulation work in pass C