Home   

SURATGARH (2X660 MW)


PT PLANT CONTROL ROOM

CHLORINATION PLANT COMMISSIONING

CHLORINATION PLANT

2X660MW SURATGARH THERMAL POWER PLANT PLANT

11KV SWITCHBOARD UNIT#7

INTERLOCK-PROTECTION CHECKING CONTROL ROOM UNIT#7

TG UNIT#7

MAIN GATE

HYDROGEN GENERATOR-1 COMMISSIONING

HYDROGEN GENERATOR-2 COMMISSIONING

PLANT OVERVIEW

PLANT MAIN GATE

CHLORINATION PLANT EQUIPMENT ERECTION

MRS STRUCTURE ERECTION

CW TREATMENT PLANT

PAINTING OF LUBE OIL SKID OF MILLS

BOILER U#8

NDCT U#8 INTERNAL ERECTION

PLC CHLORINATION PLANT

TG UNIT#8

BOILER U#7

TG UNIT#7

LP ROTOR TG UNIT#8

MAIN CONTROL ROOM

CHLORINATION PLANT

CHLORINATION PLANT

BOILER U7 AND 8

ADMIN BUILDING

PT PLANT

NDCT U7&8

BOOSTER PUMP HOUSE

BOOSTER PUMP HOUSE

CRH NRV UNIT 8 COMMISSIONED FROM DCS

TDBFP-A GOVERNING RACK COMMISSIONED FROM DCS

TDBFP-B GOVERNING RACK COMMISSIONED FROM DCS

SOFA and CCOFA Damper commissioned from remote U7

FILLS ERECTION IN COOLING TOWER UNIT#8

FILLS ERECTION IN COOLING TOWER UNIT#8

FILLS ERECTION IN COOLING TOWER UNIT#8

WATER CHARGED IN COOLING TOWER HALF PORTION UNIT#8

BOILERUNIT#8

INSTRUMENT RACK ERECTION TG UNIT#8

INSULATION TG UNIT#8

Main Gate

Furniture assembly in service building

CW Treatment plant PLC commissioning

Unit-8 Secondary Air Duct insulation Boiler

PT Plant area

Unit-7 SWAS Panel

Unit-8 ESP control room

Plant Main gate

Site overview

floor tiles fixing TG u#7

Unit-8 Boiler MRS Erection

Unit-7 Boiler Cabling

Unit-8 Duct insulation

DM Plant

TG UNIT 7

TG UNIT 8

Unit-7& 8 Boiler

NDCT

CTP Pump commissioning Unit-7

Power House Roof Walk Way Path Tiles erection

TDBFP U#7

TDBFP ERECTION U#8

Unit-8 NDCT erection

Unit-7 CRH after NRV valve supports is completed

Unit-7 AHP-B module assembly

Auxiliary spray water line of completed at TG 17 meter

Piping insulation work under progress

Unit-7 Boiler SH, RH Ceramicwool insulation completed

Unit-7 ESP painting is in progress

RHS Bunker tripper floor structure painting

Boiler structure painting under progress RHS 90 Meter

Boiler structure painting under progress at RHS

Unit-7 Boiler painting under progress

Unit-7 Dexaerator Floor

CW PUMP HOUSE

ADMIN BUILDING

Unit-7 Boiler Flash Tank Vent Support Erection

Unit-7 Boiler Duct Insulation

Unit-8 TG Condensate piping welding

Main Plant Gate

Unit-7 NDCT

Unit-8 NDCT

Unit-7 HPSU Commissioning

Unit-7 Boiler Coal feeder erection

LP Bypass Spray Valve Commissioning

Unit-7 LP Bypass valve commissioning

PT Plant

Unit-8 Boiler Acid Cleaning preparation

Stair Case erection for Boiler MCC Unit-8

Ducting insulation between Boiler Unit-8 & ESP

Unit-8 TDBFB erection

Unit-8 Boiler

Unit-8 Power House Side Cladding

UNIT#8 ID FAN-A OUTLET DUCT INSULATION

UNIT#8 ID FAN OUTLET GATE DAMPER PLATFORM ERECTION

ESP #8 A,B,C,D STRUCTURE PAINTING UNDER PROGRESS

ESP #8 OUTLET STRUCTURE PAINTING COMPLETED

STRUCTURE PLATFORM ERECTION FOR ESP #8 INLET

UNIT#8 ESP INLET FUNNEL A,B PASS INSULATION

BOILER U#8 SEAL AIR FAN ALIGNMENT IS IN PROGRESS

BOILER UNIT#8 RING HEADER INSULATION

UNIT-7 BOILER FRONT SIDE PAINTING UPTO 80M. COMPLETED

UNIT#7 RIGHT SIDE FEEDER ALIGNMENT COMPLETED

UNIT#7 PRIMARY AIR DUCT INSULATION

UNIT#7 APH -B MODULE REPLACEMENT UNDER PROGRESS

UNIT#7 FAN HANDLING STRUCTURE PAINTING

UNIT #7 SAFETY VALVE ERECTION

UNIT#7 FLASH TANK & DRAIN TANK INSULATION COMPLETED

UNIT#7 LP CONDENSER PUMP DISCHARGE LINE ERECTION

BOILER UNIT#7 SAFETY VALVE ERECTION UNDER PROGRESS

BOILER UNIT#7 PIPING INSULATION UNDER PROGRESS

BOILER UNIT #7 MILL FIRE FITTING LINE COMPLETE

UNIT-7 BOILER HPBP CONTROL VALVE ERECTION

Unit-7 BOILER FLOW NOZZLES

UNIT#7 FLOW NOZZLE ERECTION ON HP BYPASS LINE

Unit-8 Boiler Left Side

Unit-7 Boiler Right Side

Power House Unit-8 Side cladding erection

Duct Erection Between Boiler Unit-8 and ESP

IP Stop Valve Erection TG Unit-7

Unit-8 NDCT Hot Water Duct casting

Unit-8 NDCT Internal column erection

Unit- 7 TG Steam Blowing Piping Normalization

Unit-7 Boiler Condensate Transfer Pump erection

Unit-8 GT back charging done

Unit-8 GT Charging

Unit-7 Steam blowing 3rd stage is in progress

Vacuum Pump

CST Tank and Pump House

Unit-7 Boiler Left Side Feeder erection

Power House AC Plant area

Unit-7 Power House area

Unit-7 TG area

Unit-8 TG insulation erection

Unit-7 MDBFP area

MRS Structure Erection Unit-7 Boiler

CW Pump House area

Admin Building

Reservoir and PT plant

Site overview

Main Gate

Unit-7 Boiler MRS Piping Erection

Unit-7 Boiler Soot Blower Erection

Unit-7 Boiler Primary Air Duct Insulation

Unit-7 Boiler Duct Support Painting

Unit-7 ESP area

BOILER UNIT #8 LIFT SHAFT

BOILER U#8 FEEDER CONNECTION

BOILER U#8 TO ESP DUCT CONNECTION

BOILER U#8 DUCT STRUCTURE PAINTING

ECP Panel DM Plant

Unit-7 Cooling tower internal area

Unit-7 & 8 Cooling Tower

Unit-7 & 8 Boiler

Power Plant Main Gate

DM PLANT

DM MCC ECP PANEL

DM PLANT AUTO OPERATION

NDCT UNIT#7 WATER CHARGED

BOILER U#7

Unit-7 NDCT water charged

Unit-4 NDCT Internal Column Casting work

PT Plant

Control Room Panel

Unit-7 Control Room Panel cabling

AC Chiller Pumps Unit-7

AC Chiller Unit-7

Unit-8 DMCW Pump

Steam Blowing under progress

Main Gate

Plant overview

PT Plant area

Steam blowing under progress

Unit-7 PA Fan

Unit-7 Boiler Mill Lube Oil Skid Flushing

Cooling Water Treatment Plant

Unit-7 Steam Blowing in progress

Workshop Building

Internal Column Erection in Unit-8 Cooling Tower

Unit-8 Cooling Tower

CW Pump House area

Unit-8 PT Plant and Raw Water Reservoir

Unit-8 Boiler LHS

Duct Erection

Unit-8 Power House Side Cladding

Main Gate

Site overview

Cooling Tower Unit-7 &8

Raw Water Reservoir

Power House Unit-7&8

Cooling Tower Unit-7&8

Admin Building Approach Road

Main Gate

Raw Water Reservoir and PT Plant

Boiler Unit-7 & 8 Top View

Duct Erection Between ESP Unit-8 and Boiler

Boiler Unit-8 LHS

Power House Unit-8 Side Cladding

Unit-7 APH-B Motor Final Alignment

Road along the boundary wall

Unit-7&8 Power House

Unit-7&8 Cooling Tower

PT Plant

Unit-7 Cooling Tower

Unit-8 Cooling Tower

Unit-7 & 8 Power house

Secondary Crusher House 1(Left) and 2(Right)

Ash Slurry pipe Rack up to power Boundary

Wagon Tippler#1

Wagon Tippler#2

CHP MCC#2

Wagon Tippler#3&4

Ash Silo Utility Building

Ash silo

Ash Silo, Ash Slurry Pump House Area

Admin Building

Cooling tower-7&8

Site overview