PT PLANT CONTROL ROOM
|
CHLORINATION PLANT COMMISSIONING
|
CHLORINATION PLANT
|
2X660MW SURATGARH THERMAL POWER PLANT PLANT
|
11KV SWITCHBOARD UNIT#7
|
INTERLOCK-PROTECTION CHECKING CONTROL ROOM UNIT#7
|
TG UNIT#7
|
MAIN GATE
|
HYDROGEN GENERATOR-1 COMMISSIONING
|
HYDROGEN GENERATOR-2 COMMISSIONING
|
PLANT OVERVIEW
|
PLANT MAIN GATE
|
CHLORINATION PLANT EQUIPMENT ERECTION
|
MRS STRUCTURE ERECTION
|
CW TREATMENT PLANT
|
PAINTING OF LUBE OIL SKID OF MILLS
|
BOILER U#8
|
NDCT U#8 INTERNAL ERECTION
|
PLC CHLORINATION PLANT
|
TG UNIT#8
|
BOILER U#7
|
TG UNIT#7
|
LP ROTOR TG UNIT#8
|
MAIN CONTROL ROOM
|
CHLORINATION PLANT
|
CHLORINATION PLANT
|
BOILER U7 AND 8
|
ADMIN BUILDING
|
PT PLANT
|
NDCT U7&8
|
BOOSTER PUMP HOUSE
|
BOOSTER PUMP HOUSE
|
CRH NRV UNIT 8 COMMISSIONED FROM DCS
|
TDBFP-A GOVERNING RACK COMMISSIONED FROM DCS
|
TDBFP-B GOVERNING RACK COMMISSIONED FROM DCS
|
SOFA and CCOFA Damper commissioned from remote U7
|
FILLS ERECTION IN COOLING TOWER UNIT#8
|
FILLS ERECTION IN COOLING TOWER UNIT#8
|
FILLS ERECTION IN COOLING TOWER UNIT#8
|
WATER CHARGED IN COOLING TOWER HALF PORTION UNIT#8
|
BOILERUNIT#8
|
INSTRUMENT RACK ERECTION TG UNIT#8
|
INSULATION TG UNIT#8
|
Main Gate
|
Furniture assembly in service building
|
CW Treatment plant PLC commissioning
|
Unit-8 Secondary Air Duct insulation Boiler
|
PT Plant area
|
Unit-7 SWAS Panel
|
Unit-8 ESP control room
|
Plant Main gate
|
Site overview
|
floor tiles fixing TG u#7
|
Unit-8 Boiler MRS Erection
|
Unit-7 Boiler Cabling
|
Unit-8 Duct insulation
|
DM Plant
|
TG UNIT 7
|
TG UNIT 8
|
Unit-7& 8 Boiler
|
NDCT
|
CTP Pump commissioning Unit-7
|
Power House Roof Walk Way Path Tiles erection
|
TDBFP U#7
|
TDBFP ERECTION U#8
|
Unit-8 NDCT erection
|
Unit-7 CRH after NRV valve supports is completed
|
Unit-7 AHP-B module assembly
|
Auxiliary spray water line of completed at TG 17 meter
|
Piping insulation work under progress
|
Unit-7 Boiler SH, RH Ceramicwool insulation completed
|
Unit-7 ESP painting is in progress
|
RHS Bunker tripper floor structure painting
|
Boiler structure painting under progress RHS 90 Meter
|
Boiler structure painting under progress at RHS
|
Unit-7 Boiler painting under progress
|
Unit-7 Dexaerator Floor
|
CW PUMP HOUSE
|
ADMIN BUILDING
|
Unit-7 Boiler Flash Tank Vent Support Erection
|
Unit-7 Boiler Duct Insulation
|
Unit-8 TG Condensate piping welding
|
Main Plant Gate
|
Unit-7 NDCT
|
Unit-8 NDCT
|
Unit-7 HPSU Commissioning
|
Unit-7 Boiler Coal feeder erection
|
LP Bypass Spray Valve Commissioning
|
Unit-7 LP Bypass valve commissioning
|
PT Plant
|
Unit-8 Boiler Acid Cleaning preparation
|
Stair Case erection for Boiler MCC Unit-8
|
Ducting insulation between Boiler Unit-8 & ESP
|
Unit-8 TDBFB erection
|
Unit-8 Boiler
|
Unit-8 Power House Side Cladding
|
UNIT#8 ID FAN-A OUTLET DUCT INSULATION
|
UNIT#8 ID FAN OUTLET GATE DAMPER PLATFORM ERECTION
|
ESP #8 A,B,C,D STRUCTURE PAINTING UNDER PROGRESS
|
ESP #8 OUTLET STRUCTURE PAINTING COMPLETED
|
STRUCTURE PLATFORM ERECTION FOR ESP #8 INLET
|
UNIT#8 ESP INLET FUNNEL A,B PASS INSULATION
|
BOILER U#8 SEAL AIR FAN ALIGNMENT IS IN PROGRESS
|
BOILER UNIT#8 RING HEADER INSULATION
|
UNIT-7 BOILER FRONT SIDE PAINTING UPTO 80M. COMPLETED
|
UNIT#7 RIGHT SIDE FEEDER ALIGNMENT COMPLETED
|
UNIT#7 PRIMARY AIR DUCT INSULATION
|
UNIT#7 APH -B MODULE REPLACEMENT UNDER PROGRESS
|
UNIT#7 FAN HANDLING STRUCTURE PAINTING
|
UNIT #7 SAFETY VALVE ERECTION
|
UNIT#7 FLASH TANK & DRAIN TANK INSULATION COMPLETED
|
UNIT#7 LP CONDENSER PUMP DISCHARGE LINE ERECTION
|
BOILER UNIT#7 SAFETY VALVE ERECTION UNDER PROGRESS
|
BOILER UNIT#7 PIPING INSULATION UNDER PROGRESS
|
BOILER UNIT #7 MILL FIRE FITTING LINE COMPLETE
|
UNIT-7 BOILER HPBP CONTROL VALVE ERECTION
|
Unit-7 BOILER FLOW NOZZLES
|
UNIT#7 FLOW NOZZLE ERECTION ON HP BYPASS LINE
|
Unit-8 Boiler Left Side
|
Unit-7 Boiler Right Side
|
Power House Unit-8 Side cladding erection
|
Duct Erection Between Boiler Unit-8 and ESP
|
IP Stop Valve Erection TG Unit-7
|
Unit-8 NDCT Hot Water Duct casting
|
Unit-8 NDCT Internal column erection
|
Unit- 7 TG Steam Blowing Piping Normalization
|
Unit-7 Boiler Condensate Transfer Pump erection
|
Unit-8 GT back charging done
|
Unit-8 GT Charging
|
Unit-7 Steam blowing 3rd stage is in progress
|
Vacuum Pump
|
CST Tank and Pump House
|
Unit-7 Boiler Left Side Feeder erection
|
Power House AC Plant area
|
Unit-7 Power House area
|
Unit-7 TG area
|
Unit-8 TG insulation erection
|
Unit-7 MDBFP area
|
MRS Structure Erection Unit-7 Boiler
|
CW Pump House area
|
Admin Building
|
Reservoir and PT plant
|
Site overview
|
Main Gate
|
Unit-7 Boiler MRS Piping Erection
|
Unit-7 Boiler Soot Blower Erection
|
Unit-7 Boiler Primary Air Duct Insulation
|
Unit-7 Boiler Duct Support Painting
|
Unit-7 ESP area
|
BOILER UNIT #8 LIFT SHAFT
|
BOILER U#8 FEEDER CONNECTION
|
BOILER U#8 TO ESP DUCT CONNECTION
|
BOILER U#8 DUCT STRUCTURE PAINTING
|
ECP Panel DM Plant
|
Unit-7 Cooling tower internal area
|
Unit-7 & 8 Cooling Tower
|
Unit-7 & 8 Boiler
|
Power Plant Main Gate
|
DM PLANT
|
DM MCC ECP PANEL
|
DM PLANT AUTO OPERATION
|
NDCT UNIT#7 WATER CHARGED
|
BOILER U#7
|
Unit-7 NDCT water charged
|
Unit-4 NDCT Internal Column Casting work
|
PT Plant
|
Control Room Panel
|
Unit-7 Control Room Panel cabling
|
AC Chiller Pumps Unit-7
|
AC Chiller Unit-7
|
Unit-8 DMCW Pump
|
Steam Blowing under progress
|
Main Gate
|
Plant overview
|
PT Plant area
|
Steam blowing under progress
|
Unit-7 PA Fan
|
Unit-7 Boiler Mill Lube Oil Skid Flushing
|
Cooling Water Treatment Plant
|
Unit-7 Steam Blowing in progress
|
Workshop Building
|
Internal Column Erection in Unit-8 Cooling Tower
|
Unit-8 Cooling Tower
|
CW Pump House area
|
Unit-8 PT Plant and Raw Water Reservoir
|
Unit-8 Boiler LHS
|
Duct Erection
|
Unit-8 Power House Side Cladding
|
Main Gate
|
Site overview
|
Cooling Tower Unit-7 &8
|
Raw Water Reservoir
|
Power House Unit-7&8
|
Cooling Tower Unit-7&8
|
Admin Building Approach Road
|
Main Gate
|
Raw Water Reservoir and PT Plant
|
Boiler Unit-7 & 8 Top View
|
Duct Erection Between ESP Unit-8 and Boiler
|
Boiler Unit-8 LHS
|
Power House Unit-8 Side Cladding
|
Unit-7 APH-B Motor Final Alignment
|
Road along the boundary wall
|
Unit-7&8 Power House
|
Unit-7&8 Cooling Tower
|
PT Plant
|
Unit-7 Cooling Tower
|
Unit-8 Cooling Tower
|
Unit-7 & 8 Power house
|
Secondary Crusher House 1(Left) and 2(Right)
|
Ash Slurry pipe Rack up to power Boundary
|
Wagon Tippler#1
|
Wagon Tippler#2
|
CHP MCC#2
|
Wagon Tippler#3&4
|
Ash Silo Utility Building
|
Ash silo
|
Ash Silo, Ash Slurry Pump House Area
|
Admin Building
|
Cooling tower-7&8
|
Site overview
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|