U#4 Generator painting done
|
U#4 HP casing insulation
|
U#4 Waterbox painting done
|
Primery Water Skid
|
Condenser Rear side View
|
Condenser Front side View
|
seal oil room
|
HRH Right side
|
HRH left side
|
Generator side view
|
Turbine Floor view1
|
Painting of condenser
|
Primery Water Skid commissioning is in progress
|
Generator side view
|
Turbine Floor view2
|
Turbine Floor view1
|
HRH Right side
|
HRH left side
|
Cond B Front Side
|
Exciter End
|
HRH left Side
|
HRH Right Side
|
Turbine Floor
|
LP3 Outer casing
|
Condenser Rear Side
|
Cond C Front Side
|
Cond B Front Side
|
Cond A Front Side
|
LP 1 Turbine
|
LP 3 Turbine
|
HP Turbine
|
Turbine Floor
|
Exciter End
|
Turbine Floor
|
HRH Line Right Side
|
Cond -A
|
Cond -B
|
Hydro of Cond -C
|
Condenser Rear Side
|
Preperation for oil Filling
|
Cond A Front Side
|
Cond B Front Side
|
Cond C Front Side
|
HRH Line Right Side
|
Turbine Floor
|
Control Room Unit #4
|
Turbine Floor
|
HRH Line Right Side
|
HRH Line Left Side
|
Cond C Front Side
|
Cond B Front Side
|
Cond A Front Side
|
Condenser A,B &C Front side
|
Cond B rear Side Water Box Hinge FitupPreperation
|
Water Box Hinge Fitup of Cond C Rear
|
Lube oil Return Line Welding is in progress
|
Gen H2 Cooler Allignment
|
Cond A Water Box Welding is in progress
|
CRH Line
|
Cond A Neck Plate Allignment
|
HRH Line Left Side
|
Turbine Floor
|
Turbine Floor Unit #4
|
H2 Cooler Hydro
|
LP 2 LS HRH piping Sector 4 Joint welding
|
Condenser B front side Hinge welding is in progress
|
Vaccume Pump A Duplex filter erection under progre
|
Vaccume Pump B Duplex filter erection completed
|
LP 3 Turbine Work is in progress
|
Unit #4 Control Room
|
Seal Oil Room Piping work Under progress
|
Unit #4 Turbine Floor
|
Vaccume Pump B Duplex filter erection under progre
|
Condenser C Hinge Assembly Welding
|
Condenser A water Box make up plate welding is in progress
|
HRH Pipe Left Side Erection Work
|