NAMRUP REPLACEMENT PROJECT (98.4 MW)


CCW PUMP HOUSE

STG BUILDING

CWPH AND COOLING TOWER

ROAD

HRSG

GBC BUILDING

GT BUILDING

STG Insulation application completed.

Kota stone laying on STG floor.

STG Governing rack and its piping completedd.

STG EOT crane erection and commissioning completed

STG WORK STARTED

STG WORK STARTED

STG ROOF STRUCTURE

STG ROOF STRUCTURE

STG ROOF STRUCTURE

House keeping works at Namrup

House keeping works at Namrup

Stuctural works for Roof strengthening

Stuctural works for Roof strengthening

Stuctural works for Roof strengthening

Stuctural works for Roof strengthening

Stuctural works for Roof strengthening

Stuctural works for Roof strengthening

Stuctural works for Roof strengthening

Stuctural works for Roof strengthening

Removing of GTG water proofing roof layer

Removing of GTG water proofing roof layer

Removing of GTG water proofing roof layer

Removal of Water proofing layer from GTG roof

Removal of Water proofing layer from GTG roof

Removal of Water proofing layer from GTG roof

Removal of water proofing layer at GTG building

Removal of water proofing layer at GTG building

GT Building roof treatment layer removal under progress

Removal of water proofing layer in GTG

Removal of water proofing layer in GTG

Structure job for Temporary strengthening in GTG

Bus Bar erection uder progress

Bus Bar erection uder progress

Bus Bar erection uder progress

Bus Bar erection uder progress

Bus Bar erection uder progress

Bus Bar erection uder progress

Bus Bar erection uder progress

GTG Roof temporary strengthening. Tower crane

GTG Roof temporary strengthening

GTG Roof temporary strengthening

Removing of roof water proofing layers at GTG buil

Removing of roof water proofing layers at GTG buil

BC Bay roof treatment layer removal under progress

Debris removal at TG floor under progress

Debris removal at TG floor under progress

Man lift under operation at site.

Clarified Water supply terminal point ready

Gas Station Modification Piping Work

Clarified water supply terminal point piping is in progress

Centrifugal fan at 0 mtrs in position

Side Stream Filtration Foundation ready

Passenger Elevator commissioning completed

Gas Turbine exhaust upper casing erection complete

chlorination building MCC on position.

Chlorination building pumps and motor erected

Piping work of chiller under progress

Admin Building

GT rotor unloaded in GT Hall

CCW-2 Pump assembly under progress

Load Gear Box erection under progress

Clarified Water Pump House ready

Deaerator insulation completed

BFP Building flooring completed

DM plant- Acid and resin filling completed

Side Stream Filtration Foundation ready

Road construction to CWPH under progress

Feed control station insulation

C&I instrument erection in DM plant

Deaerator insulation work completed

Paver Block erection infront of STG Building

Road construction to CWPH under progress

Deaerator insulation work under progress

Paver block erection completed along GT & GBC road