Mauda FGD


Truck Unloader

ACW and Compressor Pump House

Auxilliary Absorbant Tank

Unit-2 Booster Fans and Duct

Unit-2 Booster Fans and Duct

Unit-2 Booster Fans and Duct

Unit-2 Booster Fans and Duct

Unit-2 Chimney Flue can Works

Unit-2 Chimney Flue can Works

Unit-2 Chimney Flue can Works

Unit-2 Absorber Sump Area

Unit-2 Absorber Sump Area

Unit-2 Absorber, Elevator and RC Pump House

Unit-2 Absorber, Elevator and RC Pump House

Unit-2 Absorber, Elevator and RC Pump House

Unit-1 Booster Fans and Duct

Unit-1 Booster Fans and Duct

Unit-1 Booster Fans and Duct

Unit-1 Booster Fans and Duct

Unit-1 Chimney Flue can and Shell

Unit-1 Chimney Flue can and Shell

Unit-1 Chimney Flue can and Shell

Limestone Transfer Point

Limestone Slurry Storage Tanks

Limestone Belt Conveyor System

Limestone Belt Conveyor System

Gypsum Handling System

Gypsum Handling System

Gypsum Handling System

Gypsum Handling System

FGD Control Room

FGD Control Room

Day Silo

Crusher House

Bulk Silo Structure

Bulk Silo Structure

Ball Mill Building

Ball Mill Building

Pipe Racks

Pipe Racks

Pipe Racks

Pipe Racks

Pipe Racks

Pipe Racks

Pipe Racks

Pipe Racks

Pipe Racks

Pipe Racks

Unit-1 Absorber

Unit-1 Absorber

Unit-1 Absorber

Unit-2 Chimney Flue can

Unit-2 Booster Fan Area and Duct

Unit-2 Booster Fan Area and Duct

Unit-2 Booster Fan Area and Duct

Unit-2 Booster Fan Area and Duct

Unit-1 Duct and Booster Fan Area

Unit-1 Duct and Booster Fan Area

Unit-1 Duct and Booster Fan Area

Unit-1 Duct and Booster Fan Area

Unit-1 Duct and Booster Fan Area

Unit-1 Duct and Booster Fan Area

Unit-1 Duct and Booster Fan Area

Absorber Unit-1

Absorber Unit-1

Absorber Unit-1

Unit-1 RC Pump House

Pipe Racks

Pipe Racks

Pipe Racks

Pipe Racks

Pipe Racks

Pipe Racks

Pipe Racks

Pipe Racks

LTP

LSST

LBC-3A/B

LBC-3A/B

LBC-1A/B

Gypsum Handling Area

Gypsum Handling Area

Gypsum Handling Area

FGD Control Room

Day Silo

Crusher House

Bulk Silo

FGD Control Room

FGD Control Room

FGD Control Room

FGD Control Room

Auxiliary Absorbant Tank

Unit-1 and 2 FGD CR, Duct and Absorber Area

Unit-1 and 2 FGD CR, Duct and Absorber Area

Unit-1 and 2 FGD CR, Duct and Absorber Area

Unit-1 and 2 FGD CR, Duct and Absorber Area

Unit-1 and 2 FGD CR, Duct and Absorber Area

FGD Lime and Gypsum Handling Area

FGD Lime and Gypsum Handling Area

FGD Lime and Gypsum Handling Area

FGD Lime and Gypsum Handling Area

FGD Lime and Gypsum Handling Area

FGD Lime and Gypsum Handling Area

FGD Lime and Gypsum Handling Area

FGD Lime and Gypsum Handling Area

FGD Lime and Gypsum Handling Area

FGD Lime and Gypsum Handling Area

FGD Lime and Gypsum Handling Area

FGD Lime and Gypsum Handling Area

FGD Control Room

Unit-2 Duct and Absorber Area

Unit-2 Duct and Absorber Area

Unit-2 Duct and Absorber Area

Unit-1 Duct and Absorber Area

Unit-1 Duct and Absorber Area

Unit-1 Duct and Absorber Area

Unit-1 Duct and Absorber Area

Unit-1 Duct and Absorber Area

Unit-1 Duct and Absorber Area

Unit-2 Tap Off Duct (For Booster Fan-D)

Unit-2 TapOff Duct and Damper Erection in progress

Unit-1 Duct Support Structure

Booster Fan-A Foundation

Booster Fan-B Foundation

Booster Fan-D Foundation

Unit-1 Absorber

Unit-1 Duct Support Foundation Work under progress

FGD Transformer Foundation

Unit-2 Duct Support Structure

Unit-1 Tap-Off Duct and Damper

Unit-2 Duct Support and Pipe Rack-4 Foundations.

Unit-2 Elevator and Staircase Foundations

Unit-2 Absorber Structural Works

Unit-2 Absorber, RC Pump House and Eqp foundations

Pipe Rack-3 Foundations

Auxiliary Absorbant Tank

Unit-1 Chimney (Height achieved - 60.4 mtrs)

Unit-2 Chimney SlipForm Erection Works

Unit-1 RC Pump and Oxidation Blower Foundations

Limestone Weigh Bridge Civil Works

Truck Unloader Civil Works

Unit-1 Absorber and RC Pump House Structural Works

Compressor Pump House

LHP MCC Building

Crusher House Foundations.

Limestone Slurry Storage Tanks Foundation works.

Limestone Silo and Bucket Elevator Foundations

Limestone Day Silo

Ball Mill Building and Equipment Foundations.

Pipe Rack-1

Process Water Tanks

PHFT, SHWT, Filtrate Tank and Waste Water Tanks.

ACW/ECW Building foundation Readiness

Grade Slab Work in progress in Compressor House

Foundation Work in Gypsum Shed.