MAITREE BANGLADESH [BIFPCL] (2 x 660 MW)


/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

/

Construction Water Reservoir/

Construction water /

Construction water /

/

Batching Plant of Dipon For RMC Job /

Sub-station of Construction Power/

Sub-station of Construction Power/

Temporary High Mast/

Preparation for Load testing of pile/

Testing Lab of Dipon/

Temporary Jetty/

Permeability Test /Under Progress

Permeability Test /Under Progress

Electrical Resistivity /Under Progress

Preparation Borehole for Cross hole shear wave test/Under Progress

Plate Load Test /Under Progress

River Boring /Under Progress

River Boring /Under Progress

Static Cone Penetration /Under Progress

Borehole/Under Progress

Soil Sample collected for Lab Test/

Ash Dyke Area/

Site Photograph/

Split Spoon Sampler and Sample Tube/

Split Spoon Sampler and Sample Tube/

Standard Penetration Test (SPT)/Under Progress

Vane Shear Test /Under Progress

MAITREE/WORK UNDER PROGRESS

MAITREE/WORK UNDER PROGRESS

MAITREE/BORING WITH ROTARY DRILLING RIG IN UNDER PROGRESS

MAITREE/BORING WITH ROTARY DRILLING RIG IN UNDER PROGRESS

MAITREE/VANE SHEAR TEST IN PROGRESS

MAITREE/PLATE LOADTEST IN PROGRESS

MAITREE/PLATE LOADTEST IN PROGRESS