KAMENG HEP [NEEPCO] (4 X 150 MW)


Unit 4 Generator Box/

Stator Unit 4 Lowering in Pit/

Stator Unit 4 Lowering in Pit/

Machine Hall Viewed from Service Bay/

Ventilation Duct Erected at Auxiliary Floor/

Lowering of Generator Rotor/Unit IV

Power House /from Unit 4 Side

AC Duct Erection/

200 DC System Commissioned and Load Tested/

Pre-Commissioning of Electrical Panels/

Erection of Brushgear Assembly/

Erection of Generator /Unit 3

252 MT Stator Assembly Lowering /

252 MT Stator Assembly Lowering /

252 MT Stator Assembly Lowering /

Stator Unit 3 / in position

Winding work/Stator Unit 4

Assembly of spring cushion of thrust surface of generator shaft/Unit 4

Unit 3/Top Bracket Arm Assembling

Stator Unit 4/Toroidal Coil for Core Flux Test

/

Unit 1 Boxed Up/

Stator 4 Core Building/

/

/

/

Machine Hall View Showing Unit 1 and Unit 2/

Stator Unit 3 and Unit 4, Rotor Unit 3/ at service bay

Rotor unit 4/ at service bay

Erection of Panels/in Progress

Stator 3/Winding

Bottom Shaft 3/Getting Ready for Erection

Erection of Valve/

Transportation of BF Valve/(60MT)

Erection of Penstock drain valve/

Header extension and pump erection/

U1 Marshalling Box cable termination/

U1 Inside turbine pit piping/

Unit 3 Rotor pole key fixing and locking/

Unit 1 - 4 machine floor/

Bottom bracket cleaning at service bay/

U2 Regulating lowered at pit for final assembly/

U2 TGB cooler pit inside piping/

U2 Turbine pit inside piping/

Power House fire fighting system suction pump/

U3 Stator Core Flux Test Done/

1 BF Valve Shifted to Valve house and unloaded at service bay/

1 BF Valve Shifted to Valve house and unloaded at service bay/

Unit 4/Rotor Rim Building

Unit 1 and 2/Boxing Up Work

Unit 3/Pole Mounting

Unit 3/Erection of Bus Duct

Erection of Guide Vanes/Unit 3

Bearing Box Up/Unit 1

Bus Duct Erection in/Unit 1 and 2

Power House/Tail Race

Stator III/Core Building

Power House/Tail Race

Stator III/Core Building

Unit 3 Turbine Final Assembly/Pivot Ring in Picture

Unit 3 Rotor/Rim Building

Unit 2 Box up/Top Bracket and Top Shaft Assembly

Unit 2/Rotor Lowering to Unit Pit

Unit 2/Stator Lowering to Unit Pit

UNIT-I TO UNIT-IV MACHINE HALL PHOTO/

/

/

/

/

/