Unit 4 Generator Box/
|
Stator Unit 4 Lowering in Pit/
|
Stator Unit 4 Lowering in Pit/
|
Machine Hall Viewed from Service Bay/
|
Ventilation Duct Erected at Auxiliary Floor/
|
Lowering of Generator Rotor/Unit IV
|
Power House /from Unit 4 Side
|
AC Duct Erection/
|
200 DC System Commissioned and Load Tested/
|
Pre-Commissioning of Electrical Panels/
|
Erection of Brushgear Assembly/
|
Erection of Generator /Unit 3
|
252 MT Stator Assembly Lowering /
|
252 MT Stator Assembly Lowering /
|
252 MT Stator Assembly Lowering /
|
Stator Unit 3 / in position
|
Winding work/Stator Unit 4
|
Assembly of spring cushion of thrust surface of generator shaft/Unit 4
|
Unit 3/Top Bracket Arm Assembling
|
Stator Unit 4/Toroidal Coil for Core Flux Test
|
/
|
Unit 1 Boxed Up/
|
Stator 4 Core Building/
|
/
|
/
|
/
|
Machine Hall View Showing Unit 1 and Unit 2/
|
Stator Unit 3 and Unit 4, Rotor Unit 3/ at service bay
|
Rotor unit 4/ at service bay
|
Erection of Panels/in Progress
|
Stator 3/Winding
|
Bottom Shaft 3/Getting Ready for Erection
|
Erection of Valve/
|
Transportation of BF Valve/(60MT)
|
Erection of Penstock drain valve/
|
Header extension and pump erection/
|
U1 Marshalling Box cable termination/
|
U1 Inside turbine pit piping/
|
Unit 3 Rotor pole key fixing and locking/
|
Unit 1 - 4 machine floor/
|
Bottom bracket cleaning at service bay/
|
U2 Regulating lowered at pit for final assembly/
|
U2 TGB cooler pit inside piping/
|
U2 Turbine pit inside piping/
|
Power House fire fighting system suction pump/
|
U3 Stator Core Flux Test Done/
|
1 BF Valve Shifted to Valve house and unloaded at service bay/
|
1 BF Valve Shifted to Valve house and unloaded at service bay/
|
Unit 4/Rotor Rim Building
|
Unit 1 and 2/Boxing Up Work
|
Unit 3/Pole Mounting
|
Unit 3/Erection of Bus Duct
|
Erection of Guide Vanes/Unit 3
|
Bearing Box Up/Unit 1
|
Bus Duct Erection in/Unit 1 and 2
|
Power House/Tail Race
|
Stator III/Core Building
|
Power House/Tail Race
|
Stator III/Core Building
|
Unit 3 Turbine Final Assembly/Pivot Ring in Picture
|
Unit 3 Rotor/Rim Building
|
Unit 2 Box up/Top Bracket and Top Shaft Assembly
|
Unit 2/Rotor Lowering to Unit Pit
|
Unit 2/Stator Lowering to Unit Pit
|
UNIT-I TO UNIT-IV MACHINE HALL PHOTO/
|
/
|
/
|
/
|
/
|
/
|