MIV Inlet pipe of U#1 lowered at its position.
|
Head race level measuring instrument
|
Unit#1: Lowering of Generator stator completed
|
Unit#1: Coupling of Runner and Shaft under progress
|
|
|
|
|
|
welding of Draft tube-V
|
Insertion of Top bars of U-II stator
|
First GT unloaded at Punatsangchu-II service Bay
|
unit-v DT Elbow Liner
|
Unit-3 Pit Liner
|
unit-3 spiral casing welding
|
|
Laying of Stator-2 bottom Bar
|
Spiral casing-3
|
Draft Tube & Stator-1
|
Draft Tube & Stator-1
|
Top View Machine Hall
|
HV Test of Stator#1 has been completed
|
HV Test of Stator#1 has been completed
|
Installation of Draft Tube Liner Unit#5
|
Placement of DT Liner segments of Unit#5
|
Stator Unit#1 dry out is in progress
|
Stator Unit#1 dry out is in progress
|
Fixing of embedment in foundations of DT Liner U#5
|
Assembly of spiral casing segments Unit#3
|
Assembly of spiral casing segments Unit#3
|
Assembly of spiral casing segments Unit#3
|
Assembly of spiral casing segments Unit#3
|
Assembly of spiral casing segments Unit#3
|
Completion of erection of Draft Tube Liner Unit#6
|
Preparation of stator winding dry out Unit#1
|
Insulation tapping of Stator winding Unit#1
|
Assembly of Pit Liner at its position at Unit#2
|
Completion of Hydro Test of Unit-2 Spiral casing
|
Completion of HV Testing of Bottom Bar (Unit-2)
|
Completion of HV Testing of Bottom Bar (Unit-2)
|
Lowering of Pit Liner at Unit#2
|
Lowering of Pit Liner at Unit#2
|
Lowering of Pit Liner at Unit#2
|