Punatsangchhu-II(Hyrdo), BHUTAN


MIV Inlet pipe of U#1 lowered at its position.

Head race level measuring instrument

Unit#1: Lowering of Generator stator completed

Unit#1: Coupling of Runner and Shaft under progress






welding of Draft tube-V

Insertion of Top bars of U-II stator

First GT unloaded at Punatsangchu-II service Bay

unit-v DT Elbow Liner

Unit-3 Pit Liner

unit-3 spiral casing welding


Laying of Stator-2 bottom Bar

Spiral casing-3

Draft Tube & Stator-1

Draft Tube & Stator-1

Top View Machine Hall

HV Test of Stator#1 has been completed

HV Test of Stator#1 has been completed

Installation of Draft Tube Liner Unit#5

Placement of DT Liner segments of Unit#5

Stator Unit#1 dry out is in progress

Stator Unit#1 dry out is in progress

Fixing of embedment in foundations of DT Liner U#5

Assembly of spiral casing segments Unit#3

Assembly of spiral casing segments Unit#3

Assembly of spiral casing segments Unit#3

Assembly of spiral casing segments Unit#3

Assembly of spiral casing segments Unit#3

Completion of erection of Draft Tube Liner Unit#6

Preparation of stator winding dry out Unit#1

Insulation tapping of Stator winding Unit#1

Assembly of Pit Liner at its position at Unit#2

Completion of Hydro Test of Unit-2 Spiral casing

Completion of HV Testing of Bottom Bar (Unit-2)

Completion of HV Testing of Bottom Bar (Unit-2)

Lowering of Pit Liner at Unit#2

Lowering of Pit Liner at Unit#2

Lowering of Pit Liner at Unit#2