Both Unit in Running Condition/
|
Rotor 2 Erection in Pit/
|
Unit 1 and 2/
|
Unit 2 Upper Bracket/
|
Unit 2/
|
Stator Unit 2/
|
Rotor Unit 2/
|
Sync of Unit 1/
|
Rotor 2/
|
Stator 2/
|
Lower Bracket 2/
|
Unit 2/
|
Unit 2 Stator/
|
Unit 2 Rotor/
|
Unit 1/
|
Unit 2 Job/
|
Unit 1 Panel/
|
Unit 1 and 2/
|
Unit 1 and 2/Top View
|
Unit 2/Stator
|
Unit 2/Rotor
|
Unit 2 / Rotor
|
Unit 1 and 2 / Top View
|
Generator Barrel/Unit 2
|
Stator Joining of Segment/Unit 2
|
OPU System at 29m EL Floor/
|
Bus Duct and Cabling Work/
|
Transformer Yard/
|
Valve Pit/Fixing of valves completed
|
Drainage Sump/
|
Dewatering Sump/
|
HSS Lubrication/Unit 1
|
MIV and Inlet pipe erected/Unit 1
|
Fixing fans and interconnections of pole/Unit 1
|
Stator in Position/Unit 1
|
Generator Barrel Concreting /Unit 2
|
Turbine Pit/Unit 1
|
Fixing of Pole and Key /Rotor Unit 1
|
Generator Shaft/Unit 1
|
Generator Barrel/Unit 1
|
Generator Barrel/Unit 1
|
Unit 2/Transformer Shifting
|
Unit 2/Spiral Casing HT done
|
Unit 1 MIV (Main Inlet Valve)/Foundation Plate Fixed
|
Unit 1 Turbine/Pivot Ring Fixed
|
Unit 1 Rotor/Final Pressing, Pole Fixing done
|
Unit 1 Stator/Final HV test, Painting, finishing done
|
Spiral 2 with Pit Liner/
|
Rotor 1/
|
Stator 1/
|
Top Cover/
|
Guide Vane 1/
|
Stator of Unit-1/
|
Stator of Unit-1/
|
Rotor of Unit 1/
|
Pivot Ring Job of Unit-1/
|
Pivot Ring Job of Unit-1/
|
Pit Liner of Unit-2/
|
Pit Liner of Unit-2/
|
Duplex Filter/
|
Unit 2 Spiral Casing/
|
Transformer Bay/
|
Stator/
|
Rotor/
|
Gen Barrel/
|
Top bar fixing under progress at Stator/
|
Ruuner removal Trolley/
|
Transformer Bay/
|
Shifting of panels at Floor/
|
DSL of EOT crane/
|
generator barrel of unit 1/
|
/
|
/
|
/
|
/
|
Stator Job at Service Floor/Unit 1
|
Rotor Rim Punching Job/Unit 1
|
Stay Ring Alignment/Unit 2
|
Drainage Dewatering /Piping Job
|
Barrel Concreting at 33.5 m/Unit 1
|
Cable Tray Job/
|
Spiral Shifting/Unit 2
|
Barrel Concreting/Unit 1
|
Unit 2/
|
Transformer Bay/
|
Stator Job/
|
Rotor Job/
|
HV Test Kit/
|
Front Side of PH/
|
D Line Side Job/
|
B Line Side Job/
|
Unit 2/Stay Ring
|
Unit 1/Barrel Casting Job
|
Unit 1/Progress
|
EOT Beam/
|
Cable Tray Erection/
|
Cable Tray fixing at EL33.5M and EL38M/under progress
|
Cable Tray fixing at EL33.5M and EL38M/under progress
|
/under progress
|
Second Pressing of Rotor Rim Plate /Completed
|
Four segment of Stator alignment /under progress
|
TUIRIAL HEP/Progress
|
TUIRIAL HEP/Progress
|
TUIRIAL HEP/Progress
|
TUIRIAL HEP/Progress
|
TUIRIAL HEP/Progress
|
TUIRIAL HEP/Progress
|