Bunker # 7L/progress
|
Bunker # 6 /progress
|
BOF to ESP # 7/progress
|
ASPH/progress
|
plant view/progress
|
plant view/progress
|
TDBFP/progress
|
TDBFP/progress
|
Acid cleaning after BTL repair/progress
|
ESP Control room/progress
|
ESP – RHS unit no 6/
|
Mill Reject System Works Unit no 6 (RHS) FD fan‐/
|
Mill Reject System Works Unit no 6 (LHS)/
|
Mill Bunker Bay LHS‐ Unit no 6 Mill Reject/
|
View Of Power plant from LHS‐6 Mill Bunker side/
|
TG Floor unit no 6/
|
Mills RHS Unit no 6 : Ready/
|
ESP ‐6 : Outlet ducting completed. Mill Bunker/
|
Technical Building/
|
Transport Air Compressor House/
|
CWPH‐ Cladding/
|
PHB Cladding/
|
Mills‐ LHS unit no 6/
|
TDBFP‐6A/
|
TDBFP‐ 6B/
|
Gallery from TP‐5
|
Ash slurry Pump House/
|
AHP‐ Wet Ash Lines/
|
AHP‐ Wet Ash Lines/
|
Transport Air piping lines/
|
/
|
/
|
/
|
/
|
/
|
/
|
/
|
/
|
Mill B
|
Mill A/
|
Flue Duct Insulation/In Progress
|
Conveyor Galleries/In Progress
|
RHS Bunker/In Progress
|
/
|
/
|
/
|
/
|
/
|
/
|
/
|
/
|
/
|
/
|
/
|
/
|
/
|
/
|
/
|
/
|
/
|
/
|
/
|
/
|
/
|
UAT 6A
|
UAT 6A
|
power house are cabling/PROGRESS
|
ST#6/PROGRESS
|
HTSWGRT/PROGRESS
|
Cabling Works/PROGRESS
|
Outlet Funnel Pass A/PROGRESS
|
POWER HOUSE ROOF SLAB/PROGRESS
|
TDBFP DECK FONDATION/PROGRESS
|
CWPH SCREEN GATE/PROGRESS
|
CWPH SCREEN GATE/PROGRESS
|
CWPH SCREEN GATE/PROGRESS
|
CWPH SCREEN GATE/PROGRESS
|
A Row cladding sheet/PROGRESS
|
GATE COMPLEX/PROGRESS
|
LDO TANK/PROGRESS
|
HFO TANK/PROGRESS
|
CT # 6B/PROGRESS
|
CT # 6B/PROGRESS
|
CT # 6B/PROGRESS
|
CT # 6B/PROGRESS
|
Mill Bunker 1/PROGRESS
|
Boiler cabling works/PROGRESS
|
TAC/PROGRESS
|
O
|
LHS PR-9A cabling works/PROGRESS
|
UAT#6A FPS/PROGRESS
|
U#6 Mill Bunker/PROGRESS
|
PR-1 3/PROGRESS
|
INERT GAS PIPING PREE ASSBY AT 8.5 MTR./PROGRESS
|
ID FAN 6B (1)/PROGRESS
|
ID FAN 6B (1)/PROGRESS
|
HYD. PIPING AROUND FO DYKE AREA (2)/PROGRESS
|
FOAM TANKS/PROGRESS
|
FD FAN 7 B/PROGRESS
|
FD FAN
|
ESP 6 Pass D (1)/PROGRESS
|
CWPH 1/PROGRESS
|
CW MACKUP LINE TO CHANNEL/PROGRESS
|
CW MACKUP LINE TO CHANNEL/PROGRESS
|
CT #6B GEAR BOX/PROGRESS
|
CT #6A HT In progress/PROGRESS
|
UAT#6A FPS SUPT./PROGRESS
|
U#6 A Row/PROGRESS
|
SPRAY SYS FOR FOPH/PROGRESS
|
SPRAY SYS FOR FO PIPING/PROGRESS
|
NN-100 PIPING IN CCR#6/PROGRESS
|
MTM Thermocouple in U#6/PROGRESS
|
ID FAN 6B (3)/PROGRESS
|
ID FAN 6B (2)/PROGRESS
|
FFLine FOPH-D/PROGRESS
|
FD FAN
|
FD FAN
|
FD FAN
|
FD FAN
|
FD FAN
|
ESP 7 PASS A (1)/PROGRESS
|
ESP 7 PASS A (1)/PROGRESS
|
CWPH/PROGRESS
|
ASPH 1/PROGRESS
|
UAT#6A Fire Protection System/
|
Cooling Water Pump House/In Progress
|
Cooling Water makeup Discharge Line/In Progress
|
Cooling Wataer Makeup line to Channel/In Progress
|
Cooling Tower #6B Gear Box/
|
Ash Slurry pump house/In Progress
|
Cladding/In Progress
|
Cable tray works for both FD and PA/completed
|
Mill Bunker RHS/In Progress
|
Mill Bunker LHS/
|
ESP Control Room cable tray
|
FD FAN
|
ESP Control Room/In Progress
|
ESP Pass D/In Progress
|
Cooling Water Mackup Pump/
|
Cooling Tower Hot water piping/
|
Cooling Tower 6B Motor/In Progress
|
DEAERATOR STRUCTURE ERECTION/In Progress
|
TG Lube oil oil canal piping /In Progress
|
CT Switchgear and FOPH-D cabling/In Progress
|
TG Lube oil oil canal piping/In Progress
|
U#7 HTSWGR Panel erection/PROGRESS
|
U#7 Fan to ESp ducting works/PROGRESS
|
U#7 Boiler to Fans Ducting works/PROGRESS
|
U#7 8.5m Cable tray works/PROGRESS
|
U#6 RHS Boiler to FD-6B ducting works/PROGRESS
|
U#6 RHS Boiler to Fan Flue ducting works/PROGRESS
|
U#6 LHS Boiler to Fans ducting works/PROGRESS
|
FD-6B Lube oil flushing/PROGRESS
|
ESP pass-D insulation works preparation/PROGRESS
|
ESP pass-D ATT/PROGRESS
|
Air receiver tank works/PROGRESS
|
O
|
O
|
LDO tank/PROGRESS
|
HFO tank/PROGRESS
|
Gate House/PROGRESS
|
FOPH-D FO Piping/PROGRESS
|
Flue Cans/PROGRESS
|
CWPH/PROGRESS
|
CW Forebay/PROGRESS
|
CW Channel/PROGRESS
|
CCR ROOM/PROGRESS
|
ASPH -9.0 M/PROGRESS
|
ASPH -9.0 M/PROGRESS
|
A-row Cladding/PROGRESS
|
Anpara-A to D FO line 2/PROGRESS
|
Anpara-A to D FO line 2/PROGRESS
|
Mill Bunker RHS/PROGRESS
|
A row/PROGRESS
|
Chimney/Inside view platform erection Top to Bottom
|
IPBD erection/PROGRESS
|
Installation of Flue Can Arrangement/PROGRESS
|
UT/6A, 6B, 7A, 7B
|
UT/6A, 6B, 7A, 7B
|
UT/6A, 6B, 7A, 7B
|
UT/6A, 6B, 7A, 7B
|
mill/RHS
|
O
|
ESP/Control room
|
TP 5 To TP 6 Gallary lifted/PROGRESS
|
Mill/LHS
|
Mill/LHS
|
Power House/side cladding works
|
Power House/side cladding works
|
Cooling Tower/7B
|
Cooling Tower/7B
|
Cooling Tower/7A
|
Cooling Tower/6B
|
Cooling Tower/6B
|
Cooling Tower/6A
|
Cooling Tower/6A
|
Gallary erected /between TP 5
|
Gallary erected /between TP 5
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|
misc/PROGRESS
|